| Start date | Site | Title |
---|
IR 05000261/2023001 | 2 May 2023 | Robinson | Integrated Inspection Report 05000261/2023001 |
ML22307A019 | 1 November 2022 | Clinton | EN 56196 - NRC 10 CFR Part 21 Notification, Nutherm, Written Notification of Potential Defect Found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (Ups), S4K2U1000-NM 191 |
IR 05000520/2022002 | 5 August 2022 | Palo Verde Hartsville | Integrated Inspection Report 05000528/2022002 and 05000529/2022002 and 05000520/2022002 |
SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements | 7 March 2022 | Seabrook | Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements |
IR 05000346/2021050 | 19 November 2021 | Davis Besse | Special Inspection Reactive Report 05000346/2021050 and Apparent Violation |
ML21305A195 | 11 October 2021 | Diablo Canyon | 6 to Updated Final Safety Analysis Report, Figure 8.3-12, Sheet 1 of 11, Drawing 437579-1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 11 & 12 |
ML21305A214 | 11 October 2021 | Diablo Canyon | 6 to Updated Final Safety Analysis Report, Figure 8.3-12, Sheet 5 of 11, Drawing 441357-1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 |
ML21305A240 | 11 October 2021 | Diablo Canyon | 6 to Updated Final Safety Analysis Report, Figure 8.3-12, Sheet 3 of 11, Drawing 437667-1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 |
ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) | 3 June 2021 | Vogtle | Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) |
ML21154A213 | 3 June 2021 | Vogtle | Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16) |