05000528/FIN-2018008-01 | 2018Q3 | Palo Verde | Inadequate Corrective Actions For Missing Control Room Hand-Switch Operator Knob | |
05000397/FIN-2018003-01 | 2018Q3 | Columbia | Failure to Follow Radiologically Controlled Area Procedures | High Radiation Area Locked High Radiation Area |
05000446/FIN-2018011-02 | 2018Q3 | Comanche Peak | Failure to Follow a Quality Procedure Associated with the Reactor Makeup and Chemical Control System | |
05000313/FIN-2018002-01 | 2018Q2 | Arkansas Nuclear | Failure to Implement Procedural Guidance to Close Spent Fuel Pool Cooler Outlet Crosstie Valve | |
05000483/FIN-2018002-01 | 2018Q2 | Callaway | Failure to Adequately Assess and Manage Risk Associated with Switchyard Work During a Planned Risk Significant Turbine-Driven Auxiliary Feedwater Pump Equipment Outage | |
05000397/FIN-2018002-01 | 2018Q2 | Columbia | Failure to Maintain Configuration Control in the Diesel Generator 2 Diesel Cooling Water System | |
05000416/FIN-2018002-07 | 2018Q2 | Grand Gulf | Loss of Shutdown Cooling | |
05000416/FIN-2018002-05 | 2018Q2 | Grand Gulf | Failure to Follow Procedure Requirements Resulting in Unplanned Dose | |
05000382/FIN-2018002-01 | 2018Q2 | Waterford | Failure to Ensure Appropriate Chemistry Controls on the Component Cooling Water Heat Exchangers | |
05000529/FIN-2017003-03 | 2017Q3 | Palo Verde | Failure to Follow Conduct of Operations Procedure | Significance Determination Process |
05000528/FIN-2017003-02 | 2017Q3 | Palo Verde | Loss of Refrigerant Failure of Essential Chiller Unit due to Installation of Incorrect Parts | Significance Determination Process |
05000397/FIN-2017003-01 | 2017Q3 | Columbia | Inadequate High Pressure Core Spray Fill and Vent Procedure | Maintenance Rule Program |
05000382/FIN-2017002-05 | 2017Q2 | Waterford | Failure to Perform Maintenance on the Correct Safety-Related Component | Significance Determination Process Maintenance Rule Program |
05000313/FIN-2017002-03 | 2017Q2 | Arkansas Nuclear | Failure to Comply with ECCS Technical Speci fications | |
05000254/FIN-2017001-01 | 2017Q1 | Quad Cities | Failure to Ensure Hardware Secure for Breaker MOC Switch Linkage | Significance Determination Process |
05000313/FIN-2017001-01 | 2017Q1 | Arkansas Nuclear | Failure to Identify Damaged Lugs | Significance Determination Process |
05000458/FIN-2017001-01 | 2017Q1 | River Bend | Failure to Follow Station Guidance on Control of Scaffolding | Significance Determination Process Scaffolding |
05000397/FIN-2016009-05 | 2017Q1 | Columbia | Failure of the QA program to assure compliance with 10 CFR 61.55 and 10 CFR 61.56 | |
05000397/FIN-2016009-04 | 2017Q1 | Columbia | Failure to Provide an Accurate Shipping Manifest | Significance Determination Process |
05000397/FIN-2016009-03 | 2017Q1 | Columbia | Failure to Label or Provide Written Information for Items Stored in the Spent Fuel Pool | Significance Determination Process |
05000416/FIN-2016007-05 | 2016Q4 | Grand Gulf | Failure to Establish Adequate Procedures for Building Sandbag Barriers | Significance Determination Process |
05000382/FIN-2016403-02 | 2016Q4 | Waterford | Security | |
05000298/FIN-2016004-01 | 2016Q4 | Cooper | Failure to Maintain Reactor Vessel Assembly Procedure to Ensure Adequate Moisture Separator Shielding | Significance Determination Process Substantial potential for an overexposure |
05000397/FIN-2016004-03 | 2016Q4 | Columbia | Flow Indicating Switch Adjustment | Maintenance Rule Program |
05000445/FIN-2016004-02 | 2016Q4 | Comanche Peak | Failure to Scope the Containment Ventilation System in the Maintenance Rule Program | Significance Determination Process Maintenance Rule Program |
05000313/FIN-2016004-01 | 2016Q4 | Arkansas Nuclear | Failure to Pre-plan Walkdown to Avoid Impacting Safety Bus | Significance Determination Process Fuel cladding |
05000397/FIN-2016002-01 | 2016Q2 | Columbia | Loss of RCC Cooling Requiring a Reactor Scram | Significance Determination Process |
05000323/FIN-2016002-01 | 2016Q2 | Diablo Canyon | Misplaced Spent Fuel Assembly in the Spent Fuel Pool | Fuel cladding |
05000530/FIN-2016001-02 | 2016Q1 | Palo Verde | Fatigue failure of pneumatic fitting due to excessive vibrations | |
05000458/FIN-2015010-05 | 2016Q1 | River Bend | Failure to Identify and Correct an Adverse Condition in a Timely Manner | Significance Determination Process Maintenance Rule Program |
05000368/FIN-2016001-04 | 2016Q1 | Arkansas Nuclear | Failure to Inject Service Water with Corrosion Inhibitors during Refueling Outages | Significance Determination Process |
05000458/FIN-2015004-05 | 2015Q4 | River Bend | Failure to Follow Procedure Results in Inadvertent Draindown of Reactor Pressure Vessel | Significance Determination Process |
05000416/FIN-2015008-03 | 2015Q4 | Grand Gulf | Failure to Declare Secondary Containment Inoperable Based on Failed Surveillance Testing | Significance Determination Process |
05000416/FIN-2015007-11 | 2015Q4 | Grand Gulf | Failure to Implement Equipment Control Procedures for Loose Items in Containment | Significance Determination Process Foreign Material Exclusion |
05000313/FIN-2015004-02 | 2015Q4 | Arkansas Nuclear | Failure to Identify and Correct Rain Water Accumulation in the Emergency Diesel Generator System Exhausts | Condition Adverse to Quality |
05000397/FIN-2015004-01 | 2015Q4 | Columbia | Incorrect Electrical Component Operated During Maintenance | Significance Determination Process |
05000483/FIN-2015009-07 | 2015Q4 | Callaway | Failure to Identify and Correct Additional Undersized Components on Auxiliary Feedwater System Flow Control Valve Modified Modutronics Controller Cards | Condition Adverse to Quality |
05000254/FIN-2015003-02 | 2015Q3 | Quad Cities | Failure to Establish Adequate Procedure to Preclude Unacceptable Preconditioning of the SBGT System | Fuel cladding |
05000298/FIN-2015003-05 | 2015Q3 | Cooper | Failure to Follow Primary Containment Atmosphere Sampling Procedure | Grab sample Post Accident Monitoring Significance Determination Process Maintenance Rule Program |
05000275/FIN-2015003-02 | 2015Q3 | Diablo Canyon | Failure to Secure a Locked High Radiation Area | Locked High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000368/FIN-2015003-01 | 2015Q3 | Arkansas Nuclear | Failure to Follow Procedure Results in Increased Reactor Coolant Activity | Significance Determination Process |
05000458/FIN-2015003-01 | 2015Q3 | River Bend | Failure to Operate the Unit 1 Feedwater System In Accordance With Procedures | Reactor Vessel Water Level Internal Flooding Significance Determination Process |
05000397/FIN-2015002-02 | 2015Q2 | Columbia | Failure to Barricade a High Radiation Area | High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000416/FIN-2015002-02 | 2015Q2 | Grand Gulf | Failure to Identify High Vibration on the Division 3 EDG Soak Back Oil Pump | Significance Determination Process Maintenance Rule Program |
05000458/FIN-2015009-04 | 2015Q2 | River Bend | Failure to Identify High Reactor Water Level as a Condition Adverse to Quality | Condition Adverse to Quality Significance Determination Process Maintenance Rule Program |
05000397/FIN-2015002-01 | 2015Q2 | Columbia | Failure to Follow Procedures Associated with Operation of the Fuel Pool Cooling System | |
05000482/FIN-2015009-01 | 2015Q2 | Wolf Creek | Failure to Provide Adequate Instructions for Control of Feedwater Flow in Startup Procedures | Significance Determination Process |
05000416/FIN-2015002-01 | 2015Q2 | Grand Gulf | Failure to Have Appropriate Instructions Resulted in the Unplanned Unavailability of the Reactor Core Isolation Cooling System | Significance Determination Process Maintenance Rule Program |
05000445/FIN-2015001-05 | 2015Q1 | Comanche Peak | Failure to Provide an Accurate Shipping Manifest | Significance Determination Process |
05000298/FIN-2015001-01 | 2015Q1 | Cooper | Inadequate Operations Procedure | Significance Determination Process Maintenance Rule Program |