 QuarterSiteTitle
05000334/FIN-2018003-012018Q3Beaver ValleyInadequate Verification of Full Low Head Safety Injection Suction Piping
05000461/FIN-2018003-012018Q3ClintonFailure to Revise an Operability Evaluation When No Longer Meeting a Compensatory Measure
05000327/FIN-2018003-012018Q3SequoyahLicensee-Identified Violation
05000331/FIN-2018003-012018Q3Duane ArnoldLicensee-Identified Violation
05000249/FIN-2018003-012018Q3DresdenFailure to Follow Maintenance Procedures for Assembling Unit 3 HPCI Room Cooler Fan
05000282/FIN-2018003-012018Q3Prairie IslandFailure to Repair a D2 EDG Jacket Water Leak per the Leak Management Process
05000280/FIN-2018003-012018Q3SurryFailure to Control a Modification on the Containment Spray System
05000254/FIN-2018003-012018Q3Quad CitiesFailure to Maintain the Design Basis for Residual Heat Removal Torus Suction Valve
05000336/FIN-2018003-012018Q3MillstoneFailure to Assure that Safety-Related Service Water Piping Conformed to the Procurement Documents
05000348/FIN-2018002-062018Q2FarleyLicensee-Identified Violation
05000315/FIN-2018002-022018Q2CookLicensee-Identified Violation
05000266/FIN-2018002-022018Q2Point BeachUnanalyzed Condition for Tornado Generated Missiles
05000458/FIN-2018002-022018Q2River BendEnforcement Action (EA)-18-053: Enforcement Discretion for Tornado-Generated Missile Protection Noncompliances
05000286/FIN-2018002-012018Q2Indian PointReactor Pressure Boundary Leakage Due to Weld Failure in Reactor Vessel Head Penetration #3
05000387/FIN-2018002-012018Q2SusquehannaControl Structure Chiller Inoperability Due to Identified Refrigerant Leaks Not Corrected
05000266/FIN-2018002-012018Q2Point BeachPrimary Auxiliary Building Floor Plug Removal Creates Unanalyzed Flood Path
05000250/FIN-2018002-012018Q2Turkey PointUnit 3 Emergency Diesel Generator (EDG) Operability during Fuel Oil Transfer to Unit 4 Fuel Oil Storage Tanks
05000390/FIN-2018002-012018Q2Watts BarInadequate Procedure Results in Exceeding the Design Pressure of the RHR Piping
05000456/FIN-2018002-022018Q2BraidwoodWork Instruction Error Results in Reactor Coolant System Pressure Transient
05000341/FIN-2018002-032018Q2FermiFailure to Adequately Evaluate the Operability of Emergency Diesel Generator11
05000413/FIN-2018002-022018Q2CatawbaFailure to Promptly Identify and Correct a Condition Adverse to Quality
05000397/FIN-2018002-012018Q2ColumbiaFailure to Maintain Configuration Control in the Diesel Generator 2 Diesel Cooling Water System
05000458/FIN-2018012-052018Q2River BendFailure to Develop an Adequate Operational Decision-Making Issue for Compensatory Measures Related to a Degraded Condition of the Feedwater System Sparger Nozzles
05000461/FIN-2018002-012018Q2ClintonFailure to Perform an Operability Determination for Suspected Leakage Past Shutdown Service Water Isolation Valves
05000237/FIN-2018001-012018Q1DresdenEnforcement Action: EA18016: Unanalyzed Condition for Tornado Missiles
05000373/FIN-2018001-012018Q1LaSallePost-Maintenance Testing Failed to Demonstrate Testable Check Valve Function
05000331/FIN-2018001-012018Q1Duane ArnoldFailure to Perform Nondestructive Examination of Main Steam Isolation Valve 4415 Following Machining of Valve Bore
05000482/FIN-2018001-012018Q1Wolf CreekInadequate Functionality Assessment Associated with the Emergency Excess Letdown Flowpath
05000364/FIN-2018001-012018Q1FarleyFailure to conduct an In-Service Testing (IST)surveillance on the 2B charging pump discharge check valve
05000327/FIN-2018001-012018Q1SequoyahEssential Raw Cooling Water Pumps Inoperable due to Frozen Motor Bearing Cooling Lines
05000315/FIN-2018001-012018Q1CookFailure of Unit 1 Turbine Driven Auxiliary Feedwater Pump to Reach Rated Speed
05000390/FIN-2018001-012018Q1Watts BarMisapplication of Technical Specification Limiting Condition for Operation 3.0.6
05000255/FIN-2018001-022018Q1PalisadesLicensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance
05000373/FIN-2018001-032018Q1LaSalleEnforcement Action (EA) 18035: Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance
05000266/FIN-2018001-042018Q1Point BeachEnforcement Action: EA18030: Unanalyzed Condition for Tornado Generated Missiles
05000254/FIN-2018001-042018Q1Quad CitiesEnforcement Action: EA18021: EDG Non-conformance for Tornado Missiles (EGM 15002)
05000413/FIN-2017004-012017Q4CatawbaInadequate Testing of Fuel Pool Ventilation Radiation Monitors
05000260/FIN-2017004-012017Q4Browns FerryInadequate Determination of Operability for the HPCI System
05000390/FIN-2017004-012017Q4Watts BarMisapplication of Technical Specification Limiting Condition for Operation 3.0.6
05000280/FIN-2017004-022017Q4SurryFailure to Identify a Non-Functional Flood Control Barrier
05000410/FIN-2017004-032017Q4Nine Mile PointInadequate Operability Determination forImpairedInternal Flood Barrier
05000366/FIN-2017004-012017Q4HatchContinuous Fire Watch or Compensatory Measures Not Established per FHA
05000425/FIN-2017004-012017Q4VogtleFailure to Implement and Establish Appropriate Work Instructions for PMT of Namco Limit Switch on 2HV-8920
05000296/FIN-2017004-022017Q4Browns FerryFailure to Perform an IDO without delay for 3A EDG after Observing Indications of a Degraded Condition
05000373/FIN-2017004-032017Q4LaSallePrimary Containment Structure, Suppression Pool Columns, Downcomer Vent and Downcomer Vent Bracing Did Not Meet Seismic Category I Requirements
05000373/FIN-2017004-022017Q4LaSalleFailure to Establish Brazing Repair Procedures with Appropriate Acceptance Criteria
05000413/FIN-2017004-022017Q4CatawbaFailure to Perform a 10 CFR 50.59 Evaluation for a Change to Engineering Safety Features Actuation Periodic Test.
05000456/FIN-2017008-012017Q4BraidwoodFailure to Prevent Secondary Missiles Following a Postulated HELB
05000454/FIN-2017010-012017Q4ByronFailure to Prevent Secondary Missiles Following a Postulated HELB
05000341/FIN-2017003-012017Q3FermiFailure to Satisfy 10 CFR 50.73 Reporting Requirements for Primary Containment Isolation Valve Actuations