Semantic search
Jump to navigation
Jump to search
Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000306/FIN-2018003-04 | 2018Q3 | Prairie Island | Failure to Promptly Identify and Correct 21 125 VDC Battery Lid Conditions Adverse to Quality | |
05000341/FIN-2018002-01 | 2018Q2 | Fermi | Failure to Document a Condition Assessment Resolution Document for Reactor Recirculation Motor-Generator Set A Brush Gear Sparking | |
05000346/FIN-2018002-02 | 2018Q2 | Davis Besse | Failure to Apply Technical Specification for Safety Features Actuation SystemInstrumentation | |
05000341/FIN-2017004-03 | 2017Q4 | Fermi | Failure to Perform Fit Testing on Self-Contained Breathing Apparatus Respirators | Substantial potential for an overexposure |
05000315/FIN-2017004-04 | 2017Q4 | Cook | Failure to Verify the Adequacy of the Design for a Temporary Modification | Temporary Modification |
05000454/FIN-2017405-02 | 2017Q3 | Byron | Security | |
05000461/FIN-2017003-04 | 2017Q3 | Clinton | Flow Control Valves Not Locked Out Results in Reactor Recirculation Pump Runback | Significance Determination Process |
05000266/FIN-2017003-02 | 2017Q3 | Point Beach | Service Water Cable Support Failure | Condition Adverse to Quality Significance Determination Process |
05000255/FIN-2017201-02 | 2017Q3 | Palisades | Security | |
05000461/FIN-2017001-02 | 2017Q1 | Clinton | Failed to Verify an Appropriate Alternate Method of Decay Heat Removal | |
05000461/FIN-2017001-01 | 2017Q1 | Clinton | Plant Barrier Control Program Failed to Compensate for an Impacted Flood Barrier ( | |
05000263/FIN-2016011-01 | 2016Q3 | Monticello | Failure to Plan and Perform maintenance to Correct HPCI Oil Leak | Condition Adverse to Quality Significance Determination Process |
05000341/FIN-2016007-15 | 2016Q3 | Fermi | Failure to Identify that a Non-Conservative Min-K Insulation Volume Calculation Error Was Nonconforming to the ECCS Suction Strainer Licensing Basis | |
05000461/FIN-2016002-03 | 2016Q2 | Clinton | Failure to Properly Install Cable Vault Mitigating Equipment | |
05000461/FIN-2016404-01 | 2016Q2 | Clinton | Security | |
05000341/FIN-2016001-02 | 2016Q1 | Fermi | Failure to Correctly Interpret and Implement TS Requirements for RPS Trip Functions | Significance Determination Process |
05000315/FIN-2016001-01 | 2016Q1 | Cook | Incorrect Auxiliary Feedwater Mission Time | Mission time |
05000440/FIN-2016008-02 | 2016Q1 | Perry | Failure to Provide Instructions to Completely Vent Reference Legs | |
05000237/FIN-2015004-01 | 2015Q4 | Dresden | Failure to Maintain Design Control of Secondary Containment Interlock Doors | |
05000331/FIN-2015004-02 | 2015Q4 | Duane Arnold | Failure to Declare High Pressure Coolant Injection and Reactor Core Isolation Cooling Inoperable when the High Pressure Coolant Injection and Reactor Core Isolation Cooling Pump Suction Swap Logic was Inoperable | |
05000461/FIN-2015003-04 | 2015Q3 | Clinton | Failure to enter appropriate TS action statement for inoperable radiation monitors during OPDRV activities | |
05000263/FIN-2015002-04 | 2015Q2 | Monticello | Failure to Fill the Reactor Cavity in Accordance with Refueling Preparation Procedure | Fuel cladding |
05000456/FIN-2015002-02 | 2015Q2 | Braidwood | Mechanic Joint Leakage Accepted for Continued Service Without Code Corrective Actions | Boric Acid |
05000374/FIN-2015002-03 | 2015Q2 | LaSalle | Inadequate 10 CFR 50.59 Evaluation for Jet Pump Plugs Affecting Fuel Bundle Cooling | Anticipated operational occurrence |
05000346/FIN-2014008-01 | 2015Q2 | Davis Besse | Departure from Method of Evaluation Required Prior NRC Approval Under 10 CFR 50.59 (c)(2) | |
05000331/FIN-2015002-01 | 2015Q2 | Duane Arnold | Failure to Accomplish a Procedure for an Activity Affecting Quality in a Manner Appropriate to the Circumstances | |
05000341/FIN-2015008-04 | 2015Q1 | Fermi | Failure to Test the Electrical Characteristics for Control Power Transformers to Verify the Degraded Voltage Calculations Results | |
05000255/FIN-2015001-06 | 2015Q1 | Palisades | Failure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers | |
05000461/FIN-2016008-01 | 2015Q1 | Clinton | Failure to Perform and Adequate Equipment Apparent Cause Evaluation | |
05000461/FIN-2015001-01 | 2015Q1 | Clinton | Failure to perform adequate channel calibration on seismic instrumentation | Significance Determination Process Earthquake |
05000455/FIN-2014005-04 | 2014Q4 | Byron | Failure to Evaluate Operability of a TS SSC Upon Discovery of a Support System Degraded Condition | |
05000249/FIN-2014005-03 | 2014Q4 | Dresden | Failure to Maintain Configuration Control in the Unit 3 Containment Pressure Suppression System | Significance Determination Process |
05000255/FIN-2014008-08 | 2014Q4 | Palisades | Failure to Establish an Adequate Test Program for the Shutdown Cooling Heat Exchangers | |
05000282/FIN-2014005-01 | 2014Q4 | Prairie Island | Failure to Implement the Winter Plant Operation Procedure | |
05000456/FIN-2014004-02 | 2014Q3 | Braidwood | Multiple Failures to Follow Operability Evaluation Process Following Discovery of a Non-Conforming Condition in the Ultimate Heat Sink | Unanalyzed Condition Time of Discovery Ultimate heat sink Mission time |
05000315/FIN-2014004-02 | 2014Q3 | Cook | Turbine-Driven Auxiliary Feedwater Mission Time | Mission time |
05000346/FIN-2013010-03 | 2014Q3 | Davis Besse | Failure to Completely Repair Shield Building Concrete Voiding | Significance Determination Process Fuel cladding |
05000346/FIN-2014004-01 | 2014Q3 | Davis Besse | Failure to Properly Perform Required Fire Watch | Safe Shutdown Fire impairment Fire Watch |
05000266/FIN-2014004-03 | 2014Q3 | Point Beach | Deficiencies in Calculation Performed to Support Containment Dome Truss Operability | Time of Discovery Significance Determination Process Fuel cladding |
05000341/FIN-2014003-01 | 2014Q2 | Fermi | Incorrect Application of TSSR 3.0.3 to Never-Performed Battery Surveillances | Missed surveillance |
05000263/FIN-2014002-02 | 2014Q1 | Monticello | Failure to Follow Procedure for RCS Operability Determination | Pressure Boundary Leakage |
05000282/FIN-2014002-01 | 2014Q1 | Prairie Island | Failure to Implement the Scaffolding, Ladders and Cable Trays Platforms Procedure | Scaffolding |
05000263/FIN-2014002-04 | 2014Q1 | Monticello | Failure to Follow Procedure for Drywell-Torus Vacuum Breaker Operability Determination | |
05000263/FIN-2014002-05 | 2014Q1 | Monticello | Inadequate Drywell-Torus Monthly Vacuum Breaker Test Procedure due to Proceduralized Unacceptable Preconditioning | |
05000306/FIN-2013005-01 | 2013Q4 | Prairie Island | Failure to Evaluate Corrosive Effects of Boric Acid on the 22 Residual Heat Removal Pump | Boric Acid |
05000331/FIN-2013008-01 | 2013Q4 | Duane Arnold | Failed to Establish Measures for the Selection and Review for the Suitability of Safety-Related Cables | |
05000455/FIN-2013005-04 | 2013Q4 | Byron | Analytical Basis for PTL Curves Not Maintained Consistent With the Unit 2 Vessel Head Stud Configuration | Pressure and Temperature Limits Report Fuel cladding |
05000455/FIN-2013005-05 | 2013Q4 | Byron | Reactor Vessel Design Documents Not Updated to Reflect Unit 2 Missing Head Stud | Significance Determination Process |
05000331/FIN-2013008-02 | 2013Q4 | Duane Arnold | Failed to Ensure the SBDG Power Cables Were Not Submerged | Condition Adverse to Quality |
05000266/FIN-2013004-01 | 2013Q3 | Point Beach | Failure to Follow Operability/Functionality Evaluation Process Following Radiation Monitor Failure | Functionality Assessment |