 Issue dateTitleTopic
ML20203F02126 November 1997Technical Evaluation Rept for Calvert Cliffs Nuclear Power Plant,Units 1 & 2,Baltimore Gas & Electric Co, Third 10-Yr Interval Pump & Valve Inservice Testing ProgramSafe Shutdown
Boric Acid
Cold shutdown justification
ML20135F94928 February 1997Experiments to Investigate Direct Containment Heating Phenomena with Scaled Models of the Calvert Cliffs Nuclear Power PlantGrab sample
Finite Element Analysis
ML20106J14831 January 1996Technical Evaluation Rept of Calvert Cliffs Individual Plant Exam Back-End Submittal, Final ReptInternal Flooding
Probabilistic Risk Assessment
Severe Accident Management Guideline
ML20106J13816 January 1996Technical Evaluation Rept on IPE Front End AnalysisShutdown Margin
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML20107F94510 January 1996TER on IPE Submittal Human Reliability Analysis Final ReptInternal Flooding
ML20006D67931 July 1989Second 10-Yr Interval Inservice Insp Program:Bg&E,Calvert Cliffs Nuclear Power Plant,Units 1 & 2, Technical Evaluation ReptHydrostatic
Temporary Modification
VT-2
Incorporated by reference
ML20246A35930 June 1989PRA Applications Program for Inspection at Calvert Cliffs Unit 1 Nuclear Power PlantBoric Acid
Probabilistic Risk Assessment
ML20235P0828 July 1987Technical Evaluation of Bg&E Topical Rept:Retran Computer Code Reactor Transient Analysis Model Qualification
ML18052B19330 June 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept
ML20215M05131 May 1987Conformance to Generic Ltr 83-28,Item 2.2.1, 'Equipment Classification for All Other Safety-Related Components,' Calvert Cliffs Units 1 & 2, Informal Technical Evaluation ReptSafe Shutdown
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML20214N82131 March 1987a Retran Model of the Calvert CLIFFS-1 Pressurized Water Reactor for Assessing the Safety Implications of Control Systems
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML20212M84231 August 1986Interfacing Sys LOCA at PWRs Tasks 1B & 2B, Draft Ltr ReptBoric Acid
Hydrostatic
Probabilistic Risk Assessment
ML20210M45031 July 1986an Assessment of the Safety Implications of Control at the Calvert CLIFFS-1 Nuclear Plant.Volume 2:AppendicesBoric Acid
Power change
ML20212M27631 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1
ML20210K68430 April 1986Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3
ML20206T04930 April 1986an Assessment of the Safety Implications of Control at the Calvert CLIFFS-1 Nuclear PlantSafe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Probabilistic Risk Assessment
Earthquake
Fuel cladding
Backfit
ML20206H53530 April 1986Conformance to Reg Guide 1.97,Calvert Cliffs Nuclear Power Plant,Units 1 & 2, Informal ReptGrab sample
ML20136B31131 October 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review...,' Technical Evaluation Rept
ML20151U34815 October 1985Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept
ML20138Q69830 September 1985Pressurized Thermal Shock Evaluation of the Calvert Cliffs Unit 1 Nuclear Power PlantBoric Acid
Loop seal
Earthquake
ML20133Q10630 April 1985Review of Trac Calculations for Calvert Cliffs PTS Study
ML20115G92730 April 1985TRAC-PF1 Analyses of Potential PRESSURIZED-THERMAL Shock Transients at Calvert Cliffs/Unit 1.A Combustion Engineering PWR
ML20114B92325 January 1985Coolant to RHR Entry Conditions Using Atmospheric Dump Valves & Auxiliary Pressurizer Spray Following Loss-of-Offsite Power at Calvert Cliffs Unit 1
ML20100J44831 October 1984Interim Reliability Evaluation Program:Analysis of the Calvert Cliffs Unit 1 Nuclear Power Plant.Volume II, Appendices A,B and CBoric Acid
Failure to Scram
ML20100F28112 September 1984Masonry Wall Design,Calvert Cliffs Nuclear Power Plant Units 1 & 2, Technical Evaluation ReptSafe Shutdown Earthquake
Operating Basis Earthquake
Tornado Generated Missile
Earthquake
ML20097F18324 August 1984Draft App E, Quantification of Operator Actions by Stahr Methodology, to Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant
ML20097F17722 August 1984Draft App D, Socio-Technical Approach to Assessing Human Reliability (Stahr), to Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant
ML20097F99121 August 1984Draft Chapter 6, Pressurized Thermal Shock Integrated Risk for Calvert Cliffs Unit 1 & Potential Mitigation Measures, of Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant
ML20095C99727 July 1984Draft Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant,Chapter 5:Probabilistic Fracture-Mechanics Analysis of Calvert Cliffs Unit 1 Sequences
ML20090H87131 May 1984Interim Reliability Evaluation Program:Analysis of the Calvert Cliffs Unit 1 Nuclear Power Plant.Volume 1.Main ReportSafe Shutdown
Boric Acid
Ultimate heat sink
Probabilistic Risk Assessment
Earthquake
Weak link
ML20093A34431 May 1984Draft Chapter 4, Thermal-Hydraulic Analysis of Potential Overcooling Transients Occuring at Calvert Cliffs Unit 1 to Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1
ML20092F18630 April 1984THREE-DIMENSIONAL Calculations of Transient FLUID-THERMAL Mixing in the Downcomer of the Calvert CLIFFS-1 Plant Using SOLA-PTS
ML20084A33319 March 1984Draft, Evaluation of Effects of Calvert Cliffs Nuclear Power Station Electric Power,Compressed Air & Cooling Water Sys Failures on Pressurized Thermal Shock Event SequencesBoric Acid
ML20083F72813 December 1983Draft Trac Analysis of Potential Overcooling Transients at Calvert Cliffs-1 for Pressurized Thermal Shock Risk Assessment:Preliminary Summary
ML20077E98213 July 1983PWR Main Steam Line Break W/Continued Feedwater Addition, Bg&E Calvert Cliffs Nuclear Power Plant Units 1 & 2, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20071M77031 May 1983Control of Heavy Loads (C-10) Calvert Cliffs Nuclear Power Plants Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
Liquid penetrant
ML20071P05613 October 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Calvert Cliffs Nuclear Power Plant Unit 1, Technical Evaluation Rept
ML20077K10313 October 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Calvert Cliffs Nuclear Power Plant Unit 2, Technical Evaluation ReptBoric Acid
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20076B64924 September 1982ECCS Repts (F-47) TMI Action Plan Requirements,Calvert Cliffs Nuclear Power Plants Units 1 & 2, Technical Evaluation Rept
ML20065B31610 September 1982Inservice Insp Program, Technical Evaluation ReptHigh Radiation Area
Hydrostatic
Incorporated by reference
Liquid penetrant
ML20069N78031 August 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4,Calvert Cliffs,Units 1 & 2, Technical Evaluation ReptFuel cladding
Power change
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20062B11231 July 1982Socioeconomic Impacts of Nuclear Generating Stations: Calvert Cliffs Case Study.Docket Nos. 50-317 and 50-318. (Baltimore Gas and Electric Company)
ML20054H42830 June 1982Reactor Safety Study Methodology Applications Program: Calvert Cliffs No. 2 PWR Power Plant
ML20042C17328 February 1982Tech Spec for Redundant Decay Heat Removal Capability, Calvert Cliffs Nuclear Power Plant,Units 1 & 2, Preliminary Technical Evaluation Rept for Feb 1982
ML20041E08230 April 1981Technical Evaluation of Licensee Response to IE Bulletin 80-06 Re ESF Reset Controls for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.Boric Acid
ML20062J03621 July 1980Primary Coolant Sys Pressure Isolation Valves,Calvert Cliffs Units 1 & 2, Technical Evaluation Rept