Reactor Vessel Water Level (RVWL) is the height of water in the reactor vessel. It is typically described in terms of inches above active fuel.
It is expected that the reactor vessel water level remains constant during operations. It tends toward decreasing due to steam production and it is compensated for by adding feed water.
Rapid changes in water level is indicative of problems or breaks in containment. If water level goes below active fuel then it will no longer moderate fuel temperatures and fuel damage becomes possible. There are automatic systems which react to low water level to add fluid or close possible lines which may be responsible for leakage.
Topic |
---|
|
|
10 CFR | |
---|
All by date | | Start date | Site | Title |
---|
NUREG-2194 Volume 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | 31 January 2024 | | NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | ML23360A760 | 26 December 2023 | | NRC Enforcement Manual, Rev 11, Change 15 | IR 05000254/2023010 | 20 December 2023 | Quad Cities | Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 | ML23321A125 | 18 December 2023 | Technical Specifications Task Force | Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation Requirements | GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | 5 December 2023 | Columbia | Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | ML23335A065 | 1 December 2023 | Grand Gulf | NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) | ML23345A084 | 28 November 2023 | Susquehanna | Technical Requirements Manual | ML23345A088 | 28 November 2023 | Susquehanna | Technical Requirements Manual | L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | 15 November 2023 | Turkey Point | License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | IR 05000458/2023003 | 13 November 2023 | River Bend | Integrated Inspection Report 05000458/2023003 |
|
---|