Semantic search

Jump to navigation Jump to search
 QuarterSiteTitleTopic
05000316/FIN-2018003-012018Q3CookMisaligned Heater Level Column Valves Leads to Manual Reactor Trip
05000373/FIN-2017004-022017Q4LaSalleFailure to Establish Brazing Repair Procedures with Appropriate Acceptance CriteriaSignificance Determination Process
05000461/FIN-2017004-022017Q4ClintonFailure to Assess and Manage Risk Associated with the Performance of Control Rod Time TestingSignificance Determination Process
05000461/FIN-2017004-012017Q4ClintonReactor Down Power due to Reactor Recirculation Pump Motor Lower Bearing Oil Leak
05000461/FIN-2017012-012017Q4ClintonFailure to Perform a Corrective Action to Prevent RecurrenceCondition Adverse to Quality
05000263/FIN-2017004-012017Q4MonticelloFailure to Maintain Radiation Exposure ALARASignificance Determination Process
05000346/FIN-2017004-012017Q4Davis BesseFailure to Maintain Procedures Associated with Ventilation Air Monitoring Assessment ProgramSignificance Determination Process
05000461/FIN-2017201-012017Q3ClintonSecurity
05000454/FIN-2017007-012017Q3ByronFai lure to Perform Maintenance in Accordance with Performance Centered Maintenance Template
05000255/FIN-2017003-032017Q3Palisades12 Diesel Generator Trip During Maintenance Resulting in Additional Unavailability of the 12 DGSignificance Determination Process
05000316/FIN-2017002-022017Q2CookUnit 2 CEQ Fan Failed SurveillanceSignificance Determination Process
Large early release frequency
05000461/FIN-2017008-012017Q2ClintonFailure to Perform Required S urveillances on Multiple Fire DampersFire Barrier
Fire Protection Program
Grace period
05000456/FIN-2017002-012017Q2BraidwoodFailure to Adequately Implement Surveillance Frequency Program for the Deferral of a Technical Specification SurveillanceSurveillance Frequency Control Program
05000373/FIN-2017001-012017Q1LaSallenadequate Controls for ASME Code VT 3 Internal Examination of Pumps and Valves
05000331/FIN-2016003-032016Q3Duane ArnoldFailure to Implement Controls to the Duane Arnold Energy Center Switchyard Resulting in an Unplanned Technical Specification Limiting Condition for Operation 3.8.1 Entry and an Unplanned Risk Change from Green to YellowSignificance Determination Process
05000440/FIN-2016009-022016Q3PerryFailure to Establish a Periodic Maintenance Program for Communications Equipment Associated with FLEXFLEX
Significance Determination Process
Spent Fuel Pool Instrumentation
05000315/FIN-2016002-012016Q2CookUnanalyzed Scaffold Near Safety-Related EquipmentSignificance Determination Process
Scaffolding
05000374/FIN-2016001-032016Q1LaSalleFailure to Maintain Appropriate Work Instructions Led to Lost Parts in the Reactor VesselSignificance Determination Process
05000457/FIN-2016001-022016Q1BraidwoodFailure to Have Adequate Work Instructions and Procedures Leads to a Loss of Inventory From the Volume Control Tank
05000456/FIN-2016001-012016Q1BraidwoodFailure to Follow Fire Prevention for Hot Work Procedure
05000454/FIN-2016001-022016Q1ByronEntry into Mode 3 with Turbine Trip Function of SSPS Disabled
05000255/FIN-2016403-012016Q1PalisadesSecurity
05000440/FIN-2015008-022015Q4PerryFailure to Inspect Penetration Seals Within the Required Time FrequencySafe Shutdown
Fire Barrier
Fire Protection Program
Grace period
05000263/FIN-2015003-022015Q3MonticelloFailure to Perform High Radiation Area Portable Fire Extinguisher SurveillancesHigh Radiation Area
Hydrostatic
Fire Protection Program
05000249/FIN-2015003-032015Q3DresdenFailure to Post Protected Pathway Signs
05000461/FIN-2015002-022015Q2ClintonPost-Maintenance Test Failed To Demonstrate Required Flow Through RCIC Room CoolerSignificance Determination Process
05000237/FIN-2015001-012015Q1Dresden10 CFR 20.1701; Failure to Implement Effective Radiological Engineering ControlsSignificance Determination Process
Substantial potential for overexposure
05000282/FIN-2015001-022015Q1Prairie IslandFailure to Follow Foreign Material Exclusion Procedure during Reactor Coolant Pump Seal ReplacementForeign Material Exclusion
05000255/FIN-2015001-072015Q1PalisadesInadequate Procedure Leads to Primary Coolant Pump Seal Degradation
05000440/FIN-2015001-012015Q1PerryFailure to Initiate A Transient Combustible PermitFire Protection Program
Fire Watch
05000461/FIN-2014005-052014Q4ClintonFailure to Provide Procedure Instructions Results in Exceeding Technical Specification Heat Up Rate During Plant Start Up
05000301/FIN-2014005-012014Q4Point BeachFailure to Promptly Correct a Failed Emergency Diesel Generator Day Tank Room HeaterSignificance Determination Process
05000455/FIN-2014005-052014Q4ByronContainment Penetration Isolation Valves Rendered Inoperable for Operational ConvenienceSignificance Determination Process
05000331/FIN-2014005-032014Q4Duane ArnoldFailure to Evaluate Maintenance Activities for PreconditioningSignificance Determination Process
Fuel cladding
05000440/FIN-2014005-012014Q4PerryUnevaluated Preconditioning of Emergency Service Water Motor-Operated Valves and Check Valves Prior to Conducting As-Found Inservice Surveillance Testing
05000346/FIN-2014005-022014Q4Davis BesseInadequate Procedural Guidance During Restoration From Valve Maintenance Results in Feedwater Heater System and Plant Power TransientSignificance Determination Process
05000315/FIN-2014005-022014Q4CookUnplanned Inoperability of the AB Fuel Oil Storage Tank during MaintenanceSignificance Determination Process
Foreign Material Exclusion
05000263/FIN-2014009-032014Q4MonticelloFailure to Maintain Procedures to Ensure Design Requirements Would Be Met During Construction of the External Flooding Protection Levee
05000331/FIN-2014004-022014Q3Duane ArnoldHydraulic Control Unit Configuration Control ErrorSignificance Determination Process
05000341/FIN-2014004-032014Q3FermiFailure to Promptly Correct a Condition Adverse to Quality on EDG 11Condition Adverse to Quality
05000237/FIN-2014008-022014Q2DresdenFailure to Seismically Secure Nitrogen Bottles
05000461/FIN-2014003-012014Q2ClintonForeign Material in Relay Prevents Emergency Diesel Generator Output Breaker from ClosingSignificance Determination Process
Foreign Material Exclusion
05000341/FIN-2013408-012014Q1FermiSecurity
05000237/FIN-2013005-012013Q4DresdenInadvertent Lo-Lo Reactor Water Level Indication Received During Maintenance Resulting in Unavailability of the 2/3 EDG to Unit 3
05000346/FIN-2013005-022013Q4Davis BesseEmergency Diesel Generator No. 2 Rendered Unavailable By Scheduled MaintenanceSignificance Determination Process
05000263/FIN-2013005-032013Q4MonticelloFailure to Maintain Radiation Exposure ALARA During RFO 26Significance Determination Process
05000282/FIN-2013004-012013Q3Prairie IslandImproper Work Instructions Rendered 2R-49 Inoperable
05000315/FIN-2013004-062013Q3CookInadvertent Operation of Plant Equipment
05000282/FIN-2013004-022013Q3Prairie IslandImproper Work Instructions Rendered Reactor Protection Instrument AC Inverter 13 Inoperable
05000266/FIN-2013003-052013Q2Point BeachFailure to Implement Risk Management Actions During Bus D-40 OutageSignificance Determination Process