Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleTopic
ENS 57036Browns Ferry19 March 2024 15:30:00High Pressure Coolant Injection Isolation
ENS 56990Browns Ferry24 February 2024 08:19:00Automatic Start of Emergency Diesel Generator
ENS 56971Farley16 February 2024 11:34:00Manual Reactor Trip and Automatic Actuation of Auxiliary Feedwater System
ENS 56941Browns Ferry1 February 2024 18:17:00Offsite Notification - Workplace Injury
ENS 56852Farley14 November 2023 16:41:00Manual Reactor Trip
ENS 56784Farley10 October 2023 00:10:00FITNESS-FOR-DUTY ViolationFitness for Duty
ENS 56531Browns Ferry20 May 2023 08:15:00Automatic Reactor Scram
ENS 56505Browns Ferry5 May 2023 01:34:00Fitness for Duty ReportFitness for Duty
ENS 56411Browns Ferry15 March 2023 03:57:00Reactor Coolant System (RCS) Boundary Degraded Condition
ENS 56385Browns Ferry2 March 2023 19:12:00Offsite Notification
ENS 56371Browns Ferry18 February 2023 10:39:00Degraded Condition
ENS 56329Farley1 February 2023 15:56:00Automatic Reactor Trip Due and Automatic Actuation of Auxiliary Feedwater System
ENS 56321Browns Ferry24 January 2023 07:21:00High Pressure Coolant Injection InoperableTime of Discovery
ENS 56257Browns Ferry3 December 2022 16:00:00Degraded Condition Discovered on Shutdown Cooling Test Line
ENS 56168Browns Ferry18 October 2022 19:40:00Standby Liquid Control Inoperable
ENS 56112Farley17 September 2022 03:57:00Fitness for Duty (FFD) ReportFitness for Duty
ENS 56028Farley3 August 2022 17:58:00Automatic Reactor Trip Due to Loss of Power to START-UP Transformer
ENS 55992Browns Ferry12 July 2022 14:17:00High Pressure Coolant Injection Inoperable
ENS 55818Browns Ferry2 April 2022 18:45:00Unusual Event Declared Due to a Fire at the 3B Reactor Feedwater Pump
ENS 55706Browns Ferry16 January 2022 05:20:00Degraded Condition Discovered on Shutdown Cooling Test Line
ENS 55660Browns Ferry20 October 2021 13:05:00Invalid Actuation of a General Containment Isolation Signal Affecting More than One SystemReactor Vessel Water Level
Half scram
ENS 55490Farley24 September 2021 05:00:00General Electric Hitachi Trip Units Rivets Popping Off
ENS 55462Farley15 September 2021 11:58:00Offsite Notification Due to Employee FatalityFatality
ENS 55365Farley20 July 2021 14:52:00Fitness for Duty ReportFitness for Duty
ENS 55200Browns Ferry19 April 2021 23:10:00Fitness-For-Duty Report - Employee Supervisor Confirmed Positive for Alcohol
ENS 55287Browns Ferry1 April 2021 18:02:0060-Day Telephonic Notification of Invalid Actuation of a General Containment Isolation Signal Affecting More than One SystemReactor Vessel Water Level
Half scram
ENS 54983Browns Ferry5 November 2020 03:50:00High Pressure Coolant Injection InoperableTime of Discovery
ENS 54932Browns Ferry6 August 2020 22:49:0060-Day Optional Telephonic Notification of an Invalid Actuation of a General Containment Isolation Signal Affecting More than One System
ENS 54931Browns Ferry6 August 2020 06:28:0060-Day Optional Telephonic Notification of an Invalid Specified System ActuationUltimate heat sink
ENS 54795Browns Ferry21 July 2020 09:35:00Biofouling of Intake Structure Leads to Manual Reactor Scram of Unit 1Biofouling
ENS 54794Browns Ferry20 July 2020 18:25:00Biofouling of Intake Structure Leads to Manual Reactor Scram of Unit 2 and Downpower of Units 1 & 3Biofouling
Downpower
ENS 54709Browns Ferry16 March 2020 06:02:00Invalid Specified System Actuation
ENS 54697Browns Ferry9 March 2020 01:21:00Invalid Actuation of a General Containment Isolation Signal Affecting More than One SystemReactor Vessel Water Level
ENS 54559Browns Ferry3 March 2020 10:16:00Emergency Diesel Generator Actuation
ENS 54382Browns Ferry12 November 2019 12:00:00Emergency Operations Facility Out of Service
ENS 54320Farley10 October 2019 04:40:00
ENS 54302Browns Ferry1 October 2019 08:07:00Automatic Reactor Scram During Reactor Startup
ENS 54287Farley21 September 2019 13:00:00Manual Trip Due to Reactor Coolant Pump Vibration Alarm
ENS 54278Browns Ferry13 September 2019 09:27:00En Revision Imported Date 9/17/2019
ENS 54266Browns Ferry11 September 2019 00:34:00Unanalyzed Condition Due to Lightning StrikeSafe Shutdown
Unanalyzed Condition
ENS 54332Browns Ferry20 August 2019 16:33:0060-Day Optional Telephonic Notification of Invalid Specified System ActuationReactor Vessel Water Level
ENS 54300Browns Ferry31 July 2019 21:50:0060-Day Optional Telephonic Notification Due to an Invalid Actuation of a Containment Isolation Signal
ENS 54162Browns Ferry12 July 2019 21:40:00Invalid Auto Isolation Signal of High Pressure Coolant InjectionTime of Discovery
ENS 54040Farley1 May 2019 21:43:00En Revision Imported Date 5/9/2019
ENS 54002Farley16 April 2019 04:55:00Offsite Notification - on Site Fataility
ENS 53959Browns Ferry26 March 2019 15:30:00Report of Degraded Condition Due to Leaking Valve
ENS 53942Browns Ferry17 March 2019 12:35:00En Revision Imported Date 4/24/2019Time of Discovery
Past operability
ENS 53922Browns Ferry10 March 2019 05:12:00Notice of Unusual Event Due to Loss of Offsite Power
ENS 53923Browns Ferry10 March 2019 04:59:00Automatic Scram Resulting in Rps and Eccs Actuation
ENS 53918Browns Ferry8 March 2019 17:13:00Offsite Notification for Oil Spill Into U.S. Waters