Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000390/FIN-2018003-01 | 2018Q3 | Watts Bar | Configuration Control Error Results in Actual Auxiliary Building Internal Flooding Event | Internal Flooding |
05000390/FIN-2018003-03 | 2018Q3 | Watts Bar | Failure to Collect Compensatory Samples for an Out-of-Service Effluent Monitor | Offsite Dose Calculation Manual |
05000327/FIN-2018411-01 | 2018Q3 | Sequoyah | Security | |
05000369/FIN-2018411-01 | 2018Q3 | Mcguire McGuire | Security | |
05000400/FIN-2018002-04 | 2018Q2 | Harris | Failure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures | |
05000390/FIN-2018410-01 | 2018Q2 | Watts Bar | Security | |
05000259/FIN-2018412-01 | 2018Q2 | Browns Ferry | Security | |
05000389/FIN-2017004-02 | 2017Q4 | Saint Lucie | Failure to Follow Surveillance Maintenance Procedure Resulting in a Condition Prohibited by Technical Specifications | Maintenance Rule Program |
05000348/FIN-2017004-03 | 2017Q4 | Farley | Failure to Follow Procedure Resulted in Inoperable TDAFW pump | Significance Determination Process |
05000425/FIN-2017003-03 | 2017Q3 | Vogtle | Failure to Maintain Cleanliness of Motor Operated Valve Limit Switch Compartment | |
05000250/FIN-2017003-02 | 2017Q3 | Turkey Point | Inadequate Operator Fundamentals during Diesel Driven Fire Pump Surveillance Testing | |
05000250/FIN-2017003-03 | 2017Q3 | Turkey Point | Inadequate Maintenance Rule (a)(4) Risk Assessment for the High Head Safety Injection Pumps | Incremental Core Damage Probability Deficit |
05000259/FIN-2017003-02 | 2017Q3 | Browns Ferry | Failure to Maintain Intake Building Flood Barrier | |
05000259/FIN-2017002-01 | 2017Q2 | Browns Ferry | Inadequate Fire Risk Evaluation for Postulated Fires Affecting EECW Strainers | |
05000369/FIN-2017002-01 | 2017Q2 | Mcguire McGuire | Inadequate Survey Results in Unposted HRA | High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000390/FIN-2017002-02 | 2017Q2 | Watts Bar | Failure to Implement Clearance on Containment Isolation Valve Results in TS 3.6.3 Violation | |
05000280/FIN-2017001-01 | 2017Q1 | Surry | Failure to Maintain Requalification Examination Integrity | Significance Determination Process |
05000259/FIN-2017001-03 | 2017Q1 | Browns Ferry | Failure to Perform Airborne Radioactivity Surveys | |
05000335/FIN-2017001-01 | 2017Q1 | Saint Lucie | Inadequate Procedure Results in Adding an Incorrect Lubrication Oil to the 1B CS Motor Inboard Bearing | |
05000259/FIN-2017406-01 | 2017Q1 | Browns Ferry | Security | |
05000335/FIN-2016012-01 | 2016Q4 | Saint Lucie | Failure to Maintain Component Configuration Control Resulted in a Complicated Reactor Trip | Significance Determination Process |
05000327/FIN-2016003-01 | 2016Q3 | Sequoyah | Hydrogen Mitigation System Inoperable Longer than Allowed by Technical Specifications | |
05000424/FIN-2016403-01 | 2016Q3 | Vogtle | Security | |
05000395/FIN-2016003-01 | 2016Q3 | Summer | Failure to Meet HRA Entry Requirements (Two Examples) | High Radiation Area Substantial potential for overexposure |
05000250/FIN-2016003-03 | 2016Q3 | Turkey Point | Improper ECC Fuse Installation | |
05000325/FIN-2016008-01 | 2016Q2 | Brunswick | Inadequate Procedures to Perform Maintenance on the SAT non-segregated bus and the 1B RRP VFD cables | Significance Determination Process |
05000425/FIN-2016002-01 | 2016Q2 | Vogtle | Failure to properly implement a maintenance procedure caused a Reactor Trip | |
05000390/FIN-2016001-04 | 2016Q1 | Watts Bar | Failure to Place the RHR System in ECCSStandby Mode Prior to Exceeding an RCS Temperature of 212 oF | |
05000261/FIN-2016001-03 | 2016Q1 | Robinson | Failure to Follow Procedure for a Light Indication Replacement | Significance Determination Process |
05000261/FIN-2016001-05 | 2016Q1 | Robinson | Failure to Adequately Maintain Emergency Operating Procedures EOP-ECA-0.0 and EOP-E-0 | Significance Determination Process Maintenance Rule Program |
05000413/FIN-2015004-01 | 2015Q4 | Catawba | Failure to Adequately Implement In-service Test Procedure for the Unit 1 Standby Makeup Pump | Large early release frequency |
05000390/FIN-2015004-03 | 2015Q4 | Watts Bar | Failure to Comply with Source Range Neutron Flux Channel Technical Specification Requiprements | |
05000424/FIN-2015007-02 | 2015Q3 | Vogtle | Failure to Identify and Repair a Degraded Fire Penetration Seal | Significance Determination Process Fire Protection Program Fire Watch |
05000335/FIN-2015003-04 | 2015Q3 | Saint Lucie | Failure to Follow Reactor Protection System Surveillance Procedure Resulting in Reactor Plant Trip | Significance Determination Process |
05000390/FIN-2015002-02 | 2015Q2 | Watts Bar | Failure to Track ApplicableTechnical Specification Action Statement for Residual Heat Removal System | |
05000269/FIN-2015002-01 | 2015Q2 | Oconee | Inadequate Design Inputs for PSW Testing and Engineering Evaluations | |
05000269/FIN-2015002-02 | 2015Q2 | Oconee | Inadequate Acceptance Criteria for PSW Pump Surveillance Testing | |
05000327/FIN-2015001-01 | 2015Q1 | Sequoyah | Failure to Follow Procedure Results in an Inadvertent Sprinkler Deluge in the Cable Spreading Room | Fire Protection Program |
05000324/FIN-2014005-02 | 2014Q4 | Brunswick | Failure to Follow Emergency Diesel Generator No. 3 Monthly Load Test Surveillance Procedure | Maintenance Rule Program |
05000250/FIN-2014005-01 | 2014Q4 | Turkey Point | Non-Compliance with HRA Entry Requirements | High Radiation Area Substantial potential for an overexposure |
05000364/FIN-2014009-01 | 2014Q3 | Farley | Installation of 1.5-hour UL Labeled Fire Door in a Required 3-hour Fire Barrier on Unit 2 | Fire Barrier Significance Determination Process Fire Protection Program Fire Watch |
05000424/FIN-2014004-04 | 2014Q3 | Vogtle | Failure to Correctly Implement a Chemical and Volume Control System Procedure for Reactor Water Makeup | Boric Acid Significance Determination Process |
05000321/FIN-2014004-03 | 2014Q3 | Hatch | Failure to Promptly Identify Malfunction of HPCI Exhaust Drain Pot Level Instrumentation | Significance Determination Process |
05000327/FIN-2014003-02 | 2014Q2 | Sequoyah | Failure to Comply with Entry requirements to a HRA | High Radiation Area Substantial potential for overexposure |
05000424/FIN-2014003-02 | 2014Q2 | Vogtle | Unauthorized Entry into a High Radiation Area | High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000321/FIN-2014002-03 | 2014Q1 | Hatch | Failure to Operate the Unit 2 Master Feedwater Controller In Accordance With Procedures | Internal Flooding |
05000338/FIN-2014002-01 | 2014Q1 | North Anna | Failure to Mark a Foreign Material Exclusion Closure Device Results in Non-Functionality of the Alternate AC Diesel | Significance Determination Process Foreign Material Exclusion Maintenance Rule Program |
05000259/FIN-2013011-04 | 2013Q2 | Browns Ferry | Two BFN Assistant Unit Operators Closed and Danger Tagged the A1 RHRSW Pump Manual Discharge Valve Instead of the Required A2 RHRSW Pump Discharge Valve | |
05000348/FIN-2013003-01 | 2013Q2 | Farley | Failure to Properly Maintain Procedures to Ensure Reactor Vessel Head Vent Path was Preserved | Significance Determination Process |
05000260/FIN-2013002-02 | 2013Q1 | Browns Ferry | Failure to Follow Operating Procedure Guidance Resulted in Unit 2 Reactor Scram |