Semantic search

Jump to navigation Jump to search
 QuarterSiteTitle
05000440/FIN-2018010-012018Q3PerryFailure to Correctly Establish Maintenance/Replacement Frequencyfor the WeedTemperature Transmitters In Zone FB-7
05000331/FIN-2018011-012018Q2Duane ArnoldFailure to Translate Environmental Qualification Requirements into Maintenance Procedures/Instructions
05000275/FIN-2018010-012018Q2Diablo CanyonFailure to install conduit to environmentally qualified solenoid valves in a manner to prevent moisture intrusion and accumulation within the solenoid enclosure
05000324/FIN-2018011-032018Q2BrunswickPotential Unjustified Activation Energy for Rosemont Transmitters
05000324/FIN-2018011-022018Q2BrunswickFailure to Evaluate Effects of MOV Space Heaters on Qualified Life
05000324/FIN-2018011-012018Q2BrunswickFailure to Justify Qualified Life Extension of ASCO Solenoid Operated Valves
05000395/FIN-2018010-022018Q1SummerFailure to Verify the Seismic Qualification of Valcor Solenoid Operated Valve XVX06050A
05000395/FIN-2018010-012018Q1SummerFailure to Justify Activation Energy for Valcor SOV XVX06050A
05000395/FIN-2018010-032018Q1SummerInadequate Radiation Harsh Environmental Qualification of Reactor Building Spray Pump A
05000395/FIN-2018010-042018Q1SummerUnjustified Qualified Life for ASCO Valves
05000395/FIN-2018010-052018Q1SummerPotential High Radiation Dose Areas with Unqualified Components
05000395/FIN-2018010-062018Q1SummerPotential Unjustified Activation Energy for Barton Transmitters
05000327/FIN-2017008-012017Q4SequoyahUnjustified Qualified Life for Target Rock Power-Operated Relief Valves
05000352/FIN-2017007-012017Q4LimerickFailure to Document Technical Basis for Service Temperature Changes for Limitorque Motor Operated Valve Limit Switches
05000261/FIN-2017007-012017Q4RobinsonFailure to Correctly Determine Qualified Life
05000261/FIN-2017007-022017Q4RobinsonFailure to Perform Required O-ring Replacement to Maintain Qualification
05000261/FIN-2017007-032017Q4RobinsonFailure to Determine Most Severe Containment Spray pH
05000261/FIN-2017007-042017Q4RobinsonCrouse-Hinds Qualification and Life Extension
05000261/FIN-2017007-052017Q4RobinsonQuestions Regarding EQDP-0401 Method Used to Determine Activation Energy and Responsibility for Verification
05000261/FIN-2017007-062017Q4RobinsonPenetration F01 Submergence
05000261/FIN-2017007-072017Q4RobinsonJustification of Activation Energy of ASCO Solenoid Coil Assemblies
05000327/FIN-2017008-022017Q4SequoyahInadequate Qualification for Unit 1 Reactor Lower Compartment Cooler Motors
05000327/FIN-2017008-032017Q4SequoyahPotential Inadequate Use of Thermal Aging and the Arrhenius Methodology
05000327/FIN-2017008-042017Q4SequoyahPotential Inadequate Determination of Failure Modes for Qualified Life for Foxboro/Weed Instrument
05000327/FIN-2017008-052017Q4SequoyahPotential Inadequate Justification for Eliminating Preventative Maintenance for ASCO Valves
05000327/FIN-2017008-062017Q4SequoyahPotential Unjustified Qualified Life for ASCO Solenoid Operated Valves
05000425/FIN-2017009-012017Q4VogtleFailure to Install Drain Hole
05000336/FIN-2017007-012017Q3MillstoneFailure to Replace Auxiliary Feedwater Solenoid Valves within the Required Frequency
05000313/FIN-2017007-012017Q3Arkansas NuclearFailure to Promptly Identify and Correct an Inadequate Design Bases Calculation
05000482/FIN-2017007-012017Q2Wolf CreekFailure to Maintain Effectiveness of the Emergency Plan upon Loss of Containment High Radiation Monitoring
05000369/FIN-2017007-012017Q1Mcguire
McGuire
Failure to Translate Required Gasket Replacement Requirements into Limit Switch Maintenance Manual
05000237/FIN-2016009-012016Q3DresdenMain Steam Acoustic Safety/Relief Valve Monitoring Channel Calibration Not Performed
05000335/FIN-2016010-032016Q2Saint LucieFailure to Define, Justify, and Document Activation
05000335/FIN-2016010-022016Q2Saint LucieFailure to Implement Qualification Procedures and Methods in Accordance with IEEE 323-1974
05000335/FIN-2016010-012016Q2Saint LucieFailure to comply with TS requirements for CHRRMs
05000259/FIN-2016010-012016Q2Browns FerryFailure to Include Required Gasket Replacement in Limit Switch Surveillance Procedure