Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000461/FIN-2018412-01 | 2018Q3 | Clinton | Security | |
05000461/FIN-2018050-01 | 2018Q2 | Clinton | Failure to Follow Multiple Procedure | |
05000255/FIN-2017004-01 | 2017Q4 | Palisades | Improperly Connected M&TE Leads to Unexpected AFU Fan Trip | Significance Determination Process |
05000440/FIN-2017403-01 | 2017Q1 | Perry | Security | |
05000456/FIN-2016004-01 | 2016Q4 | Braidwood | Inadequate Control of Welding During FW System Pipe Replacement | Non-Destructive Examination Significance Determination Process |
05000373/FIN-2016004-04 | 2016Q4 | LaSalle | Block Wall Evaluations Not Consistent with As-Built Condition | Fukushima Dai-Ichi |
05000255/FIN-2016004-03 | 2016Q4 | Palisades | Failure to Translate Design Analysis Stack-up Configuration into Specifications, Drawings, Procedures, and Instructions | |
05000346/FIN-2016003-02 | 2016Q3 | Davis Besse | Inadequate Modification Design Control Measures Result in Reactor Protection System Inoperability | |
05000461/FIN-2016002-01 | 2016Q2 | Clinton | Material Unsecure in the Secured Material Zone | |
05000346/FIN-2016002-04 | 2016Q2 | Davis Besse | Inadequate Post-Manufacture Quality Control Inspections Performed for ASME Section III, Class 2 Reactor Coolant Pump Seal Cavity Vent Line Flexible Hose | |
05000255/FIN-2015004-01 | 2015Q4 | Palisades | Inadequate Dye Penetrant Examination of Pipe Lug Welds | |
05000461/FIN-2015003-02 | 2015Q3 | Clinton | Failure to Implement and Comply with Transient Equipment/Materials Program | Maintenance Rule Program |
05000237/FIN-2015002-02 | 2015Q2 | Dresden | Inadvertent Manipulation of a Test Switch at ESF Bus 23-1 During Surveillance Testing Results in the Inoperability of the 2/3 EDG to Unit 2 | |
05000266/FIN-2015002-02 | 2015Q2 | Point Beach | Failure to Control Transient Combustibles During Service Water Pumphouse Maintenance | Significance Determination Process Fire Protection Program |
05000341/FIN-2015001-01 | 2015Q1 | Fermi | Failure to Correct a Nonconforming Condition Adversely Affecting Plant Safety with the Reactor Building Steam Tunnel Floor Drain | Internal Flooding |
05000331/FIN-2014011-01 | 2015Q1 | Duane Arnold | Failure to Install Torus Coating in Accordance with Established Processes | |
05000341/FIN-2014005-04 | 2014Q4 | Fermi | Failure to Maintain Radiation Exposure ALARA During RF-16 | Significance Determination Process |
05000282/FIN-2014005-02 | 2014Q4 | Prairie Island | Unqualified Reactor Vessel Examination Procedures | |
05000461/FIN-2013009-01 | 2013Q4 | Clinton | Insulation Resistance Testing for Unit Substation Transformers Was Incorrectly Performed | |
05000373/FIN-2013005-04 | 2013Q4 | LaSalle | Failure to Maintain and Report UFSAR Revisions for Safety Analysis and Methodology Chan | Significance Determination Process |
05000263/FIN-2013005-01 | 2013Q4 | Monticello | Failure to Follow Procedure for AO 13-22 Furmanite Injection | |
05000282/FIN-2013405-02 | 2013Q3 | Prairie Island | Security | |
05000440/FIN-2013004-03 | 2013Q3 | Perry | Unprofessional Worker Conduct Inside A Locked High Radiation Area In The Turbine Building 620 Auxiliary Steam Tunnel | Locked High Radiation Area Significance Determination Process |
05000282/FIN-2013004-04 | 2013Q3 | Prairie Island | Inappropriate Removal of Diesel Lube Oil Valve Mounting Causes Vibration and Fretting | |
05000440/FIN-2013009-02 | 2013Q2 | Perry | Failure to Lock or Continuously Guard Doors to Prevent Unauthorized Entry to an LHRA | High Radiation Area Locked High Radiation Area Significance Determination Process |
05000266/FIN-2013003-01 | 2013Q2 | Point Beach | Failure to Control Materials Classified as High Winds/Tornado Hazards | High winds |
05000315/FIN-2013003-02 | 2013Q2 | Cook | Failure to Implement the Scaffold Guidelines Procedure | Scaffolding |
05000305/FIN-2013007-01 | 2013Q1 | Kewaunee | Failure to Perform Announced Fire Drills In Accordance With Fire Protection Program Plan | Safe Shutdown Significance Determination Process Fire Protection Program |
05000341/FIN-2013403-02 | 2013Q1 | Fermi | Security | |
05000341/FIN-2013403-01 | 2013Q1 | Fermi | Security | |
05000255/FIN-2013402-01 | 2013Q1 | Palisades | Security | |
05000331/FIN-2013002-03 | 2013Q1 | Duane Arnold | Failure to Implement and Maintain Procedures Regarding Breathing Air Quality | Significance Determination Process Substantial potential for an overexposure |
05000263/FIN-2013002-02 | 2013Q1 | Monticello | Failure to Enter Radionuclide on Radioactive Waste Shipment Documentation | Significance Determination Process |
05000315/FIN-2013002-01 | 2013Q1 | Cook | Failure to Establish Feed Pump Control Bands | Significance Determination Process |
05000461/FIN-2013002-01 | 2013Q1 | Clinton | Incomplete ED Dose Rate Alarm Evaluation | Significance Determination Process Substantial potential for overexposure |
05000266/FIN-2013002-04 | 2013Q1 | Point Beach | Failure to Survey for Neutron Dose from Source Storage | |
05000341/FIN-2012005-02 | 2012Q4 | Fermi | Inadequate Implementation of Overhaul Post-maintenance Testing and Operation of South Reactor Feed Pump Turbine | |
05000341/FIN-2012004-03 | 2012Q4 | Fermi | Failure to Perform ASME Inservice Testing Comprehensive Pump Test Requirement | |
05000282/FIN-2012004-01 | 2012Q3 | Prairie Island | Failure to Perform Adequate Past Operability Evaluations After Discovering Degraded Component Cooling Heat Exchangers | Past operability |
05000263/FIN-2012004-01 | 2012Q3 | Monticello | Failure to Control the Configuration of Door 45 during Modification | Significance Determination Process |
05000266/FIN-2012004-04 | 2012Q3 | Point Beach | Weld Design Deficiency in Emergency Diesel Generator Missle Protection Barriers | Tornado Generated Missile Significance Determination Process |
05000255/FIN-2012004-03 | 2012Q3 | Palisades | Foreign Material in SIRWT | Foreign Material Exclusion |
05000255/FIN-2012003-03 | 2012Q2 | Palisades | Failure to Follow Work Management Process for Reactor Head Work | Significance Determination Process |
05000305/FIN-2012003-01 | 2012Q2 | Kewaunee | Failure to Utilize Work Order for Temporary Weld Repair on ASME Code, Class 2 Piping | Temporary Modification Through Wall Leak |
05000341/FIN-2012003-02 | 2012Q2 | Fermi | Energizing Bus 65E with Ground Truck Installed and Subsequent Loss of Shutdown Cooling | Significance Determination Process |
05000255/FIN-2012003-01 | 2012Q2 | Palisades | Inadequate Design Margins for Evaluation of Leaking SIRWT Nozzles | Significance Determination Process |
05000331/FIN-2012003-01 | 2012Q2 | Duane Arnold | Lack of Procedures for Monitoring the Performance of RHRSW Pump Motor Cooling Coils | |
05000440/FIN-2012003-03 | 2012Q2 | Perry | Inadequate Lift Plan Causes Lifting Rig Failure | |
05000440/FIN-2012003-01 | 2012Q2 | Perry | Failure To Follow Operations Procedures | |
05000237/FIN-2012002-07 | 2012Q1 | Dresden | Inadequate Work instruction Leads to Failure of Secondary Containment Interlock | Significance Determination Process |