 QuarterSiteTitleTopic
05000306/FIN-2018003-042018Q3Prairie IslandFailure to Promptly Identify and Correct 21 125 VDC Battery Lid Conditions Adverse to Quality
05000341/FIN-2018002-012018Q2FermiFailure to Document a Condition Assessment Resolution Document for Reactor Recirculation Motor-Generator Set A Brush Gear Sparking
05000346/FIN-2018002-022018Q2Davis BesseFailure to Apply Technical Specification for Safety Features Actuation SystemInstrumentation
05000341/FIN-2017004-032017Q4FermiFailure to Perform Fit Testing on Self-Contained Breathing Apparatus RespiratorsSubstantial potential for an overexposure
05000315/FIN-2017004-042017Q4CookFailure to Verify the Adequacy of the Design for a Temporary ModificationTemporary Modification
05000454/FIN-2017405-022017Q3ByronSecurity
05000461/FIN-2017003-042017Q3ClintonFlow Control Valves Not Locked Out Results in Reactor Recirculation Pump RunbackSignificance Determination Process
05000266/FIN-2017003-022017Q3Point BeachService Water Cable Support FailureCondition Adverse to Quality
Significance Determination Process
05000255/FIN-2017201-022017Q3PalisadesSecurity
05000461/FIN-2017001-022017Q1ClintonFailed to Verify an Appropriate Alternate Method of Decay Heat Removal
05000461/FIN-2017001-012017Q1ClintonPlant Barrier Control Program Failed to Compensate for an Impacted Flood Barrier (
05000263/FIN-2016011-012016Q3MonticelloFailure to Plan and Perform maintenance to Correct HPCI Oil LeakCondition Adverse to Quality
Significance Determination Process
05000341/FIN-2016007-152016Q3FermiFailure to Identify that a Non-Conservative Min-K Insulation Volume Calculation Error Was Nonconforming to the ECCS Suction Strainer Licensing Basis
05000461/FIN-2016002-032016Q2ClintonFailure to Properly Install Cable Vault Mitigating Equipment
05000461/FIN-2016404-012016Q2ClintonSecurity
05000341/FIN-2016001-022016Q1FermiFailure to Correctly Interpret and Implement TS Requirements for RPS Trip FunctionsSignificance Determination Process
05000315/FIN-2016001-012016Q1CookIncorrect Auxiliary Feedwater Mission TimeMission time
05000440/FIN-2016008-022016Q1PerryFailure to Provide Instructions to Completely Vent Reference Legs
05000237/FIN-2015004-012015Q4DresdenFailure to Maintain Design Control of Secondary Containment Interlock Doors
05000331/FIN-2015004-022015Q4Duane ArnoldFailure to Declare High Pressure Coolant Injection and Reactor Core Isolation Cooling Inoperable when the High Pressure Coolant Injection and Reactor Core Isolation Cooling Pump Suction Swap Logic was Inoperable
05000461/FIN-2015003-042015Q3ClintonFailure to enter appropriate TS action statement for inoperable radiation monitors during OPDRV activities
05000263/FIN-2015002-042015Q2MonticelloFailure to Fill the Reactor Cavity in Accordance with Refueling Preparation ProcedureFuel cladding
05000456/FIN-2015002-022015Q2BraidwoodMechanic Joint Leakage Accepted for Continued Service Without Code Corrective ActionsBoric Acid
05000374/FIN-2015002-032015Q2LaSalleInadequate 10 CFR 50.59 Evaluation for Jet Pump Plugs Affecting Fuel Bundle CoolingAnticipated operational occurrence
05000346/FIN-2014008-012015Q2Davis BesseDeparture from Method of Evaluation Required Prior NRC Approval Under 10 CFR 50.59 (c)(2)
05000331/FIN-2015002-012015Q2Duane ArnoldFailure to Accomplish a Procedure for an Activity Affecting Quality in a Manner Appropriate to the Circumstances
05000341/FIN-2015008-042015Q1FermiFailure to Test the Electrical Characteristics for Control Power Transformers to Verify the Degraded Voltage Calculations Results
05000255/FIN-2015001-062015Q1PalisadesFailure to Evaluate the Adverse Effects of the Use of Non-Seismic Temporary Jumpers
05000461/FIN-2016008-012015Q1ClintonFailure to Perform and Adequate Equipment Apparent Cause Evaluation
05000461/FIN-2015001-012015Q1ClintonFailure to perform adequate channel calibration on seismic instrumentationSignificance Determination Process
Earthquake
05000455/FIN-2014005-042014Q4ByronFailure to Evaluate Operability of a TS SSC Upon Discovery of a Support System Degraded Condition
05000249/FIN-2014005-032014Q4DresdenFailure to Maintain Configuration Control in the Unit 3 Containment Pressure Suppression SystemSignificance Determination Process
05000255/FIN-2014008-082014Q4PalisadesFailure to Establish an Adequate Test Program for the Shutdown Cooling Heat Exchangers
05000282/FIN-2014005-012014Q4Prairie IslandFailure to Implement the Winter Plant Operation Procedure
05000456/FIN-2014004-022014Q3BraidwoodMultiple Failures to Follow Operability Evaluation Process Following Discovery of a Non-Conforming Condition in the Ultimate Heat SinkUnanalyzed Condition
Time of Discovery
Ultimate heat sink
Mission time
05000315/FIN-2014004-022014Q3CookTurbine-Driven Auxiliary Feedwater Mission TimeMission time
05000346/FIN-2013010-032014Q3Davis BesseFailure to Completely Repair Shield Building Concrete VoidingSignificance Determination Process
Fuel cladding
05000346/FIN-2014004-012014Q3Davis BesseFailure to Properly Perform Required Fire WatchSafe Shutdown
Fire impairment
Fire Watch
05000266/FIN-2014004-032014Q3Point BeachDeficiencies in Calculation Performed to Support Containment Dome Truss OperabilityTime of Discovery
Significance Determination Process
Fuel cladding
05000341/FIN-2014003-012014Q2FermiIncorrect Application of TSSR 3.0.3 to Never-Performed Battery SurveillancesMissed surveillance
05000263/FIN-2014002-022014Q1MonticelloFailure to Follow Procedure for RCS Operability DeterminationPressure Boundary Leakage
05000282/FIN-2014002-012014Q1Prairie IslandFailure to Implement the Scaffolding, Ladders and Cable Trays Platforms ProcedureScaffolding
05000263/FIN-2014002-042014Q1MonticelloFailure to Follow Procedure for Drywell-Torus Vacuum Breaker Operability Determination
05000263/FIN-2014002-052014Q1MonticelloInadequate Drywell-Torus Monthly Vacuum Breaker Test Procedure due to Proceduralized Unacceptable Preconditioning
05000306/FIN-2013005-012013Q4Prairie IslandFailure to Evaluate Corrosive Effects of Boric Acid on the 22 Residual Heat Removal PumpBoric Acid
05000331/FIN-2013008-012013Q4Duane ArnoldFailed to Establish Measures for the Selection and Review for the Suitability of Safety-Related Cables
05000455/FIN-2013005-042013Q4ByronAnalytical Basis for PTL Curves Not Maintained Consistent With the Unit 2 Vessel Head Stud ConfigurationPressure and Temperature Limits Report
Fuel cladding
05000455/FIN-2013005-052013Q4ByronReactor Vessel Design Documents Not Updated to Reflect Unit 2 Missing Head StudSignificance Determination Process
05000331/FIN-2013008-022013Q4Duane ArnoldFailed to Ensure the SBDG Power Cables Were Not SubmergedCondition Adverse to Quality
05000266/FIN-2013004-012013Q3Point BeachFailure to Follow Operability/Functionality Evaluation Process Following Radiation Monitor FailureFunctionality Assessment