Issue date | Title | Topic | |
---|---|---|---|
0CAN012402, Emergency Plan Revision 50 | 17 January 2024 | Emergency Plan Revision 50 | |
0CAN092301, Emergency Plan Implementing Procedure Revision | 5 September 2023 | Emergency Plan Implementing Procedure Revision | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Grace period Unidentified leakage |
ML22167A124 | 16 June 2022 | Emergency Plan Implementing Procedure Revision | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
0CAN012001, Submittal of Emergency Plan and Emergency Plan Implementing Procedure | 15 January 2020 | Submittal of Emergency Plan and Emergency Plan Implementing Procedure | |
ML18283A775 | 4 October 2018 | Attachments 1 & 2: Summary of Changes to ANO Emergency Plan Implementing Document and Procedure OP-1903.010, Rev. 57, Emergency Action Level Classification | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
0CAN101801, Submittal of Emergency Plan Implementing Procedure OP-1903.010, Rev. 57 | 4 October 2018 | Submittal of Emergency Plan Implementing Procedure OP-1903.010, Rev. 57 | |
0CAN061802, Emergency Plan Implementing Procedure | 28 June 2018 | Emergency Plan Implementing Procedure | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
0CAN081702, Submittal of Emergency Plan Implementing Procedure, OP-1903.010, Emergency Action Level Classification | 14 August 2017 | Submittal of Emergency Plan Implementing Procedure, OP-1903.010, Emergency Action Level Classification | |
0CAN121102, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme | 1 December 2011 | Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme | Safe Shutdown Boric Acid High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Failure to Scram |
0CAN071102, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme | 18 July 2011 | Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme | Safe Shutdown Boric Acid High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Failure to Scram |
NEI 99-01, Arkansas Nuclear One Units 1 & 2, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme | 18 July 2011 | Arkansas Nuclear One Units 1 & 2, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme | Safe Shutdown Boric Acid High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage |
ML041260186 | 20 April 2004 | Document Update Notification for Document No. OP-1903.023, Personnel Emergency. | High Radiation Area |
ML041260189 | 19 April 2004 | Change 007-03-0 to Procedure OP-1903.064, Emergency Response Facility - Control Room | |
ML040910358 | 24 March 2004 | OP-1903.065, Change 016-03-0 to Emergency Response Facility Technical Support Center (TSC) | Safe Shutdown Health Physics Network Temporary Modification Severe Accident Management Guideline Overexposure |
ML040910356 | 23 March 2004 | OP-1903.066, Change 013-01-0, Emergency Response Facility - Operational Support Center (Osc). | Health Physics Network |
ML040910352 | 23 March 2004 | OP-1903.067, Change 018-00-0, Emergency Response Facility - Emergency Operations Facility (Eof). | Health Physics Network Severe Accident Management Guideline Overexposure |
ML040770049 | 3 March 2004 | Arkansas, Units 1 and 2 - Change No. 034-04-0 to OP-1903-060, Emergency Supplies & Equipment. | High Radiation Area Met Tower |
ML040140269 | 23 December 2003 | Revised EPIP 1903.065, Change 016-02-0, Emergency Response Facility Technical Support Center. | Safe Shutdown Health Physics Network Temporary Modification Severe Accident Management Guideline Overexposure |
ML033510534 | 3 December 2003 | ANO, Units 1 and 2 - Change No. 023-01-0 to OP-1903.044, Administration and Maintenance of the Emergency Plan and Implementing Procedures. | |
ML033230387 | 4 November 2003 | Change 027-01-0 to OP-1903.011, Emergency Response/Notifications | Power change |
ML033180155 | 30 October 2003 | Change No. 006-00-0 to Procedure OP-1903.068, Emergency Response Facility - Emergency News Center Enc. | |
ML032690810 | 12 September 2003 | Change No. 023-00-0 to OP-1903.004, Admin. and Maintenance of the Emergency Plan & Implementing Procedures. | |
ML032250672 | 7 August 2003 | Document No. OP-1903.023, Change No. 034-02-0, Personnel Emergency. | High Radiation Area |
ML032180018 | 31 July 2003 | Change 037-02-0 to OP-1903.010, Emergency Action Level Classification | High winds Grab sample Earthquake Fuel cladding Power change |
ML031970647 | 9 July 2003 | Change No. 016-02-0 to OP-1903.067, Emergency Response Facility - Emergency Operations Facility (EOF) | Health Physics Network Severe Accident Management Guideline Overexposure |
ML031970463 | 9 July 2003 | Emergency Response Facility Control Room, Change 007-02-0 to OP-1903.064 | |
ML031970436 | 9 July 2003 | Arkansas, Units 1 and 2, Noram Natural Gas Line Rupture | |
ML031900055 | 1 July 2003 | Admin. & Maintenance of the Emergency Plan & Implementing Procedures, Change 022-04-0, Procedure 1903.004 | |
ML031690502 | 12 June 2003 | Emergency Response Facility Technical Support Center (TSC) | Safe Shutdown Health Physics Network Temporary Modification Severe Accident Management Guideline Overexposure |
ML031611095 | 3 June 2003 | Logistical Support | |
ML031611091 | 3 June 2003 | EOF Radiological Controls | |
ML031611087 | 3 June 2003 | Organization and Use of Emergency Plan Implementing Procedures | |
ML031611084 | 3 June 2003 | Assignment of Personnel to the Emergency Response Organization | |
ML031610847 | 3 June 2003 | Personnel Emergency | High Radiation Area |
ML031610843 | 3 June 2003 | Emergency Radiological Controls | Health Physics Network High Radiation Area Deep Dose Equivalent |
ML031260731 | 1 May 2003 | Transmittal of Emergency Plan Implementing Procedure OP-1903.010, Emergency Action Level Classification. | High winds Grab sample Earthquake Fuel cladding Power change |
ML030990096 | 27 March 2003 | Arkansas, Emergency Response Facility Technical Support Center (Tsc), Change No. 016-00-0 | Safe Shutdown Health Physics Network Temporary Modification Severe Accident Management Guideline Fire Protection Program Overexposure |
ML030990024 | 27 March 2003 | Arkansas, Emergency Response Facility - Operational Support Center (OSC) | |
ML030980713 | 27 March 2003 | Arkansas, Emergency Response Facility - Emergency Operations Facility (EOF) | Health Physics Network Severe Accident Management Guideline Overexposure |
ML030980501 | 27 March 2003 | Change 008-02-0 to Document OP-1905.003, Rad Protection Requirements for Post-Accident Sampling of Rc. | Fuel cladding |
ML030840740 | 13 March 2003 | Change 027-00-0 to Document OP-1903.011, Emergency Response/Notifications. | Power change |
ML030550114 | 12 February 2003 | Change No. 034-00-0 to OP-1903.023, Personnel Emergency | High Radiation Area |
ML030550199 | 12 February 2003 | OP-1903.023, Personnel Emergency, Change 034-00-0 | High Radiation Area |
ML022740439 | 18 September 2002 | Arkansas Units 1 & 2 Emergency Response Facility - Emergency Operations Facility (EOF) | Health Physics Network Severe Accident Management Guideline Overexposure |
ML022060222 | 17 July 2002 | Procedure 1903.060, Emergency Supplies & Equipment | High Radiation Area Met Tower |
ML022000125 | 10 July 2002 | Arkansas Units 1 & 2 Rad Protection Requirements for Post-Accident Sampling of Rc, Revision No. 008-01-0 | |
ML021980417 | 5 July 2002 | 37-00-0, Change AP-37 to EPIP OP-1903.010, Emergency Action Level Classification | High winds Grab sample Earthquake Fuel cladding Power change |
ML021980212 | 5 July 2002 | Arkansas Units 1 & 2 Rad Protection Requirements for Post Accident Sampling of Rc | Fuel cladding |
ML021550439 | 14 May 2002 | Transmittal of OP-1903.011, Revision 026-04-0, Change No. PC-04, Emergency Response/Notifications. | |
ML021330545 | 2 May 2002 | Transmittal of OP-1903.010, Revision No. 036-05-0, Change No. PC-05 to Emergency Action Level Classification. | High winds Grab sample Earthquake Fuel cladding Power change |