05000346/FIN-2018002-03 | 2018Q2 | Davis Besse | Failure to Perform a Procedure Affecting Quality | |
05000461/FIN-2017004-03 | 2017Q4 | Clinton | Failure to Identify the Extent of Condition for an Inadequate 10 CFR 50.59 Evaluation | |
05000374/FIN-2017010-01 | 2017Q4 | LaSalle | Failure To Ensure Fire Door Was Engaged And Pinned | Hourly Fire Watch |
05000282/FIN-2017002-02 | 2017Q2 | Prairie Island | Failure to Implement the Emergency Plan | |
05000440/FIN-2016004-02 | 2016Q4 | Perry | Modifications to Underdrain and Gravity Discharge System Manhole Covers Without a 10 CFR 50.59 Safety Evaluation | Significance Determination Process |
05000315/FIN-2016201-01 | 2016Q4 | Cook | Security | |
05000440/FIN-2016009-01 | 2016Q3 | Perry | Failure to Implement a Periodic Replacement Program for FLEX Hoses | FLEX Significance Determination Process Spent Fuel Pool Instrumentation |
05000341/FIN-2016003-03 | 2016Q3 | Fermi | Failure to Follow Procedures During Concrete Placement of Flexible Storage Facility Buildings | FLEX |
05000440/FIN-2016007-01 | 2016Q2 | Perry | Failure to Document 50.59 Evaluation for Replacement of a Manual Action with an Automatic Action | Significance Determination Process |
05000440/FIN-2016002-01 | 2016Q2 | Perry | Failure to Comply with ODCM During Liquid Effluent Discharge | Offsite Dose Calculation Manual |
05000454/FIN-2016405-01 | 2016Q2 | Byron | Security | |
05000461/FIN-2016002-04 | 2016Q2 | Clinton | Inadequate Ultrasonic Examination for Service Water System Pipe Repaired | Weld Overlay Significance Determination Process |
05000461/FIN-2016001-06 | 2016Q1 | Clinton | Inadequate Extent of Condition Associated with an ACE | Significance Determination Process |
05000461/FIN-2015003-03 | 2015Q3 | Clinton | Failure to Obtain a License Amendment prior to Making Modifications to Secondary Containment | Tornado Missile Significance Determination Process Fuel cladding |
05000316/FIN-2015003-02 | 2015Q3 | Cook | Failure of Steam Dump Valves Results in Plant Trip | Temporary Modification Significance Determination Process |
05000341/FIN-2015001-04 | 2015Q1 | Fermi | Operation Above the Licensed Thermal Power Limit | Fuel cladding |
05000373/FIN-2015001-02 | 2015Q1 | LaSalle | Failure to Measure Interpass Temperature | |
05000454/FIN-2014005-01 | 2014Q4 | Byron | failure to Measure Interpass Temperature | Significance Determination Process |
05000331/FIN-2014005-01 | 2014Q4 | Duane Arnold | Construction Code Used during a Replacement Activity Not Reconciled with the Owner's Requirements | Code Reconciliation |
05000315/FIN-2014005-04 | 2014Q4 | Cook | Inadvertent Trip of the Unit 1 TDAFW Pump | Significance Determination Process |
05000266/FIN-2014004-01 | 2014Q3 | Point Beach | Failure to Identify Degraded Water Sprinkler System | Safe Shutdown Significance Determination Process Fire Watch Hourly Fire Watch Scaffolding |
05000331/FIN-2014009-02 | 2014Q3 | Duane Arnold | Incomplete Corrective Actions To Prevent Recurrence | Condition Adverse to Quality Significance Determination Process |
05000331/FIN-2014009-03 | 2014Q3 | Duane Arnold | Failure to Establish EFR Attributes to Assess the Effectiveness of Corrective Actions | Condition Adverse to Quality Significance Determination Process |
05000237/FIN-2014003-01 | 2014Q2 | Dresden | Failure to Take Appropriate Corrective Action When a Maintenance Rule Performance Goal for the Standby Coolant System was Not Met | Significance Determination Process Maintenance Rule Program |
05000255/FIN-2014003-02 | 2014Q2 | Palisades | Exam Security Issues | Job Performance Measure |
05000282/FIN-2014008-01 | 2014Q2 | Prairie Island | No Compensatory Measure were established for Lack of Fuses Coordination associated with Safe Shutdown Power Supplies | Safe Shutdown Fire Protection Program |
05000456/FIN-2014002-03 | 2014Q1 | Braidwood | Failure to Identify Fire Doors that Did Not Conform to NFPA Codes and Standards | Safe Shutdown Significance Determination Process Fire Protection Program |
05000255/FIN-2013005-02 | 2013Q4 | Palisades | Three Examples of Inadequate Control of Entry into High Radiation Areas | High Radiation Area Locked High Radiation Area Substantial potential for an overexposure |
05000373/FIN-2013005-03 | 2013Q4 | LaSalle | Failure to Provide Station ALARA Committee With Necessary Information to Ensure Occupational Radiation Exposure Is Maintained | Significance Determination Process |
05000263/FIN-2013405-01 | 2013Q3 | Monticello | Security | |
05000440/FIN-2013004-04 | 2013Q3 | Perry | Failure To Perform Representative Sampling of Fish In Order to Accurately Assess Ingestion Radiation As Required By The ODCM | Offsite Dose Calculation Manual Significance Determination Process |
05000346/FIN-2013404-02 | 2013Q2 | Davis Besse | Licensee-Identified Violation | |
05000341/FIN-2013003-03 | 2013Q2 | Fermi | Failure to Maintain Configuration Control During Plant Operation | Significance Determination Process Scaffolding |
05000266/FIN-2013003-04 | 2013Q2 | Point Beach | Incorrect Equipment Selected for Ultrasonic Examination | VT-2 Significance Determination Process |
05000282/FIN-2013403-01 | 2013Q2 | Prairie Island | Security | |
05000440/FIN-2013404-01 | 2013Q1 | Perry | Security | |
05000266/FIN-2013002-02 | 2013Q1 | Point Beach | Failure to Properly Implement a Compensatory Fire Watch as Required by the Fire Protection Program | Safe Shutdown High Radiation Area Fire Protection Program Fire Watch |
05000282/FIN-2013002-06 | 2013Q1 | Prairie Island | Failure to Provide Accurate Performance Indicator Data | |
05000282/FIN-2013002-07 | 2013Q1 | Prairie Island | Failure to Provide Accurate Performance Indicator Data | |
05000237/FIN-2012005-02 | 2012Q4 | Dresden | Failure to Post Protected Pathway Signs for a Red Risk Path System | Significance Determination Process Large early release frequency |
05000331/FIN-2012005-03 | 2012Q4 | Duane Arnold | Failure to Make Surveys to Evaluate the Potential Radiological Hazards in the Torus | Significance Determination Process Substantial potential for overexposure |
05000315/FIN-2012005-01 | 2012Q4 | Cook | Failure to Perform an Evaluation on Essential Service Water Piping | Internal Flooding |
05000266/FIN-2012004-02 | 2012Q3 | Point Beach | Failure to Implement Risk Management Actions During Various Emergent Work Activities | Significance Determination Process |
05000373/FIN-2012007-02 | 2012Q3 | LaSalle | Failure to Perform a Written Safety Evaluation for TRM Changes | |
05000373/FIN-2012004-02 | 2012Q3 | LaSalle | Failure to Follow Plant Barrier Control Process for High Energy Line Break Protection Doors | |
05000456/FIN-2012007-02 | 2012Q2 | Braidwood | Surveillance Procedure Not Followed | |
05000373/FIN-2012002-01 | 2012Q1 | LaSalle | Potential Impact on Operability of Safety-Related Components Due to Defeated High Energy Line Break Barriers | |
05000255/FIN-2011014-03 | 2011Q4 | Palisades | Failure to Implement Human Performance Tools and to Perform an Infrequently Performed Test or Evolution Brief | Temporary Modification |
05000461/FIN-2011005-02 | 2011Q4 | Clinton | Failure to Control the Work Hours of a Covered Worker | |
05000255/FIN-2011405-01 | 2011Q3 | Palisades | Security | |