05000334/FIN-2018003-01 | 2018Q3 | Beaver Valley | Inadequate Verification of Full Low Head Safety Injection Suction Piping |
05000461/FIN-2018003-01 | 2018Q3 | Clinton | Failure to Revise an Operability Evaluation When No Longer Meeting a Compensatory Measure |
05000327/FIN-2018003-01 | 2018Q3 | Sequoyah | Licensee-Identified Violation |
05000331/FIN-2018003-01 | 2018Q3 | Duane Arnold | Licensee-Identified Violation |
05000249/FIN-2018003-01 | 2018Q3 | Dresden | Failure to Follow Maintenance Procedures for Assembling Unit 3 HPCI Room Cooler Fan |
05000282/FIN-2018003-01 | 2018Q3 | Prairie Island | Failure to Repair a D2 EDG Jacket Water Leak per the Leak Management Process |
05000280/FIN-2018003-01 | 2018Q3 | Surry | Failure to Control a Modification on the Containment Spray System |
05000254/FIN-2018003-01 | 2018Q3 | Quad Cities | Failure to Maintain the Design Basis for Residual Heat Removal Torus Suction Valve |
05000336/FIN-2018003-01 | 2018Q3 | Millstone | Failure to Assure that Safety-Related Service Water Piping Conformed to the Procurement Documents |
05000348/FIN-2018002-06 | 2018Q2 | Farley | Licensee-Identified Violation |
05000315/FIN-2018002-02 | 2018Q2 | Cook | Licensee-Identified Violation |
05000266/FIN-2018002-02 | 2018Q2 | Point Beach | Unanalyzed Condition for Tornado Generated Missiles |
05000458/FIN-2018002-02 | 2018Q2 | River Bend | Enforcement Action (EA)-18-053: Enforcement Discretion for Tornado-Generated Missile Protection Noncompliances |
05000286/FIN-2018002-01 | 2018Q2 | Indian Point | Reactor Pressure Boundary Leakage Due to Weld Failure in Reactor Vessel Head Penetration #3 |
05000387/FIN-2018002-01 | 2018Q2 | Susquehanna | Control Structure Chiller Inoperability Due to Identified Refrigerant Leaks Not Corrected |
05000266/FIN-2018002-01 | 2018Q2 | Point Beach | Primary Auxiliary Building Floor Plug Removal Creates Unanalyzed Flood Path |
05000250/FIN-2018002-01 | 2018Q2 | Turkey Point | Unit 3 Emergency Diesel Generator (EDG) Operability during Fuel Oil Transfer to Unit 4 Fuel Oil Storage Tanks |
05000390/FIN-2018002-01 | 2018Q2 | Watts Bar | Inadequate Procedure Results in Exceeding the Design Pressure of the RHR Piping |
05000456/FIN-2018002-02 | 2018Q2 | Braidwood | Work Instruction Error Results in Reactor Coolant System Pressure Transient |
05000341/FIN-2018002-03 | 2018Q2 | Fermi | Failure to Adequately Evaluate the Operability of Emergency Diesel Generator11 |
05000413/FIN-2018002-02 | 2018Q2 | Catawba | Failure to Promptly Identify and Correct a Condition Adverse to Quality |
05000397/FIN-2018002-01 | 2018Q2 | Columbia | Failure to Maintain Configuration Control in the Diesel Generator 2 Diesel Cooling Water System |
05000458/FIN-2018012-05 | 2018Q2 | River Bend | Failure to Develop an Adequate Operational Decision-Making Issue for Compensatory Measures Related to a Degraded Condition of the Feedwater System Sparger Nozzles |
05000461/FIN-2018002-01 | 2018Q2 | Clinton | Failure to Perform an Operability Determination for Suspected Leakage Past Shutdown Service Water Isolation Valves |
05000237/FIN-2018001-01 | 2018Q1 | Dresden | Enforcement Action: EA18016: Unanalyzed Condition for Tornado Missiles |
05000373/FIN-2018001-01 | 2018Q1 | LaSalle | Post-Maintenance Testing Failed to Demonstrate Testable Check Valve Function |
05000331/FIN-2018001-01 | 2018Q1 | Duane Arnold | Failure to Perform Nondestructive Examination of Main Steam Isolation Valve 4415 Following Machining of Valve Bore |
05000482/FIN-2018001-01 | 2018Q1 | Wolf Creek | Inadequate Functionality Assessment Associated with the Emergency Excess Letdown Flowpath |
05000364/FIN-2018001-01 | 2018Q1 | Farley | Failure to conduct an In-Service Testing (IST)surveillance on the 2B charging pump discharge check valve |
05000327/FIN-2018001-01 | 2018Q1 | Sequoyah | Essential Raw Cooling Water Pumps Inoperable due to Frozen Motor Bearing Cooling Lines |
05000315/FIN-2018001-01 | 2018Q1 | Cook | Failure of Unit 1 Turbine Driven Auxiliary Feedwater Pump to Reach Rated Speed |
05000390/FIN-2018001-01 | 2018Q1 | Watts Bar | Misapplication of Technical Specification Limiting Condition for Operation 3.0.6 |
05000255/FIN-2018001-02 | 2018Q1 | Palisades | Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance |
05000373/FIN-2018001-03 | 2018Q1 | LaSalle | Enforcement Action (EA) 18035: Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance |
05000266/FIN-2018001-04 | 2018Q1 | Point Beach | Enforcement Action: EA18030: Unanalyzed Condition for Tornado Generated Missiles |
05000254/FIN-2018001-04 | 2018Q1 | Quad Cities | Enforcement Action: EA18021: EDG Non-conformance for Tornado Missiles (EGM 15002) |
05000413/FIN-2017004-01 | 2017Q4 | Catawba | Inadequate Testing of Fuel Pool Ventilation Radiation Monitors |
05000260/FIN-2017004-01 | 2017Q4 | Browns Ferry | Inadequate Determination of Operability for the HPCI System |
05000390/FIN-2017004-01 | 2017Q4 | Watts Bar | Misapplication of Technical Specification Limiting Condition for Operation 3.0.6 |
05000280/FIN-2017004-02 | 2017Q4 | Surry | Failure to Identify a Non-Functional Flood Control Barrier |
05000410/FIN-2017004-03 | 2017Q4 | Nine Mile Point | Inadequate Operability Determination forImpairedInternal Flood Barrier |
05000366/FIN-2017004-01 | 2017Q4 | Hatch | Continuous Fire Watch or Compensatory Measures Not Established per FHA |
05000425/FIN-2017004-01 | 2017Q4 | Vogtle | Failure to Implement and Establish Appropriate Work Instructions for PMT of Namco Limit Switch on 2HV-8920 |
05000296/FIN-2017004-02 | 2017Q4 | Browns Ferry | Failure to Perform an IDO without delay for 3A EDG after Observing Indications of a Degraded Condition |
05000373/FIN-2017004-03 | 2017Q4 | LaSalle | Primary Containment Structure, Suppression Pool Columns, Downcomer Vent and Downcomer Vent Bracing Did Not Meet Seismic Category I Requirements |
05000373/FIN-2017004-02 | 2017Q4 | LaSalle | Failure to Establish Brazing Repair Procedures with Appropriate Acceptance Criteria |
05000413/FIN-2017004-02 | 2017Q4 | Catawba | Failure to Perform a 10 CFR 50.59 Evaluation for a Change to Engineering Safety Features Actuation Periodic Test. |
05000456/FIN-2017008-01 | 2017Q4 | Braidwood | Failure to Prevent Secondary Missiles Following a Postulated HELB |
05000454/FIN-2017010-01 | 2017Q4 | Byron | Failure to Prevent Secondary Missiles Following a Postulated HELB |
05000341/FIN-2017003-01 | 2017Q3 | Fermi | Failure to Satisfy 10 CFR 50.73 Reporting Requirements for Primary Containment Isolation Valve Actuations |