05000316/FIN-2018003-01 | 2018Q3 | Cook | Misaligned Heater Level Column Valves Leads to Manual Reactor Trip | |
05000373/FIN-2017004-02 | 2017Q4 | LaSalle | Failure to Establish Brazing Repair Procedures with Appropriate Acceptance Criteria | Significance Determination Process |
05000461/FIN-2017004-02 | 2017Q4 | Clinton | Failure to Assess and Manage Risk Associated with the Performance of Control Rod Time Testing | Significance Determination Process |
05000461/FIN-2017004-01 | 2017Q4 | Clinton | Reactor Down Power due to Reactor Recirculation Pump Motor Lower Bearing Oil Leak | |
05000461/FIN-2017012-01 | 2017Q4 | Clinton | Failure to Perform a Corrective Action to Prevent Recurrence | Condition Adverse to Quality |
05000263/FIN-2017004-01 | 2017Q4 | Monticello | Failure to Maintain Radiation Exposure ALARA | Significance Determination Process |
05000346/FIN-2017004-01 | 2017Q4 | Davis Besse | Failure to Maintain Procedures Associated with Ventilation Air Monitoring Assessment Program | Significance Determination Process |
05000461/FIN-2017201-01 | 2017Q3 | Clinton | Security | |
05000454/FIN-2017007-01 | 2017Q3 | Byron | Fai lure to Perform Maintenance in Accordance with Performance Centered Maintenance Template | |
05000255/FIN-2017003-03 | 2017Q3 | Palisades | 12 Diesel Generator Trip During Maintenance Resulting in Additional Unavailability of the 12 DG | Significance Determination Process |
05000316/FIN-2017002-02 | 2017Q2 | Cook | Unit 2 CEQ Fan Failed Surveillance | Significance Determination Process Large early release frequency |
05000461/FIN-2017008-01 | 2017Q2 | Clinton | Failure to Perform Required S urveillances on Multiple Fire Dampers | Fire Barrier Fire Protection Program Grace period |
05000456/FIN-2017002-01 | 2017Q2 | Braidwood | Failure to Adequately Implement Surveillance Frequency Program for the Deferral of a Technical Specification Surveillance | Surveillance Frequency Control Program |
05000373/FIN-2017001-01 | 2017Q1 | LaSalle | nadequate Controls for ASME Code VT 3 Internal Examination of Pumps and Valves | |
05000331/FIN-2016003-03 | 2016Q3 | Duane Arnold | Failure to Implement Controls to the Duane Arnold Energy Center Switchyard Resulting in an Unplanned Technical Specification Limiting Condition for Operation 3.8.1 Entry and an Unplanned Risk Change from Green to Yellow | Significance Determination Process |
05000440/FIN-2016009-02 | 2016Q3 | Perry | Failure to Establish a Periodic Maintenance Program for Communications Equipment Associated with FLEX | FLEX Significance Determination Process Spent Fuel Pool Instrumentation |
05000315/FIN-2016002-01 | 2016Q2 | Cook | Unanalyzed Scaffold Near Safety-Related Equipment | Significance Determination Process Scaffolding |
05000374/FIN-2016001-03 | 2016Q1 | LaSalle | Failure to Maintain Appropriate Work Instructions Led to Lost Parts in the Reactor Vessel | Significance Determination Process |
05000457/FIN-2016001-02 | 2016Q1 | Braidwood | Failure to Have Adequate Work Instructions and Procedures Leads to a Loss of Inventory From the Volume Control Tank | |
05000456/FIN-2016001-01 | 2016Q1 | Braidwood | Failure to Follow Fire Prevention for Hot Work Procedure | |
05000454/FIN-2016001-02 | 2016Q1 | Byron | Entry into Mode 3 with Turbine Trip Function of SSPS Disabled | |
05000255/FIN-2016403-01 | 2016Q1 | Palisades | Security | |
05000440/FIN-2015008-02 | 2015Q4 | Perry | Failure to Inspect Penetration Seals Within the Required Time Frequency | Safe Shutdown Fire Barrier Fire Protection Program Grace period |
05000263/FIN-2015003-02 | 2015Q3 | Monticello | Failure to Perform High Radiation Area Portable Fire Extinguisher Surveillances | High Radiation Area Hydrostatic Fire Protection Program |
05000249/FIN-2015003-03 | 2015Q3 | Dresden | Failure to Post Protected Pathway Signs | |
05000461/FIN-2015002-02 | 2015Q2 | Clinton | Post-Maintenance Test Failed To Demonstrate Required Flow Through RCIC Room Cooler | Significance Determination Process |
05000237/FIN-2015001-01 | 2015Q1 | Dresden | 10 CFR 20.1701; Failure to Implement Effective Radiological Engineering Controls | Significance Determination Process Substantial potential for overexposure |
05000282/FIN-2015001-02 | 2015Q1 | Prairie Island | Failure to Follow Foreign Material Exclusion Procedure during Reactor Coolant Pump Seal Replacement | Foreign Material Exclusion |
05000255/FIN-2015001-07 | 2015Q1 | Palisades | Inadequate Procedure Leads to Primary Coolant Pump Seal Degradation | |
05000440/FIN-2015001-01 | 2015Q1 | Perry | Failure to Initiate A Transient Combustible Permit | Fire Protection Program Fire Watch |
05000461/FIN-2014005-05 | 2014Q4 | Clinton | Failure to Provide Procedure Instructions Results in Exceeding Technical Specification Heat Up Rate During Plant Start Up | |
05000301/FIN-2014005-01 | 2014Q4 | Point Beach | Failure to Promptly Correct a Failed Emergency Diesel Generator Day Tank Room Heater | Significance Determination Process |
05000455/FIN-2014005-05 | 2014Q4 | Byron | Containment Penetration Isolation Valves Rendered Inoperable for Operational Convenience | Significance Determination Process |
05000331/FIN-2014005-03 | 2014Q4 | Duane Arnold | Failure to Evaluate Maintenance Activities for Preconditioning | Significance Determination Process Fuel cladding |
05000440/FIN-2014005-01 | 2014Q4 | Perry | Unevaluated Preconditioning of Emergency Service Water Motor-Operated Valves and Check Valves Prior to Conducting As-Found Inservice Surveillance Testing | |
05000346/FIN-2014005-02 | 2014Q4 | Davis Besse | Inadequate Procedural Guidance During Restoration From Valve Maintenance Results in Feedwater Heater System and Plant Power Transient | Significance Determination Process |
05000315/FIN-2014005-02 | 2014Q4 | Cook | Unplanned Inoperability of the AB Fuel Oil Storage Tank during Maintenance | Significance Determination Process Foreign Material Exclusion |
05000263/FIN-2014009-03 | 2014Q4 | Monticello | Failure to Maintain Procedures to Ensure Design Requirements Would Be Met During Construction of the External Flooding Protection Levee | |
05000331/FIN-2014004-02 | 2014Q3 | Duane Arnold | Hydraulic Control Unit Configuration Control Error | Significance Determination Process |
05000341/FIN-2014004-03 | 2014Q3 | Fermi | Failure to Promptly Correct a Condition Adverse to Quality on EDG 11 | Condition Adverse to Quality |
05000237/FIN-2014008-02 | 2014Q2 | Dresden | Failure to Seismically Secure Nitrogen Bottles | |
05000461/FIN-2014003-01 | 2014Q2 | Clinton | Foreign Material in Relay Prevents Emergency Diesel Generator Output Breaker from Closing | Significance Determination Process Foreign Material Exclusion |
05000341/FIN-2013408-01 | 2014Q1 | Fermi | Security | |
05000237/FIN-2013005-01 | 2013Q4 | Dresden | Inadvertent Lo-Lo Reactor Water Level Indication Received During Maintenance Resulting in Unavailability of the 2/3 EDG to Unit 3 | |
05000346/FIN-2013005-02 | 2013Q4 | Davis Besse | Emergency Diesel Generator No. 2 Rendered Unavailable By Scheduled Maintenance | Significance Determination Process |
05000263/FIN-2013005-03 | 2013Q4 | Monticello | Failure to Maintain Radiation Exposure ALARA During RFO 26 | Significance Determination Process |
05000282/FIN-2013004-01 | 2013Q3 | Prairie Island | Improper Work Instructions Rendered 2R-49 Inoperable | |
05000315/FIN-2013004-06 | 2013Q3 | Cook | Inadvertent Operation of Plant Equipment | |
05000282/FIN-2013004-02 | 2013Q3 | Prairie Island | Improper Work Instructions Rendered Reactor Protection Instrument AC Inverter 13 Inoperable | |