Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000293/FIN-2018003-01 | 2018Q3 | Pilgrim | Failure to Identify an Adverse Condition Associated with Elevated Standby Gas Treatment System Accumulator Leakage | |
05000219/FIN-2018410-03 | 2018Q2 | Oyster Creek | Security | |
05000293/FIN-2018002-02 | 2018Q2 | Pilgrim | Loss of Secondary Containment Integrity due to Simultaneously Opened Airlock Doors | |
05000353/FIN-2017001-01 | 2017Q1 | Limerick | Inadequate Work Instructions for Staging of Equipment and Routing of Temporary Power Cables | |
05000334/FIN-2017403-01 | 2017Q1 | Beaver Valley | Security | |
05000247/FIN-2016404-01 | 2016Q4 | Indian Point | Security | |
05000352/FIN-2016001-03 | 2016Q1 | Limerick | Inadequate Work Staging and Housekeeping Walkdowns During PreOutage Preparations | Internal Flooding Scaffolding |
05000244/FIN-2016403-01 | 2016Q1 | Ginna | Security | |
05000219/FIN-2015002-02 | 2015Q2 | Oyster Creek | Failure Rates Exceed Twenty Percent for Annual Requalification Exam | |
05000412/FIN-2015002-02 | 2015Q2 | Beaver Valley | Failure to Perform Maintenance in accordance with Licensee Maintenance Process | |
05000247/FIN-2014403-02 | 2014Q4 | Indian Point | Security | |
05000271/FIN-2014005-02 | 2014Q4 | Vermont Yankee | Misclassification of Emergency Conditions Based on Radiological Criteria | Significance Determination Process |
05000354/FIN-2014003-01 | 2014Q2 | Hope Creek | Inadequate Procedural Guidance for Responding to an Internal Flooding Event in the HPCI and RCIC Rooms | Internal Flooding Reasonable doubt of operability |
05000247/FIN-2012403-01 | 2012Q3 | Indian Point | Security | |
05000271/FIN-2012004-02 | 2012Q3 | Vermont Yankee | Dedicated Operators Required for Operability Under Applied Administrative Controls Left Immediate Vicinity of Open Valves | Significance Determination Process Fuel cladding |
05000334/FIN-2012004-01 | 2012Q3 | Beaver Valley | Remedial Examination Failure Rate Exceeds 10 Percent | Significance Determination Process |
05000219/FIN-2012003-01 | 2012Q2 | Oyster Creek | Entry into a non-conservative technical specification with both isolation condensers inoperable during power operation. | |
05000219/FIN-2012403-01 | 2012Q1 | Oyster Creek | Security | |
05000317/FIN-2011004-04 | 2011Q3 | Calvert Cliffs | Lack of Proficiency Evaluating Seismic Recorder Data | |
05000336/FIN-2011008-02 | 2011Q2 | Millstone | Improper Operation of Turbine Control Valves During Testing | |
05000271/FIN-2011403-01 | 2011Q1 | Vermont Yankee | Security | |
05000334/FIN-2010005-03 | 2010Q4 | Beaver Valley | Maximum Differential Temperature Exceeded for Spray Nozzle during Pressurizer Heatup | |
05000289/FIN-2010007-02 | 2010Q1 | Three Mile Island | Deficient Design Change Implementation and Controls Caused Unfiltered Radioactivity Release to the Environment | Significance Determination Process |
05000334/FIN-2009005-02 | 2009Q4 | Beaver Valley Catawba | Inadequate RHS Shutdown Procedure Results in Unusual Event Declaration. | |
05000219/FIN-2009003-03 | 2009Q2 | Oyster Creek | Improper Solder Joint Causes Safety Related Station Battery Charger Failure | |
05000354/FIN-2009006-03 | 2009Q1 | Hope Creek | Failure to Follow Procedures Contributes to Emergency Diesel Generator Inoperability (Section 4AO2.1.c.(3)) | |
05000219/FIN-2008003-01 | 2008Q2 | Oyster Creek | Improper Valve Reassembly Results in Instrument Air Transient | |
05000219/FIN-2008003-04 | 2008Q2 | Oyster Creek | Diesel Driven Fire Pump Unavailable Due to Improper Testing | Significance Determination Process |