Semantic search
Jump to navigation
Jump to search
- 05000440/FIN-2017403-01 (Site: Perry, Quarter: 2017Q1, Title: Security)
- 05000289/FIN-2017008-01 (Site: Three Mile Island, Quarter: 2017Q1, Title: Failure to Correct Deficiency in Implementing Controls for Pre-Staging Material in the Reactor Building)
- 05000247/FIN-2016004-04 (Site: Indian Point, Quarter: 2016Q4, Title: Failure to Follow RPS Logic Train B Actuation Logic Test)
- 05000395/FIN-2016010-02 (Site: Summer, Quarter: 2016Q4, Title: Failure to identify unsealed cabinet Specified by NFPA 805 Section 3.3.1.2(1))
- 05000456/FIN-2016004-01 (Site: Braidwood, Quarter: 2016Q4, Title: Inadequate Control of Welding During FW System Pipe Replacement)
- 05000373/FIN-2016004-04 (Site: LaSalle, Quarter: 2016Q4, Title: Block Wall Evaluations Not Consistent with As-Built Condition)
- 05000255/FIN-2016004-03 (Site: Palisades, Quarter: 2016Q4, Title: Failure to Translate Design Analysis Stack-up Configuration into Specifications, Drawings, Procedures, and Instructions)
- 05000336/FIN-2016004-02 (Site: Millstone, Quarter: 2016Q4, Title: Failure to Maintain Licensed Operator Examination Integrity)
- 05000348/FIN-2016003-03 (Site: Farley, Quarter: 2016Q3, Title: Failure to Perform Adequate Preventive maintenance on Circuit Breaker Cell Switch)
- 05000354/FIN-2016404-02 (Site: Hope Creek, Quarter: 2016Q3, Title: Security)