Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000416/FIN-2016403-02 | 2016Q4 | Grand Gulf | Security | |
05000416/FIN-2016004-02 | 2016Q4 | Grand Gulf | Failure to Use Procedures and Engineering Controls to Maintain Occupational Doses ALARA | Significance Determination Process |
05000482/FIN-2016004-01 | 2016Q4 | Wolf Creek | Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes | Significance Determination Process |
05000482/FIN-2016007-03 | 2016Q2 | Wolf Creek | Inadequate Analysis of Essential Service Water Piping | Significance Determination Process |
05000482/FIN-2016008-01 | 2016Q2 | Wolf Creek | Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes | Significance Determination Process Large early release frequency Preliminary White Finding |
05000313/FIN-2016007-11 | 2016Q1 | Arkansas Nuclear | Pressurizer Block Valve Not Installed in the Qualified Environmental Configuration | Significance Determination Process |
05000458/FIN-2015010-03 | 2016Q1 | River Bend | Failure to Identify and Correct Circuit Breaker Failure Mechanism | Condition Adverse to Quality Significance Determination Process Maintenance Rule Program |
05000285/FIN-2015009-02 | 2015Q4 | Fort Calhoun | Failure to Revise Procedures and Perform Additional Training | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2015011-01 | 2015Q3 | Fort Calhoun | Failure to Ensure the Suitability of Replacement Materials during the Design Review Process | Significance Determination Process |
05000254/FIN-2015003-03 | 2015Q3 | Quad Cities | Failure to Adequately Inspect Relay Contacts for Oxidation Results in Relay Failure | |
05000285/FIN-2015007-03 | 2015Q1 | Fort Calhoun | Failure to Account for Elevated Battery Room Temperature Effects on Battery Service Life | Significance Determination Process |
05000528/FIN-2014404-03 | 2015Q1 | Palo Verde | Security | |
05000285/FIN-2014009-21 | 2014Q3 | Fort Calhoun | Failure to Take Timely Corrective Actions for an Unsealed Raw Water System Control Panel | Significance Determination Process Maintenance Rule Program |
05000285/FIN-2014009-07 | 2014Q3 | Fort Calhoun | Failure to Accurately Model Flow Path for External Flood Mitigation | Significance Determination Process Maintenance Rule Program |
05000313/FIN-2014003-07 | 2014Q2 | Arkansas Nuclear | Inadequate Filling and Venting of High Pressure Injection Pump | Significance Determination Process |
05000416/FIN-2014009-01 | 2014Q2 | Grand Gulf | Failure To Correct Degraded Viewing Ports In A Timely Manner | Significance Determination Process |
05000368/FIN-2013012-02 | 2014Q1 | Arkansas Nuclear | Main Feedwater Regulating Valve Maintenance Practices | Significance Determination Process |
05000285/FIN-2013013-12 | 2014Q1 | Fort Calhoun | Failure to Perform Adequate Operating Experience Reviews | Time to boil Significance Determination Process |
05000458/FIN-2014002-04 | 2014Q1 | River Bend | Failure to Promptly Correct a Degraded Emergency Diesel Generator Voltage Regulator | Large early release frequency |
05000528/FIN-2014002-03 | 2014Q1 | Palo Verde | Failure to Establish Adequate Procedures for Performing Nitrogen Pre-Charge Checks | |
05000397/FIN-2013010-03 | 2013Q4 | Columbia | Failure to Perform Adequate Testing of the Service Water Supplied Room Coolers | Significance Determination Process Maintenance Rule Program |
05000528/FIN-2013407-01 | 2013Q4 | Palo Verde | Security | |
05000529/FIN-2013005-02 | 2013Q4 | Palo Verde | Failure to Replace Oil Soaked Insulation Results in a Fire | Significance Determination Process |
05000528/FIN-2013004-02 | 2013Q3 | Palo Verde | Failure to Include Inspection Requirements in Preventative Maintenance Basis | Significance Determination Process |
05000483/FIN-2013003-01 | 2013Q2 | Callaway | Failure to Monitor and Maintain Emergency Core Cooling System Room Coolers | |
05000382/FIN-2013003-05 | 2013Q2 | Waterford | Failure to provide adequate post modification testing instructions for vibration monitoring on the feedwater piping system | Significance Determination Process |
05000445/FIN-2013007-01 | 2013Q2 | Comanche Peak | Inadequate Calculations and Procedures for Offsite Power Availability | Significance Determination Process |
05000285/FIN-2012011-02 | 2012Q4 | Fort Calhoun | Failure to Follow Radiation Work Permit Requirements | High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000397/FIN-2012005-03 | 2012Q4 | Columbia | Failure to Initiate a Condition Report upon Identification of Degraded Lubrication in Safety-Related Equipment | Significance Determination Process |
05000382/FIN-2012008-01 | 2012Q3 | Waterford | Failure to Promptly Determine the Operability of the Emergency Diesel Generators | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2012004-02 | 2012Q3 | Fort Calhoun | Fuel Move with SFP Ventilation Inoperable a Condition Prohibited by Technical Specification 2.8.3(4) | Significance Determination Process |
05000416/FIN-2012008-06 | 2012Q3 | Grand Gulf | Failure to Incorporate Test and Inspection Requirements for 4160 Vac Circuit Breakers into Preventive Maintenance Procedures | Significance Determination Process |
05000458/FIN-2012004-03 | 2012Q3 | River Bend | Failure to Appropriately Tune the Reactor Core Isolation Cooling Turbine Speed Controller | Significance Determination Process Maintenance Rule Program |
05000397/FIN-2012004-02 | 2012Q3 | Columbia | Failure to Develop Preventive Maintenance Schedule for Safety-Related 480V Starter Coils | Significance Determination Process Fuel cladding |
05000458/FIN-2012010-06 | 2012Q3 | River Bend | Failure to Establish an Adequate Cable Reliability Program | Significance Determination Process |
05000382/FIN-2012004-01 | 2012Q3 | Waterford | Failure to Establish Procedural Controls to Ensure That Licensed Operators Could Perform Immediate and Time Critical Operator Actions Associated with Security and Fire Events | Time Critical Operator Action Minimum staff |
05000483/FIN-2012003-02 | 2012Q2 | Callaway | Failure to Declare Component Cooling Water Train A Inoperable Due to Voids | |
05000445/FIN-2011005-03 | 2011Q4 | Comanche Peak | Failure to Provide Guidelines for Protective Action Recommendations Outside the Emergency Planning Zone | |
05000382/FIN-2011005-02 | 2011Q4 | Waterford | Failure to Identify and Correct a Condition Adverse to Quality Associated with the Main Feedwater Isolation Valves | Condition Adverse to Quality |
05000528/FIN-2011005-03 | 2011Q4 | Palo Verde | Failure of Unit 1 Reactor Coolant Pump 2A Motor Junction Box Due to Inadequate Maintenance | Significance Determination Process |
05000254/FIN-2011009-07 | 2011Q4 | Quad Cities | Failure to Ensure that RHR Would Be Capable to Respond to a LOCA at Mode 3 | Significance Determination Process |
05000458/FIN-2011008-08 | 2011Q4 | River Bend | Inadequate Emergency and Abnormal Procedures for Standby Diesel Generator Fail to Load Sequences | |
05000382/FIN-2011004-01 | 2011Q3 | Waterford | Failure to Evaluate and Adequately Perform Preventive Maintenance Activities Associated with Dry Cooling Tower Process Analog Control Cards | |
05000416/FIN-2011004-02 | 2011Q3 | Grand Gulf | Failure to Perform Preventative Maintenance on the Fuel Handling Bridge Paddle Switch | Fuel cladding |
05000382/FIN-2011009-01 | 2011Q3 | Waterford | Failure To Use Effective Engineering Controls As Part Of PreJob Planning To Reduce Contamination and Subsequent Exposure | Significance Determination Process |
05000285/FIN-2011003-04 | 2011Q2 | Fort Calhoun | Failure to Provide Procedural Guidance to Replace or Evaluate Age Degraded Components | |
05000416/FIN-2011003-05 | 2011Q2 | Grand Gulf | Failure to Provide Adequate Procedures for High Pressure Core Spray Minimum Flow Valve Surveillance Testing | |
05000382/FIN-2011003-01 | 2011Q2 | Waterford | Failure to Evaluate and Adequately Monitor Activities Associated with the Internal Conditions of the Condensate and Refueling Water Storage Pool Structures | Boric Acid |
05000254/FIN-2011002-02 | 2011Q1 | Quad Cities | Unit 1/2 EDG Output Breaker Failure to Unit 2 | |
05000458/FIN-2011002-07 | 2011Q1 | River Bend | Failure to Implement Procedure AOP-0027, Fuel Handling Mishaps | Significance Determination Process Fuel cladding |