SNRC-1444, Responds to NRC Re Violations Noted in Insp Rept 50-322/88-01.Corrective Actions:Change to Station Procedure Sp 84.654.03 Approved,Cautioning Against Overpressurizing Test Vols Utilizing Water

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-322/88-01.Corrective Actions:Change to Station Procedure Sp 84.654.03 Approved,Cautioning Against Overpressurizing Test Vols Utilizing Water
ML20154J194
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/18/1988
From: Leonard J
LONG ISLAND LIGHTING CO.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20154J186 List:
References
SNRC-1444, NUDOCS 8805260215
Download: ML20154J194 (2)


Text

,, . . .

'N

.a O

i

/gj @ LONG ISLAND LIGHTING COMPANY I SHOREHAM NUCLEAR POWER STATION

. P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 JOHN D. t,EONARD, JR.

VICE PR EstD t NT . NUCt E AR OPE R ATIONS SNRC-1444 APR 181988 Mr. William T. Russell Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Routine Inspection 50-322/88-01 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Reference:

NRC letter (J. P. Durr) to LILCO (J. D. Leonard, Jr.), dated March 21, 1988, including Appendix A -

Notice of Violation, and NRC Inspection Report 50-322/88-01

Dear Mr. Russell:

Attachment 1 is being forwarded in response to the referenced letter. This attachment addresses the referenced Notice of Violation in accordance with NRC instructions.

Very truly yours, J hn D. L nard, Jr.

Vice President - Nuclear Operations TD:ck Attachment cc: S. Brown J. P. Durr -

Chief Engineering Branch Division of Reactor Safety F. Crescenzo Document Control Desk 8805260215 880519 PDR ADOCK 05000322 Q DCD

=.

~

ATTACHMENT 1

'~

SNRC-1444  ;

l 1

Violation: 10 CFR 50, Appendix J, Section III.C.1 requires that for Type C tests, each valve to be tested be closed by normal operation and without any preliminary exercising.

Contrary to the above, on January 13, 1988, while preparing to leak test RCIC turbine exhaust check valve lE51*08V-0021, the valve was preliminarily exercised in that the test volume was overpressurized

< to greater than 100 psig instead of the required 40 psig test pressure. This occurred as a result of an inadequacy in Procedure SP 84.654.03, Revision 4.

LILCO's Response:

The Long Island Lighting Company acknowledges the occurrence of >

the event. An investigation to determine the cause of the event was initiated and the results concluded that it occurred because insufficient precautions were stipulated in station procedure SP 84.654.03, Rev. 4, "Primary Containment Leak Rate Test".

Engineering has performed an evaluation of this_ event and has determined that this overpressurization (of test pressure, not valve design pressure) would not have damaged the valve. This determination was based on the valve having an ANSI rating of ,

150#,

1. Corrective Steps which Have Been Taken and the Results
Achieved i

A change to station procedure SP 84.654.03 has been approved by the Plant Manager, cautioning against'overpressurizing 4

test volumes utilizing water. The caution statement requires the use of a relief valve in the water supply header and recommends the use of a needle or globe valve to control flow into the test volume.

2. Corrective Steps Which Will Be Taken to Avoid Further Violations The correction of the identified procedural inadequacy by
adding the above mentioned caution statement should prevent recurrence of this event. A revision to the Maintenance I l Section's Training Program, to incorporate the identified procedure change, will be complete by May 31, 1988.
3. The Date When Full Compliance Will Be Achieved

) Full compliance has been achieved.