Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000382/FIN-2018404-01 | 2018Q2 | Waterford | Security | |
05000530/FIN-2017003-01 | 2017Q3 | Palo Verde | Failure to Initiate Corrective Actions for Thermography Tests | Significance Determination Process |
05000482/FIN-2017002-01 | 2017Q2 | Wolf Creek | Failure to Ensure Safety-Related Valves were Adequately Protected from Internal Flooding Hazards | Internal Flooding Significance Determination Process Fuel cladding |
05000446/FIN-2017002-02 | 2017Q2 | Comanche Peak | Inadequate Operability Evaluation for Safety - related Pipe Supports | Boric Acid Significance Determination Process |
05000298/FIN-2017001-01 | 2017Q1 | Cooper | Failure to Maintain Alternate Shutdown Emergency Procedure | Significance Determination Process |
05000458/FIN-2016404-02 | 2016Q4 | River Bend | Security | |
05000382/FIN-2016008-02 | 2016Q4 | Waterford | Failure to Perform Operability Determinations for Nonconforming Conditions | Condition Adverse to Quality |
05000313/FIN-2016008-06 | 2016Q4 | Arkansas Nuclear | Readiness to Cope with External Flooding | Significance Determination Process |
05000382/FIN-2016002-01 | 2016Q2 | Waterford | Failure to Properly Pre-Plan and Perform Maintenance on the Cable Vault and Switchgear Ventilation System | Significance Determination Process |
05000254/FIN-2016002-02 | 2016Q2 | Quad Cities | Failure to Identify Conditions Adverse to Quality | Condition Adverse to Quality |
05000313/FIN-2016007-15 | 2016Q1 | Arkansas Nuclear | Failure to Maintain Structural Design Clearances inside the Unit 1 and 2 Reactor Containment Buildings | Significance Determination Process |
05000313/FIN-2016007-12 | 2016Q1 | Arkansas Nuclear | Failure to Perform Predictive Maintenance on Safety-Related Medium-Voltage Switchgear | Significance Determination Process |
05000458/FIN-2015007-01 | 2015Q4 | River Bend | Failure to Establish Adequate Procedures for Severe Weather Operations | Significance Determination Process |
05000416/FIN-2015008-01 | 2015Q4 | Grand Gulf | Failure to Enter a Condition Adverse to Quality into the Corrective Action Program | Condition Adverse to Quality Significance Determination Process Maintenance Rule Program |
05000416/FIN-2015008-02 | 2015Q4 | Grand Gulf | Failure to Promptly Initiate Condition Reports | Significance Determination Process Maintenance Rule Program |
05000298/FIN-2015003-02 | 2015Q3 | Cooper | Failure to Ensure Measurement Conditions Were Consistent With Instrument Calibration | Functionality Assessment Significance Determination Process |
05000254/FIN-2015003-01 | 2015Q3 | Quad Cities | Failure to Evaluate Degraded or Non-Conforming Conditions for Operability | Unanalyzed Condition |
05000445/FIN-2015002-02 | 2015Q2 | Comanche Peak | Failure to Critique Weaknesses in Radiation Protection Practices | Significance Determination Process |
05000482/FIN-2014005-01 | 2014Q4 | Wolf Creek | Failure to Conduct and Evaluate Simulator Testing In Accordance with ANSI/ANS 3.5-2009 and ANSI/ANS 3.5-1998 | Significance Determination Process |
05000382/FIN-2014005-03 | 2014Q4 | Waterford | Failure to Establish an Inspection Schedule of the Dry Cooling Towers | |
05000458/FIN-2014007-01 | 2014Q3 | River Bend | Improper Sequencing of Maintenance of 4160 Vac Circuit Breakers Prior to As-Found Tests | Significance Determination Process |
05000275/FIN-2014007-01 | 2014Q3 | Diablo Canyon | Failure to Document Degraded Emergency Diesel Generator Fuel Injector Nozzles in the Corrective Action Program | |
05000482/FIN-2014007-03 | 2014Q3 | Wolf Creek | Failure to Include the Containment Coolers in a Test Program | Significance Determination Process |
05000275/FIN-2014003-01 | 2014Q2 | Diablo Canyon | Failure to Follow Procedure Associated with Seismically Induced System Interactions | Earthquake |
05000483/FIN-2014007-05 | 2014Q2 | Callaway | Failure to Adequately Analyze Maximum Electrical Equipment Temperatures Resulting from the Single Failure of Control Building Heating Ventilation/Air Conditioning | Significance Determination Process |
05000397/FIN-2014003-04 | 2014Q2 | Columbia | Failure to Maintain Procedures For a Design Basis Ashfall Event | |
05000285/FIN-2013013-08 | 2014Q1 | Fort Calhoun | Failure to Correct Overstressed Components | Significance Determination Process Maintenance Rule Program |
05000445/FIN-2013008-02 | 2013Q4 | Comanche Peak | Failure to Provide Adequate Acceptance Criteria | |
05000445/FIN-2013008-03 | 2013Q4 | Comanche Peak | Components of Indeterminate Quality Installed in Safety-Related Applications | |
05000397/FIN-2013007-01 | 2013Q3 | Columbia | Failure to Support the Ability to Restore Class 1E Diesel Generator Standby Power and Recover from Station Blackout (SBO) Conditions | |
05000382/FIN-2013003-01 | 2013Q2 | Waterford | Failure to provide design control measures to withstand the effects of flooding on the reactor auxiliary building roof | Anticipated operational occurrence Significance Determination Process |
05000397/FIN-2013003-02 | 2013Q2 | Columbia | Failure to Follow Corrective Action Program Procedures | Significance Determination Process |
05000285/FIN-2013008-19 | 2013Q2 | Fort Calhoun | Failure to Initiate Condition Reports in Accordance with the Corrective Action Program Procedures | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2013008-20 | 2013Q2 | Fort Calhoun | Failure to Identify Conditions Adverse to Quality | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2013008-21 | 2013Q2 | Fort Calhoun | Failure to Ensure That Design Requirements Associated with the Containment Electrical Penetration Assemblies Were Correctly Translated Into Installed Plant Equipment | Significance Determination Process Fuel cladding |
05000285/FIN-2013008-35 | 2013Q2 | Fort Calhoun | Failure to Correct Condition Adverse to Quality Associated with Corrective Action Program Procedures and the Operability Process | Condition Adverse to Quality Significance Determination Process |
05000285/FIN-2013008-36 | 2013Q2 | Fort Calhoun | Deficient Evaluation of NRC Bulletin 88-04, Strong Pump Weak Pump Due to Failure to Consider the Effect of AFW Pumps Discharge Check Valves Leakage | Significance Determination Process Maintenance Rule Program |
05000528/FIN-2013002-02 | 2013Q1 | Palo Verde | Failure to identify weak performance during an exercise | |
05000361/FIN-2013002-03 | 2013Q1 | San Onofre | Failure to Write Nuclear Notifications for Degraded or Nonconforming Conditions | Significance Determination Process |
05000445/FIN-2013002-04 | 2013Q1 | Comanche Peak | Failure to Identify Inadequate Auxiliary Feedwater Valve Maintenance | Condition Adverse to Quality Significance Determination Process |
05000416/FIN-2013002-04 | 2013Q1 | Grand Gulf | Failure to Correct a Scaffold Affecting Fire Brigade Access | Significance Determination Process Fire Protection Program Scaffolding |
05000361/FIN-2013002-06 | 2013Q1 | San Onofre | Failure to Follow Procedure for Plant Preservation Rust Grading | Significance Determination Process |
05000254/FIN-2012005-03 | 2012Q4 | Quad Cities | Both Unit 1 Core Spray Subsystems Inoperable | |
05000298/FIN-2012004-09 | 2012Q3 | Cooper | Failure to Correct Exercise Performance Deficiencies | Significance Determination Process |
05000528/FIN-2012004-01 | 2012Q3 | Palo Verde | Failure to Correct Scupper Obstruction | Condition Adverse to Quality Significance Determination Process |
05000416/FIN-2012008-04 | 2012Q3 | Grand Gulf | Failure to Promptly Enter an NRC Violation Regarding the Standby Service Water System into the Corrective Action Program | Mission time Condition Adverse to Quality Significance Determination Process |
05000397/FIN-2012004-07 | 2012Q3 | Columbia | Failure to Identify a Performance Weakness During a Drill | Significance Determination Process |
05000483/FIN-2012008-03 | 2012Q3 | Callaway | Failure to initiate a corrective action document | Breakaway torque |
05000285/FIN-2012301-06 | 2012Q2 | Fort Calhoun | Four Examples of Inadequate Procedures for the Barrier Integrity Cornerstone | Fuel cladding |
05000416/FIN-2012003-01 | 2012Q2 | Grand Gulf | Failure to Ensure Materials are Stored Properly in the 500 KV Switchyard |