05000391/FIN-2018003-02 | 2018Q3 | Watts Bar | Unauthorized Entry Into a High Radiation Area | High Radiation Area |
05000280/FIN-2017002-01 | 2017Q2 | Surry | Failure to Have Work Instructions Impacting MER 5 Flood Barrier | Significance Determination Process |
05000348/FIN-2017002-02 | 2017Q2 | Farley | Failure to Follow Procedure Resulted in Inoperable PRF System Boundary | Significance Determination Process |
05000324/FIN-2017001-02 | 2017Q1 | Brunswick | Failure to Control a Temporary Fire Ignition Source Near the Unit 2 Standby Liquid Control Pump Motor and Cables | Continuous fire watch |
05000259/FIN-2017001-02 | 2017Q1 | Browns Ferry | Unauthorized Entry into a High Radiation Area | High Radiation Area |
05000390/FIN-2016004-01 | 2016Q4 | Watts Bar | Inadequate Immediate Determination of Operability for Essential Raw Cooling Water Pumps | |
05000261/FIN-2016008-01 | 2016Q3 | Robinson | Failure to Failure to Keep EOP FRP-H.1 in Conformance with Plant Specific Guidelines | |
05000413/FIN-2016002-01 | 2016Q2 | Catawba | Failure to Adequately Implement RHR Operating Procedure | Significance Determination Process |
05000338/FIN-2015008-03 | 2015Q4 | North Anna | Failure to Ensure that the Turbine-driven Auxiliary Feed Water Pump had the Capability to Provide Sufficient Flow Such that Residual Heat Removal Entry Conditions Could Be Achieved during Fire Event | Significance Determination Process |
05000259/FIN-2015004-02 | 2015Q4 | Browns Ferry | Failure to Properly Manage Risk During Planned Maintenance Activities | Significance Determination Process |
05000269/FIN-2015002-03 | 2015Q2 | Oconee | Failure To Translate The Design Basis Into Procedures Used To Test The HPI Motor Coolers | |
05000261/FIN-2015002-02 | 2015Q2 | Robinson | Failure to Follow Engineering Change Procedure for Modification of RPS | |
05000369/FIN-2014005-01 | 2014Q4 | Mcguire McGuire | Failure to Adequately Control Transient Combustible Materials and Ignition Sources in Accordance with the Fire Protection Program | Fire Protection Program |
05000324/FIN-2014004-03 | 2014Q3 | Brunswick | Failure to Post a High Radiation Area | High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000339/FIN-2014003-02 | 2014Q2 | North Anna | Unit 2 Manual Reactor Trip After Loss of Main Feedwater Pump | |
05000348/FIN-2014002-02 | 2014Q1 | Farley | Failure to Implement Preventive Maintenance on 4160V Breaker Mechanism Operated Cell Switches | Significance Determination Process |
05000280/FIN-2013005-02 | 2013Q4 | Surry | Failure to Missile Protect Beyond Design Bases FLEX Modification to Low Head Safety Injection Piping | FLEX Tornado Generated Missile Significance Determination Process Tornado Missile Protection Fuel cladding |
05000327/FIN-2013002-04 | 2013Q1 | Sequoyah | Failure of Ground Fault Relay Leads to Loss of RCP and Reactor Trip | |
05000327/FIN-2012007-01 | 2012Q1 | Sequoyah | Reactor Trip Due to Improper Preferred Inverter Maintenance | |
05000348/FIN-2011014-01 | 2011Q4 | Farley | TDAFW Pump Inoperable due to Improper Control of Station Drawings | Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process |
05000413/FIN-2011004-01 | 2011Q3 | Catawba | Failure to Adequately Implement Tagout Procedures | |
05000400/FIN-2010005-04 | 2010Q4 | Harris | Inadequate Post Maintenance Test Procedure Results in Deenergization of the B Safety Bus and Loss of Decay Heat Removal | Time to boil Significance Determination Process |
05000327/FIN-2010005-02 | 2010Q4 | Sequoyah | Failure to implement Technical Specification requirements to vent ECCS piping | Significance Determination Process |
05000321/FIN-2010004-01 | 2010Q3 | Hatch | Failure to correct a condition adverse to quality results in a 1A emergency diesel generator fuel oil line failure | Condition Adverse to Quality |
05000424/FIN-2010004-01 | 2010Q3 | Vogtle | Failure to Correct Instrument Uncertainty Associated with the ECCS Accumulators | |
05000250/FIN-2010004-01 | 2010Q3 | Turkey Point | Failure to provide adequate instructions when working on the reactor protection system results in reactor trip | |
05000269/FIN-2010003-03 | 2010Q2 | Oconee | Failure to Conduct an Adequate Area Radiation Survey of a Room in the Radwaste Facility | |
05000390/FIN-2010003-01 | 2010Q2 | Watts Bar | Failure to Assure that Adequate Test Requirements Were Developed and Implemented Following a Repair | Significance Determination Process |
05000390/FIN-2010002-01 | 2010Q1 | Watts Bar | Failure to Assure that Test Requirements Were Satsified Following a Design Change | |
05000269/FIN-2009005-01 | 2009Q4 | Oconee | Inadequate Implementation of Risk Management Actions Associated With Modification Work Activities on the BWSTs for all Three Oconee Units | Significance Determination Process |
05000348/FIN-2009005-02 | 2009Q4 | Farley | Failure to Implement Maintenance Inspections of Safety-Related Switchgear | |
05000390/FIN-2009006-01 | 2009Q2 | Watts Bar | Failure to Promptly Correct a Condition Adverse to Quality Associated with the \'A\' Shutdown Boardroom Chiller | Condition Adverse to Quality |
05000259/FIN-2009003-01 | 2009Q2 | Browns Ferry | Failure to Assess and Manage Shutdown Risk Associated with Outage maintenance Activities | Time to boil Significance Determination Process |
05000324/FIN-2009002-03 | 2009Q1 | Brunswick | Failure to Follow Procedures During Reactor Head Disassembly (Section 1R20) | Reactor Vessel Water Level Significance Determination Process |
05000335/FIN-2009002-03 | 2009Q1 | Saint Lucie | Failure to Perform an Adequate Post Maintenance Test on the 1A-EDG Fuel Oil Day Tank Low Level Switch | |
05000335/FIN-2009007-01 | 2009Q1 | Saint Lucie | Failure to Correct Conditions Adverse to Quality | |
05000413/FIN-2008005-01 | 2008Q4 | Catawba | Inadequate Implementation of Risk Management Actions Associated With Planned Maintenance on the Unit 2 A Train KC Heat Exchanger | |
05000261/FIN-2008004-02 | 2008Q3 | Robinson | Failure to maintain emegency diesel generator service water valve configuration control | |
05000259/FIN-2008003-01 | 2008Q2 | Browns Ferry | Failure to Conspicuously Post, Barricade and Control Access to a High Radiation Area During Power Ascension | High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000269/FIN-2008002-02 | 2008Q1 | Oconee | Failure to Implement the Procedure to Stroke RBS Valves | Significance Determination Process |