Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000373/FIN-2016004-02 | 2016Q4 | LaSalle | Failure to Provide Sufficient Guidance for the Successful Troubleshooting of Safety-Related Equipment | |
05000331/FIN-2015004-04 | 2015Q4 | Duane Arnold | Failure to Follow Temporary Configuration Control Procedure | |
05000341/FIN-2015003-04 | 2015Q3 | Fermi | Failure to Perform Preventive Maintenance on SafetyRelated Auxiliary Trip Unit Relays for the Spent Fuel Pool Ventilation Exhaust Radiation Monitors | |
05000255/FIN-2015003-01 | 2015Q3 | Palisades | Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond Their Service Life | Significance Determination Process |
05000263/FIN-2015002-02 | 2015Q2 | Monticello | Failure to Measure Interpass Temperature | Significance Determination Process |
05000346/FIN-2015008-05 | 2015Q1 | Davis Besse | Failure to Comply with Technical Specifications for the Borated Water Storage Tank | |
05000266/FIN-2015001-01 | 2015Q1 | Point Beach | Failure to Process Vendor Technical Information | Significance Determination Process |
05000315/FIN-2015001-03 | 2015Q1 | Cook | Failure to Ensure NFPA805 Sprinkler System Demands Met | |
05000373/FIN-2015001-01 | 2015Q1 | LaSalle | Liquid Penetrant Testing Procedure Was Not Qualified for Its Full Applicability Range | Nondestructive Examination Liquid penetrant |
05000249/FIN-2014005-02 | 2014Q4 | Dresden | Failure to Ensure Continued Operability of Unit 3 Electromatic Relief Valve 302033E Following Implementation of Extended Power Uprate Plant Conditions | Significance Determination Process |
05000461/FIN-2014005-01 | 2014Q4 | Clinton | Station Procedures Failed to Provide Controls for Material Near Transformers | High winds Significance Determination Process |
05000331/FIN-2014005-07 | 2014Q4 | Duane Arnold | Ineffective Radiological Engineering Controls Resulted in Unplanned and Unintended Radiological Intakes to Workers | Substantial potential for an overexposure |
05000341/FIN-2014004-02 | 2014Q3 | Fermi | Failure to Incorporate Operating Experience into Preventive Maintenance Activities | Significance Determination Process |
05000461/FIN-2014004-03 | 2014Q3 | Clinton | Failure to Establish a Surveillance Procedure for Reactor Core Isolation Cooling Pump due to Unacceptable Preconditioning | Significance Determination Process |
05000255/FIN-2014004-02 | 2014Q3 | Palisades | Spent Fuel Pool Region II Criticality Analysis | |
05000346/FIN-2014406-01 | 2014Q3 | Davis Besse | Security | |
05000373/FIN-2013008-02 | 2013Q4 | LaSalle | Failure to Ensure Battery Margin Maintained for Station Blackout | |
05000282/FIN-2013003-01 | 2013Q2 | Prairie Island | Improper Work Instructions Rendered D1 EDG Inoperable | |
05000255/FIN-2013003-02 | 2013Q2 | Palisades | Failure to Follow Corrective Action Process for Service Water Leaks | Nondestructive Examination Significance Determination Process Through-Wall Leak |
05000456/FIN-2013003-05 | 2013Q2 | Braidwood | Inadequate Functionality Evaluations for a Degraded Unit 1 BAST Bladder | Boric Acid Significance Determination Process |
05000373/FIN-2013009-02 | 2013Q2 | LaSalle | Failure to Satisfy 10 CFR 50.72 Reporting Requirements | Significance Determination Process |
05000331/FIN-2013002-02 | 2013Q1 | Duane Arnold | Failure to Ensure Operability of Low Pressure Coolant Injection Following a Postulated LOCA in Mode 3 | |
05000282/FIN-2013002-04 | 2013Q1 | Prairie Island | Inadequate Work Instructions for Foreign Material Removal from D2 EDG Air Start Piping | |
05000282/FIN-2013002-08 | 2013Q1 | Prairie Island | Failure to Correct Condition Adverse to Quality on the D1 EDG | Condition Adverse to Quality |
05000440/FIN-2012005-04 | 2012Q4 | Perry | Deficiencies with Periodic Venting Procedures and Void Quantification | |
05000456/FIN-2012005-05 | 2012Q4 | Braidwood | Inadequate Work Instructions for Ensuring 2A EDG Jacket Water Heat Exchanger Gasket Compression | |
05000331/FIN-2012005-02 | 2012Q4 | Duane Arnold | Degraded/Non-Conforming Conditions Not Properly Evaluated | Significance Determination Process |
05000440/FIN-2012005-03 | 2012Q4 | Perry | Inappropriate Procedures for Restoring LPCI Mode of RHR Following a LOCA at Mode 3 | Significance Determination Process |
05000440/FIN-2012009-03 | 2012Q4 | Perry | Failure to Appropriately Control Access to a Locked High Radiation Area | Locked High Radiation Area Scaffolding Substantial potential for overexposure |
05000316/FIN-2012008-05 | 2012Q3 | Cook | Inadequate Procedure for Responding to a MODE 4 LOCA | |
05000440/FIN-2012003-02 | 2012Q2 | Perry | Failure To Appropriately Control Access To A Locked High Radiation Area | Locked High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000305/FIN-2012003-02 | 2012Q2 | Kewaunee | Loose Cable Clamp Caused Loaded Spent Fuel Upender to Unintentionally Lower | |
05000440/FIN-2012008-03 | 2012Q2 | Perry | Failure to Ensure Sprinkler Piping Could Be Drained | |
05000456/FIN-2012007-04 | 2012Q2 | Braidwood | Failure to Follow Corrective Action Program Procedure | |
05000237/FIN-2012008-01 | 2012Q1 | Dresden | Flammable Hydrogen Gas Bottles Installed in the Reactor Building | |
05000255/FIN-2012002-03 | 2012Q1 | Palisades | Intermittent Fuse Contact Causes Feedwater Transient and Plant Trip | |
05000237/FIN-2012002-03 | 2012Q1 | Dresden | Failure to Ensure Packages Containing Solid Waste Contain as Little Free Standing and Noncorrosive Liquid as Reasonably Achievable | Significance Determination Process |
05000237/FIN-2012008-02 | 2012Q1 | Dresden | Failure to Conduct Adequate Post Installation and Maintenance Inspections on Standby Liquid Control System Components | Squib Significance Determination Process |
05000237/FIN-2012002-02 | 2012Q1 | Dresden | Failure to Ensure the Effectiveness of Packages as required by DOT Regulations | Significance Determination Process |
05000255/FIN-2011016-01 | 2011Q4 | Palisades | Failure to Prevent Recurrence of a Significant Condition Adverse to Quality | Condition Adverse to Quality |
05000461/FIN-2011005-04 | 2011Q4 | Clinton | Unacceptable Preconditioning of Reactor Core Isolation Cooling System Check Valve Prior to Leak Rate Test Measurement | Past operability |
05000305/FIN-2011005-08 | 2011Q4 | Kewaunee | Procedures for Reduced Inventory Operations were not Appropriate to Preclude Air Entrainment | |
05000456/FIN-2011005-05 | 2011Q4 | Braidwood | Failure to Follow and Establish Adequate Hazard Barrier Impairment Procedures | Significance Determination Process |
05000263/FIN-2011005-04 | 2011Q4 | Monticello | Failure to Properly Block and Brace a Radioactive Package for Transport | |
05000454/FIN-2011008-02 | 2011Q3 | Byron | Failure to Initiate Issue Reports | Significance Determination Process |
05000454/FIN-2011004-03 | 2011Q3 | Byron | Modification of the Auxiliary Feedwater System | Significance Determination Process |
05000306/FIN-2011004-08 | 2011Q3 | Prairie Island | Unit 2 Reactor Trip due to Mis-operation of Substation Breakers | |
05000255/FIN-2011009-03 | 2011Q3 | Palisades | Procedures Were Not Appropriate To Address Gas Accumulation Issues | |
05000456/FIN-2011004-07 | 2011Q3 | Braidwood | Modification of the Auxiliary Feedwater System Without Prior NRC Approval | Significance Determination Process |
05000282/FIN-2011003-08 | 2011Q2 | Prairie Island | Failure to Evaluate the Effects of Dynamic Loads at the CS Discharge Piping | Significance Determination Process Large early release frequency |