 QuarterSiteTitleTopic
05000390/FIN-2018003-012018Q3Watts BarConfiguration Control Error Results in Actual Auxiliary Building Internal Flooding EventInternal Flooding
05000390/FIN-2018003-032018Q3Watts BarFailure to Collect Compensatory Samples for an Out-of-Service Effluent MonitorOffsite Dose Calculation Manual
05000327/FIN-2018411-012018Q3SequoyahSecurity
05000369/FIN-2018411-012018Q3Mcguire
McGuire
Security
05000400/FIN-2018002-042018Q2HarrisFailure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures
05000390/FIN-2018410-012018Q2Watts BarSecurity
05000259/FIN-2018412-012018Q2Browns FerrySecurity
05000389/FIN-2017004-022017Q4Saint LucieFailure to Follow Surveillance Maintenance Procedure Resulting in a Condition Prohibited by Technical SpecificationsMaintenance Rule Program
05000348/FIN-2017004-032017Q4FarleyFailure to Follow Procedure Resulted in Inoperable TDAFW pumpSignificance Determination Process
05000425/FIN-2017003-032017Q3VogtleFailure to Maintain Cleanliness of Motor Operated Valve Limit Switch Compartment
05000250/FIN-2017003-022017Q3Turkey PointInadequate Operator Fundamentals during Diesel Driven Fire Pump Surveillance Testing
05000250/FIN-2017003-032017Q3Turkey PointInadequate Maintenance Rule (a)(4) Risk Assessment for the High Head Safety Injection PumpsIncremental Core Damage Probability Deficit
05000259/FIN-2017003-022017Q3Browns FerryFailure to Maintain Intake Building Flood Barrier
05000259/FIN-2017002-012017Q2Browns FerryInadequate Fire Risk Evaluation for Postulated Fires Affecting EECW Strainers
05000369/FIN-2017002-012017Q2Mcguire
McGuire
Inadequate Survey Results in Unposted HRAHigh Radiation Area
Significance Determination Process
Substantial potential for overexposure
05000390/FIN-2017002-022017Q2Watts BarFailure to Implement Clearance on Containment Isolation Valve Results in TS 3.6.3 Violation
05000280/FIN-2017001-012017Q1SurryFailure to Maintain Requalification Examination IntegritySignificance Determination Process
05000259/FIN-2017001-032017Q1Browns FerryFailure to Perform Airborne Radioactivity Surveys
05000335/FIN-2017001-012017Q1Saint LucieInadequate Procedure Results in Adding an Incorrect Lubrication Oil to the 1B CS Motor Inboard Bearing
05000259/FIN-2017406-012017Q1Browns FerrySecurity
05000335/FIN-2016012-012016Q4Saint LucieFailure to Maintain Component Configuration Control Resulted in a Complicated Reactor TripSignificance Determination Process
05000327/FIN-2016003-012016Q3SequoyahHydrogen Mitigation System Inoperable Longer than Allowed by Technical Specifications
05000424/FIN-2016403-012016Q3VogtleSecurity
05000395/FIN-2016003-012016Q3SummerFailure to Meet HRA Entry Requirements (Two Examples)High Radiation Area
Substantial potential for overexposure
05000250/FIN-2016003-032016Q3Turkey PointImproper ECC Fuse Installation
05000325/FIN-2016008-012016Q2BrunswickInadequate Procedures to Perform Maintenance on the SAT non-segregated bus and the 1B RRP VFD cablesSignificance Determination Process
05000425/FIN-2016002-012016Q2VogtleFailure to properly implement a maintenance procedure caused a Reactor Trip
05000390/FIN-2016001-042016Q1Watts BarFailure to Place the RHR System in ECCSStandby Mode Prior to Exceeding an RCS Temperature of 212 oF
05000261/FIN-2016001-032016Q1RobinsonFailure to Follow Procedure for a Light Indication ReplacementSignificance Determination Process
05000261/FIN-2016001-052016Q1RobinsonFailure to Adequately Maintain Emergency Operating Procedures EOP-ECA-0.0 and EOP-E-0Significance Determination Process
Maintenance Rule Program
05000413/FIN-2015004-012015Q4CatawbaFailure to Adequately Implement In-service Test Procedure for the Unit 1 Standby Makeup PumpLarge early release frequency
05000390/FIN-2015004-032015Q4Watts BarFailure to Comply with Source Range Neutron Flux Channel Technical Specification Requiprements
05000424/FIN-2015007-022015Q3VogtleFailure to Identify and Repair a Degraded Fire Penetration SealSignificance Determination Process
Fire Protection Program
Fire Watch
05000335/FIN-2015003-042015Q3Saint LucieFailure to Follow Reactor Protection System Surveillance Procedure Resulting in Reactor Plant TripSignificance Determination Process
05000390/FIN-2015002-022015Q2Watts BarFailure to Track ApplicableTechnical Specification Action Statement for Residual Heat Removal System
05000269/FIN-2015002-012015Q2OconeeInadequate Design Inputs for PSW Testing and Engineering Evaluations
05000269/FIN-2015002-022015Q2OconeeInadequate Acceptance Criteria for PSW Pump Surveillance Testing
05000327/FIN-2015001-012015Q1SequoyahFailure to Follow Procedure Results in an Inadvertent Sprinkler Deluge in the Cable Spreading RoomFire Protection Program
05000324/FIN-2014005-022014Q4BrunswickFailure to Follow Emergency Diesel Generator No. 3 Monthly Load Test Surveillance ProcedureMaintenance Rule Program
05000250/FIN-2014005-012014Q4Turkey PointNon-Compliance with HRA Entry RequirementsHigh Radiation Area
Substantial potential for an overexposure
05000364/FIN-2014009-012014Q3FarleyInstallation of 1.5-hour UL Labeled Fire Door in a Required 3-hour Fire Barrier on Unit 2Fire Barrier
Significance Determination Process
Fire Protection Program
Fire Watch
05000424/FIN-2014004-042014Q3VogtleFailure to Correctly Implement a Chemical and Volume Control System Procedure for Reactor Water MakeupBoric Acid
Significance Determination Process
05000321/FIN-2014004-032014Q3HatchFailure to Promptly Identify Malfunction of HPCI Exhaust Drain Pot Level InstrumentationSignificance Determination Process
05000327/FIN-2014003-022014Q2SequoyahFailure to Comply with Entry requirements to a HRAHigh Radiation Area
Substantial potential for overexposure
05000424/FIN-2014003-022014Q2VogtleUnauthorized Entry into a High Radiation AreaHigh Radiation Area
Significance Determination Process
Substantial potential for overexposure
05000321/FIN-2014002-032014Q1HatchFailure to Operate the Unit 2 Master Feedwater Controller In Accordance With ProceduresInternal Flooding
05000338/FIN-2014002-012014Q1North AnnaFailure to Mark a Foreign Material Exclusion Closure Device Results in Non-Functionality of the Alternate AC DieselSignificance Determination Process
Foreign Material Exclusion
Maintenance Rule Program
05000259/FIN-2013011-042013Q2Browns FerryTwo BFN Assistant Unit Operators Closed and Danger Tagged the A1 RHRSW Pump Manual Discharge Valve Instead of the Required A2 RHRSW Pump Discharge Valve
05000348/FIN-2013003-012013Q2FarleyFailure to Properly Maintain Procedures to Ensure Reactor Vessel Head Vent Path was PreservedSignificance Determination Process
05000260/FIN-2013002-022013Q1Browns FerryFailure to Follow Operating Procedure Guidance Resulted in Unit 2 Reactor Scram