 Issue dateTitleTopic
ML23270B99329 September 2023Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary
ML23142A10624 May 2023Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035Reactor Vessel Water Level
ML22073A0957 April 2022Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2021-LLR-0084) (NON-PROPRIETARY)Nondestructive Examination
Finite Element Analysis
Liquid penetrant
ML21294A06728 October 2021Inservice Testing Program Relief Request VRR-GGNS-2021-1, Alternative Request for Pressure Isolation Valve Testing FrequencyIncorporated by reference
Power-Operated Valves
ML21293A09628 October 2021Relief ANO2-R&R-012 Concerning Proposed Alternative for Repair of Reactor Vessel Closure Head Penetration 46
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code
ML21258A40821 September 2021Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project GuidelinesAging Management
EVT-1
ML21168A0569 July 2021Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel CodePressure Boundary Leakage
ML21118B03919 May 2021Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel CodeNon-Destructive Examination
Probabilistic Risk Assessment
ML21054A33024 February 2021Approval of Alternative IP3-ISI-RR-16 to American Society of Mechanical Engineers Code Case N-513-4 Inspection RequirementTime of Discovery
Nondestructive Examination
VT-2
Through-Wall Leak
ML20365A00119 January 2021Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration NozzlesDissimilar Metal Weld
ML20282A76416 October 2020Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant - Relief Request 5-8 for Alternate Repair of Reactor Closure Head Penetration Nozzles
ML20275A3431 October 2020Verbal Authorization for Proposed Alternative (RR 5-8) Reactor Vessel Closure Head Penetration Repairs
ML20272A16630 September 2020Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program,
ML20267A38723 September 2020Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations
ML20267A38823 September 2020Attachment 1 - Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head PenetrationsNondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)12 August 2020Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)Nondestructive Examination
Incorporated by reference
ML20121A1936 May 2020Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water ValvesIncorporated by reference
ML20119A07329 April 2020Withdrawal of Requested Alternatives for the Fifth 10-Year Interval Inservice Testing of Service Water Pumps and Visual Examination of Snubbers
ML20083J96826 March 2020Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping
ML20022A25828 January 2020Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume ControlWeld Overlay
Liquid penetrant
ML20002A02013 January 2020Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control SystemWeld Overlay
Liquid penetrant
ML19254A60319 September 2019Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1
ML19247B1979 September 2019Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination
ML19232A02527 August 2019Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement ActivitiesWeld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping25 July 2019Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary PipingVT-2
W3F1-2019-0052, CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2)18 July 2019CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2)Boric Acid
Weld Overlay
Probabilistic Risk Assessment
Operating Basis Earthquake
Liquid penetrant
Through-Wall Leak
ML19184A55415 July 2019Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
ML19156A40011 June 2019Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME CodeIncorporated by reference
ML19039A14925 February 2019Issuance of Relief Request IP3-ISI-RR-14 Alternative Examination Required by ASME Code Case N-724-4Incorporated by reference
Dissimilar Metal Weld
DM weld
CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 131 January 2019Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Dissimilar Metal Weld
RBG-47913, Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021)30 November 2018Request for Alternative in Accordance with 10 CFR 50.55a(g)(5)(iii) Proposed Alternative to CFR 50.55a Examination Requirements for Third Interval Volumetric Exams (RBS-ISI-021)VT-2
Pressure Boundary Leakage
W3F1-2018-0065, Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-03230 November 2018Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-032VT-2
Pressure Boundary Leakage
ML18310A01316 November 2018Relief from the Requirements of the ASME Code to Use Boiling Water Reactor Vessel Internals Guidelines as an AlternativeVT-2
Incorporated by reference
Fuel cladding
EVT-1
ML18299A2737 November 2018Request for Relief from Requirements of Asme Code RBS-ISI-016 from the Requirements of the ASME Code for Pressure Retaining Welds in Control Rod Housings (EPID-L-2018-LLR-0042)VT-2
Incorporated by reference
Liquid penetrant
ML18251A00418 September 2018Safety Evaluation for Relief Request IP3-ISI-RR-11, RR-12, RR-15 Approval of Alternative Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections (EPID: L-2017-LLR-0124,0127)Probabilistic Risk Assessment
Large early release frequency
DM weld
ML18193B03018 July 2018Safety Evaluation for Relief Request IP3-ISI-RR-13 Fourth Ten-year Inservice Inspection Interval ExtensionNon-Destructive Examination
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Through-Wall Leak
Through-Wall Leakage
1CAN041801, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period23 April 2018Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period
ML18099A3739 April 201804/09/2018 E-mail from R. Guzman to R. Walpole, Verbal Authorization for Relief Request IP2-ISI-RR-06
ML18059A1566 March 2018Safety Evaluation for Relief Request IP2-ISI-RR-05 Alternative Examination Volume Required by ASME Code Case N-729-4Locked High Radiation Area
ML18005A06623 January 2018Safety Evaluation of Relief Requests ISI-RR-20, ISI-RR-21, and ISI-RR-22 Regarding the Fourth 10-Year Interval of the Inservice Inspection ProgramVT-2
Incorporated by reference
Pressure Boundary Leakage
ML17341A12011 December 2017Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049)Incorporated by reference
ML17328A88229 November 2017Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47)Boric Acid
Power-Operated Valves
Grace period
CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 117 November 2017Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1Nondestructive Examination
Finite Element Analysis
Through-Wall Leak
ML17285A79430 October 2017Grand Gulf Nuclear Station, Unit 1 - Relief Request GG-ISI-021 Proposing An Alternative For Fourth Ten Year Inservice Inspection Program (CAC NO. MF9752; EPID L-2017-LLR-0031)
ML21067A4987 September 2017Relief Request No. RR 5-4 Proposed Alternative, Weld Reference SystemIncorporated by reference
Scaffolding
ML17235A53331 August 2017Relief Request GG-ISI-022 to Allow Use of Later Editions and Addenda of American Society of Mechanical Engineers Code for Inservice InspectionVT-2
Incorporated by reference
Through-Wall Leak
ML17194A80714 August 2017Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML17174B14412 July 2017Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME CodeNondestructive Examination
Incorporated by reference
Dissimilar Metal Weld