 QuarterSiteTitleTopic
05000346/FIN-2018002-032018Q2Davis BesseFailure to Perform a Procedure Affecting Quality
05000461/FIN-2017004-032017Q4ClintonFailure to Identify the Extent of Condition for an Inadequate 10 CFR 50.59 Evaluation
05000374/FIN-2017010-012017Q4LaSalleFailure To Ensure Fire Door Was Engaged And PinnedHourly Fire Watch
05000282/FIN-2017002-022017Q2Prairie IslandFailure to Implement the Emergency Plan
05000440/FIN-2016004-022016Q4PerryModifications to Underdrain and Gravity Discharge System Manhole Covers Without a 10 CFR 50.59 Safety EvaluationSignificance Determination Process
05000315/FIN-2016201-012016Q4CookSecurity
05000440/FIN-2016009-012016Q3PerryFailure to Implement a Periodic Replacement Program for FLEX HosesFLEX
Significance Determination Process
Spent Fuel Pool Instrumentation
05000341/FIN-2016003-032016Q3FermiFailure to Follow Procedures During Concrete Placement of Flexible Storage Facility BuildingsFLEX
05000440/FIN-2016007-012016Q2PerryFailure to Document 50.59 Evaluation for Replacement of a Manual Action with an Automatic ActionSignificance Determination Process
05000440/FIN-2016002-012016Q2PerryFailure to Comply with ODCM During Liquid Effluent DischargeOffsite Dose Calculation Manual
05000454/FIN-2016405-012016Q2ByronSecurity
05000461/FIN-2016002-042016Q2ClintonInadequate Ultrasonic Examination for Service Water System Pipe RepairedWeld Overlay
Significance Determination Process
05000461/FIN-2016001-062016Q1ClintonInadequate Extent of Condition Associated with an ACESignificance Determination Process
05000461/FIN-2015003-032015Q3ClintonFailure to Obtain a License Amendment prior to Making Modifications to Secondary ContainmentTornado Missile
Significance Determination Process
Fuel cladding
05000316/FIN-2015003-022015Q3CookFailure of Steam Dump Valves Results in Plant TripTemporary Modification
Significance Determination Process
05000341/FIN-2015001-042015Q1FermiOperation Above the Licensed Thermal Power LimitFuel cladding
05000373/FIN-2015001-022015Q1LaSalleFailure to Measure Interpass Temperature
05000454/FIN-2014005-012014Q4Byronfailure to Measure Interpass TemperatureSignificance Determination Process
05000331/FIN-2014005-012014Q4Duane ArnoldConstruction Code Used during a Replacement Activity Not Reconciled with the Owner's RequirementsCode Reconciliation
05000315/FIN-2014005-042014Q4CookInadvertent Trip of the Unit 1 TDAFW PumpSignificance Determination Process
05000266/FIN-2014004-012014Q3Point BeachFailure to Identify Degraded Water Sprinkler SystemSafe Shutdown
Significance Determination Process
Fire Watch
Hourly Fire Watch
Scaffolding
05000331/FIN-2014009-022014Q3Duane ArnoldIncomplete Corrective Actions To Prevent RecurrenceCondition Adverse to Quality
Significance Determination Process
05000331/FIN-2014009-032014Q3Duane ArnoldFailure to Establish EFR Attributes to Assess the Effectiveness of Corrective ActionsCondition Adverse to Quality
Significance Determination Process
05000237/FIN-2014003-012014Q2DresdenFailure to Take Appropriate Corrective Action When a Maintenance Rule Performance Goal for the Standby Coolant System was Not MetSignificance Determination Process
Maintenance Rule Program
05000255/FIN-2014003-022014Q2PalisadesExam Security IssuesJob Performance Measure
05000282/FIN-2014008-012014Q2Prairie IslandNo Compensatory Measure were established for Lack of Fuses Coordination associated with Safe Shutdown Power SuppliesSafe Shutdown
Fire Protection Program
05000456/FIN-2014002-032014Q1BraidwoodFailure to Identify Fire Doors that Did Not Conform to NFPA Codes and StandardsSafe Shutdown
Significance Determination Process
Fire Protection Program
05000255/FIN-2013005-022013Q4PalisadesThree Examples of Inadequate Control of Entry into High Radiation AreasHigh Radiation Area
Locked High Radiation Area
Substantial potential for an overexposure
05000373/FIN-2013005-032013Q4LaSalleFailure to Provide Station ALARA Committee With Necessary Information to Ensure Occupational Radiation Exposure Is MaintainedSignificance Determination Process
05000263/FIN-2013405-012013Q3MonticelloSecurity
05000440/FIN-2013004-042013Q3PerryFailure To Perform Representative Sampling of Fish In Order to Accurately Assess Ingestion Radiation As Required By The ODCMOffsite Dose Calculation Manual
Significance Determination Process
05000346/FIN-2013404-022013Q2Davis BesseLicensee-Identified Violation
05000341/FIN-2013003-032013Q2FermiFailure to Maintain Configuration Control During Plant OperationSignificance Determination Process
Scaffolding
05000266/FIN-2013003-042013Q2Point BeachIncorrect Equipment Selected for Ultrasonic ExaminationVT-2
Significance Determination Process
05000282/FIN-2013403-012013Q2Prairie IslandSecurity
05000440/FIN-2013404-012013Q1PerrySecurity
05000266/FIN-2013002-022013Q1Point BeachFailure to Properly Implement a Compensatory Fire Watch as Required by the Fire Protection ProgramSafe Shutdown
High Radiation Area
Fire Protection Program
Fire Watch
05000282/FIN-2013002-062013Q1Prairie IslandFailure to Provide Accurate Performance Indicator Data
05000282/FIN-2013002-072013Q1Prairie IslandFailure to Provide Accurate Performance Indicator Data
05000237/FIN-2012005-022012Q4DresdenFailure to Post Protected Pathway Signs for a Red Risk Path SystemSignificance Determination Process
Large early release frequency
05000331/FIN-2012005-032012Q4Duane ArnoldFailure to Make Surveys to Evaluate the Potential Radiological Hazards in the TorusSignificance Determination Process
Substantial potential for overexposure
05000315/FIN-2012005-012012Q4CookFailure to Perform an Evaluation on Essential Service Water PipingInternal Flooding
05000266/FIN-2012004-022012Q3Point BeachFailure to Implement Risk Management Actions During Various Emergent Work ActivitiesSignificance Determination Process
05000373/FIN-2012007-022012Q3LaSalleFailure to Perform a Written Safety Evaluation for TRM Changes
05000373/FIN-2012004-022012Q3LaSalleFailure to Follow Plant Barrier Control Process for High Energy Line Break Protection Doors
05000456/FIN-2012007-022012Q2BraidwoodSurveillance Procedure Not Followed
05000373/FIN-2012002-012012Q1LaSallePotential Impact on Operability of Safety-Related Components Due to Defeated High Energy Line Break Barriers
05000255/FIN-2011014-032011Q4PalisadesFailure to Implement Human Performance Tools and to Perform an Infrequently Performed Test or Evolution BriefTemporary Modification
05000461/FIN-2011005-022011Q4ClintonFailure to Control the Work Hours of a Covered Worker
05000255/FIN-2011405-012011Q3PalisadesSecurity