Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000255/FIN-2018003-01 | 2018Q3 | Palisades | Wire Not Landed on Safety Injection Initiation Relay Circuit | |
05000373/FIN-2018003-01 | 2018Q3 | LaSalle | Failure to Establish Heat Exchanger Inspection Procedures Appropriate for the Circumstances | |
05000455/FIN-2018002-01 | 2018Q2 | Byron | Overspeed Trip of 2B Auxiliary Feedwater Pump During Surveillance | |
05000440/FIN-2018002-01 | 2018Q2 | Perry | Failure to Control Transient Combustible Materials in a Designated Combustible Control Zone | Fire Protection Program |
05000346/FIN-2018002-01 | 2018Q2 | Davis Besse | Failure to Follow the Makeup and Purification Procedure | |
05000461/FIN-2018050-02 | 2018Q2 | Clinton | Failure to Promptly Identifya Condition Adverse to Quality | Condition Adverse to Quality |
05000373/FIN-2018010-01 | 2018Q2 | LaSalle | Failure to Translate Reactor Building Superstructure Design Basis | |
05000455/FIN-2017004-01 | 2017Q4 | Byron | Fire Barrier Impaired without Authorization | Fire Barrier Significance Determination Process Fire Protection Program |
05000440/FIN-2017008-02 | 2017Q4 | Perry | Inadequate Evaluation of Emergency Closed Cooling System Pipe Support | |
05000461/FIN-2017002-03 | 2017Q2 | Clinton | Unexpected Start of the Division 3 Emergency Diesel Generato | |
05000461/FIN-2017001-03 | 2017Q1 | Clinton | Failure to Develop and Review a Worker Tag Out | |
05000346/FIN-2016004-01 | 2016Q4 | Davis Besse | Mispositioned Instrument Air Valves Result in Plant Transient | |
05000341/FIN-2016004-05 | 2016Q4 | Fermi | Failure to Lock an Area Meeting Locked High Radiation Area Conditions | High Radiation Area Locked High Radiation Area Substantial potential for an overexposure |
05000331/FIN-2016004-01 | 2016Q4 | Duane Arnold | Failure to Control Emergency Preparedness Drill Scenario | |
05000440/FIN-2016004-01 | 2016Q4 | Perry | ECC B Heat Exchanger Flow Root Valves Out of Position | |
05000316/FIN-2016004-02 | 2016Q4 | Cook | Moisture Separator Reheater Rupture | Safe Shutdown Significance Determination Process |
05000461/FIN-2016003-01 | 2016Q3 | Clinton | Failure to Scope Fuel Building Ventilation Pressure Control into Maintenance Rule | Significance Determination Process Maintenance Rule Program Fuel cladding |
05000263/FIN-2016003-01 | 2016Q3 | Monticello | Failure to Follow Procedures While Performing Activities Affecting Quality | |
05000454/FIN-2016003-01 | 2016Q3 | Byron | DOST Flood Barrier Door Left Open | Significance Determination Process Large early release frequency |
05000455/FIN-2016003-02 | 2016Q3 | Byron | Failure to Use Alteration Log Resulted in Fuel Oil Leak | Significance Determination Process |
05000456/FIN-2016002-01 | 2016Q2 | Braidwood | Multiple Failure to Follow Procedures Leads to Inadequate Monitoring of Gas Susceptible Locations | Surveillance Frequency Control Program |
05000266/FIN-2016002-05 | 2016Q2 | Point Beach | Fuel Assembly Move Sequence Planned Incorrectly | Significance Determination Process B.5.b Mitigating Strategies |
05000266/FIN-2016002-06 | 2016Q2 | Point Beach | Incorrect Wiring Causes Transformer Lockout | Significance Determination Process |
05000341/FIN-2016002-01 | 2016Q2 | Fermi | Failure to Control Combustible Materials | Safe Shutdown Fire Protection Program |
05000331/FIN-2016002-01 | 2016Q2 | Duane Arnold | Failure to Accomplish a Surveillance Test Procedure in Accordance with Instructions Resulting in Safety System Inoperability | |
05000440/FIN-2016001-03 | 2016Q1 | Perry | Failure to Take Actions to Prevent a Loss of Safety Function during Reactor Recirculation Pump Downshift | |
05000341/FIN-2015004-01 | 2015Q4 | Fermi | Failure to Satisfy Technical Specification Requirements During an Unplanned Operation with the Potential to Drain the Reactor Vessel | Reactor Vessel Water Level Significance Determination Process |
05000454/FIN-2015004-01 | 2015Q4 | Byron | Inaccurate Technical Basis for Operability Evaluation of Reactor Head Flange Damage | Time of Discovery Significance Determination Process |
05000315/FIN-2015004-02 | 2015Q4 | Cook | Probabilistic Risk Assessment Model Errors | Probabilistic Risk Assessment Significance Determination Process |
05000282/FIN-2015008-05 | 2015Q4 | Prairie Island | Failure to Identify a Continuous Gas Intrusion into RHR | Past operability |
05000440/FIN-2015007-02 | 2015Q3 | Perry | Failure to Adequately Evaluate Damaged CRD Flange | |
05000341/FIN-2015406-01 | 2015Q3 | Fermi | Security | |
05000454/FIN-2015007-01 | 2015Q3 | Byron | Failure to Evaluate the Impact of a FLEX-Related Configuration Change on Available DG Fuel Oil Margin | Mission time FLEX |
05000440/FIN-2015003-02 | 2015Q3 | Perry | Failure to Properly Implement Steps Outlined in a Technical Specification Surveillance Proce | Maintenance Rule Program |
05000263/FIN-2015002-06 | 2015Q2 | Monticello | Loss of Electrical Buses and Shutdown Cooling (SDC) Due to Inadequate Procedure Adherence | |
05000374/FIN-2015002-02 | 2015Q2 | LaSalle | Inadvertent Operation of Circuit Breaker Affecting Unit 2 Train A Residual Heat Removal Suppression Chamber Spray Isolation Valve (235Y-2 C3) | |
05000263/FIN-2015001-05 | 2015Q1 | Monticello | Two Emergency Diesels Inoperable Due to Human Error | |
05000331/FIN-2015001-01 | 2015Q1 | Duane Arnold | Failure to Classify and Declare a Notification of Unusual Event | |
05000255/FIN-2015001-02 | 2015Q1 | Palisades | Inoperability of Safety Injection Tank Due to Long-Term Leakage | Condition Adverse to Quality |
05000255/FIN-2015001-01 | 2015Q1 | Palisades | Inadequate Procedure Results in Failure of Component Cooling Water Pump | |
05000341/FIN-2014005-01 | 2014Q4 | Fermi | Potential Missile Hazards from Unrestrained Equipment Near the 345-Kilovolt and 120-Kilovolt Switchyards | High winds Internal Flooding |
05000282/FIN-2014005-03 | 2014Q4 | Prairie Island | Failure to Follow Procedures during EDG 24 Hour Load Test | |
05000456/FIN-2014005-01 | 2014Q4 | Braidwood | Failure to Adequately Evaluate Operability Following the Discovery of an Unanalyzed Condition Involving the Probable Maximum Precipitation Event | Unanalyzed Condition |
05000266/FIN-2014004-02 | 2014Q3 | Point Beach | Failure to Perform Required Fire Watch Inspections | Significance Determination Process Fire Watch |
05000461/FIN-2014004-01 | 2014Q3 | Clinton | Exceeded Technical Specification Allowed Outage Time for Electrical Power Systems Due to Auxiliary Equipment Out of Service | Significance Determination Process |
05000456/FIN-2014004-03 | 2014Q3 | Braidwood | Station Diesel-Driven Fire Pump Restored to Service Non-Functional Due to Incorrect Stop Push Button Switch Replacement | Fire Protection Program |
05000346/FIN-2014003-03 | 2014Q2 | Davis Besse | Failure to Ensure Auxiliary Feedwater Design Bases Were Correctly Translated into Design Documents and Procedures | |
05000341/FIN-2014003-03 | 2014Q2 | Fermi | Mis-Positioned Control Switch Inadvertently Rendered the Division 2 EECW System and Supported Systems Inoperable | Significance Determination Process |
05000237/FIN-2014008-01 | 2014Q2 | Dresden | Inadequate Applicability Reviews of Configuration Changes for De-Energizing Safety-Related Valves | Multiple Spurious Operation Fire Protection Program |
05000263/FIN-2014008-03 | 2014Q1 | Monticello | Repairs Credited for Hot Shutdown Conditions | Safe Shutdown |