05000293/FIN-2018003-012018Q3PilgrimFailure to Identify an Adverse Condition Associated with Elevated Standby Gas Treatment System Accumulator Leakage
05000219/FIN-2018410-032018Q2Oyster CreekSecurity
05000293/FIN-2018002-022018Q2PilgrimLoss of Secondary Containment Integrity due to Simultaneously Opened Airlock Doors
05000353/FIN-2017001-012017Q1LimerickInadequate Work Instructions for Staging of Equipment and Routing of Temporary Power Cables
05000334/FIN-2017403-012017Q1Beaver ValleySecurity
05000247/FIN-2016404-012016Q4Indian PointSecurity
05000352/FIN-2016001-032016Q1LimerickInadequate Work Staging and Housekeeping Walkdowns During PreOutage PreparationsInternal Flooding
Scaffolding
05000244/FIN-2016403-012016Q1GinnaSecurity
05000219/FIN-2015002-022015Q2Oyster CreekFailure Rates Exceed Twenty Percent for Annual Requalification Exam
05000412/FIN-2015002-022015Q2Beaver ValleyFailure to Perform Maintenance in accordance with Licensee Maintenance Process
05000247/FIN-2014403-022014Q4Indian PointSecurity
05000271/FIN-2014005-022014Q4Vermont YankeeMisclassification of Emergency Conditions Based on Radiological CriteriaSignificance Determination Process
05000354/FIN-2014003-012014Q2Hope CreekInadequate Procedural Guidance for Responding to an Internal Flooding Event in the HPCI and RCIC RoomsInternal Flooding
Reasonable doubt of operability
05000247/FIN-2012403-012012Q3Indian PointSecurity
05000271/FIN-2012004-022012Q3Vermont YankeeDedicated Operators Required for Operability Under Applied Administrative Controls Left Immediate Vicinity of Open ValvesSignificance Determination Process
Fuel cladding
05000334/FIN-2012004-012012Q3Beaver ValleyRemedial Examination Failure Rate Exceeds 10 PercentSignificance Determination Process
05000219/FIN-2012003-012012Q2Oyster CreekEntry into a non-conservative technical specification with both isolation condensers inoperable during power operation.
05000219/FIN-2012403-012012Q1Oyster CreekSecurity
05000317/FIN-2011004-042011Q3Calvert CliffsLack of Proficiency Evaluating Seismic Recorder Data
05000336/FIN-2011008-022011Q2MillstoneImproper Operation of Turbine Control Valves During Testing
05000271/FIN-2011403-012011Q1Vermont YankeeSecurity
05000334/FIN-2010005-032010Q4Beaver ValleyMaximum Differential Temperature Exceeded for Spray Nozzle during Pressurizer Heatup
05000289/FIN-2010007-022010Q1Three Mile IslandDeficient Design Change Implementation and Controls Caused Unfiltered Radioactivity Release to the EnvironmentSignificance Determination Process
05000334/FIN-2009005-022009Q4Beaver Valley
Catawba
Inadequate RHS Shutdown Procedure Results in Unusual Event Declaration.
05000219/FIN-2009003-032009Q2Oyster CreekImproper Solder Joint Causes Safety Related Station Battery Charger Failure
05000354/FIN-2009006-032009Q1Hope CreekFailure to Follow Procedures Contributes to Emergency Diesel Generator Inoperability (Section 4AO2.1.c.(3))
05000219/FIN-2008003-012008Q2Oyster CreekImproper Valve Reassembly Results in Instrument Air Transient
05000219/FIN-2008003-042008Q2Oyster CreekDiesel Driven Fire Pump Unavailable Due to Improper TestingSignificance Determination Process