RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition

From kanterella
Jump to navigation Jump to search
Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition
ML16323A008
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 11/17/2016
From: Gallagher M P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RS-16-228
Download: ML16323A008 (157)


Text

Michael P. Gallagher Exelon Nuclear Exelon Generation Vice President License Renewal and Decommissioning RS-16-228 200 Exelon Way Kennett Square. PA 19348 610 765 5958 Office 6 10 765 5658 Fax www.exeloncorp.com m1chaelp.gallagher@exeloncorp.com 10 CFR 50.90 November 17, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket Nos. 50-461and 72-1046

Subject:

License Amendment Request-Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition References

1. Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Certification of Permanent Cessation of Power Operations

," dated June 20, 2016(ML16172A137)

2. Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request -Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition," dated July 28, 2016(ML16210A300)
3. Letter from Michael P. Gallagher (Exelon Generation Company , LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition

-Supplement 1," dated November 4, 2016(ML16309A013)

4. Letter from U.S. Nuclear Regulatory Commission to Bryan C. Hanson (Exelon Generation Company, LLC), "Oyster Creek Nuclear Generating Station; Clinton Power Station, Unit No. 1; and Quad Cities Nuclear Power Station, Units 1 And 2 -Approval Of Certified Fuel Handler Training And Retraining Program (CAC NOS. MF8109, MF8138, MF8139, AND MF8140)," dated September 6, 2016(ML16222A787)

In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit" Exelon Generation Company, LLC (EGC) requests amendment to the Facility Operating License (FOL) and Appendix A, Technical Specifications (TS), of FOL No. NPF-62 for Clinton Power Station (CPS). The proposed amendment would revise the FOL and the associated TS to Permanently Defueled Technical Specifications (POTS) consistent with the permanent cessation of reactor operation and permanent defueling of the reactor.

U.S. Nuclear Regulatory Commission Clinton License Amendment Request

Docket No. 50-461 November 17, 2016 Page 2 On June 2, 2016, EGC announced that it plans to close CPS, Unit 1 due to deteriorating economics. Under the terms of this announcement, EGC agreed to permanently cease operations at CPS by June 1, 2017. By letter dated June 20, 2016 (Reference 1), EGC

provided formal notification to the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.4(b)(8) and 10 CFR 50.82(a)(1)(i) of EGC's determination to permanently cease operations at CPS by June 1, 2017.

Once the certifications for permanent cessation of operations and removal of fuel from the reactor vessel are docketed for CPS in accordance with 10 CFR 50.82(a)(1)(i) and (ii), and pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel. In support of this condition, the CPS FOL and associated TS are being proposed for revision to reflect the planned permanently shutdown and defueled condition in accordance with 10 CFR

50.36(c)(6).

Reference 2 proposed changes to the staffing and training requirements for the CPS staff contained in Section 5.0, Administrative Controls, of the CPS TS to reflect the revised station organization, including Certified Fuel Handlers, which will be implemented once CPS is permanently defueled. This submittal was supplemented on November 4, 2016 (Reference 3). By letter dated September 6, 2016, the NRC approved the Certified Fuel Handler training program (Reference 4).

to this letter provides a detailed description and evaluation of the proposed changes to the FOL and TS. Attachment 2 contains a markup of the current FOL and TS pages (TS sections that are deleted in their entirety are identified as such, but the associated deleted pages are not included in Attachment 2). Attachment 3 contains a markup of the Bases pages. The Bases changes are provided for information only. Since the changes to the TS are considered a major rewrite, revision bars are not used.

EGC has concluded that the proposed changes present no significant hazards consideration under the standards set forth in 10 CFR 50.92, "Issuance of amendment."

The proposed changes have been reviewed and approved by the CPS Plant Operations Review Committee in accordance with the requirements of the EGC Quality Assurance Program.

EGC requests review and approval of this proposed amendment by November 17, 2017, to support the current schedule for the CPS transition to a permanently defueled facility. EGC requests that the approved amendment become effective upon NRC approval of this proposed amendment, or 60 days following the docketing of the certifications required by 10 CFR 50.82(a)(1) that CPS has been permanently shutdown and defueled, whichever is later. The amendment shall be implemented with in 90 days from the effective date of the amendment. This timeframe will allow for CPS to complete defueling operations, provides for sufficient decay of the reactor fuel to occur, and implement the proposed TS amendment.

There are no regulatory commitments contained within this submittal.

U.S. Nuclear Regulatory Commission Clinton License Amendment Request Docket No. 50-461 November 17, 2016 Page 3 In accordance with 10 CFR 50.91 "Notice for public comment; State consultation," paragraph (b), EGC is notifying the State of Illinois of this application for license amendment by transmitting a copy of this letter and its attachments to the designated State Official.

If you have any questions concerning this submittal, please contact Mr. Paul Bonnett at (610) 765-5264.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1th day of November 2016. Respectfully, Michael P. Gallagher Vice President, License Renewal & Decommissioning Exelon Generation Company, LLC Attachments:

1. Evaluation of Proposed Changes 2. Proposed Technical Specifications (Marked-Up Pages) 3. Proposed Technical Specifications Bases (Marked-Up Pages) cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector

-Clinton Power Station Illinois Emergency Management Agency -Division of Nuclear Safety Attachment 1 License Amendment Request Clinton Power Station Docket Nos. 50-461 and 72-1046 EVALUATION OF PROPOSED CHANGES

Subject:

Proposed Changes to Facility Operating License and Appendix A, Technical Specifications 1.0

SUMMARY

DESCRIPTION 2.0 DETAILED DESCRIPTION AND BASIS FOR THE CHANGES

3.0 REGULATORY EVALUATION

3.1 Applicable Regulatory Requirements/Criteria 3.2 Precedent 3.3 No Significant Hazards Consideration 3.4 Conclusion

4.0 ENVIRONMENTAL CONSIDERATION

5.0 REFERENCES

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 2 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes 1.0

SUMMARY

DESCRIPTION Pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (Exelon), proposes an amendment to the Facility Operating License (FOL) and Appendix A, Technical Specifications (TS), of FOL No. NPF-62 for Clinton Power Station (CPS). The proposed amendment would revise the FOL and the associated TS to Permanently Defueled Technical Specifications (PDTS) consistent with the permanent cessation of reactor operation and permanent defueling of the reactor. On June 2, 2016, Exelon announced that it plans to close CPS, Unit 1 due to deteriorating economics. Under the terms of this a nnouncement, Exelon agreed to permanently cease operations at CPS by June 1, 2017. By letter dated June 20, 2016 (Reference 1), Exelon provided formal notification to the U.S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.4(b)(8) and 10 CFR 50.82(a)(1)(i) of Exelon's determination to permanently cease operations at CPS by June 1, 2017. Once the certifications for permanent cessation of operations and removal of fuel from the reactor vessel are docketed for CPS in accordance with 10 CFR 50.82(a)(1)(i) and (ii), and pursuant to 10 CFR 50.82(a)(2), the 10 CFR 50 license will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel. In support of this condition, the CPS FOL and associated TS are being proposed for revision to reflect the planned permanently shutdown and defueled condition in accordance with 10 CFR 50.36(c)(6) "Decommissioning." On July 28, 2016, Exelon submitted proposed changes to the staffing and training requirements for the CPS staff contained in Section 5.0, Administrative Controls, of the CPS TS (Reference 2) to reflect the revised station organization, including Certified Fuel Handlers, which will be implemented once CPS is permanently defueled. This submittal was supplemented on November 4, 2016 (Reference 3). By letter dated September 6, 2016, the NRC approved the Certified Fuel Handler training program (Reference 4). The proposed PDTS changes revise and remove certain requirements contained within the FOL and TS, and remove the requirements that would no longer be applicable after all of the fuel has been permanently removed from the CPS reactor in accordance with 10 CFR 50.82(a)(1)(ii).

The proposed changes to the FOL and TS are in accordance with 10 CFR 50.36(c)(1) through 10 CFR 50.36(c)(5). The proposed changes also include a renumbering of pages and sections, where appropriate, to condense and reduce the number of pages in the TS without affecting the technical content. The TS table of contents is also accordingly revised. The existing CPS TS contain Limiting Conditi ons for Operation (LCOs) that provide for appropriate functional capability of equipment required for safe operation of the facility, including the plant being in a defueled condition. Since the safety function related to safe storage and management of irradiated fuel at an operating plant is similar to the corresponding function at a permanently defueled facility, the existing TS provide an appropriate level of control. However, the majority of the existing TS are only applicable with the reactor in an operational mode. LCOs and associated Surveillance Requirements (SRs) that will not apply in the permanently defueled condition are being proposed for deletion. The remaining portions of the TS are being proposed for revision and incorporation as the PDTS to provide a continuing acceptable level of safety which addresses the reduced scope of postulated design basis accidents associated with a defueled plant. In the development of the proposed PDTS changes, Exelon reviewed the PDTS requirements from other plants that have permanently shutdown, primarily Vermont Yankee (Reference 7), Kewaunee (Reference 8), San Onofre Nuclear Generating Station (Reference 9), Zion Nuclear License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 3 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Power Station (Reference 10), and Crystal River Nuclear Plant, Unit 3 (Reference 11). Exelon also evaluated the applicable guidance in NURE G-1434, "Standard Technical Specifications - General Electric Plants (BWR/6)" (Reference 6). This LAR provides a discussion and description of the proposed FOL and TS changes, a technical evaluation of the proposed FOL and TS changes, and information supporting a finding of No Significant Hazards Consideration (NSHC). Pending Licensing Actions under NRC Review There are several other pending licensing actions currently under NRC review that complement and support the changes proposed by this License Amendment Request (LAR). For clarity, the marked-up FOL and TS pages included in Attachment 2 reflect the changes proposed by these pending actions. In Reference 2, proposed changes to staffing and training requirements contained in CPS TS Section 5.0, Administrative Controls were submitted and supplemented (Reference 3) to reflect the revised station organization, which includes Certified Fuel Handlers (CFH). Reference 14 proposed changes to remove the "Inservice Testing Program" in TS 5.5.6. The NRC has approved the CFH training and retraining program (Reference 4), which will be implemented once all of the fuel has been permanently removed from the CPS reactor and the certification of permanent removal of fuel from the reactor vessel, has been docketed in accordance with 10 CFR 50.82(a)(2). There are currently two other pending license amendment requests involving proposed changes to TS currently docketed for CPS. One proposed amendment is a request to revise TS 5.5.13, "Primary Containment Leakage Rate Testing Program"; and the other proposed amendment is a request to revise TS Limiting Condition for Operation (LCO) 3.10.1, "Inservice Leak and Hydrostatic Testing Operation." On August 11, 2016, Exelon requested the NRC temporarily suspend review of the two LARs until an evaluation of the need for the LARs can be completed (Reference 5). Exelon expects that this evaluation will be completed prior to the end of 2016. 2.0 DETAILED DESCRIPTION AND BASIS FOR THE CHANGES The proposed amendment would modify the CPS license and revise CPS TS into PDTS to comport with a permanently defueled condition. General Analysis Applicable to Proposed Change Chapter 15 of the CPS Updated Safety Analysis Report (USAR) describes the design basis accidents (DBAs) and transient scenarios applicable to CPS during power and refueling operations and the accidents with the greatest potential for radiation exposure. During normal power operations, the forced inlet flow of water through the reactor coolant system (RCS) removes the heat from the reactor by generating steam. The steam system, operating at high temperatures and pressures, transfers this heat to the turbine generator. The most severe postulated accidents for nuclear power plants involve damage to the nuclear reactor core and the release of large quantities of fission products to the reactor coolant system. Many of the accident scenarios postulated in the USAR involve failures or malfunctions of the reactor, RCS, steam system, turbine generator, and emergency core cooling systems (ECCS) which could affect the reactor core. However, once the certifications for permanent cessation of operations and removal of fuel from the reactor vessel are docketed for CPS in accordance with 10 CFR 50.82(a)(1)(i) and (ii), and pursuant to 10 CFR 50.82(a)(2), the majority of the DBA scenarios postulated in the USAR will no longer be applicable. The irradiated fuel will be stored in the spent fuel pool (SFP) in the Fuel Building and the Independent Spent Fuel Storage Installation (ISFSI) until it is shipped off site in License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 4 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes accordance with the schedules to be provided in the Post Shutdown Decommissioning Activities Report (PSDAR) and the Irradiated Fuel Management Plan. The postulated DBAs that will remain applicable to CPS in its permanently shutdown and defueled condition are the fuel handling accident (FHA) in the SFP, the Postulated Radioactive Releases Due to Liquid Radwaste Tank Failures, and the Cask Drop Accident. The Cask Drop Accident is no longer a credible accident since the Fuel Building Crane has been upgraded to meet single-failure proof requirements in accordance with NUREG-0612. On July 5, 2001, Exelon submitted a License Amendment Request to revise the TS requirements that apply during the movement of irradiated fuel and during Core Alterations.

Specifically, the proposed changes relaxed the operability requirements for primary containment systems, secondary containment systems, and the Standby Gas Treatment (SGT) system due to a revised analysis of the FHA for CPS based on the implementation of the alternative source term (AST) (Reference 12). The NRC issued the associated License Amendment on April 3, 2002 (Reference 13). This is the current CPS analysis of record (AOR) for the FHA. Following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of decay time after reactor shut down, the CPS FHA AOR concluded that with the exception of control room ventilation and AC systems, that the dose consequences are acceptable without relying on any other structures, systems, and components (SSCs) remaining operable for accident mitigation during and following the event. As such, the FHA AOR did not support the revision of TS Limiting Condition for Operation (LCOs) 3.7.3, "Control Room Ventilation Sy stem" and 3.7.4, "Control Room Air Conditioning (AC) System." Specifically, the TS LCO Applicability was not changed from "movement of irradiated fuel" to "movement of recently irradiated fuel." This was because of a key assumption for the FHA analysis, which stated, "the dual inlet control room ventilation is used including the radiation monitors at the inlets consistent with the requirements of the control room ventilation TS." A new FHA Evaluation was performed as discussed below to support removal the requirements for TS LCOs 3.7.3 and 3.7.4. Once the control room ventilation/AC TS LCOs are eliminated, the TS LCOs for other systems that support the control room ventilation/AC systems will no longer be needed and are being proposed for deletion. The support systems include a majority of the TS LCOs in TS Section 3.8 Electric Power System. 10 CFR 50.36, "Technical Specifications," promulgates the regulatory requirements related to the content of Technical Specifications. As detailed in subsequent sections of this proposed amendment, this regulation lists four criteria to define the scope of equipment and parameters that must be included in TS. In a permanently defueled condition, the scope of equipment and parameters that must be included in the CPS TS is limited to those needed to address the remaining applicable DBA (i.e., the postulated FHA) so that the consequences of the accident

are maintained within acceptable limits. Fuel Handling Accident Analysis for the Permanently Defueled Condition In the permanently defueled condition, the Chapter 15 accident that remains applicable to determining main control room radiological dose is the FHA. The FHA AOR determined the projected dose due to the drop of a fuel assembly onto other fuel assemblies as a function of time after shut down. It demonstrates that radiological doses at the exclusion area boundary, low population zone, and in the control room from a FHA after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following shut down are within allowable limits. Primary and Secondary containment operability and the standby gas treatment system operation, or control room air intake or recirculation filtration were not credited. However, one of the key assumption for the FHA AOR stated that "the dual inlet control room ventilation is used including the radiation monitors at the inlets consistent with the requirements of the control room ventilation TS."

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 5 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes To support this proposed LAR, an analysis (IP-F-0179, Site Boundary and Control Room Dose Following a FHA in Containment - Post Cessation of Power Operations) was performed to assess the dose consequences of a postulated FHA after cessation of power operations. This

analysis was performed using the methodology currently described in the CPS USAR, which is based on the Alternative Source Term (AST) defined in Regulatory Guide 1.183. This analysis determined the consequences resulting from an FHA without credit of safety-related SSCs currently in the USAR analysis, in cluding the control room and AC systems in TS 3.7.3 and 3.7.4. The only mitigation credited in the analysis is due to the decontamination action provided by the water covering the damaged fuel. Thus the requirement of 23 feet of water covering the fuel in the spent fuel pool is retained in TS 3.7.7. The analysis determined the required amount of radioactive decay to ensure the dose consequences are within the limits prescribed in 10 CFR 50.67 as supplemented by Regulatory Guide 1.183. The accident is assumed to occur during handling of a spent fuel assembly. The spent fuel assembly is assumed to drop and strike assemblies stored in the spent fuel pool. As in the current USAR analysis, the amount of fuel that fails is assumed to correspond to a dropped fuel assembly from 34 feet onto the reactor core during refueling. This amount of fuel damage is significantly higher than a drop in the spent fuel pool, which corresponds to a fall of six feet. The damaged fuel assemblies are assumed to release the gaseous gap activity associated with noble gases and iodine. The released activity instantaneously releases and passes through the 23 feet of water in the spent fuel pool. The water provides a decontamination effect to retain most of the iodine. The remaining airborne activity is assumed to release to the environment over a 2-hour period as prescribed in Regulatory Guide 1.183. The release is assumed to occur at ground-level near the location of Main Steam Isolation Valves (MSIVs) in the turbine building.

This release point was selected because it conservatively bounds the atmospheric dispersion from the fuel building to any control room intake and was previously evaluated to address the ground-level MSIV leakage during the AST Loss of Coolant Accident (LOCA) analysis. The control room dose model consists of a finite volume and assumes amounts of infiltration and exfiltration of the activity released to the environment. There is no credit for filtration in the control room ventilation model. To address downgrading of safety-related features of the control room ventilation system, a sensitivity study on flow rate was performed. This study determined that the maximum control room dose consequences occur after the control room is completely isolated (no inflow or outflow) at 31 minutes post-accident. This assumption ensures dose rates that bound any scenario where the control room ventilation system stops and traps activity inside. It is noted that this assumption is very conservative and does not factor in the flow due to ingress and egress, which would reduce the airborne activity trapped inside the control room. The dose consequences were calculated using the RADTRAD computer software. It was determined that 60 days of decay was adequate to meet the dose consequence limits. The results are summarized below:

Receptor Dose (rem TEDE)

Limit Control Room 4.61 5 Exclusion Area Boundary 2.56E-3 6.3 Low Population Zone 5.85E-4 6.3 The resulting dose consequences are within the limits of 10 CFR 50.67 and Regulatory Guide 1.183. The analysis does not credit any safety systems and assumes very conservative atmospheric dispersion. There are no operator actions assumed in this analysis and there is no License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 6 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes reliance on any radiation monitoring or HVAC system actuations. The analysis conservatively assumes a large unfiltered in-leakage into the control room and also accounts for unplanned stoppage of the ventilation flow in and out of the control room. A detailed summary of the inputs used in this analysis are provided below:

Parameter Current AORRevised Analysis Reactor Power (MWth) 3473 3473 No. of Damaged Rods 172 172 Equivalent Full Length Rods per Fuel Bundle 85.6 85.6 No. of Bundles in Core 624 624 Radial Peaking Factor 1.7 1.7 Core Average Burnup (GWD/MTU) 34.3 40 Fuel Decay (days) 1 60 Gap Release Fractions 8% I-131, 10% Kr-85, 5%

Other Noble Gas, 5% Other Halogens, 12% Alkali Metals 8% I-131, 10% Kr-85, 5%

Other Noble Gas, 5% Other Halogens, 12% Alkali Metals Core Inventory After Decay (Ci/MWth) I-131 2.52E+4 I-132 3.20E+4 I-133 2.53E+4 I-134 1.30E-3 I-135 4.09E+3 Kr-85 3.32E+2 Kr-85m 1.68E+2

Kr-87 2.74E-2

Kr-88 5.21E+1 Xe-133 5.13E+4 Xe-135 1.38E+4 I-131 1.60E+2 I-132 1.14E-1 I-133 8.10E-17 I-134 0 I-135 0 Kr-85 3.62E+2 Kr-85m 0

Kr-87 0

Kr-88 0 Xe-133 2.36E+1 Xe-135 0 Iodine Form of Gap Release 99.85% Elemental 0.15% Organic 99.85% Elemental 0.15% Organic Water Decontamination

Factors 500 Elemental 1 Organic 1 Noble Gas

Infinite Particulates 500 Elemental 1 Organic 1 Noble Gas

Infinite Particulates Duration of Release to Environment (hours) 2 2 Standby Gas Treatment System Credit None None Secondary Containment Volume Credit None None Offsite and Control Room Breathing Rate (m 3/s) 3.47E-4 3.47E-4 Control Room Free Volume (ft 3) 324,100 324,100 Control Room Filtration Credit None None Time After Accident to Control Room Isolation (minutes)

None 31 License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 7 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Control Room Flow Prior to Isolation (cfm) 5,060 unfiltered infiltration 5,060 exfiltration 5,060 unfiltered infiltration 5,060 exfiltration Control Room Flow After Isolation (cfm) 5,060 unfiltered infiltration 5,060 exfiltration 0 infiltration 0 exfiltration Control Room Occupancy

Factors 1.0, 0 to 1 day 0.6, 1 to 4 days 0.4, 4 to 30 days 1.0, 0 to 1 day 0.6, 1 to 4 days 0.4, 4 to 30 days 0 to 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Atmospheric Dispersion Factors (s/m

3) Control Room 4.61E-4 EAB 1.8E-4 LPZ 4.2E-5 Control Room 6.25E-3 EAB 2.46E-4 LPZ 5.62E-5 Dose Conversion Factors Federal Guidance Reports 11 and 12 Federal Guidance Reports 11 and 12 Spent Fuel Pool - Neutron Absorbing Material This section describes the actions that will be taken to maintain and monitor the neutron absorbing materials in the SFP during decommissioning. This section is based on a request for additional information at Vermont Yankee Nuclear Power Station (Reference 15) and Exelon's response to NRC Generic Letter 2016-01 "Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools" (Reference 16). There are three types of spent fuel storage racks in use at CPS. Two types of high-density racks utilizing a neutron poison are installed in the fuel building spent fuel storage pool. The fuel cask storage pool (FCSP) may also be used to hold up to two high-density storage racks, as needed, to extend core offload capacity. The cast aluminum racks in the upper containment fuel storage area will no longer be used once the reactor is permanently defueled. The SFP contains a mix of fuel storage racks with Boral Neutron Absorbing Material (NAM) and Metamic NAM (i.e., both built into stainless steel rack structures). No single rack contains more than one type of NAM. The two spent fuel racks reserved for the FCSP contain Boral NAM. The SFP contains 26 storage racks to store a maximum of 3,796 fuel assemblies. The FCSP may be utilized on an as-need basis (to extend core offload capacity) for storage of up to 2 storage racks to store a maximum of 264 fuel assemblies. CPS is licensed to store 3,796 fuel assemblies in the spent fuel pool and an additional 363 in the fuel cask storage pool, as needed. Ten of the 22 original-equipment Boral racks remain in the SFP today. Sixteen Metamic SFP racks were added to expand spent fuel pool storage capacity in 2005 and 2007. The design of the spent fuel storage racks provides for a subcritical multiplication factor Keff of less than or equal to 0.95 for normal and abnormal storage conditions. CPS utilizes periodic coupon measurements to monitor the ability of the Metamic to perform its safety function. Coupon material monitoring methods rely on the strong correlation between aging/degradation impacts on a set of surrogate material pieces (coupons) from the same manufacturing process as the as-installed material. The station maintains the ability to detect aging/degradation mechanisms that the in-service NAM experiences through monitoring the coupon material characteristics. Metamic coupon trees are maintained in SFP locations that have conditions projected to be the most challenging to the materials (e.g., high gamma dose, high neutron dose, high temperature) to ensure early detection of aging/degradation mechanisms that are driven by environmental factors. One Metamic coupon is removed after 2, 4, 8, 12, 20, 28, and 36 years. Coupons are also subject to neutron attenuation measurements after 4, 12, and 20 years to confirm the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 8 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes attenuation capabilities. This periodicity is sufficient to provide an indication of degradation of the Metamic material prior to reaching an impact of more than 5 percent of the subcriticality margin. This is based on the industry experience with Metamic that has not shown any

mechanism that leads to the loss of the boron from the Metamic material. The NRC accepted this coupon frequency and sampling size in Reference 17. EGC also monitors industry experience with the Metamic NAM through operating experience reviews and through industry group participation (e.g., NEI, EPRI). CPS currently has no coupon or other monitoring program for the Boral NAM in the SFP. EGC monitors Boral operating experience from its own fleet of plants with Boral racks and also through participation in industry groups such as INPO, EPRI Neutron Absorber Users Group, and the NEI Criticality Task Force. There have been no industry reports that have identified a concern with respect to the Boral having a loss of B-10 areal density. EPRI Report 1025204, "Strategy for Managing the Long Term Use of Boral in Spent Fuel Storage Pools," July 2012 (Reference 18), contains the following conclusions:

Possible BORAL performance issues can be divided into two main classes: A) Safety (criticality safety) relative to the functionality of the B-10 in the core material; and, B) Operational as characterized by blistering of the BORAL surface where the aluminum cover material (cladding) separates from the core Boron containing material thus potentially effecting fuel handling.

BORAL has successfully met all the criticality safety performance requirements for over 25 years of service as demonstrated by the following considerations: There have been no surveillance data or observed cases where there has been significant loss or redistribution of B-10 from BORAL

. No mechanisms have been identified or observed that would lead to severe degradation of the BORAL core material. No mechanisms have been identified that would lead to a sudden loss or reconfiguration of the BORAL core material. Clinton Power Station is continuing with its current programs and processes described above to monitor the fuel in the SFP since CPS does not have a renewed operating license. These programs and processes will continue as long as spent fuel is stored in the SFP. All spent fuel is scheduled to be placed into dry casks and stored on the Independent Spent Fuel Storage Installation (ISFSI) by 2023. This will be reflected in the Post-Shutdown Decommissioning Activities Report which is planned to be submitted in early 2017. Therefore, the current program and processes are more than adequate to manage aging of equipment relied upon to safely

store fuel within the SFP.

Detailed Discussion The following table identifies each FOL and TS section that is being changed, the proposed changes, and the basis for each change. Changes to the FOL are listed first followed by the TS. Attachment 2 provides the marked-up version of the CPS FOL and TS to establish the changes. The TS that are deleted in their entirety are identified as such below, but the associated deleted pages are not included in Attachment 2. Additionally, the proposed changes to the TS are considered a major rewrite. The following administrative changes are not shown in the marked-up (Attachment 2) FOL and TS pages, because they do not affect the technical content of the

FOL or TSs:

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 9 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Reformatting (margins, font, tabs, etc.) content to create a continuous electronic file; and Renumbering of pages, where appropriate, to condense and reduce the number of pages. Proposed changes to the TS Bases are provided for information in Attachment 3. The TS Bases Sections that are deleted in their entirety are not included in Attachment 3. Upon approval of this amendment, changes to the Bases will be incorporated in accordance with TS 5.5.11, the TS Bases Control Program. License Finding 1.B.Current License Finding 1.B.

Construction of the Clinton Power Station, Unit No. 1 (the facility) has been subs tantially completed in conformity with Construction Permit No. CPPR-137 and the application, as amended, the provisions of the Act and the regulations of the Commission; Proposed License Finding 1.B.

Deleted BasisThis License Finding is proposed for deletion in its entirety. Decommissioning of CPS is not dependent on the regulations that govern construction of the facility.

License Finding 1.C.

Current License Finding 1.C.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below); Proposed License Finding 1.C.

The facility will operate is prohibited from operating the reactor in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission (except as exempted from compliance in Section 2.D. below);

BasisThis License Finding is revised to reflect the change from an operating license to being prohibited from operating the reactor. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, reference to operation of the facility would be inconsistent with the provisions of 10 CFR 50.82(a)(2).

License Condition 2.B.(1)

Current License Condition 2.B.(1)

Exelon Generation Company, pursuant to section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in Harp Township, DeWitt County, Illinois, in accordance with the procedures and limitations set

forth in this license; Proposed License Condition 2.B.(1)

Exelon Generation Company, pursuant to section 103 of the Act and 10 CFR Part 50, to possess, and use and operate the fac ility at the designated location in Harp Township, DeWitt County, Illinois, in accordance with the procedures and limitations set

forth in this license; BasisThis License Condition is revised to reflect the change from an operating license to being prohibited from operating the reactor pursuant to 10 CFR 50.82(a)(2).

As such, the facility would remain authorized to possess the existing spent fuel and use the systems required to support safe fuel storage (e.g., the SFP) during the decommissioning period, in accordance with the specified limitations for storage.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 10 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes License Condition 2.B.(3)

Current License Condition 2.B.(3)

Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; Proposed License Condition 2.B.(3)

Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material that was used as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; BasisThis License Condition is revised to reflect the change from an operating license to being prohibited from operating the reactor and that special nuclear material (SNM) can no longer be used as reactor fuel. The proposed change removes the authorization for receipt and use of SNM as reactor fuel and eliminates the reference to use of the SNM for reactor operations. The proposed change limits the possession of SNM to SNM "that was used" as reactor fuel. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, 10 CFR 50.82(a)(2) will prohibit operation of the CPS reactor.

License Condition 2.B.(4)Current License Condition 2.B.(4)

Exelon Generation Company, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; Proposed License Condition 2.B.(4)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30,40, and 70, to receive, possess, and use, at any time, any byproduct, source, and special nuclear material as sealed neutron sources that were used for reactor startup, sealed sources that were used for reactor instrumentation calibration and are used in radiation monitoring equipment calibration, and as fission detectors in amounts as required; Basis This License Condition is revised regarding receipt and use of sealed neutron sources for reactor startup. This License Condition is revised to reflect authorization only for continued possession of those sources used for reactor startups. The Part 50 license will no longer authorize operation of the facility pursuant to 10 CFR 50.82(a)(2), this License Condition is being revised to no longer authorize receipt and use of byproduct, source, and SNM for reactor startup or for calibration of reactor instrumentation. The License Condition will continue to allow use of sealed sources in radiation monitoring equipment calibration and as fission detectors.

License Condition 2.B.(6)

Current License Condition 2.B.(6)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation; and Proposed License Condition 2.B.(6)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be that were produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation; and Basis This License Condition is revised regarding the possession of byproduct and SNM, but not the separation of material that may be produced by operation of the reactor. Since the Part 50 license will no longer authorize operation of the facility pursuant to 10 CFR 50.82(a)(2), this License Condition is revised to allow License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 11 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes possession of byproduct and SNM that were produced during operation of the reactor, but not the separation of material that was produced by operations of the reactor.

License Condition 2.C.(1)

Current License Condition 2.C.(1)

Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. Proposed License Condition 2.C.(1)

Deleted Basis This License Condition is proposed for deletion in its entirety to reflect the permanently defueled condition of the facility. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, 10 CFR 50.82(a)(2) prohibits operation of the CPS reactor since the certifications described therein will have been submitted.

License Condition 2.C.(5)Current License Condition 2.C.(5)

Exelon Generation Company shall store new fuel assemblies in accordance with the requirements specified in Attachment 2. Attachment 2 is hereby incorporated into this license.

In conjunction with deletion of License Condition 2.C.(5), Attachment 2 to NPF-62 "NEW FUEL STORAGE," is also being deleted. Proposed License Condition 2.C.(5)

Deleted BasisThis License Condition is proposed for deletion in its entirety to reflect the permanently defueled condition of the facility. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, pursuant to 10 CFR 50.82(a)(2) the 10 CFR 50 license will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel.

License Condition 2.C.(23)Current License Condition 2.C.(23)

Upon implementation of Amendment No. 178 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 3.7.3.5, in accordance with TS 5.5.15.c.(i), the assessment of CRE habitability as required by Specification 5.5.15.c.(ii), and the measurement of CRE pressure as required by Specification 5.5.15.d, shall be considered met. Following implementation:

(a) The first performance of SR 3.7.3.5, in accordance with Specification 5.5.15.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from November 16, 2004, the date of the most recent successful tracer Proposed License Condition 2.C.(23)

Deleted License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 12 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes gas test, as stated in the February 8, 2005 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.

(b) The first performance of the periodic assessment of CRE habit ability, Specification 5.5.15.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from November 16, 2004, the date of the most recent successful tracer gas test, as stated in the February 8, 2005 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.

(c) The first performance of the periodic measurement of CRE pressure, Specification 5.5.15.d, shall be within 24 months, plus the 6 months allowed by SR 3.0.2, as measured from the date of the most recent successful pressure measurement test, or within 6 months if not performed previously.

Basis This License Condition supported implementation of the TS changes associated with the Control Room Envelope (CRE) Habitability program by requiring initial performance of the required surveillance SR 3.7.3.5, the first performance of the required periodic assessment of CRE habitability, and the first performance of the periodic measurement of CRE pressure within the specified frequency. These surveillances and assessments were completed in accordance with the schedule specified in the License Condition.

This License Condition is proposed for elimination. Following 60 days of decay post-shutdown, the FHA analysis (IP-F-0179) shows that the dose consequences to occupants in the control room are acceptable without relying on the main control room envelope to remain functional during and following a FHA. The dose at the control room would be 4.61 rem, which is less than the 10 CFR 50.67 dose limit of 5 rem. The calculation did not credit ventilation isolation or filtered recirculation to limit inleakage. As such, a Control Room Envelope (CRE) Habitability Program is not required to provide airborne r adiological protection for the control room operators. This submittal also proposes to remove TS 3.7.3 for control room ventilation system and TS 5.5.15 for the CRE Habitability Program. Since TS 3.7.3 and TS 5.5.15 are no longer necessary, this License Condition is no longer needed; therefore, the proposed deletion of this License Condition is acceptable.

License Condition 2.D.Current License Condition 2.D.

The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70. These include: (a) an exemption from the requirements of 10 CFR 70.24 for the criticality alarm monitors around the fuel storage area; (b) an exemption from the requirement of 10 CFR Part 50, Appendix J - Option B, paragraph III.B, exempting Proposed License Condition 2.D.

The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70. These include: (a) an exemption from the requirements of 10 CFR 70.24 for the criticality alarm monitors around the fuel storage area.; (b) an exemption from the requirement of 10 CFR Part 50, Appendix J - Option B, paragraph III.B, exempting License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 13 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes the measured leakage rates from the main steam isolation valves from inclusion in the combined leak rate for local leak rate tests (Section 6.2.6 of SSER 6); and (c) an exemption from the requirements of paragraph III. B of Option B of 10 CFR Part 50, Appendix J, exempting leakage from the valve packing and the body-to-bonnet seal of valve 1E51-F374 associated with containment penetration 1MC-44 from inclusion in the combined leakage rate for penetrations and valves subject to Type B and C tests (SER supporting Amendment 62 to

Facility Operating License No. NPF-62). The special circumstances regarding each exemption, except for item (a) above, are identified in the referenced section of the safety evaluation report and the supplements thereto.

An exemption was previously granted pursuant to 10 CFR 70.24. The exemption was granted with NRC Material License No. SNM-1886, issued November 27, 1985, and relieved the licensee from the requirement of having a criticality alarm system. Exelon Generation Company is hereby exempted from the criticality alarm system provision of 10 CFR 70.24 so far as this section applies to the storage of fuel assemblies held under this license.

These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions in items (b) and (c) above are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

the measured leakage rates from the main steam isolation valves from inclusion in the combined leak rate for local leak rate tests (Section 6.2.6 of SSER 6); and (c) an exemption from the requirements of paragraph III. B of Option B of 10 CFR Part 50, Appendix J, exempting leakage from the valve packing and the body-to-bonnet seal of valve 1E51-F374 associated with containment penetration 1MC-44 from inclusion in the combined leakage rate for penetrations and valves subject to Type B and C tests (SER supporting Amendment 62 to Facility Operating License No. NPF-62). The special circumstances regarding each exemption, except for item (a) above, are identified in the referenced section of the safety evaluation report and the supplements thereto.

An exemption was previously granted pursuant to 10 CFR 70.24. The exemption was granted with NRC Material License No. SNM-1886, issued November 27, 1985, and relieved the licensee from the requirement of having a criticality alarm system. Exelon Generation Company is hereby exempted from the criticality alarm system provision of 10 CFR 70.24 so far as this section applies to the storage of fuel assemblies held under this license.

These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. The exemptions in items (b) and (c) above are granted pursuant to 10 CFR 50.12. With these this exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

Basis This License Condition documents specific exemptions from 10 CFR Part 50 and 10 CFR Part 70 as approved by the NRC. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, 10 CFR 50.82(a)(2) will prohibit operation of the CPS reactor. Therefore, CPS will no longer be performing leak testing of the main steam isolation valves and valve 1E51-F374 associated with containment penetration 1MC-44. Since these leak tests will no longer be performed, there is no longer a need for the specified exemption and the details of these exemptions are being deleted from this License Condition. The exemption to 10 CFR Part 70 remains unchanged.

License Condition 2.F.

Current License Condition 2.F.

Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Proposed License Condition 2.F.

Deleted License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 14 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Analysis Report as amended, for the Clinton Power Station, Unit No. 1, and as approved in the Safety Evaluation Report (NUREG-0853) dated February 1982 and Supplement Nos. 1 thru 8 thereto subject to the following provision:

Exelon Generation Company may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

BasisThis License Condition is proposed for deletion to reflect the permanently defueled condition of the facility. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, the fire protection program will be revised to take into account the facility conditions and activities during decommissioning. CPS will continue to utilize the defense-in-depth concept, placing special emphasis on detection and suppression in order to minimize radiological releases to the environment.

This condition , which is based on maintaining an operational fire protection program in accordance with 10 CFR 50.48, with the ability to achieve and maintain safe shut down of the reactor in the event of a fire, will no longer be applicable at CPS. However, many of the elements that are applicable for the operating plant fire protection program continue to be applicable during facility decommissioning. During the decommissioning process, a fire protection program is required by 10 CFR 50.48(f) to address the potential for fires that could result in a radiological hazard. However, the regulation is applicable regardless of whether a requirement for a fire protection program is includ ed in the facility license. Therefore, a License Condition requiring such a program for a permanently shut down and defueled facility is not needed.

License Condition 2.I.Current License Condition 2.I.

This license is effective as of the date of issuance and shall expire at midnight on September 29, 2026.Proposed License Condition 2.I.

This license is effective as of the date of issuance and shall expire at midnight on September 29, 2026is effective until the Commission notifies the licensee in writing that the license is terminated.

Basis This License Condition is revised to reflect the permanently defueled condition of the facility. Once CPS has permanently ceased operation and certified that fuel has been removed from the reactor, 10 CFR 50.82(a)(2) prohibits operation of the CPS reactor since the certifications required by 10 CFR 50.82(a)(1) will have been submitted. This License Condition is being revised in accordance with 10 CFR 50.51(b) in that the license authorizes ownership and possession by Exelon until the Commission notifies the licensee in writing that the license is terminated.

Facility Operating License No. NPF-62 Attachments and Appendix C Current License Attachment 1 - Previously deleted Attachment 2 - New Fuel Storage (See 2.C.(5) above)

Appendix C - Previously deleted Proposed License

[Pages removed]

BasisThis proposed change is to remove deleted pages for pagination and is administrative in nature.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 15 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS Section 1.1 - Definitions TS 1.1, "Definitions," provides defined terms that are applicable throughout the TS and TS Bases. New definitions for Certified Fuel Handler and Non-Certified Operator were previously proposed for addition (reference 2 and 3). The definitions identified below for deletion pertain to an operating reactor and, therefore, they would no longer apply to the permanently defueled reactor.

Proposed Definitions Added Basis CERTIFIED FUEL HANDLER The definition for Certified Fuel Handler was proposed for addition in the LAR proposing changes to TS Sections 1.1 and 5.0 (Reference 2) currently under NRC review.

NON-CERTIFIED OPERATOR The definition for Non-Certified Operator was proposed for addition in the supplemented LAR proposing changes to TS Sections 1.1 and 5.0 (Reference 3) currently under NRC review.

Proposed Definitions Deleted Basis AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term is only meaningful to a reactor authorized to operate. CHANNEL CALIBRATION This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. There is no instrumentation credited in the analysis of the accidents that remain credible. CHANNEL CHECK This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. There is no instrumentation credited in the analysis of the accidents that remain credible. CHANNEL FUNCTIONAL TEST This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. There is no instrumentation credited in the analysis of the accidents that remain credible. CORE ALTERATION This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term has no meaning when there is no fuel in the reactor core.

CORE OPERATING LIMITS REPORT (COLR) This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification and Specification 5.6.5 that requires the COLR is also proposed for elimination.

DOSE EQUIVALENT I-131 This definition is not proposed for inclusion in the PDTS since this term is not used in any PDTS specification. This term is used to express dose from a mixture of iodine isotopes created in an operating core and contained in plant primary or secondary coolant. The value of Dose Equivalent I-131 is used for dose analysis of accidents involving primary coolant releases. Those accident conditions will no longer apply to the permanently shut down and defueled facility.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 16 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes EMERGENCY CORE COOLING SYSTEM (ECCS) RESPONSE TIME This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. ECCS will have no function in the permanently shut down and defueled facility. END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) SYSTEM RESPONSE TIME This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. Reactor Recirculation Pumps will have no function in the permanently shut down and defueled facility. ISOLATION SYSTEM RESPONSE

TIME This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. There is no instrumentation credited in the analysis of the accidents that remain credible. LEAKAGE This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. None of the SSCs from or into which leakage is monitored are credited in the analysis of the accidents that remain credible.

LINEAR HEAT GENERATION RATE (LHGR) This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term is only meaningful to a reactor authorized to operate.

LOGIC SYSTEM FUNCTIONAL TEST This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. There are no logic systems credited in the analysis of the accidents that remain credible. MINIMUM CRITICAL POWER RATIO (MCPR) This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term is only meaningful to a reactor authorized to operate.

MODE In conjunction with deletion of the term "Mode," TS Table 1.1-1, "MODES," is also being deleted. This definition, including TS Table 1.1-1, is not proposed for inclusion in the PDTS since operating Modes are not used in any PDTS specification. Modes are defined for operating or refueling conditions. This term does not apply to a facility in the permanently defueled condition.

RATED THERMAL POWER (RTP) This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term is only meaningful to a reactor authorized to operate.

REACTOR PROTECTION SYSTEM (RPS) RESPONSE TIME This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. The RPS will have no function in the permanently shut down and defueled facility.

SHUTDOWN MARGIN (SDM) This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term does not apply to a facility in the permanently defueled condition.

STAGGERED TEST BASIS This definition is not proposed for inclusion in the PDTS since the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 17 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes term is not used in any PDTS specification. This definition applies to the performance of surveillance tests on systems with multiple subsystems or channels. There are no surveillance requirements in the PDTS for operating systems.

THERMAL POWER This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. This term is only meaningful to a reactor authorized to operate.

TURBINE BYPASS SYSTEM RESPONSE TIME This definition is not proposed for inclusion in the PDTS since the term is not used in any PDTS specification. The main turbine bypass system has no function in the permanently defueled condition.

TS SECTION 1.2, LOGIC CONNECTORS TS 1.2, "Logical Connectors," contains an explanation of the logical connectors used to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies throughout TS. Logic Connectors are no longer used in the PDTS. This section is proposed for deletion in its entirety.

TS SECTION 1.3, COMPLETION TIMESBACKGROUND This is proposed for revision to remove reference to

" operation of the unit

" and replace it with reference to "handling and storage of spent nuclear fuel." Proposed changes are shown in Attachment 2. DESCRIPTION This explanation is proposed for revision to remove discussion of Modes that will not exist in a permanently defueled facility. Reference to "inoperable equipment

" is proposed for elimination because the specifications remaining in PDTS apply only to a variable (SFP Level).

The term "unit" is typically associated with an operating reactor and is revised with the term "facility." This administrative change more appropriately represents the permanently shutdown and defueled condition. Proposed changes are shown in Attachment 2. EXAMPLES The examples in this section are proposed for deletion. The examples are no longer necessary because they describe examples of Completion Times that do not remain in the PDTS. The Action that remains in the PDTS must be completed

" Immediately" which is retained in PDTS section 1.3.

TS SECTION 1.4, FREQUENCY DESCRIPTION This explanation is proposed for revision to remove discussion of surveillance performance situations that do not exist in the PDTS. Proposed changes are shown in Attachment 2. EXAMPLES This section is proposed for revision to remove discussion of surveillance performance situations that do not exist in the PDTS, and to explicitly address those that do exist. An administrative change in this section replaces the term "unit" with the term "facility." Proposed changes are shown in Attachment 2.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 18 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS SECTION 2.0, SAFETY LIMITS (SLs)

All TS in Section 2.0, Safety Limits (SLs) are being proposed for deletion. The safety limits do not apply to a reactor that is in a permanently defueled condition. TS 2.1, "Safety Limits" (SLs), contains two separate specifications: TS 2.1.1, Reactor Core SLs; and TS 2.1.2, Reactor Coolant System Pressure SL The restrictions of the SLs promulgated in TS 2.1.1 are established to protect the integrity of the fuel clad barrier to the release of radioactive materials to the environs. TS 2.1.1 is applicable in Modes 1, 2, 3, 4, and 5. TS 2.1.2 provides requirements on parameters to protect the integrity of the RCS against overpressure. TS 2.1.2 is applicable in Modes 1, 2, 3, 4, and 5. TS 2.2, SL Violations, directs actions to be taken if a safety limit specified in TS 2.1 is violated. TS 2.2 is applicable commensurate with the applicable Modes of the respective safety limits specified in TS 2.1. The above TS contain limits upon important process variables that are necessary to reasonably protect the integrity of certain physical barriers required for safe operation of the facility only when the reactor is in Modes 1 through 5. However, 10 CFR 50.82(a)(2) will prohibit operation of the plant or placing fuel in the reactor vessel. Therefore, the TS listed in the previous paragraphs, which address only these specific process variables will no longer be applicable. Based on the above, the proposed deletion of the TS related to these Safety Limits is acceptable.

TS SECTION 3.0, LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY TS 3.0, "Limiting Condition for Operation (LCO) Applicability," consist of LCOs 3.0.1 th rough LCO 3.0.7. These LCOs establish the general requirements applicable to all TSs and apply at all times, unless otherwise stated. The proposed revisions to these LCOs are shown in Attachment 2. LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual TS as the requirement for when the LCO is required to be met (i.e., when the unit is in the Mode or other specified condition of the Applicability statement of each Specification). LCO 3.0.1 is being retained in the PDTS with the proposed revisions shown in Attachment 2. Because 10 CFR 50.82(a)(2) will prohibit operation of the plant or placing fuel in the reactor vessel, the reference to operating Modes will no longer be relevant and is therefore being deleted. Additionally, reference to LCO 3.0.7 is also being deleted to conform to deletion of this LCO as discussed below. LCO 3.0.2 LCO 3.0.2 establishes that upon disc overy of a failure to meet an LCO, the associated ACTIONS shall be met. LCO 3.0.2 is proposed for revision to remove references to LCO 3.0.5 and LCO 3.0.6 to conform to deletion of these LCOs as discussed below. LCO 3.0.3 LCO 3.0.3 establishes the actions that must be implemented when an LCO is not met and the associated actions are not met, an associated action is not provided, or if directed by the associated action. LCO 3.0.3 is only applicable in Modes 1, 2, and 3. LCO 3.0.3 does not apply with the reactor defueled. LCO 3.0.3 is being proposed for deletion in its entirety.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 19 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Because 10 CFR 50.82(a)(2) prohibits operation of the plant or placing fuel in the reactor vessel, LCO 3.0.3 will no longer be applicable. Therefore, the proposed deletion of LCO 3.0.3 is acceptable. LCO 3.0.4 LCO 3.0.4 establishes limitations on changes in Modes or other specified conditions in the Applicability when an LCO is not met. LCO 3.0.4 is proposed for deletion because all actions in the PDTS have a completion time of "Immediately." This makes LCO 3.0.4 unnecessary. LCO 3.0.5 LCO 3.0.5 establishes the allowance for restoring equipment to service under administrative controls when it has been removed from service or declared inoperable to comply with ACTIONS. LCO 3.0.5 is proposed for deletion, because there are no LCOs for equipment to be operable or in operation in the PDTS. LCO 3.0.6 LCO 3.0.6 addresses the actions required for a supported system when the support system LCO is not met. LCO 3.0.6 is proposed for deletion since there are no LCOs for equipment to be operable or in operation in the PDTS. LCO 3.0.7 LCO 3.0.7 pertains to certain special tests and operations required to be performed at various times over the life of the unit. LCO 3.0.7 is proposed for deletion since special tests and operations are not applicable to a permanently defueled facility. This aligns with the proposed deletion of TS LCO Section 3.10.

TS SECTION 3.0, SURVEILLANCE REQUIREMENT (SR) APPLICABILITY TS 3.0, "Surveillance Requirement (SR) Applicability," consists of SRs 3.0.1 through SR 3.0.4. These SRs establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated. The proposed revisions to these LCOs are shown in Attachment 2. SR 3.0.1 SR 3.0.1 establishes the requirement that SRs must be met during the Modes or other specified conditions in the Applicability for which the requirements of the LCO apply, unless otherwise specified in the individual SRs. This Specification is to ensure that Surveillances are performed to verify the OPERABILITY of systems and components, and that variables are within specified limits. SR 3.0.1 is proposed for revision to remove references to operating Modes and inoperable equipment since there are no LCOs for equipment to be operable or in operation in the PDTS. Because 10 CFR 50.82(a)(2) prohibits operation of the plant or placing fuel in the reactor vessel, the reference to operating Modes is no longer relevant and is therefore being deleted. SR 3.0.2 SR 3.0.2 provides an allowance for extending the frequency for performance of a SR to 1.25 times the interval specified in the frequency to facilitate scheduling or unforeseen problems that may prevent performance during normal intervals. SR 3.0.2 is proposed for revision to remove conditions for frequencies that do not exist in PDTS LCOs.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 20 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes SR 3.0.4 SR 3.0.4 establishes requirements that all applicable SRs must be met before entry into an operational Mode or other specified condition in the applicability. SR 3.0.4 is being modified, such that, the surveillance requirement in TS 3.7.7 for SFP must be met prior to entry in to the specified condition. The remaining application is not necessary to preclude this and is being eliminated. Because 10 CFR 50.82(a)(2) will prohibit operation of the plant or placing fuel in the reactor vessel, the reference to operating Modes and shutdown of the unit will no longer be relevant and are being deleted. Additionally, the reference to exceptions and allowances stated in the TS LCO is deleted since these items are not applicable in PDTS.

TS Section 3.1, REACTIVITY CONTROL SYSTEMS TS Section 3.1 contains LCOs and SRs to assure and verify operability of reactivity control systems. Once CPS dockets the certifications required by 10 CFR 50.82(a)(1), the 10 CFR Part 50 license will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel, in accordance with 10 CFR 50.82(a)(2). Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, reactivity control systems will not be required and these LCOs (and associated SRs) will not apply in a defueled condition. Therefore, TS Section 3.1 is proposed for deletion in its entirety.

TS 3.1.1, SHUT DOWN MARGIN (SDM)

This specification defines the minimum shut down margin in the reactor core for Modes 1, 2, 3, 4, and 5. SDM was included in the Improved Technical Specifications (ITS) to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii).

TS 3.1.1 is not proposed for inclusion in the PDTS since CPS will be permanently shut down and defueled. This TS does not provide protection for the cladding of fuel stored in the SFP.

TS 3.1.2, Reactivity Anomalies This specification defines the required accuracy for measured vs. predicted rod density. This specification is applicable during Modes 1 and 2. Reactivity anomaly was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii).

TS 3.1.2 is not included in the PDTS since CPS will be permanently shut down and defueled, and this TS does not provide protection for the cladding of fuel stored in the SFP. TS 3.1.3, Control Rod

OPERABILITY This specification defines the operability requirements for the control rods. This specification is applicable during Modes 1 and 2. Control rod OPERABILITY was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii).

TS 3.1.3 is not proposed for inclusion in the PDTS, since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. At that time, the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel. TS 3.1.4, Control Rod Scram Times This specification defines the control rod scram times. This specification is applicable during Modes 1 and 2. Control rod scram times were License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 21 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.1.4, including Table 3.1.4-1, "Control Rod Scram Times," is not proposed for inclusion in the PDTS, since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. At that time, the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel. TS 3.1.5, Control Rod Scram Accumulators This specification defines the operability requirements for the control rod scram accumulators. This specification is applicable during Modes 1 and 2. Control rod scram accumulators were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii).

TS 3.1.5 is not proposed for inclusion in the PDTS, since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. At that time, the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel. TS 3.1.6. Control Rod Pattern This Specification defines the control rod sequences to assure that the control rod patterns are consistent with the assumptions of the Control Rod Drop Accident analyses. This specification is applicable during Modes 1 and 2 with THERMAL POWER < 16.7% RTP. Rod pattern control was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii).

TS 3.1.6 is not proposed for inclusion in the PDTS, since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. At that time, the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel. TS 3.1.7, Standby Liquid Control (SLC) System This specification defines the operability requirements for the SLC System. This specification is applicable during Modes 1, 2, and 3. The SLC System was included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.1.7, including Figure 3.1.7-1, "Weight Percent Sodium Pentaborate Solution Concentration/Net Tank Volume Requirements," is not proposed for inclusion in the PDTS, since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. At that time, the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel.

TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves This specification defines the operability requirements for the SDV vent and drain valves. This specification is applicable during Modes 1 and 2. The SDV vent and drain valves were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii).

TS 3.1.8 is not proposed for inclusion in the PDTS, since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. At that time, the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 22 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS SECTION 3.2, POWER DISTRIBUTION LIMITS TS Section 3.2 contains LCOs and SRs to ensure that power distribution limits are met. Once CPS dockets the certifications required by 10 CFR 50.82(a)(1), the 10 CFR Part 50 license will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel, in accordance with 10 CFR 50.82(a)(2). Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, power distribution limits will not be required and these LCOs (and associated SRs) will not apply in a defueled condition. Therefore, TS Section 3.2 is proposed for deletion in its entirety. TS 3.2.1, AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) This specification defines limits for the APLHGR to ensure that the peak cladding temperature (PCT) during the postulated design basis Loss of Coolant Accident (LOCA) does not exceed the limits specified in 10 CFR 50.46. This specification is applicable when THERMAL POWER > 21.6% RTP. The APLHGR was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.2.1 is not proposed for inclusion in the PDTS since the 10 CFR Part 50 license no longer will per mit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. This TS does not provide protection for the cladding of fuel stored in the SFP.

TS 3.2.2, MINIMUM CRITICAL POWER RATIO (MCPR) This specification defines limits for the MCPR to ensure that no fuel damage results during abnormal operational transients. This specification is applicable when THERMAL POWER > 21.6% RTP. The MCPR was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.2.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. This TS does not provide protection for the cladding of fuel stored in the SFP.

TS 3.2.3, LINEAR HEAT GENERATION RATE (LHGR) This specification defines limits for the LHGR to ensure that fuel design limits are not exceeded anywhere in the core during normal operation, including abnormal operational transients, and to ensure that the PCT during a postulated design basis LOCA does not exceed the limits specified in 10 CFR 50.46. This specification is applicable when THERMAL POWER > 21.6% RTP. The LHGR was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.2.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. This TS does not provide protection for the cladding of fuel stored in the SFP.

TS SECTION 3.3, INSTRUMENTATION TS Section 3.3 contains LCOs and SRs to assure and verify operability of instrumentation systems. Once CPS dockets the certifications required by 10 CFR 50.82(a)(1), the 10 CFR Part 50 license will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel, in License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 23 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes accordance with 10 CFR 50.82(a)(2). The design basis FHA was assessed for post-cessation of power operations in order to justify the elimination of TS requirements for the operability of control room ventilation (CRV) systems. Following 60 days of decay post-shutdown, the dose consequences to occupants in the control room are acceptable without relying on the control room systems to remain functional during and following a FHA. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the instrumentation addressed in TS Section 3.3 will not be required and these LCOs (and associated SRs) will not apply in a defueled condition. Therefore, TS Section 3.3 is proposed for deletion in its entirety. TS 3.3.1.1, Reactor Protection System (RPS) Instrumentation This specification provides the operability requirements for the RPS instrumentation specified in TS Table 3.3.1.1-1. The RPS Instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). Functions not specifically credited in the accident analysis are retained for the RPS as required by the NRC approved licensing basis. The Scram Discharge Volume water level - high function was retained in the ITS to ensure the RPS remained operable. The Drywell Pressure - High, Intermediate Range Monitor - Inop, Average Power Range Monitor - Inop, Reactor Mode Switch - Shut down Position and the Manual Scram functions were retained in the ITS for the RPS as required by the NRC approved licensing basis. TS 3.3.1.1, including TS Table 3.3.1.1-1, is not proposed for inclusion in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for RPS instrumentation to protect

the core. TS 3.3.1.2, Source Range Monitor (SRM) Instrumentation This specification provides the operability requirements for the SRM instrumentation specified in TS Table 3.3.1.2-1. The SRM Instrumentation was retained in the ITS, because they provided the only on-scale monitoring of neutron flux levels during startup and refueling. TS 3.3.1.2, including TS Table 3.3.1.2-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for SRM instrumentation to monitor flux levels during startup and refueling.

TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation This specification provides the operability requirements for the Oscillation Power Range Monitor (OPRM) Instrumentation to detect and suppress neutron flux oscillations in the event of thermal-hydraulic instability. This specification is applicable when THERMAL POWER > 21.6% RTP. The OPRM Instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.1.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for monitoring to detect events of thermal-hydraulic instability. TS 3.3.2.1, Control Rod Block Instrumentation This specification provides the operability requirements for the Control Rod Block instrumentation specified in TS Table 3.3.2.1-1. The Control Rod Block Instrumentation was included in the ITS to satisfy Criterion 3 License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 24 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes of 10 CFR 50.36(c)(2)(ii). TS 3.3.2.1, including TS Table 3.3.2.1-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for control rods to control core reactivity.

TS 3.3.3.1, Post Accident Monitoring (PAM) Instrumentation This specification provides the operability requirements for the PAM instrumentation specified in TS Table 3.3.3.1-1. This specification is applicable during Modes 1 and 2. The PAM instrumentation that satisfied the definition of Type A in Regulatory Guide 1.97 was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). PAM instrumentation that was Category 1, not Type A, instrumentation were retain in the ITS, because they were intended to assist operators in minimizing the consequences of accidents. These Category 1 variables were considered important for reducing public risk. TS 3.3.3.1, including TS Table 3.3.3.1-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The instrumentation specified in TS Table 3.3.3.1-1 would not provide information to operators during a FHA in the SFP. Thus, there will no longer be a need for PAM instrumentation.

TS 3.3.3.2, Remote Shutdown System This specification provides the operability requirements for the instrumentation and controls necessary to place and maintain the plant in Mode 3 from a location other than the control room. This specification is applicable during Modes 1 and 2. The Remote Shutdown System is considered an important contributor to reducing the risk of accidents; as such, it has been retained in the TS as indicated in the NRC Policy

Statement. TS 3.3.3.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the Remote Shutdown System to shutdown the reactor.

TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation This specification provides the operability requirements for the EOC-RPTinstrumentation. This specification is applicable when THERMAL POWER > 33.3% RTP with any recirculation pump in fast speed. This instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.4.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. A pressurizati on transient will not be a credible event once the plant is in the permanently defueled condition. Thus, there will no longer be a need for EOC-RPT instrumentation.

TS 3.3.4.2, Anticipated Transient Without Scram This specification provides the operability requirements for the ATWS-RPT instrumentation. This specification is applicable in Mode 1. This License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 25 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Recirculation Pump Trip (ATWS-RPT) Instrumentation instrumentation was included in the ITS to meet the requirements of 10CFR 50.62(c)(5) and satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.3.4.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. An ATWS will not be a credible event once the plant is in the permanently defueled condition. Thus, there will no longer be a need for ATWS-RPT instrumentation. TS 3.3.5.1, Emergency Core Cooling System (ECCS)

Instrumentation This specification provides the operability requirements for the ECCS instrumentation specified in TS Table 3.3.5.1-1. The ECCS instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). The Reactor Vessel Water Level - high, Level 8 function was retained in the TS, because it was a potentially significant contributor to risk. In addition, the manual initiation functions for the High Pressure Core Spray (HPCS) System, the Low Pressure Core Spray (LPCS) System, the low pressure coolant injection (LPCI) mode of the Residual Heat Removal (RHR) System, and the Automatic Depressurization System (ADS), were retained as required by the NRC in the plant licensing basis. TS 3.3.5.1, including TS Table 3.3.5.1-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for ECCS instrumentation.

TS 3.3.5.2, Reactor Core Isolation Cooling (RCIC) System Instrumentation This specification provides the operability requirements for the RCIC instrumentation specified in TS Table 3.3.5.2-1. This specification is applicable in Mode 1 and in Mode 2 and 3 with reactor steam dome pressure > 150psig. The RCIC instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). The manual initiation function was retained in the ITS for the RCIC function as required by the NRC in the plant licensing basis. TS 3.3.5.2, including TS Table 3.3.5.2-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for RCIC instrumentation.

TS 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation This specification provides the operability requirements for the Primary Containment and Drywell Isolation instrumentation specified in TS Table 3.3.6.1-1. The Primary Containment and Drywell isolation instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.6.1, including TS Table 3.3.6.1-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The FHA is the only credible DBA possible in the permanently defueled condition. The FHA analysis does not rely on primary containment to mitigate the consequences of the FHA. Therefore, this specification may be deleted.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 26 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.3.6.2, Secondary Containment Isolation Instrumentation This specification provides the operability requirements for the secondary containment isolation instrumentation specified in TS Table 3.3.6.2-1. This specification is applicable in Mode 1, 2, and 3, or during operations with a potential for draining the reactor vessel, or during movement of recently irradiated fuel in the primary or secondary containment or the fuel building. The secondary containment isolation instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.6.2, including TS Table 3.3.6.2-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The requirement for Mode dependency will no longer apply. This specification will not be required after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of decay following shut down, because the nuclear fuel will no longer be considered to be "recently irradiated." In addition, the other condition requiring the operability of specific functions of the secondary containment isolation instrumentation (operations with the potential to drain the reactor vessel) will not be applicable following permanent removal of the fuel from the reactor vessel. Thus, there will no longer be a need for the secondary containment isolation instrumentation.

TS 3.3.6.3, Residual Heat Removal (RHR) Containment Spray System Instrumentation This specification provides the operability requirements for the Residual Heat Removal (RHR) Containment Spray System Instrumentation specified in TS Table 3.3.6.3-1. This specification is applicable in Mode 1, 2, and 3. The RHR Containment Spray System Instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.6.3, including TS Table 3.3.6.3-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The potential for containment pressure to exceed design limits will not occur; therefore, the instrumentation specified in TS Table 3.3.6.3-1 will no longer be needed to ensure that containment pressure is maintained within its limits following a loss of coolant accident (LOCA). TS 3.3.6.4, Suppression Pool Makeup (SPMU) System Instrumentation This specification provides the operability requirements for the Suppression Pool Makeup (SPMU) System Instrumentation specified in TS Table 3.3.6.4-1. This specification is applicable in Mode 1, 2, and 3. The SPMU System Instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.6.4, including TS Table 3.3.6.4-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The potential for containment pressure and temperature to exceed design limits will not occur; therefore, the instrumentation specified in TS Table 3.3.6.4-1 will no longer be required to maintain the drywell horizontal vent coverage and adequate suppression pool heat sink volume. TS 3.3.6.5, Relief and Low-This specification provides the operability requirements for the Relief and Low-Low Set (LLS) Instrumentation. This specification is applicable in License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 27 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Low Set (LLS) Instrumentation Mode 1, 2, and 3. The Relief and LLS Instrumentation included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.6.5 is not included in the PDTS the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The potential of an overpressurization of the nuclear steam system will not occur and the relief and LLS instrumentation will not be required to ensure that the containment loads remain within the primary containment design basis.

TS 3.3.7.1, Control Room

Ventilation System Instrumentation This specification provides the operability requirements for the Control Room Ventilation (CRV) System instrumentation. This specification is applicable in Mode 1, 2, and 3, or during operations with a potential for draining the reactor vessel, or during Core Alterations or during movement of irradiated fuel in the primary or secondary containment. This instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.7.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted and after 60 days of decay following shut down. The design basis FHA was assessed for post-cessation of power operations in order to justify the elimination of TS requirements for the operability of control room ventilation (CRV) systems. The results of the evaluation indicated a 60 days decay time to meet the regulatory acceptance criteria of 10 CFR 50.67 and Regulatory Guide 1.183 without credit for CRV systems, intake radiation monitors, and operator action in selecting control room intake with the lowest concentration of airborne activity. In addition, the other conditions requiring the operability of the CRV system instrumentation (Core Alterations or operations with the potential to drain the reactor vessel) will not be applicable following permanent removal of the fuel from the reactor vessel. TS LCO 3.3.7.1 is a support LCO that supports LCO 3.7.3. Therefore, after 60 days of decay following shutdown, the conditions requiring the CRV system instrumentation to be operable will no longer be applicable and the CRV system instrumentation will not be required to mitigate the consequences of the FHA, which is the remaining DBA of concern that will be possible in the permanently defueled condition. Thus, there will no longer be a need for the CRV system instrumentation TS 3.3.8.1, Loss of Power (LOP) Instrumentation This specification provides the operability requirements for the LOP instrumentation specified in TS Table 3.3.8.1-1. This specification is applicable during Modes 1, 2 and 3 and during a specified condition of "When the associated diesel generator (DG) is required to be OPERABLE by LCO 3.8.2, "AC Sources - Shutdown." This instrumentation was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.8.1, including TS Table 3.3.8.1-1, is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for this LCO during Modes 1, 2 or 3. With the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 28 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes elimination of TS LCO 3.7.3 and 3.7.4, the EDG no longer supports the systems that are required for movement of irradiated fuel. These TS are supported by TS LCO 3.8.9 and 3.8.10, which are supported by TS LCOs 3.8.1 and 3.8.2. This TS LCO also has a specified condition of "When the associated diesel generator (DG) is required to be OPERABLE by LCO 3.8.2, "AC Sources - Shutdown." Since LCO 3.8.2 is proposed for deletion (see discussion below), LCO 3.3.8.1 is proposed for deletion. TS 3.3.8.2, Reactor Protection System (RPS) Electric Power Monitoring This specification provides the operability requirements for the RPS electric power monitoring assemblies that isolate the RPS bus from the normal uninterruptible power supply (UPS) or alternate power supply in the event of overvoltage, undervoltage, or underfrequency. This specification is applicable in Modes 1, 2, and 3, or Modes 4 and 5 with any control rod withdrawn for a core cell containing one or more fuel assemblies. They were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.3.8.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. There will no longer be a need for RPS instrumentation to protect the core. TS 3.3.1.1 RPS Instrumentation is being eliminated as documented above. Thus, there will no longer be a need for RPS Electric Power Monitoring.

TS SECTION 3.4, REACTOR COOLANT SYSTEM (RCS) TS Section 3.4 contains LCOs and SRs that provide assurance of the integrity and safe operation of the RCS and the operation of the associated equipment. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the re actor vessel, the LCOs (and associated SRs) will not apply (or are no longer needed) in a defueled condition. Therefore, TS Section 3.4 is proposed for deletion in its entirety. TS 3.4.1, Recirculation Loops Operating This specification provides the operability requirements for the Recirculation Loops. The Reactor Coolant Recirculation System provides forced coolant flow through the core to remove heat from the fuel. This specification is applicable in Mode 1 and 2. The Recirculation Loops Operating were included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.1 is not proposed for inclusion in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the Recirculation Loops. TS 3.4.2. Flow Control Valves (FCVs) This specification provides the operability requirements for the Reactor Coolant System flow control valves. A FCV in each operating recirculation loop must be operable to ensure that the assumptions of the design basis transient and accident analyses are satisfied. This specification is applicable in Mode 1 and 2. Flow control valves satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii).

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 29 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.4.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the flow control valves. TS 3.4.3, Jet Pumps This specification provides the operability requirements for the Jet pumps. The jet pumps are part of the Reactor Coolant Recirculation System and are designed to provide forced circulation through the core to remove heat from the fuel. This specification is applicable in Mode 1 and 2. The jet pumps were included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the jet pumps. TS 3.4.4, Safety/Relief Valves (S/RVs) This specification provides the operability requirements for the S/RVs. These valves provide overpressure protection to the reactor during operation. This specification is applicable in Mode 1, 2, and 3. The S/RVs were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.4.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the S/RVs. TS 3.4.5, RCS Operational

LEAKAGE This specification provides the allowable leakage rates of reactor coolant from the RCS. The limits provided protection of the reactor coolant pressure boundary from degradation and the core from inadequate cooling. This specification is applicable in Mode 1, 2, and 3. Limits on RCS operational leakage were included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.5 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the limits on RCS operational leakage.

TS 3.4.6, RCS Pressure Isolation Valve (PIV) Leakage This specification provides the allowable leakage rates for the Reactor Coolant System pressure isolation valves. This specification is applicable in Modes 1, 2, and 3 except during transition to or from shutdown cooling mode. The limits were intended to prevent overpressure failure of the low pressure portions of the systems connected to the RCS. The leakage limit is an indication that the PIVs between the RCS and the connecting systems are degraded or degrading. Limits on RCS operational leakage were included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.6 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 30 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the limits on RCS PIV leakage. TS 3.4.7, RCS Leakage Detection Instrumentation This specification provides the operability requirements for the RCS leakage detection instrumentation. This specification is applicable in Mode 1, 2, and 3. They were included in the ITS to satisfy Criterion 1 of 10 CFR 50.36(c)(2)(ii). TS 3.4.7 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the RCS leakage detection instrumentation. TS 3.4.8, RCS Specific Activity This specification provides limits regarding RCS specific activity. This specification is applicable in Mode 1 or in Mode, 2 and 3 with any main steam line not isolated. These limits were included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.8 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the limits on RCS specific activity.

TS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown This specification provides the operability requirements for the RHR shut down cooling system during hot shut down. This specification is applicable in Mode 3 with reactor steam dome pressure less than the RHR cut in permissive pressure. The RHR shut down cooling system was included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.4.9 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, the RHR shut down cooling mode of the RHR system will no longer be required. TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown This specification provides the operability requirements for the RHR shut down cooling system during cold shut down. This specification is applicable in Mode 4. The RHR shut down cooling system was included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.4.10 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, the RHR shut down cooling mode of the RHR system will no longer be required. TS 3.4.11, RCS Pressure and Temperature (P/T) Limits This specification provides RCS P/T limits that provide a margin to brittle failure of the reactor vessel and piping of the reactor coolant pressure boundary. The reactor vessel is the component most subject to brittle failure; therefore, the LCO limits apply mainly to the vessel.

Figures 3.4.11-1, 3.4.11-2, and 3.4.11-3 contain composite P/T limit curves for heatup, cooldown, and inservice leak and hydrostatic (ISLH)

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 31 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes testing. The RCS P/T limits provide a definition of acceptable operation for prevention of nonductile failure in accordance with 10 CFR 50, Appendix G. Although the P/T limits were developed to provide guidance for operation during heatup or cooldown or ISLH testing, their Applicability is at all times in keeping with the concern for nonductile failure. The P/T limits were included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.11, including Figures 3.4.11-1, 3.4.11-2, and 3.4.11-3, is not included in the PDTS since CPS will be permanently shut down and defueled. As such, the requirements of 10 CFR 50, Appendix G, no longer apply in such a condition because the reactor coolant pressure boundary will no longer be used as a fission product barrier when the reactor vessel is permanently defueled. Therefore, TS 3.4.3 is no longer needed and may be deleted. TS 3.4.12, Reactor Steam Dome Pressure This specification provides the limit on the reactor steam dome pressure. The reactor steam dome pressure is an assumed value in the determination of compliance with reactor pressure vessel overpressure protection criteria and is also an assumed initial condition of DBAs and transients. This specification is applicable in Mode 1 and 2. The reactor steam dome pressure limit was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.4.12 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The reactor vessel will remain depressurized; thus, there will no longer be a need for the reactor steam dome pressure limit. TS SECTION 3.5, EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM TS Section 3.5 contains LCOs and SRs that provide assurance of the integrity and safe operation of the ECCS and RCIC System. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the LCOs (and associated SRs) will not apply (or are no longer needed) in a defueled condition. Therefore, TS Section 3.5 is proposed for deletion in its entirety.

TS 3.5.1, ECCS - Operating This specification provides operability requirements for the ECCS under operating conditions (i.e., Modes 1, 2, and 3). The ECCS network consists of the High Pressure Core Spray (HPCS) System, the Low Pressure Core Spray (LPCS) System, the low pressure coolant injection (LPCI) mode of the Residual Heat Removal (RHR) System, and the Automatic Depressurization System (ADS). The suppression pool provides the required source of water for the ECCS. The ECCS was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.5.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the ECCS.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 32 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.5.2, ECCS - Shutdown This specification provides operability requirements for ECCS under Shutdown Conditions (i.e., Modes 4 and 5). These were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.5.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the low pressure ECCS subsystems. TS 3.5.3, RCIC System This specification provides operability requirements for RCIC system. This specification is applicable in Modes 1 or Modes 2, and 3 with reactor steam dome pressure > 150 psig. Its function was to respond to transient events by providing makeup coolant to the reactor. The RCIC System was included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.5.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the RCIC System. TS SECTION 3.6, CONTAINMENT SYSTEMS TS Section 3.6 contains LCOs and SRs that provide assurance of the integrity and safe operation of the containment systems. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the LCOs (and associated SRs) will not apply (or are no longer needed) in a defueled condition. Therefore, TS Section 3.6 is proposed for deletion in its entirety.

TS 3.6.1.1, Primary Containment This specification provides operability requirements for the primary containment. Its function was to isolate and contain fission products released from the Reactor Primary System following a DBA and to confine the postulated release of radioactive material to within limits. This specification is applicable in Modes 1, 2 and 3. The primary containment was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, the requirements for primary containment are no longer applicable.

TS 3.6.1.2, Primary Containment Air Locks This specification provides operability requirements for the primary containment air locks. This specification is applicable in Modes 1, 2, and 3, or during operations with a potential for draining the reactor vessel, or during movement of recently irradiated fuel in the primary or secondary containment. The airlocks provide personnel access to the primary containment and provide containment isolation during the process of personnel entry and exit. The primary containment air locks were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.2 is not included in the PDTS since the 10 CFR Part 50 license License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 33 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the primary containment air locks.

TS 3.6.1.3, Primary Containment Isolation Valves (PCIVs) This specification provides operability requirements for the PCIVs. Their function was to limit fission products released during and following a DBA to within limits. This specification is applicable in Modes 1, 2, 3, or during operations with a potential for draining the reactor vessel, or during movement of recently irradiated fuel in the primary or secondary containment; and Modes 4 and 5 for RHR system Level 3 containment isolation. The PCIVs were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the PCIVs. TS 3.6.1.4, Primary Containment Pressure This specification provides a limit regarding primary containment pressure during normal operation to preserve the initial conditions assumed in the accident analysis for a DBA. This specification is applicable in Modes 1, 2, and 3. The limit on primary containment pressure was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need to maintain the limit on primary containment pressure.

TS 3.6.1.5, Primary Containment Air Temperature This specification provides a limit regarding primary containment air temperature to preserve the initial conditions assumed in the accident analysis for a DBA. This specification is applicable in Modes 1, 2, and 3. The limit on primary containment air temperature was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.5 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need to maintain the limit on primary containment air temperature. TS 3.6.1.6, Low-Low Set (LLS)

Valves This specification provides operability requirements for the LLS function of five S/RVs. The LLS function prevents excessive short duration S/RV cycles with valve actuation at the relief setpoint. The requirements of this LCO are applicable to the mechanical and electrical/pneumatic capability of the LLS valves to function for controlling the opening and closing of the S/RVs. This specification is applicable in Modes 1, 2, and 3. The LLS valves were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.6 is not included in the PDTS since the 10 CFR Part 50 license License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 34 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the LLS valves. TS 3.6.1.7, Residual Heat Removal (RHR) Containment Spray System This specification provides operability requirements for the RHR containment spray system. Its function was to mitigate the effects of drywell bypass leakage and low energy steam release into the primary containment airspace. This specification is applicable in Modes 1, 2, and 3. The RHR containment spray system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.7 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the RHR containment spray system. TS 3.6.1.8 Deleted Deleted TS 3.6.1.9, Feedwater Leakage Control System (FWLCS) This specification provides operability requirements for the FWLCS. The FWLCS supplements the isolation function of primary containment isolation valves (PCIVs) in the feedwater lines which also penetrate the secondary containment. These penetrations are sealed by water from the FWLCS to prevent fission products (post-LOCA containment atmosphere) from leaking past the isolation valves and bypassing the secondary containment after a DBA LOCA. This specification is applicable in Modes 1, 2, and 3. The FWLCS was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.1.9 is not included in the PDTS since CPS will be permanently shut down and defueled. The Part 50 license will prohibit operation of the reactor once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the FWLCS. TS 3.6.2.1, Suppression Pool Average Temperature This specification provides a limit regarding suppression pool average temperature to assure that the primary containment conditions assumed for the safety analysis are met. This specification is applicable in Modes 1, 2, and 3. The limit on suppression pool average temperature was included in the ITS to satisfy Criteria 2 and 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.2.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need to maintain the limit on suppression pool average temperature. TS 3.6.2.2, Suppression Pool Water Level This specification provides a limit regarding suppression pool water level to preserve the initial conditions assumed in the accident analysis for a DBA. This specification is applicable in Modes 1, 2, and 3. The limit on suppression pool water level was included in the ITS to satisfy Criteria 2 and 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.2.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 35 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need to maintain the limit on suppression pool water level. TS 3.6.2.3, Residual Heat Removal (RHR) Suppression Pool Cooling This specification provides operability requirements for the RHR suppression pool cooling system. Its function was to remove heat from the suppression pool following a DBA. This specification is applicable in Modes 1, 2, and 3. The RHR suppression pool cooling system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.2.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the RHR suppression pool cooling system. TS 3.6.2.4, Suppression Pool Makeup (SPMU) System This specification provides operability requirements for the suppression pool makeup system. The function of the SPMU system was to transfer water from the upper containment pool to the suppression pool after a LOCA to maintain drywell horizontal vent coverage and an adequate suppression pool heat sink volume to ensure that the primary containment internal pressure and temperature stay within design limits. This specification is applicable in Modes 1, 2, and 3. The SPMU system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.2.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the suppression pool makeup system. TS 3.6.3.1 Deleted Deleted TS 3.6.3.2, Primary Containment and Drywell Hydrogen Igniters This specification provides operability requirements for the primary containment and drywell hydrogen igniters. The function of the hydrogen igniters was to reduce the hydrogen concentration in the primary containment following a degraded core accident by ensuring the combustion of hydrogen in a manner such that containment overpressure failure is prevented as a result of a postulated degraded core accident. This specification is applicable in Modes 1 and 2. The hydrogen igniters were included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.6.3.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the primary containment and drywell hydrogen igniters. TS 3.6.3.3, Containment/ Drywell Hydrogen Mixing Systems This specification provides the operability requirements for the Containment/Drywell Hydrogen Mixing System. The hydrogen mixing system ensures a uniformly mixed post-accident containment atmosphere, thereby minimizing the potential for local hydrogen burns due to a pocket of hydrogen above the flammability concentration. This specification is applicable in Mode 1 and 2. The containment/drywell License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 36 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes hydrogen mixing system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.3.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the containment/drywell hydrogen mixing system. TS 3.6.4.1, Secondary Containment This specification provides the operability requirements for secondary containment. The function of the secondary containment is to contain, dilute, and hold up fission products that may leak from primary containment following a DBA. In conjunction with operation of the Standby Gas Treatment (SGT) System and closure of certain valves whose lines penetrate the secondary containment, the secondary containment is designed to reduce the activity level of the fission products prior to release to the environment and to isolate and contain fission products that are released during certain operations that take place inside primary containment, when primary containment is not required to be operable, or that take place outside primary containment.

This specification is applicable in Mode 1, 2, and 3, or during operations with a potential for draining the reactor vessel, or during movement of recently irradiated fuel in the primary or secondary containment. The secondary containment was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.4.1 requires that secondary containment be operable for situations for which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs) or during movement of recently irradiated fuel assemblies (i.e., fuel that has occupied part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) in the primary or secondary containment. TS 3.6.4.1 is not included in the PDTS since CPS will be permanently shut down and defueled. This specification will no longer be required after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of decay following shut down, because the nuclear fuel will no longer be considered to be "recently irradiated." In addition, the other condition requiring that secondary containment integrity be met (i.e., operations with the potential to drain the reactor vessel) will not be applicable following permanent removal of the fuel from the reactor vessel. Therefore, the conditions requiring secondary containment integrity will no longer be applicable and secondary containment will not be required. TS 3.6.4.2, Secondary Containment Isolation Dampers (SCIDs) This specification provides the operability requirements for the SCIDs. The function of the SCIDs is to limit fission product release during and following postulated DBAs. This specification is applicable in Mode 1, 2, and 3, or during operations with a potential for draining the reactor vessel, or during movement of recently irradiated fuel in the primary or secondary containment. The SCIDs were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.4.2 requires that secondary containment be operable for situations for which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs) or during movement of recently irradiated fuel assemblies (i.e., fuel that has occupied part of a critical reactor core License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 37 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). TS 3.6.4.2 is not included in the PDTS since CPS will be permanently shut down and defueled. This specification will no longer be required after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of decay following shut down, because the nuclear fuel will no longer be considered to be "recently irradiated." In addition, the other condition requiring operability of the SCIDs (i.e., operations with the potential to drain the reactor vessel) will not be applicable following permanent removal of the fuel from the reactor vessel. Therefore, the conditions requiring the SCIDs to be operable will no longer be applicable and the SCIDs will not be required. TS 3.6.4.3, Standby Gas Treatment (SGT) System This specification provides the operability requirements for the SGT system. The function of the SGT system is to ensure that radioactive materials that leak from the primary containment into the secondary containment following a DBA are filtered and adsorbed prior to exhausting to the environment. This specification is applicable in Mode 1, 2, and 3, or during operations with a potential for draining the reactor vessel, or during movement of recently irradiated fuel in the primary or secondary containment. The SGT system were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.4.3 requires that standby gas treatment be operable for situationsfor which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs) or during movement of recently irradiated fuel assemblies (i.e., fuel that has occupied part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) in the primary or secondary containment. TS 3.6.4.3 is not included in the PDTS since CPS will be permanently shut down and defueled. This specification will no longer be required after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of decay following shut down, because the nuclear fuel will no longer be considered to be "recently irradiated." In addition, the other condition requiring operability of the SGT system (operations with the potential to drain the reactor vessel) will not be applicable following permanent removal of the fuel from the reactor vessel. Therefore, the conditions requiring the SGT system to be operable will no longer be applicable and the SGT system will not be required. TS 3.6.5.1, Drywell This specification provides operability requirements for the drywell. Its function was to maintain a pressure boundary that channels steam from a LOCA to the suppression pool, where it is condensed and protect accessible areas of the containment from radiation originating in the reactor and reactor coolant system. This specification is applicable in Mode 1, 2, and 3. The drywell was included in the ITS to satisfy Criteria 2 and 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.5.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the drywell. TS 3.6.5.2, Drywell Air Lock This specification provides operability requirements for the drywell air lock. The airlock forms part of the drywell boundary and provides a means for personnel access during shutdown and the low power phase of startup. This specification is applicable in Mode 1, 2, and 3. The License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 38 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes drywell air lock was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.5.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the drywell air lock. TS 3.6.5.3, Drywell Isolation

Valves This specification provides operability requirements for the drywell isolation valves. Their function was to form a part of the drywell boundary and ensure that steam and water releases to the drywell are channeled to the suppression pool to maintain the pressure suppression function of the drywell. This specification is applicable in Mode 1, 2, and 3. The drywell isolation valves were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.6.5.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the drywell isolation valves. TS 3.6.5.4, Drywell Pressure This specification provides a limit regarding drywell-to-primary containment pressure which is an assumed initial condition in the analyses that determine the primary containment thermal hydraulic and dynamic loads during a postulated LOCA. This specification is applicable in Mode 1, 2, and 3. The limit on drywell pressure was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.6.5.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need to maintain the limit on drywell pressure.

TS 3.6.5.5, Drywell Air Temperature This specification provides a limit regarding drywell air temperature to ensure that the peak drywell temperature during a design basis LOCA does not exceed the design temperature and ensures the ability of the drywell to perform its design function. This specification is applicable in Mode 1, 2, and 3. The limit on drywell air temperature was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.6.5.5 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need to maintain the limit on drywell air temperature. TS 3.6.5.6, Drywell Post-LOCA Vacuum Relief System This specification provides operability requirements for the drywell post-LOCA vacuum relief system. Its function was to support operation of the hydrogen mixing system and reduce suppression pool drag and impact loads in the event of a large break LOCA. This specification is applicable in Mode 1, 2, and 3. The drywell post-LOCA vacuum relief system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii).

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 39 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.6.5.6 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the drywell post-LOCA vacuum relief system.

TS SECTION 3.7, PLANT SYSTEMS (Current Title)

TS SECTION 3.7, FACILITY SYSTEMS (Proposed Title) TS Section 3.7 contains LCOs and SRs that provide assurance of the safe operation of various plant systems. The design basis FHA was assessed for post-cessation of power operations in order to justify the elimination of TS requirements for the operability of control room systems. Following 60 days of decay post-shutdown, the dose consequences to occupants in the control room are acceptable without relying on the control room systems to remain functional during and following a FHA. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the LCOs (and associated SRs) that do not apply (or are no longer needed) in a defueled condition are being proposed for deletion. TS 3.7.7, Spent Fuel Storage Pool Water Level, will be retained in the PDTS.

In the Section Title, the reference to the term "plant" is replaced with the term "facility," because the term "plant" generally refers to the reactor, which can no longer be operated, whereas the term "facility" refers to the overall site. TS 3.7.1, Division 1 and 2 Shutdown Service Water (SX)

Subsystems and Ultimate Heat Sink (UHS) This specification provides the operability requirements for the Division 1 and 2 Shutdown Service Water (SX) Subsystems and the Ultimate Heat Sink (UHS). The function of the SX system is to provide cooling water for the removal of heat from unit auxiliaries, such as RHR system heat exchangers, standby DGs, and room coolers for ECCS equipment required for a safe reactor shut down following a DBA or transient. The UHS is a portion of Clinton Lake that provides sufficient water inventory for all SX system post-LOCA cooling requirements for a 30-day period with no external makeup water source available. This specification is applicable during Modes 1, 2 and 3. The SX system and ultimate heat sink were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.7.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the SX system. TS 3.7.2, Division 3 Shutdown Service Water (SX) Subsystem This specification provides the operability requirements for the Division 3 Shutdown Service Water (SX) Subsystem. The function of the Division 3 SX system is to provide cooling water for the removal of heat from components of the Division 3 HPCS system and ensure the HPCS system will operate as required. This specification is applicable during Modes 1, 2 and 3. The Division 3 SX system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.7.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. In addition, the specification requiring operability of the ECCS, including the HPCS system, is being proposed for License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 40 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes deletion as described above in TS Section 3.5. Thus, there will no longer be a need for the Division 3 SX system. TS 3.7.3, Control Room Ventilation System This specification provides the operability requirements for the Control Room Ventilation System. The function of the control room ventilation system is to provide a protected environment from which occupants can control the plant following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The safety-related function of the Control Room Ventilation System used to control radiation exposure consists of two independent and redundant high efficiency air filtration subsystems for treatment of recirculated air or outside supply air and a Control Room Envelope (CRE) boundary that limits the inleakage of unfiltered air. The Control Room Ventilation System is designed to maintain a habitable environment in the CRE for a 30 day continuous occupancy after a DBA, without exceeding 5 rem total effective dose equivalent (TEDE). This specification is applicable during Modes 1, 2 and 3. TS 3.7.3 also requires that the control room ventilation system be operable for situations under which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during core alterations, or during movement of irradiated fuel assemblies in the primary or secondary containment. The control room ventilation system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.7.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted and after 60 days of decay following shut down. The design basis FHA was assessed for post-cessation of power operations in order to justify the elimination of TS requirements for the operability of control room ventilation (CRV) systems. The results of the evaluation indicated a 60 day decay time to meet the regulatory acceptance criteria of 10 CFR 50.67 and Regulatory Guide 1.183 without credit for CRV systems, intake radiation monitors, and operator action in selecting control room intake with the lowest concentration of airborne activity. In addition, following permanent removal of the fuel from the reactor vessel, operating modes and two of the three conditions requiring the operability of the CRV system (Core Alterations or operations with the potential to drain the reactor vessel) will not be applicable. The FHA analysis does not rely on the CRV system for accident mitigation (including any need for providing airborne radiological protection), the CRV system is therefore not required during movement of irradiated fuel assemblies for mitigation of a potential FHA. There are no active systems credited as part of the initial conditions of an analysis or as part of the primary success path for mitigation of the design basis accident that is credible with the unit permanently defueled. As such, the requirement for the CRV system is being deleted because there are no design basis events that rely on the CRV system for mitigation and the requirements of Criterion 3 of 10 CFR 50.36(c)(2)(ii)(C) no longer apply. Therefore, after 60 days of decay following shutdown, the conditions requiring the CRV system to be operable will no longer be applicable.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 41 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.7.4, Control Room Air Conditioning (AC) System This specification provides the operability requirements for the Control Room AC system. The function of the Control Room AC system is to provide temperature control for the control room and provide a controlled environment under both normal and accident conditions. This specification is applicable during Modes 1, 2 and 3. TS 3.7.4 also requires that the control room ventilation system be operable for situations under which significant releases of radioactive material can be postulated, such as during operations with a potential for draining the reactor vessel (OPDRVs), during core alterations, or during movement of irradiated fuel assemblies in the primary or secondary containment. The Control Room AC system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.7.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted and after 60 days of decay following shut down. Following permanent removal of the fuel from the reactor vessel, operating modes and two of the three conditions requiring the operability of the Control Room AC system (Core Alterations or operations with the potential to drain the reactor vessel) will not be applicable. The FHA analysis does not rely on the Control Room AC system for accident mitigation (including any need for maintaining control room temperature and habitability), the Control Room AC system is therefore not required during movement of irradiated fuel assemblies for mitigation of a potential FHA. There are no active systems credited as part of the initial conditions of an analysis or as part of the primary success path for mitigation of the design basis accident that is credible with the unit permanently defueled. As such, the requirement for the Control Room AC system is being deleted because there are no design basis events that rely on the Control Room AC system for mitigation and the requirements of Criterion 3 of 10 CFR 50.36(c)(2)(ii)(C) no longer apply. Therefore, after 60 days of decay following shutdown, the conditions requiring the Control Room AC system to be operable will no longer be applicable. TS 3.7.5, Main Condenser

Offgas This specification provides the operability requirements for the main condenser offgas system. The function of the main condenser offgas system is to reduce the gaseous radwaste emission. This specification is applicable during Modes 1 or in Mode 2 and 3 with any main steam line not isolated and steam jet air ejector (SJAE) in operation. The main condenser offgas system was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii).

TS 3.7.5 is not included in the PDTS since CPS will be permanently shut down and defueled. The Part 50 license will prohibit operation of the reactor once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the main condenser offgas system. TS 3.7.6, Main Turbine Bypass System This specification provides the operability requirements for the main turbine bypass system. The function of the main turbine bypass system is to control steam pressure when reactor steam generation exceeds turbine requirements during plant startup, sudden load reduction, and License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 42 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes cool down. This specification is applicable when THERMAL POWER is > 21.6% RTP. The main turbine bypass system was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.7.6 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the main turbine bypass system. TS 3.7.7, Fuel Pool Water Level This specification provides the minimum water level in the SFP and upper containment pool whenever movement of irradiated fuel assemblies occurs in the associated fuel storage pool since the potential for a release of fission products exists. TS 3.7.7 is being retained in the PDTS. The specification is administratively changed from affecting "plant" systems to "facility" systems to reflect a permanently defueled condition. The reference to the "upper containment fuel storage pool" is being deleted in the LCO statement. "Associated" fuel storage pool is being changed to "spent" fuel storage pool in the Applicability and the Required Action sections, since the upper containment pool will no longer be utilized once the reactor is permanently defueled and spent fuel is located in the SFP. The NOTE in Required Action A.1 (LCO 3.0.3 is not applicable) is being deleted to conform to the deletion of TS LCO 3.0.3 described in TS Section 3.0 LCO Applicability. The Frequency for SR 3.7.7.1 is being changed to 7 days to incorporate and conform with the deletion of the TS 5.5.16 Surveillance Frequency Control Program described in TS Section 5.0 Administrative Controls.

TS SECTION 3.8, ELECTRICAL POWER SYSTEMS TS Section 3.8 contains LCOs and SRs that provide assurance of the integrity and safe operation of AC Sources, DC Sources, and Electrical Distribution Systems. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the LCOs (and associated SRs) will not apply (or are no longer needed) in a defueled condition. Therefore, TS Section 3.8 is proposed for deletion in its entirety. TS 3.8.1, AC Sources -

Operating This specification provides the operability requirements for AC sources during specific operating Modes (i.e., Modes 1, 2, and 3). The function of the AC electrical power sources is to provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to engineered safety feature systems (ESF) so that the fuel, RCS, and containment design limits are not exceeded. The AC sources were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted.

As a result, CPS will no longer be allowed to be in Modes 1, 2, and 3. Thus, there will no longer be a need for the AC sources during the specified Modes of operation.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 43 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.8.2, AC Sources - Shutdown This specification provides the operability requirements for AC sources during specific shutdown Modes (i.e., Modes 4 and 5), or during the specified condition "During movement of irradiated fuel assemblies in the primary or secondary containment." The function of the AC electrical power sources is to provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to engineered safeguards systems so that the fuel, RCS, and containment design limits are not exceeded. The AC sources were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted.

Thus, there will no longer be a need for this TS LCO during Modes 4 and 5. This TS LCO is a support TS LCO that supports TS LCO 3.8.10 Distribution Systems - Shutdown (AC). TS LCO 3.8.10 (AC) is a support TS LCO for TS LCOs 3.7.3 and 3.7.4. Once TS LCOs 3.7.3 and 3.7.4 specified requirement "During movement of irradiated fuel assemblies in the primary or secondary containment" is eliminated after 60 days of decay following shutdown, this support TS LCO can be eliminated. TS 3.8.3, Diesel Fuel Oil, Lube

Oil, and Starting Air This specification provides limits on the diesel fuel oil, lube oil, and starting air subsystems. These systems support the operation of the standby AC power sources in accordan ce with TS 3.8.1 and TS 3.8.2. This TS LCO is applicable whenever an associate EDG is required to be operable. The diesel fuel oil, lube oil, and starting air subsystems were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). As described above, TS 3.8.1 and TS 3.8.2 are not included in the PDTS. Thus, TS 3.8.3 is not included in the PDTS, because the TSs that it supports are no longer required after CPS is permanently shut down.

TS 3.8.4, DC Sources - Operating This specification provides the operability requirements for DC sources during specific operating Modes (i.e., Modes 1, 2, and 3). The function of the DC electrical power sources is to provide the AC emergency power system with control power. It also provides both motive and control power to selected safety-related equipment. The DC sources were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. As a result, CPS will no longer be allowed to be in Modes 1, 2, and 3. Thus, there will no longer be a need for the DC sources during the specified Modes of operation. TS 3.8.5, DC Sources - Shutdown This specification provides the operability requirements for DC sources during specific shutdown Modes (i.e., Modes 4 and 5), or during the specified condition of "During the movement of irradiated fuel in the primary or secondary containment." The function of the DC electrical power sources is to provide the AC emergency power system with control power. It also provides both motive and control power to selected safety-related equipment. The DC sources were included in the ITS to License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 44 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.5 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for this LCO during Modes 4 and 5. This TS LCO is a support TS LCO for TS LCO 3.8.10 Distribution Systems - Shutdown. The (DC) distribution system supports the (AC) distribution system. TS LCOs 3.8.10 supports TS LCOs for TSs 3.7.3 and 3.7.4. Once TS LCOs 3.7.3 and 3.7.4 requirement during the specified condition "During movement of irradiated fuel assemblies in the primary or secondary containment" is eliminated after 60 days of decay following shutdown, this support TS LCO can be eliminated. TS 3.8.6, Battery Parameters This specification provides limits on various battery parameters (i.e., battery float current, electrolyte temperature, level and float voltage). These support the batteries that are required to be operable in accordance with TS 3.8.4 and TS 3.8.5. The battery cell parameters were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). As described above, TS 3.8.4 and TS 3.8.5 are not included in the PDTS. Thus, TS 3.8.6 is not included in the PDTS, because the TS that it supports are no longer required after CPS is permanently shut down. TS 3.8.7, Inverters - Operating This specification provides the operability requirements for the Inverters during specific operating Modes (i.e., Modes 1, 2, and 3). The inverters are the preferred source of power for the uninterruptible AC buses and the Reactor Power System solenoid buses because of the stability and reliability they achieve. The invert ers are powered from both AC and DC sources. The AC sources were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.7 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted.

As a result, CPS will no longer be allowed to be in Modes 1, 2, and 3. Thus, there will no longer be a need for the inverters during the specified Modes of operation. TS 3.8.8, Inverters - Shutdown This specification provides the operability requirements for the inverters during specific shutdown Modes (i.e., Modes 4 and 5), or during movement of irradiated fuel assemblies in primary or secondary containment. The inverters are the preferred source of power for the uninterruptible AC buses and the Reactor Power System solenoid buses because of the stability and reliability they achieve. The inverters are powered from both AC and DC sources. The AC sources were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.8 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the inverters during the specified Modes of operation (i.e. Modes 4 and 5). TS LCO 3.8.8 Inverters Shutdown is a support LCO that supports TS LCO 3.8.10 Distribution for the uninterruptable AC bus electrical distribution License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 45 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes system. The uninterruptable AC distribution portion of TS LCO 3.8.10 is a support LCO that supports TS LCO's 3.3.1.1, 3.3.1.3, 3.

3.2.1, 3.3.4.1, 3.3.4.2, 3.3.5.1, 3.3.5.2, 3.3.6.1, 3.3.6.2, 3.

3.6.3, 3.3.6.4 and 3.3.6.5 which are being proposed for deletion, see individual discussions above. Therefore, since all of listed support TS LCO are being proposed for deletion this support TS LCO is being is being proposed for deletion. TS 3.8.9, Distribution Systems - Operating This specification provides the operability requirements for AC and DC distribution systems during specific operating Modes (i.e., Modes 1, 2, and 3). The function of the AC and DC and uninterruptible AC bus electrical power distribution systems provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to Engineered Safety Feature systems so that the fuel, RCS, and containment design limits are not exceeded. The AC and DC distribution systems were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.9 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. As a result, CPS will no longer be allowed to be in Modes 1, 2, and 3. Thus, there will no longer be a need for AC and DC distribution systems during the specified Modes of operation. . TS 3.8.10, Distribution Systems - Shutdown This specification provides the operability requirements for AC and DC distribution systems during specific shutdown Modes (i.e., Modes 4 and 5), or during the specified condition of "During the movement of irradiated fuel assemblies in primary or secondary containment." The function of the AC and DC and uninterruptible AC bus electrical power distribution systems provide sufficient capacity, capability, redundancy, and reliability to ensure the availability of necessary power to Engineered Safety Feature systems so that the fuel, RCS, and containment design limits are not exceeded. The AC and DC distribution systems were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.8.10 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, there will no longer be a need for the distribution systems TS LCO during the specified Modes 4 or 5. This TS LCO is a support TS LCO that supports TS LCOs 3.7.3 and 3.7.4. Once TS LCOs 3.7.3 and 3.7.4 specified condition of "During movement of irradiated fuel assemblies in the primary or secondary containment" is eliminated after 60 days of decay following shutdown, this support LCO can be eliminated.

TS 3.8.11, Static VAR Compensator (SVC) Protection Systems. This specification provides the operability requirements for the SVC protection systems. Each of the auxiliary power transformers is provided with a permanently installed SVC which can be connected to the secondary side of the transformer to provide steady state, dynamic, and transient voltage support. The internal control system for each SVC includes control and protective functions. Backup protection is provided by a fully redundant and independent protection system. The protection systems are intended to minimize the potential for SVC failures to damage or degrade required ESF equipment. The SVC Protection License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 46 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes systems were included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). According to TS 3.8.11 the SVC protection system must be operable whenever its associated SVC is in operation. The SVC operation is associated with the operability of the offsite sources as governed by TS 3.8.1 and 3.8.2. As described above, TS 3.8.1 and TS 3.8.2 are not included in the PDTS. Therefore, TS 3.8.11 is not included in the PDTS, because the TSs that it supports are no longer required after CPS is permanently shut down. Additionally, all of the accident sequences that previously dominated risk at CPS do not use AC power and will no longer be applicable once the reactor is in the permanently shut down and defueled condition.

TS SECTION 3.9, REFUELING OPERATIONS TS Section 3.9 contains LCOs and SRs that provide operability requirements for systems and components and limits to: 1) prevent reactivity excursions; 2) limit offsite doses from an accident; and 3) remove decay heat from the RCS. These specifications are applicable during refueling operations. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the LCOs (and associated SRs) in Section 3.9 will no longer apply in a defueled condition. Therefore, TS Section 3.9 is proposed for deletion in its entirety. TS 3.9.1, Refueling Equipment Interlocks This specification provides the operability requirements for the refueling equipment interlocks. This specification is applicable during in-vessel fuel movement. The function of these interlocks was to restrict the operation of the refueling equipment or the withdrawal of control rods to reinforce plant procedures that prevent the reactor from achieving criticality during refueling. The refueling equipment interlocks were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.9.1 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor has been permanently defueled, refueling equipment interlocks will no longer be necessary since the interlocks are only required to be operable during in-vessel fuel movement with refueling equipment associated with the interlocks. Thus, there will no longer be a need for this specification. TS 3.9.2, Refuel Position One-

Rod-Out Interlock This specification provides the operability requirements for the refuel position one-rod-out interlock. This specification is applicable in Mode 5 with the reactor mode switch in the refuel position and any control rod withdrawn. Its function was to restrict the movement of control rods to reinforce plant procedures that prevent the reactor from becoming critical during refueling operations. The refuel position one-rod-out interlock was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.9.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor has been permanently defueled, the need to prevent an inadvertent criticality during refueling activities will no longer be a concern. Thus, there will no longer be a License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 47 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes need for this specification. TS 3.9.3, Control Rod Position This specification requires all control rods to be fully inserted when loading fuel assemblies into the core to minimize the probability of an inadvertent criticality during refueling. This specification is applicable when loading fuel assemblies into the core. The control rod position limit was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.9.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor has been permanently defueled, control rod position will no longer be necessary since the control rod position limitations are only required during loading of fuel into the core. Thus, there will no longer be a need for this specification.

TS 3.9.4, Control Rod Position Indication This specification provides operability requirements for the control rod full-in position indication channel for each control rod to provide the required inputs to the refueling interlocks. This specification is applicable during Mode 5. Control rod position indication was included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.9.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor has been permanently defueled, applicability of this requirement will never be entered again.

Control rod position indication in relation to the fuel will no longer be necessary. TS 3.9.5, Control Rod OPERABILITY - Refueling This specification provides operability requirements for withdrawn control rods during refueling to ensure the co ntrol rods will inse rt and provide the required negative reactivity to maintain the reactor subcritical. This specification is applicable during Mode 5. These control rod requirements were included in the ITS to satisfy Criterion 3 of 10 CFR 50.36(c)(2)(ii). TS 3.9.5 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor has been permanently defueled, applicability of this requirement will never be entered again. Thus, there will no longer be a need for this specification. TS 3.9.6, Reactor Pressure Vessel (RPV) Water Level - Irradiated Fuel This specification provides a limit regarding the RPV water level during movement of irradiated fuel assemblies within the RPV. This specification is applicable during movement of irradiated fuel assemblies within the RPV. The RPV water level limit was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.9.6 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any movement of irradiated fuel assemblies in the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 48 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes RPV. Since the water level limits specified in this TS are only required during refueling activities, there will no longer be a need for this specification. TS 3.9.7, Reactor Pressure Vessel (RPV) Water Level - New Fuel or Control Rods This specification provides a limit regarding the RPV water level during movement of new fuel assemblies or handling of control rods within the RPV when fuel assemblies seated within the RPV are irradiated. The RPV water level limit was included in the ITS to satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). TS 3.9.7 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any new or irradiated fuel within the RPV. Since the water level limits specified in this TS are only required during refueling activities, there will no longer be a need for this specification.

TS 3.9.8, Residual Heat Removal (RHR) - High Water Level This specification provides operability requirements for the RHR shutdowncooling subsystem during Mode 5 with irradiated fuel in the RPV and the

water level 22 ft. 8 in. above the RPV flange. The purpose of the RHR System in MODE 5 is to remove decay heat and sensible heat from the reactor coolant. These RHR shut down cooling requirements were included in the ITS to satisfy Criterion 4 of 10 CFF 50.36(c)(2)(ii). TS 3.9.8 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any refueling activities taking place. Following permanent defueling there will be no irradiated fuel in the RPV or need for RHR shutdown cooling. Thus, there will no longer be a need for this specification.

TS 3.9.9, Residual Heat Removal (RHR) - Low Water Level This specification provides operability requirements for the RHR shut down cooling subsystem during Mode 5 with irradiated fuel in the RPV and the water level < 22 ft. 8 in. above the RPV flange. The purpose of the RHR System in MODE 5 is to remove decay heat and sensible heat from the reactor coolant. These RHR shut down cooling requirements were included in the ITS to satisfy Criterion 4 of 10 CFR 50.36(c)(2)(ii). TS 3.9.9 is not included in the PDTS the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any refueling activities taking place. Following permanent defueling there will be no irradiated fuel in the RPV or need for RHR shutdown cooling. Thus, there will no longer be a need for this specification.

TS SECTION 3.10, SPECIAL OPERATIONS TS Section 3.10 contains Special Operations LCOs and SRs that prov ide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the LCOs (and associated License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 49 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes SRs) will no longer apply in a defueled condition. Therefore, TS Section 3.10 is proposed for deletion in its entirety. TS 3.10.1, Inservice Leak and Hydrostatic Testing Operation This specification provides the requirements to allow certain reactor coolant pressure tests to be performed in Mode 4 when the metallurgical characteristics of the RPV require the pressure testing at temperatures > 200°F (normally corresponding to Mode 3).

As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provideflexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.1 is not included in the PDTS the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, the reactor vessel will no longer be within the applicability condition of Modes 3 or 4, since modes will no longer be applicable. Thus, there will no longer be a need for this specification. TS 3.10.2, Reactor Mode Switch Interlock Testing This specification provides the requirements to permit operation of the reactor mode switch from one position to another to confirm certain aspects of associated interlocks during periodic tests and calibrations in Modes 3, 4, and 5. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.2 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. This specification allows reactor mode switch interlock testing during Modes 3, 4 and 5 that cannot conveniently be performed without this allowance. As described above, once the CPS reactor is permanently defueled, the operating modes will no longer be applicable. The need to test the reactor mode switch interlocks under any conditions will also no longer be necessary. Thus, there will no longer be a need for this specification. TS 3.10.3, Single Control Rod Withdrawal - Hot Shut down This specification provides the requirements and additional controls to permit the withdrawal of a single control rod for testing while in hot shut down (Mode 3 with the reactor mode switch in the Refuel position), by imposing certain restrictions. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.3 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Since the control rod withdrawal in Mode 3 requires controls consistent with those required in refueling, once the CPS reactor is permanently defuel ed, there will no longer be any License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 50 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes refueling activities taking place and therefore no restrictions on the withdrawal of control rods. As described above, once the CPS reactor is permanently defueled, the operating modes will no longer be applicable.

The need to implement controls to withdraw a single control rod in Mode 3 will no longer be required. Thus, there will no longer be a need for this specification.

TS 3.10.4, Single Control Rod Withdrawal - Cold Shut down This specification provides the requirements to permit the withdrawal of a single control rod for testing or maintenance, while in cold shut down (Mode 4 with the reactor mode switch in the Refuel position), by imposing certain restrictions.

As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.4 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Since the control rod withdrawal in Mode 4 requires controls consistent with those required in refueling, once the CPS reactor is permanently defuel ed, there will no longer be any refueling activities taking place and therefore no restrictions on the withdrawal of control rods. As described above, once the CPS reactor is permanently defueled, the operating modes will no longer be applicable. The need to implement controls to withdraw a single control rod in Mode 4 will no longer be required. Thus, there will no longer be a need for this specification. TS 3.10.5, Single Control Rod Drive (CRD) Removal -

Refueling This specification provides the requirements to permit the removal of a single CRD during refueling operations by imposing certain administrative controls. Applicable condition Mode 5 with TS 3.9.5 not met. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.5 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any mode in effect. Since the requirements specified in this TS are only required during refueling, there will no longer be a need for this specification. TS 3.10.6, Multiple Control Rod Withdrawal - Refueling This specification provides the requirements to permit multiple control rod withdrawal during refueling by imposing certain administrative controls. Applicable condition Mode 5 with TS 3.9.3, 3.9.4, and 3.9.5 not met. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.6 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 51 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any mode in effect. Since the requirements specified in this TS are only required during refueling, there will no longer be a need for this specification. TS 3.10.7, Control Rod Testing - Operating This specification provides the requirements to permit control rod testing,while in Modes 1 and 2, by imposing certain administrative controls. This Special Operations LCO provides the necessary exceptions to the requirements of LCO 3.1.6 and provides additional administrative controls to allow the deviations in such tests from the prescribed sequences in LCO 3.1.6. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.7 is not included in the PDTS the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once CPS is shutdown and permanently defueled there will no longer be a need to perform control rod testing. In addition, CPS will no longer be permitted to enter Modes 1 or 2 in accordance with 10 CFR 50.82 (a)(2). Thus, there will no longer be a need for this specification. TS 3.10.8, SHUT DOWN MARGIN (SDM) Test- Refueling This specification provides the requirements to permit SDM testing to be performed for those plant configurations in which the RPV head is either not in place or the head bolts are not fully tensioned (Mode 5). LCO 3.1.1, "Shutdown Margin (SDM)," requires that adequate SDM be demonstrated following fuel movements or control rod replacement within the RPV. The demonstration must be performed prior to or within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after criticality is reached. This SDM test may be performed prior to or during the first startup following refueling. Performing the SDM test prior to startup requires the test to be performed while in MODE 5 with the vessel head bolts less than fully tensioned (and possibly with the vessel head removed). As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.8 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted.

As described above, Exelon is proposing to delete the definition of SDM in TS 1.1 and delete TS 3.1.1 since it will not be required once the certifications required under 10 CFR 50.82(a)(1) have been submitted. Once CPS is shutdown and permanently defueled there will no longer be a need to perform SDM testing since refueling activities will no longer take place. Since the requirements specified in this TS are only required during refueling, there will no longer be a need for this

specification.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 52 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes TS 3.10.9, Training Startups This specification provides the requirements to permit training startups to be performed while in Mode 2 to provide plant startup experience for reactor operators. This training involves withdrawal of control rods to achieve criticality and then further withdrawal of control rods, as would be experienced during an actual plant startup. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.9 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Based on the fact that CPS will no longer be operated, training of operators in plant startup will no longer be required.

TS 3.10.10, Single Control Rod Withdrawal - Refueling This specification provides the requirements to permit the withdrawal of a single control rod for testing in Mode 5 without imposing the requirements for establishing the secondary containment and main control room boundaries as normally required during Core Alterations. As described in LCO 3.0.7, compliance with Special Operations LCOs is optional, and therefore, no criteria of 10 CFR 50.36(c)(2)(ii) apply. Special Operations LCOs provide flexibility to perform certain operations by appropriately modifying requirements of other LCOs. TS 3.10.10 is not included in the PDTS since the 10 CFR Part 50 license no longer will permit operation of the reactor or placement of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Once the CPS reactor is permanently defueled, there will no longer be any Core Alterations taking place in the reactor vessel; therefore, restrictions or consequences for withdrawal of control rods will no longer be necessary. As described above, once the CPS reactor is permanently defueled, the operating modes will no longer be applicable. The need to implement controls to withdraw a single control rod in Mode 5 will no longer be required. Thus, there will no longer be a need for this specification.

TS SECTION 4.0, DESIGN FEATURES The existing TS Section 4.0, "Design Features," contains descriptions and requirements for those features of the facility such as materials of construction and geometric arrangements which, if altered or modified, could have a significant effect on safety and are not covered in the previous sections of the TS. Because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel, the design features that do not apply in a defueled condition are being proposed for deletion. TS 4.2, Reactor Core TS 4.2 is being proposed for elimination. The specification has two sections: TS 4.2.1, Fuel Assemblies TS 4.2.1 provides a description and requirements regarding the reactor core fuel assemblies. This TS does not apply in a defueled condition and will not be retained in the PDTS, because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 53 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, without fuel in the reactor vessel there is no need for the specification. TS 4.2.2, Control Rod Assemblies TS 4.2.2 provides a description and requirements regarding the control rod assemblies in a reactor core. This TS does not apply in a defueled condition and will not be retained in the PDTS, because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, without fuel in the reactor vessel there is no need for the specification. TS 4.3, Fuel Storage TS 4.3 provides a description and requirements regarding prevention of criticality of spent fuel, prevention of spent fuel pool drainage, and spent fuel capacity limitations.

TS 4.3.1, Criticality TS 4.3.1.1.a will be retained. The specification requires that the K eff of the fuel in the spent fuel pool be less than or equal to 0.95 with unborated water. The basis for this requirement is described in the USAR Section 9.1.2. 4.3.1.1.b is proposed for elimination. This specification describes the spacing of fuel assemblies stored in the upper containment pool. Once the certifications required by 10 CFR 50.82(a)(1) have been submitted, all spent fuel will be stored in the SFP. The containment upper pool will no longer be used. TS 4.3.1.1.c will be reforma tted to be TS 4.3.1.1.b. TS 4.3.1.2 provides a description and requirements regarding the design of the new fuel storage racks. This description is being proposed for deletion since new fuel is no longer stored onsite and License Condition 2.B.(3) is being revised to remove the allowance to receive new fuel. The design feature associated with the new fuel storage racks is no longer applicable and may be deleted. TS 4.3.3, Capacity TS 4.3.3.2 provides a limit on the number of fuel assemblies that can be stored in the upper containment pool. Once the reactor is certified permanently defuel pursuant to 10 CFR 50.82(a)(2), all spent fuel will be stored in the SFP. The containment upper pool will no longer be used; therefore, TS 4.3.3.2 can be deleted.

TS SECTION 5.0, ADMINISTRATIVE CONTROLS The existing TS Section 5.0, Administrative Controls, contains provisions relating to organization and management, procedures, recordkeeping, review and audit, programs, and reporting necessary to assure operation of the facility in a safe manner. Previously, Exelon proposed changes to the administrative controls in TS Sections 5.1, 5.2, 5.3, and 5.4 to reflect the permanently shut down and defueled state in a letter dated July 28, 2016 (Reference 2) as supplemented in Reference 3. Because 10 CFR 50.82(a)(2) prohibits operation of the plant or placing fuel in the reactor vessel, several of the TS Section 5.0 Specifications are no longer applicable. Therefore, the administrative controls that License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 54 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes do not apply in a defueled condition are being proposed for deletion. TS Section 5.1 - Responsibility Exelon proposed changes to the adminis trative controls in TS Section 5.1 to reflect the permanently shut down and defueled state in a letter dated July 28, 2016 (Reference 2). TS Section 5.2 -

Organization Exelon proposed changes to the adminis trative controls in TS Section 5.2 to reflect the permanently shut down and defueled state in a letter dated July 28, 2016 (Reference 2) as supplemented in Reference 3. TS Section 5.3 - Unit Staff Qualifications Exelon proposed changes to the adminis trative controls in TS Section 5.3 to reflect the permanently shut down and defueled state in a letter dated July 28, 2016 (Reference 2). TS 5.3.1 is being revised to add clarific ation for staff qualification. With the transition to decommissioning certain personnel and titles for positions not stated in ANSI/ANS 3.1-1978 will be used. The comparable positions and exceptions will be specified in the Quality Assurance Program Manual (QAPM). TS 5.4 Procedures TS 5.4.1.a - Exelon proposed changes to this TS Section to reflect the permanently shut down and defueled state in a letter dated July 28, 2016 (Reference 2). TS 5.4.1.b - This TS Section requires emergency operating procedures be established, implemented, and maintained that implement the requirements of NUREG-0737 and NUREG-0737, Supplement 1.

NUREG-0737, "Clarification of TMI Action Plan Requirements," November 1980 (ADAMS Accession No. ML051400209), and NUREG-0737, Supplement 1, "Clarification of TMI Action Plan Requirements: Requirements for Emergency Response Capability," January 1983 (ADAMS Accession No. ML 102560009), as stated in Generic Letter 82-33, "Supplement 1 to NUREG-0737 - Requirements for Emergency Response Capability," dated December 17, 1982 (ADAMS Accession No. ML031080548), incorporated into one document all Three Mile Island (TMl) related items approved for implementation by the NRC at that time. This included the use of human factored, function oriented, emergency operating procedures to improve human reliability and the ability to mitigate the consequences of a broad range of initiating events for operating reactors, and subsequent multiple failures or operator errors, without the need to diagnose specific events. TS 5.4.1.b is proposed for deletion because the emergency operating procedures discussed therein only pertain to accidents and events resulting from reactor operation. The referenced procedures will no longer be required for a permanently shutdown and defueled reactor. TS 5.4.1.c and 5.4.1.d - These TS Sections will be retained without change. 5.5.2, Primary Coolant Sources Outside Containment This program was established to provide controls to minimize leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to levels as low as practicable. It addresses portions of the LPCS, HPCS, RHR, RCIC, Suppression Pool Makeup Water, Combustible Gas Control, License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 55 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Containment Monitoring, and Post-Accident Sampling Systems. As previously discussed, the TS requirements for these systems were proposed for deletion. Once the plant is permanently shut down and defueled, there will no longer be any transient or accident conditions associated with primary coolant sources. Thus, TS 5.5.2 will not be retained in the PDTS. 5.5.4, Radioactive Effluent Controls Program This program conforms to 10 CFR 50.36a for the control of radioactive effluents and for maintaining the doses to members of the public from radioactive effluents as low as reasonably achievable. The program is contained in the ODCM. The term "unit" is being changed to "facility" to be more appropriate with a defueled condition, which is consistent with other changes in this LAR. 5.5.5, Component Cyclic or Transient Limit This program provides controls to track the cyclic and transient occurrences to ensure that the reactor vessel is maintained within the design limits. The program will not be retained in the PDTS, because the CPS Part 50 license will no longer authorize emplacement or retention of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. The reactor vessel will no longer be subjected to cycles or transients after permanent shutdown.

5.5.6, Inservice Testing Program TS 5.5.6 will not be retained in the PDTS. This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. In the permanently shut down and defueled condition, there are no longer any ASME Code class pumps and valves that remain in operation and are relied upon to mitigate a DBA. As such, the inservice testing program will no longer be relevant to CPS. Exelon has proposed changes to delete this program in a letter dated October 6, 2016 (Reference 14) to incorporate TSTF-545 which is currently under NRC review.

5.5.7, Ventilation Filter Testing Program (VFTP) This program was established to implement the required testing of the filter ventilation systems for the SGTS and Control Room ventilation systems. This program will not be retained in the PDTS, because the VFTP is no longer required in a permanently shut down and defueled condition. As previously discussed, TSs 3.6.4.3 and 3.

7.3 that provided the operability requirements for the SGT System and the CRV System were proposed to be eliminated. 5.5.8, Explosive Gas and Storage Tank Radioactivity Monitoring Program This program provides controls for potentially explosive gas mixtures contained in the Radioactive Waste Disposal System, and the quantity of radioactivity contained in gas storage tanks or fed into the offgas treatment system. The requirements regarding the Storage Tank Radioactivity Monitoring Program will be retained. The requirements regardin g explosive gas mixtures contained in the main condenser offgas treatment system are not applicable during the permanently shut down and defueled condition. There will no longer be any source of explosive gas generated from reactor operation. 5.5.9, Diesel Fuel Oil Testing Program The Diesel Fuel Oil Testing Program was established to implement the required testing of both new and stored fuel oil for the emergency diesel generators. This program is proposed for elimination from the PDTS.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 56 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes As described above, TSs 3.8.1, 3.8.2 and 3.8.3 are not included in the PDTS. Therefore, TS 5.5.9 is not required to be included in the PDTS.

5.5.10, Safety Function Determination Program (SFDP) This program was established to ensure loss of safety function is detected and appropriate actions taken. The SFDP is proposed for elimination since the LCOs remaining in the PDTS do not rely on the operability of any active equipment or systems to satisfy the LCO. Because 10 CFR 50.82(a)(2) prohibits operation of the plant or placing fuel in the reactor vessel, there is no longer a need for redundant systems. Therefore, the requirements of the SFDP, which directs cross train checks of multiple and redundant safety systems, no longer apply.

Additionally, the SFDP is invoked in LCO 3.0.6, which is being deleted in its entirety as previously discussed. Thus, the SFDP is not needed in a permanently shut down and defueled condition.

5.5.12, Ultimate Heat Sink (UHS) Erosion, Sediment Monitoring, and Dredging Program This program was established to provide maintenance on the UHS in the event inspections of the UHS dam, its abutments, or the UHS shoreline indicate erosion or local instability. This program supports TS 3.7.1 which is being eliminated as described above. Therefore, TS 5.5.12 is not required to be included in the PDTS. 5.5.13, Primary Containment Leakage Rate Testing Program This program was established to implement the leakage rate testing of the primary containment as required by 10 CFR 50.54(o) and 10 CFR 50 Appendix J, Option B, as modified by exemptions. This program will not be retained in the PDTS, because the Primary Containment Leakage Rate Testing Program pertains only to reactor support systems that do not apply in a permanently defueled condition. The requirements in TSs 3.6.1.1, 3.6.1.2, and 3.6.1.3, for primary containment systems are being deleted as described in preceding sections. Therefore, the need for leakage rate testing of primary containment is no longer applicable. 5.5.14, Battery Monitoring and Maintenance Program This program was established to provide for battery restoration and maintenance. "Battery Monitoring and Maintenance Program," is being deleted because the Battery Monitoring and Maintenance Program pertains only to reactor support systems that do not apply in a permanently defueled condition. The requirement for station batteries is being deleted as described in the discussions for TS 3.8.4, 3.8.5, and 3.8.6. The revised FHA in the SFP analysis applicable to the permanently defueled condition does not rely on batteries for accident mitigation.

5.5.15, Control Room Envelope Habitability Program This program was established and implemented to ensure that the CRE habitability was maintained such that, with an operable CRV system, the occupants of the CRE can control the reactor safely under normal and emergency conditions and maintain it in a safe condition following a radiological event, hazardous chemical release or a smoke challenge. Once the certifications required by 10 CFR 50.82(a)(1) have been submitted and after 60 days of decay following shut down, the 10 CFR Part 50 license no longer will per mit operation of the reactor or placement of fuel in the reactor vessel The design basis FHA was assessed for post-cessation of power operations in order to justify the elimination of TS requirements for the operability of control room License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 57 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes ventilation systems. As previously discussed, TSs 3.7.3 and 3.7.4 will not be retained in the PDTS. Thus, TS 5.5.15 will not be retained in the PDTS. 5.5.16, Surveillance Frequency Control Program This program provides controls for Surve illance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met. The requirements regarding the Surveillance Frequency Control Program (SFCP) will not be retained in the PDTS. The remaining TS LCO proposed for this PDTS contains one surveillance requirement (SR). The proposed SR has been changed to reflect the frequency from the SFCP; therefore, no further need to maintain this program exists and it can be eliminated. 5.6.2, Annual Radiological Environmental Operating Report This reporting requirement is being retained in the PDTS with essentially no change. The reference to the term "unit" is replaced with the term "facility," because the term "unit" generally refers to the reactor, which can no longer be operated in accordance with 10 CFR

50.82(a)(2), whereas the term "facility" refers to the overall site. 5.6.3, Radioactive Effluent Release Report This reporting requirement is being retained in the PDTS with essentially no change. The reference to the term "unit" is replaced with the term "facility," because the term "unit" generally refers to the reactor, which can no longer be operated in accordance with 10 CFR 50.82(a)(2), whereas the term "facility" refers to the overall site. 5.6.5, CORE OPERATING LIMITS REPORT (COLR) According to TS 5.6.5, the COLR is established prior to each reload cycle or prior to any remaining portion of a reload cycle to document the specific limits associated with operating the reactor core and to ensure that the applicable limits of the safety analysis are met. This reporting requirement will not be retained in the PDTS, because the Part 50 license will prohibit operation of the reactor or placement or retention of fuel in the reactor vessel once the certifications required by 10 CFR 50.82(a)(1) have been submitted. Thus, the COLR does not apply in the permanently shut down and defueled condition. The proposed changes are shown on the marked-up CPS TS pages included as Attachment 2.

3.0 REGULATORY EVALUATION

3.1 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met. Exelon has determined that the proposed changes do not require any exemptions or relief from regulatory requirements.

10 CFR 50.82 "Termination of license." "(a) For power reactor licensees - (1) (i) When a licensee has determined to permanently cease operations the licensee shall, within 30 days, submit a written certification to the NRC, consistent with the requirements of § 50.4(b)(8);

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 58 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes (ii) Once fuel has been permanently removed from the reactor vessel, the licensee shall submit a written certification to the NRC that meets the requirements of § 50.4(b)(9)

and;- (2) Upon docketing of the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel, or when a final legally effective order to permanently cease operations has come into effect, the 10 CFR Part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the

reactor vessel." By letter dated June 20, 2016 (Reference 1), Exelon provided formal notification to the NRC pursuant to 10 CFR 50.82(a)(1)(i) of Exelon's contingent determination to permanently cease operations at CPS by June 1, 2017.

10 CFR 50.36 "Technical specifications." In 10 CFR 50.36, the Commission established its regulatory requirements related to the content of TSs. In doing so, the Commission placed emphasis on those matters related to the prevention of accidents and mitigation of accident consequences; the Commission noted that applicants were expected to incorporate into their TSs "those items that are directly related to maintaining the integrity of the physical barriers designed to contain radioactivity." (Statement of Consideration, "Technical Specification for Facility Licenses; Safety Analysis Reports," 33 FR 18610 (December 17, 1968). Pursuant to 10 CFR 50.36, TS are required to include items in the following five categories: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) surveillance requirements (SRs); (4) design features; and (5) administrative controls. However, the rule does not specify the particular requirements to be included in a plant's TS. The final Commission Policy Statement established four criteria to define the scope of equipment and parameters to be included in the improved Standard Technical Specifications. These criteria were developed for licenses authorizing operation (i.e.,

operating reactors) and focused on instrumentation to detect degradation of the reactor coolant system pressure boundary, process variables and equipment, design features, or operating restrictions that affect the integrity of fission product barriers during design bases accidents or transients. A fourth criterion refers to the use of operating experience and probabilistic risk assessment to identify and include in the Technical Specifications structures, systems, and components (SSCs) shown to be significant to public health and safety. These criteria, which were subsequently codified in changes to Section 36 of

Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.36) (60 FR 36953), also pertain to the Technical Specification requirements for safe storage of spent fuel. A general discussion of these considerations is provided below. Criterion 1 of 10 CFR 50.36(c)(2)(ii)(A) states that TS LCOs must be established for "installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary." Since no fuel will be present in the reactor or reactor coolant system at the CPS facility following permanent defueling, this criterion is not applicable. Criterion 2 of 10 CFR 50.36(c)(2)(ii)(B) states that TS LCOs must be established for a "process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 59 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes a challenge to the integrity of a fission product barrier." The purpose of this criterion is to capture those process variables that have initial values assumed in the DBA and transient analyses, and which are monitored and controlled during power operation.

While this criterion was developed for operating reactors, there are some DBAs which continue to apply to a facility authorized only to handle, store, and possess nuclear fuel. The scope of DBAs applicable to a facility with a reactor that is permanently shut down and defueled is markedly reduced from those postulated for an operating plant. The applicable DBA for CPS in the permanently defueled condition, the FHA, is discussed within this proposed amendment. Criterion 3 of 10 CFR 50.36(c)(2)(ii)(C) states that TS LCOs must be established for SSCs that are part of the primary success path and which function or actuate to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. The intent of this criterion is to capture into the TSs only those SSCs that are part of the primary success path of a safety sequence analysis. Also captured by this criterion are those support and actuation systems that are necessary for items in the primary success path to successfully function. The primary success path of a safety sequence analysis consists of the combination and sequences of equipment needed to operate (including consideration of the single failure criterion), so that the plant response to DBAs and transients limits the consequences of these events to within the appropriate acceptance criteria. While there are no transients that will continue to apply to CPS, there are still DBAs that will continue to apply to a facility authorized only to handle, store, and possess nuclear fuel. The scope of DBAs applicable to a facility with a reactor that is permanently shut down and defueled is markedly reduced from those postulated for an operating plant. The scope of DBAs that will be applicable to CPS is discussed in more detail within this proposed amendment. Criterion 4 of 10 CFR 50.36(c)(2)(ii)(D) states that TS LCOs must be established for SSCs that operating experience or probabilistic risk assessment has shown to be significant to public health and safety. The intent of this criterion is that risk insights and operating experience be factored into the establishment of TS LCOs. All of the accident sequences that previously dominated risk at CPS will no longer be applicable once the reactor is in the permanently shut down and defueled condition.

10 CFR 50.36(c)(5) Administrative Controls. "Administrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner." The particular administrative controls to be included in the TS generally are requirements the NRC deems necessary to support the safe operation of a facility that are not already covered by other regulations. Although 10 CFR 50.36 includes these requirements, they are predominately specified in support of an operating plant. Once CPS is in a permanently shutdown and defueled condition, certain administrative controls described in the TS will no longer be required and can be deleted or modified as reflected in this LAR.

10 CFR 50.36(c)(6) Decommissioning. "This paragraph applies only to nuclear power reactor facilities that have submitted the certifications required by § 50.82(a)(1) and to non-power reactor facilities which are not authorized to operate. Technical specifications involving safety limits, limiting safety system settings, and limiting control system settings; limiting conditions for operation; surveillance requirements; design features; and administrative controls will be developed on a case-by-case basis."

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 60 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes As noted above, by letter dated June 20, 2016 (Reference 1), Exelon provided formal notification to the NRC pursuant to 10 CFR 50.82(a)(1)(i) of Exelon's determination to permanently cease operations at CPS by June 1, 2017. Upon submittal of the final certification that fuel has been permanently removed from the CPS reactor vessel pursuant to 10 CFR 50.82(a)(1)(ii), CPS will no longer be licensed to operate. The proposed amendment deletes the portions of the previous CPS TS that are no longer applicable to a permanently defueled facility while modifying the remaining portions to correspond to the permanently shut down condition.

10 CFR 50.48 "Fire Protection." "(f) Licensees that have submitted the certifications required under § 50.82(a)(1) shall maintain a fire protection program to address the potential for fires that could cause the release or spread of radioactive materials (i.e., that could result in a radiological hazard).

A fire protection program that complies with NFPA 805 shall be deemed to be acceptable for complying with the requirements of this paragraph. (1) The objectives of the fire protection program are to-- (i) Reasonably prevent these fires from occurring; (ii) Rapidly detect, control, and extinguish those fires that do occur and that could result in a radiological hazard; and (iii) Ensure that the risk of fire-induced radiological hazards to the public, environment and plant personnel is minimized. (2) The licensee shall assess the fire protection program on a regular basis. The licensee shall revise the plan as appropriate throughout the various stages of facility decommissioning. (3) The licensee may make changes to the fire protection program without NRC approval if these changes do not reduce the effectiveness of fire protection for facilities, systems, and equipment that could result in a radiological hazard, taking into account the decommissioning plant conditions and activities." In 10 CFR 50.48(f), the NRC established the requirement for maintaining a fire protection program once a licensee has submitted the certifications required under 10 CFR 50.82(a)(1). Since the initial certification has been submitted pursuant to 10 CFR 50.82(a)(1)(i) (Reference 1) and once the final certification required by 10 CFR 50.82(a)(1)(ii) has been submitted, the requirements of 10 CFR 50.48(f) will be in full effect. 10 CFR 50.51, "Continuation of license" "(b) Each license for a facility that has permanently ceased operations, continues in effect beyond the expiration date to authorize ownership and possession of the production or utilization facility, until the Commission notifies the licensee in writing that the license is terminated. During such period of continued effectiveness the licensee shall-- (1) Take actions necessary to decommission and decontaminate the facility and continue to maintain the facility, including, where applicable, the storage, control and maintenance of the spent fuel, in a safe condition, and License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 61 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes (2) Conduct activities in accordance with all other restrictions applicable to the facility in accordance with the NRC regulations and the provisions of the specific 10 CFR part 50 license for the facility." Exelon will continue to conduct activities in accordance with the license until the Commission notifies Exelon in writing that the license is terminated.

10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.

" "(a)(1)(i) <-> This section does not apply to a nuclear power reactor facility for which the certifications required under 10 CFR 50.82(a)(1) have been submitted.

" 10 CFR 50.62, "Requirements for Reduction of Risk from Anticipated Transients without Scram (ATWS) Events for Light-Water-Cooled Nuclear Power Plants.

" "(a) Applicability. The requirements of this section apply to all commercial light-water-cooled nuclear power plants, other than nuclear power reactor facilities for which the certifications required under § 50.82(a)(1) have been submitted.

" 10 CFR 50.2 "Definitions." "Certified fuel handler means, for a nuclear power reactor facility, a non-licensed operator who has qualified in accordance with a fuel handler training program approved by the Commission." "Responsible officer means, for the purposes of § 50.55(e) of this chapter, the president, vice-president, or other individual in the organization of a corporation, partnership, or other entity who is vested with executive authority over activities subject to this part." "Safety-related structures , systems and components means those structures, systems and components that are relied upon to remain functional during and following design basis events to assure: (1) The integrity of the reactor coolant pressure boundary (2) The capability to shut down the reactor and maintain it in a safe shutdown condition; or (3) The capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures comparable to the applicable guideline exposures set forth in § 50.34(a)(1) or § 100.11 of this chapter, as applicable.

" By letter dated September 6, 2016 (Reference 4), the NRC approval of a Certified Fuel Handler training program for CPS. 3.2 Precedent The proposed changes are consistent with the intent of the license and accompanying PDTS issued to the following facilities that have been permanently shutdown and defueled: (1) Vermont Yankee Nuclear Power Station, for which an amendment was issued on October 7, 2015 (Reference 7); (2) Kewaunee Power Station, for which an amendment was issued on February 13, 2015 (Reference 8); (3) San Onofre Nuclear Generating Station, Units 2 and 3, for which an amendment was issued on July 17, 2015 (Reference 9); (4) Zion Nuclear Power Station, for which an amendment was issued on December 30, 1999 (Reference 10); and (5) Crystal River Nuclear Plant, Unit 3, for License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 62 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes which an amendment was issued on September 4, 2015 (Reference 11). 3.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (Exelon), proposes an amendment to the Facility Operating License (FOL) and Appendix A, Technical Specifications (TS), of FOL No. NPF-62 for Clinton Power Station (CPS).

The proposed amendment would revise the FOL and the associated TS to Permanently Defueled Technical Specifications (PDTS) consistent with the permanent cessation of reactor operation and permanent defueling of the reactor. The proposed changes would revise and remove certain requirements contained within the FOL and TS, and remove the requirements that would no longer be applicable once it has been certified that all fuel has permanently been removed from the CPS reactor in accordance with 10 CFR 50.82(a)(1)(ii). Once the certifications for permanent cessation of operations and permanent fuel removal from the reactor vessel are docketed, the 10 CFR Part 50 license for CPS no longer will authorize operation of the reactor or emplacement or retention of fuel in the reactor vessel, in accordance with 10 CFR 50.82(a)(2). The proposed changes to the FOL and TS being proposed for deletion or revision are in accordance with 10 CFR 50.36(c)(1) through 10 CFR 50.36(c)(5). The proposed changes also include a renumbering of pages and sections, where appropriate, to condense and reduce the number of pages in the TS without affecting the technical content. The TS table of contents is also accordingly revised. The existing CPS TS contain Limiting Conditi ons for Operation (LCOs) that provide for appropriate functional capability of equipment required for safe operation of the facility, including the plant being in a defueled condition. Since the safety function related to safe storage and management of irradiated fuel at an operating plant is similar to the corresponding function at a permanently defueled facility, the existing TS provide an appropriate level of control. However, the majority of the existing TS are only applicable with the reactor in an operational mode. LCOs and associated Surveillance Requirements (SRs) that will not apply in the permanently defueled condition are being proposed for deletion. The remaining portions of the TS are being proposed for revision and incorporation as the PDTS to provide a continuing acceptable level of safety which addresses the reduced scope of postulated design basis accidents associated with a defueled plant. Exelon has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed changes would not take effect until CPS has permanently ceased operation, entered a permanently defuel ed condition, and at least 60 days of irradiated fuel decay time after reactor shutdown. The proposed changes would revise the CPS FOL and TS by deleting or modifying certain portions of the TS that are no longer applicable to a permanently shutdown and defueled facility. This change is consistent with the criteria set forth in 10 CFR 50.36 for the contents of TS.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 63 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes Chapter 15 of the CPS Updated Safety Analysis Report (USAR) described the design basis accident (DBA) and transient scenarios applicable to CPS during power operations. Once the reactor is in a permanently defueled condition, the spent fuel pool and its cooling systems will be dedicated only to spent fuel storage. In this condition, the spectrum of credible accidents will be much smaller than for an operational plant. Once the certifications are docketed by CPS in accordance with 10 CFR 50.82(a)(1), and the consequent removal of authorization to operate the reactor or to place or retain fuel in the reactor vessel in accordance with 10 CFR 50.82(a)(2), the majority of the accident scenarios previously postulated in the USAR will no longer be possible and will be remov ed from the USAR under the provisions of 10 CFR 50.59. The deletion of TS definitions and rules of usage and application, that will not be applicable in a defueled condition, has no impact on facility structures, systems, and components (SSCs) or the methods of operation of such SSCs. The deletion of design features and safety limits not applicable to the permanently shutdown and defueled status of CPS has no impact on the remaining applicable DBAs, the Fuel Handling Accident (FHA) or the Postulated Radioactive Releases Due to Liquid Radwaste Tank Failures. The removal of LCOs or SRs that are related to only the operation of the nuclear reactor or to only the prevention, diagnosis, or mitigation of reactor-related transients or accidents do not affect the applicable DBAs previously evaluated since these DBAs are no longer applicable in the defueled mode. The safety functions involving core reactivity control, reactor heat removal, reactor coolant system inventory control, and containment integrity are no longer applicable at CPS as a permanently defueled plant. The analyzed accidents involving damage to the reactor coolant system, main steam lines, reactor core, and the subsequent release of radioactive material will no longer be possible at CPS. After CPS permanently ceases operation, the future generation of fission products will cease and the remaining source term will decay. The radioactive decay of the irradiated fuel following shutdown of the reactor will have reduced the consequences of the FHA below those previously analyzed.

The relevant parameter (water level) associated with the fuel pool provides an initial condition for the FHA analysis and is included in the PDTS. The spent fuel pool (SFP) water level and storage TSs are retained to preserve the current requirements for safe storage of irradiated fuel. SFP cooling and makeup related equipment and support equipment (e.g., electrical power systems) are not required to be continuously available since there will be sufficient time to effect repairs, establish alternate sources of makeup flow, or establish alternate sources of cooling in the event of a loss of cooling and makeup flow to the SFP. The deletion and modification of provisions of the administrative controls do not directly affect the design of SSCs necessary for safe storage of irradiated fuel or the methods used for handling and storage of such fuel in the fuel pool. The changes to the administrative controls are administrative in nature and do not affect any accidents applicable to the safe management of irradiated fuel or the permanently shutdown and defueled condition of the reactor. The probability of occurrence of previously evaluated accidents is not increased, since extended operation in a defueled condition will be the only operation allowed, and therefore bounded by the existing analyses. Additionally, the occurrence of License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 64 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes postulated accidents associated with reactor operation will no longer be credible in a permanently defueled reactor. This significantly reduces the scope of applicable accidents. Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed changes to delete and/or modify certain TS have no impact on facility SSCs affecting the safe storage of spent irradiated fuel, or on the methods of operation of such SSCs, or on the handling and storage of spent irradiated fuel itself.

The removal of TS that are related only to the operation of the nuclear reactor or only to the prevention, diagnosis, or mitigation of reactor related transients or accidents, cannot result in different or more adverse failure modes or accidents than previously evaluated because the reactor will be permanently shutdown and defueled and CPS will no longer be authorized to operate the reactor. The proposed deletion of requirements of the CPS FOL and TS do not affect systems credited in the accident analysis for the FHA in the Fuel Building at CPS.

The proposed FOL and PDTS will continue to require proper control and monitoring of safety significant parameters and activities. The TS regarding SFP water level and fuel storage required is retained to preserve the current requirements for safe storage of irradiated fuel. The restriction on the SFP water level is fulfilled by normal operating conditions and preserves initial conditions assumed in the analyses of the postulated DBA. The proposed amendment does not result in any new mechanisms that could initiate damage to the remaining relevant safety barriers for defueled plants (fuel cladding and spent fuel cooling). Since extended operation in a defueled condition will be the only operation allowed, and therefore bounded by the existing analyses, such a condition does not create the possibility of a new or different kind of accident. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response: No. The proposed changes involve deleting and/or modifying certain TS once the CPS facility has been permanently shutdown, defueled, and at least 60 days of irradiated fuel decay time after reactor shutdown. As specified in 10 CFR 50.82(a)(2), the 10 CFR 50 license for CPS will no longer authorize operation of the reactor or emplacement or retention of fuel into the reactor vessel following submittal of the certifications required by 10 CFR 50.82(a)(1). As a result, the occurrence of certain design basis postulated accidents associated with reactor operation is no longer considered credible. The only remaining credible accidents are a FHA and the Postulated Radioactive Releases Due to Liquid Radwaste Tank Failures. The License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 65 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes proposed amendment does not adversely affect the inputs or assumptions of any of the design basis analyses that impact either DBA. The proposed changes are limited to those portions of the FOL and TS that are not related to the safe storage of irradiated fuel. The requirements that are proposed to be revised or deleted from the CPS FOL and TS are not credited in the existing accident analysis for the remaining applicable postulated accident; and as such, do not contribute to the margin of safety associated with the accident analysis.

Postulated design basis accidents involving the reactor will no longer be possible because the reactor will be permanently shutdown and defueled and CPS will no longer be authorized to operate the reactor. Therefore, the proposed changes do not involve a significant reduction in the margin of safety. Based on the above, Exelon concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.

3.4 Conclusion

In conclusion, based on the considerations discussed above: 1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, 2) such activities will be conducted in compliance with the Commission's regulations, and 3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

4.0 ENVIRONMENTAL CONSIDERATION

The proposed amendment involves deleting or m odifying certain TS Limiting Conditions of Operation and administrative controls in support of proposed decommissioning efforts to reflect the permanently shutdown and defueled condition at CPS. The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational

radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). In addition, the proposed changes involve changes to recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(10). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 66 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes

5.0 REFERENCES

1. Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Certification of Permanent Cessation of Power Operations," dated June 20, 2016 (ML16172A137) 2. Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request - Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for

Permanently Defueled Condition," dated July 28, 2016 (ML16210A300) 3. Letter from Michael P. Gallagher (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request - Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 1," dated November 4, 2016 (ML16309A013) 4. Letter from U.S. NRC to Bryan C. Hanson (Exelon Generation Company, LLC), "Oyster Creek Nuclear Generating Station; Clinton Power Station, Unit No. 1; and Quad Cities Nuclear Power Station, Units 1 And 2 - Approval Of Certified Fuel Handler Training And Retraining Program (CAC NOS. MF8109, MF8138, MF8139, AND MF8140)," dated September 6, 2016 (ML16222A787) 5. Letter from Patrick R. Simpson (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Request for NRC to Suspend Review of License Amendment Request for Clinton Power Station, Unit 1," dated August 11, 2016 (ML16224A262) 6. NUREG-1434, "Standard Technical Specific ations - General Electric Plants (BWR/6)," Revision 4 (ML12104A195) 7. Letter from U.S. NRC to Entergy Nuclear Operations, Inc., "Vermont Yankee Nuclear Power Station - Issuance of Amendment for Defueled Technical Specifications and

Revised License Conditions for Permanently Defueled Condition (CAC No.

MF3714)," dated October 7, 2015 (ML15117A551) 8. Letter from U.S. NRC to Dominion Energy Kewaunee, Inc., "Kewaunee Power Station - Issuance of Amendment for Permanently Shutdown and Defueled Technical Specifications and Certain License Conditions (TAC No. MF1952)," dated

February 13, 2015 (ML14237A045) 9. Letter from U.S. NRC to Southern California Edison Company, "San Onofre Nuclear Generating Station, Units 2 and 3 - Issuance of Amendment for Permanently Shutdown and Defueled Operating License and Technical Specifications (TAC Nos.

MF3774 and MF3775)," dated July 17, 2015 (ADAMS Accession No. ML15139A390) 10. Zion Nuclear Station, Units 1 and 2, License Amendments 180 and 167 to Facility Operating License Nos. DPR-39 and DPR-48, respectively, dated December 30, 1999 (ADAMS Accession Nos. ML003672704 and ML003672696) 11. Letter from U.S. NRC to Crystal River Nuclear Plant, "Crystal River Unit 3 Nuclear Generating Plant - Issuance of Amendment for Permanently Shutdown and Defueled Operating License and Technical Specifications (TAC No MF3089)," dated September 4, 2015 (ADAMS Accession No. ML15224B286) 12. Letter from J. M. Heffley (AmerGen Energy Company, LLC) to U.S. NRC, "Request for Amendment to Technical Specifications that Revise Plant System Requirements License Amendment Request Attachment 1 Proposed Changes FOL and Technical Specifications Page 67 of 67 Docket Nos. 50-461 and 72-1046 Evaluation of Proposed Changes During Fuel Handling Based on Alternate Source Term," dated July 5, 2001 (ML011980184) 13. Letter from U.S. NRC to Mr. Oliver D. Kingsley (Exelon Generation Company, LLC), "Clinton Power Station, Unit 1 - Issuance of Amendment (TAC No. MB2572)," dated April 3, 2002 (ML020930117) 14. Letter from James Barstow (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing"," dated October 6, 2016 (ML16280A402) 15. Letter from Christopher J. Wamser (Entergy Nuclear Operations, Inc), to U.S Nuclear Regulatory Commission, "Technical Specifications Proposed Change No.

309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 5 (TAC No. MF3714)," dated May 4, 2015 (ML15127A171) 16. Letter from Patrick R. Simpson (Exelon Generation Company, LLC) to U.S Nuclear Regulatory Commission, "Response to Generic Letter 2016-01," November 3, 2016 (ML16308A470) 17. Letter from K. N. Jabbour (U.S. NRC) to C. M. Crane (AmerGen Energy Company, LLC), "Clinton Power Station, Unit 1 - Issuance of an Amendment - Re: Onsite Spent Fuel Storage Expansion (TAC NO. MC4202)," dated October 31, 2005 (ML053070593) 18. EPRI Report 1025204, "Strategy for Managing the Long Term Use of Boral in Spent Fuel Storage Pools," July 2012 Attachment 2 Proposed Technical Specifications (Marked-Up Pages)

Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461 Changes to the Facility Operating License and associated CPS Technical Specification (TS). (74 pages)

FOL Pages 1

2 3 4 7 7a 8 9 Attachment 1 Appendix C TS Pages Table of Contents (i through viii) TS 1.1 Definitions TS 1.2 Logical Connectors TS 1.3 Completion Times TS 1.4 Frequency TS 3.0 Limiting Condition for Operation (LCO) Applicability / Surveillance Requirement (SR) Applicability TS 3.7.7 Fuel Pool Water Level TS 4.2 Reactor Core TS 4.3 Fuel Storage TS 5.1 Responsibility TS 5.2 Organization TS 5.3 Unit Staff Qualifications TS 5.4 Procedures TS 5.5 Programs and Manuals TS 5.6 Reporting Requirements Attachment 3 Proposed Technical Specifications Bases (Marked-Up Pages)

Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461 Changes to the CPS Technical Specification (TS) Bases pages (TS Bases not listed are deleted in their entirety). (11 Pages)

TS B 3.0 "Limiting Condition for Operation (LCO) Applicability"/ "Surveillance Requirement (SR) Applicability" TS B 3.7.7 "Fuel Pool Water Level" UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY. LLC DOCKET NO 50-461 CLINTON POWER STATION. UNIT NO. 1 FACILITY OPERATING LICENSE License No. NPF-62 1. The Nuclear Regulatory Commission (Tne Commission or the NRC) has found that: A. The application for license filed by the applicant complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Clinton Power Station, Unit No. 1 (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-137 and the application, as amended, the provisions of the Act and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D. below); D. There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D below); E. Exelon Generation Company, LLC (Exelon Generation Company) is technically qualified to engage in the activities authorized by this operating license in accordance with the Commission's regulations set forth in 10 CFR Chapter I; F. Exelon Generation Company has satisfied the applicable provisions of 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; Amendment No. 183 G. The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Facility Operating License No. NPF-62, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; I. The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40, and 70; and J. The receipt, production, possession, transfer, and use of Cobalt-60 as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Part 30. 2. Based on the foregoing findings regarding this facility, and pursuant to approval by the Nuclear Regulatory Commission at a meeting on April 10, 1987, Facility Operating License No. NPF-62, which supersedes the license for fuel loading and low power testing, License No. NPF-55, issued on September 29, 1986, is hereby issued to Exelon Generation Company to read as follows: A. This license applies to the Clinton Power Station, Unit No. 1, a boiling water nuclear reactor and associated equipment (the facility), owned by Exelon Generation Company. The facility is located in Harp Township, DeWitt County, approximately six miles east of the city of Clinton in east-central Illinois and is described in the licensee's Final Safety Analysis Report, as supplemented and amended, and in the licensee's Environmental Operating License Stage, as supplemented and amended. B. Subject to the condition and requirements incorporated herein, the Commission hereby licenses:

(1) Exelon Generation Company, pursuant to section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in Harp Township, DeWitt County, Illinois, in accordance with the procedures and limitations set forth in this license; (2) Deleted (3) Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; Amendment No. 190 (4) Exelon Generation Company, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation; and (7) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 208, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Amendment No. 208 (3) Antitrust Conditions Deleted (4) Control System Failures (Section 7.7.3.1, SER and SSER 6)* Deleted (5) New Fuel Storage (Section 9.1.1, SER, SSER 6 and SSER 7) Exelon Generation Company shall store new fuel assemblies in accordance with the requirements specified in Attachment

2. Attachment 2 is hereby incorporated into this license. (6) Plant Operation Experience (Section 13.1.2.1, SSER 5) Deleted (7) Emergency Planning (Section 13.3, SSER 6) Deleted (B) Post-Fuel Loading Initial Test Program (Section 14, SER, SSER 5 and SSER 6) Deleted (9) Emergency Response Capabilities (Generic Letter 82-33, Supplement 1 to NUREG-0737, Section 7.5.3.1, SSER 5 and SSER 8, and Section 18, SER, SSER 5 and Safety Evaluation Dated April 17, 1987) a. Deleted b. Deleted *The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment l\Jo. 183 (22) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the follow key areas: {a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance 2. Assessment of mutual aid fire fighting assets 3. Designated staging areas for equipment and materials
4. Command and control 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets 2. Communications
3. Minimizing fire spread 4. Procedures for implementing integrated fire response strategy 5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of: 1. Water spray scrubbing
2. Dose to onsite responders (23) Upon implementation of Amendment No. 178 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 3.7 .3.5, in accordance with TS 5.5.15.c.(i), the assessment of CRE habitability as required by Specification 5.5.15.c.(ii), and the measurement of CRE pressure as required by Specification 5.5.15.d, shall be considered met. Following implementation: (a) The first performance of SR 3.7.3.5, in accordance with Specification 5.5.15.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from November 16, 2004, the date of the most recent successful tracer gas test, as stated in the February 8, 2005 letter response to Generic Letter 2003-01,.

or* within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years. (b) The first performance of the periodic assessment of CRE habitability, Specification 5.5.15.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from November 16, 2004, the date of the most recent successful tracer gas test, as stated in the February 8, 2005 letter res.ponse to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years. Amendment No. 178 I

-7a -(c) The first performance of the periodic measurement of CRE pressure, Specification 5.5.15.d, shall be within 24 months, plus the 6 months allowed by SR 3.0.2, as measured from the date of the most recent successful pressure measurement test, or within 6 months if not performed previously.

(24) At the time of the closing of the transfer of CPS and the respective license from AmerGen Energy Company, LLC (AmerGen) to Exelon Generation Company, AmerGen shall transfer to Exelon Generation Company ownership and control of AmerGen Clinton NQF, LLC, and AmerGen Consolidation, LLC shall be merged into Exelon Generation Consolidation, LLC. Also at the time of the closing, decommissioning funding assurance provided by Exelon Generation Company, using an additional method allowed under 10 CFR 50.75 if necessary, must be equal to or greater than the minimum amount calculated on that date pursuant to, and required by 10 CFR 50.75 for CPS. Furthermore, funds dedicated for CPS prior to closing shall remain dedicated to CPS following the closing. The name of AmerGen Clinton NQF, LLC shall be changed to Exelon Generation Clinton NQF, LLC at the time of the closing. (25) Irradiated GE14i fuel bundles shall be stored at least four feet from the wall of the Spent Fuel Pool. D. The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70. These include: (a) an exemption from the requirements of 10 CFR 70.24 for the criticality alarm monitors around the fuel storage area; (b) an exemption from the requirement of 10 CFR Part 50, Appendix J -Option B, paragraph 111.B, exempting the measured leakage rates from the main steam isolation valves from inclusion in the combined leak rate for local leak rate tests (Section 6.2.6 of SSER 6); and (c) an exemption from the requirements of paragraph Ill. B of Option B of 1 O CFR Part 50, Appendix J, exempting leakage from the valve packing and the body-to-bonnet seal of valve 1 E51-F374 associated with containment penetration 1 MC-44 from inclusion in the combined leakage rate for penetrations and valves subject to Type Band C tests (SER supporting Amendment 62 to Facility Operating License No. NPF-62). The special circumstances regarding each exemption, except for item (a) above, are identified in the referenced section of the safety evaluation report and the supplements thereto. Amendment No. 19 O An exemption was previously granted pursuant to 10 CFR 70.24.

The exemption was granted with NRC Material License No. SNM-1886, issued November 27, 1985, and relieved the licensee from the requirement of having a criticality alarm system. Exelon Generation Company is hereby exempted from the criticality alarm system provision of 10 CFR 70.24 so far as this section applies to the storage of fuel assemblies held under this license. These exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security.

The exemptions in items (b) and (c) above are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2," submitted by letter dated May 17, 2006. Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The Exelon Generation Company CSP was approved by License Amendment No. 194 and modified by License Amendment No. 206. F. Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report as amended, for the Clinton Power Station, Unit No. 1, and as approved in the Safety Evaluation Report (NUREG-0853) dated February 1982 and Supplement Nos. 1 thru 8 thereto subject to the following provision:

Exelon Generation Company may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. G. Deleted. 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan. Amendment No. 206 H. Exelon Generation Company shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. I. This license is effective as of the date of issuance and shall expire at midnight on September 29, 2026. FOR THE NUCLEAR REGULATORY COMMISSION Original signed by: Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Attachments 1 (Deleted) and 2 2. Appendix A -Technical Specifications (NUREG-1235)
3. Appendix B -Environmental Protection Plan 4. Appendix C -Deleted Date of Issuance:

April 17, *1997 Amendment No. 183 ATTACHMENT 1 TO NPF-62 Deleted Amendment No. 130 ATTACHMENT 2 TO NPF-62 NEW FUEL STORAGE Exelon Generation Company shall store new fuel assemblies in accordance with the following requirements.

a. No more than three fuel assemblies shall be outside their shipping containers, storage racks, or the reactor vessel at any one time. b. The minimum edge-to-edge distance between the group of three fuel assemblies and all other fuel assembles shall be 12 inches. c. Fuel assemblies, when stored in the New Fuel Storage Vault, shall be stored such that: no more than 12 rows of fuel assembles shall remain uncovered during the loading or unloading of fuel assemblies; metal covers shall cover all other rows containing fuels assemblies during loading and unloading of fuel assemblies; and when loading or unloading of fuel assemblies is not in progress, metal covers shall cover all rows of fuel assemblies.
d. Fuel assemblies shall be stored in such a manner that water would drain freely from the assemblies in the event of flooding and subsequent draining of the fuel storage area. e. Fuel assemblies shall be stored in the containment fuel storage pool only under water. f. No fuel assemblies shall be stored in the control rod racks. g. All fire hoses servicing the New Fuel Storage Vault shall be equipped with solid stream nozzles. Amendment No.183 April 17, 1987 APPENDIX C ANTITRUST CONDITIONS FACILITY OPERATING LICENSE NO. NPF-62 Deleted Amendment No. 11.'3

Design Features 4.0 CLINTON 4.0-1 Amendment No. 95 , 101 190 4.0 DESIGN FEATURES

4.1 Site Location

The site for the Clinton Power Station is located in Harp Township, DeWitt County, approximately six miles east of the city of Clinton in

east-central Illinois. The exclusion area boundary shall have a radius

of 975 meters from the Standby Gas Treatment System vent.

4.2 Reactor Core

4.2.1 Fuel Assemblies

The reactor shall contain 624 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy or ZIRLO clad fuel rods with

an initial composition of natural or slightly enriched uranium

dioxide (UO

2) as fuel material, and water rod(s). Limited substitutions of zirconium alloy or stainless steel filler rods

for fuel rods, in accordance with approved applications of fuel

rod configurations, may be used. Fuel assemblies shall be limited

to those fuel designs that have been analyzed with applicable NRC

staff approved codes and methods and shown by tests or analyses to

comply with all safety design bases. A limited number of lead

test assemblies that have not completed representative testing may

be placed in nonlimiting core regions.

A maximum of eight GE14i isotope test assemblies will be placed in non-limiting core regions, beginning with the Reload 12 Cycle 13 core reload, with the purpose of obtaining surveillance data to verify that the GE14i assemblies perform satisfactorily in service prior to use of these design features on a production basis. Each GE14i assembly contains a small number of zircaloy-2 clad isotope rods that contain Cobalt-59 targets. These Cobalt-59 targets will transition into Cobalt-60 isotope targets during the cycle irradiation of the assemblies. Details of the GE14i assemblies are contained in NEDC-33505P, "Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (ITAs) in Clinton Power Station," Revision 0, dated June 2009.

4.2.2 Control Rod Assemblies

The reactor core shall contain 145 cruciform shaped control rod assemblies. The control material shall be boron carbide or

hafnium metal, or both.

(continued)

Design Features 4.0 CLINTON 4.0-2 Amendment No. 170 4.0 DESIGN FEATURES (continued)

4.3 Fuel Storage

4.3.1 Criticality

4.3.1.1 The spent fuel storage racks are designed and shall be maintained with:

a. k eff 0.95 if fully flooded with unborated water, which includes an allowance for uncertainties as described in

Section 9.1.2 of the USAR;

b. A nominal fuel assembly center to center storage spacing of 7 inches within rows and 12.25 inches between rows in

the low density storage racks in the upper containment

pool; and

c. For the fuel storage racks supplied by Nuclear Energy Services (NES), a nominal fuel assembly spacing of 6.4375 inches in the high density storage racks in the spent fuel pool or fuel cask storage pool. For the fuel storage racks supplied by Holtec International, a nominal fuel assembly spacing of 6.243 inches in the high density storage racks in the spent fuel pool or fuel cask storage pool.

4.3.1.2 The new fuel storage racks are designed and shall be maintained with:

a. k eff 0.95 if fully flooded with unborated water, which includes an allowance for uncertainties as described in

Section 9.1.1 of the USAR; and

b. A nominal fuel assembly center to center storage spacing of 7 inches within rows and 12.25 inches between rows in

the new fuel storage racks.

4.3.2 Drainage

The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation

754 ft 0 inches.

4.3.3 Capacity

4.3.3.1 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more

than 3796 fuel assemblies. The fuel cask storage pool is designed and shall be maintained with a storage capacity limited to no more than 363 fuel assemblies.

4.3.3.2 No more than 160 fuel assemblies may be stored in the upper containment pool.

LCO Applicability B 3.0 CLINTON B 3.0-1 Revision No. 0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY

BASES

LCOs LCO 3.0.1 through LCO 3.0.7 establish the general requirements applicable to all Specifications and apply at

all times, unless otherwise stated.

LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when

the LCO is required to be met (i.e., when the unit is in the

MODES or other specified conditions of the Applicability

statement of each Specification).

LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The

Completion Time of each Required Action for an ACTIONS

Condition is applicable from the point in time that an

ACTIONS Condition is entered. The Required Actions

establish those remedial measures that must be taken within

specified Completion Times when the requirements of an LCO

are not met. This Specification establishes that:

a. Completion of the Required Actions within the specified Completion Times constitutes compliance with

a Specification; and

b. Completion of the Required Actions is not required when an LCO is met within the specified Completion

Time, unless otherwise specified.

There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the

LCO must be met. This time limit is the Completion Time to

restore an inoperable system or component to OPERABLE status

or to restore variables to within specified limits. If this

type of Required Action is not completed within the

specified Completion Time, a shutdown may be required to

place the unit in a MODE or condition in which the

Specification is not applicable. (Whether stated as a

Required Action or not, correction of the entered Condition

is an action that may always be considered upon entering

ACTIONS.) The second type of Required Action specifies the

remedial measures that permit continued operation of the (continued)

LCO Applicability B 3.0 CLINTON B 3.0-2 Revision No. 0 BASES LCO 3.0.2 unit that is not further restricted by the Completion Time.

(continued) In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.

Completing the Required Actions is not required when an LCO is met or is no longer applicable, unless otherwise stated

in the individual Specifications.

The nature of some Required Actions of some Conditions necessitates that, once the Condition is entered, the

Required Actions must be completed even though the

associated Condition no longer exists. The individual LCO's

ACTIONS specify the Required Actions where this is the case.

An example of this is in LCO 3.4.11, "RCS Pressure and

Temperature (P/T) Limits."

The Completion Times of the Required Actions are also applicable when a system or component is removed from

service intentionally. The reasons for intentionally

relying on the ACTIONS include, but are not limited to, performance of Surveillances, preventive maintenance, corrective maintenance, or investigation of operational

problems. Entering ACTIONS for these reasons must be done

in a manner that does not compromise safety. Intentional

entry into ACTIONS should not be made for operational

convenience. Alternatives that would not result in

redundant equipment being inoperable should be used instead.

Doing so limits the time both subsystems/divisions of a

safety function are inoperable and limits the time other

conditions exist which result in LCO 3.0.3 being entered.

Individual Specifications may specify a time limit for

performing an SR when equipment is removed from service or

bypassed for testing. In this case, the Completion Times of

the Required Actions are applicable when this time limit

expires, if the equipment remains removed from service or

bypassed.

When a change in MODE or other specified condition is required to comply with Required Actions, the unit may enter

a MODE or other specified condition in which another

Specification becomes applicable. In this case, the

Completion Times of the associated Required Actions would

apply from the point in time that the new Specification

becomes applicable and the ACTIONS Condition(s) are entered.

(continued)

SR Applicability B 3.0 CLINTON B 3.0-10 Revision No. 0 B 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY

BASES

SRs SR 3.0.1 through SR 3.0.4 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.

SR 3.0.1 SR 3.0.1 establishes the requirement that SRs must be met during the MODES or other specified conditions in the

Applicability for which the requirements of the LCO apply, unless otherwise specified in the individual SRs. This

Specification is to ensure that Surveillances are performed

to verify the OPERABILITY of systems and components, and

that variables are within specified limits. Failure to meet

a Surveillance within the specified Frequency, in accordance

with SR 3.0.2, constitutes a failure to meet an LCO.

Systems and components are assumed to be OPERABLE when the associated SRs have been met. Nothing in this

Specification, however, is to be construed as implying that

systems or components are OPERABLE when:

a. The systems or components are known to be inoperable, although still meeting the SRs; or
b. The requirements of the Surveillance(s) are known to be not met between required Surveillance performances.

Surveillances do not have to be performed when the unit is in a MODE or other specified condition for which the

requirements of the associated LCO are not applicable, unless otherwise specified. The SRs associated with a

Special Operations LCO are only applicable when the Special

Operations LCO is used as an allowable exception to the

requirements of a Specification.

Surveillances, including Surveillances invoked by Required Actions, do not have to be performed on inoperable equipment

because the ACTIONS define the remedial measures that apply.

Surveillances have to be met and performed in accordance

with SR 3.0.2, prior to returning equipment to OPERABLE

status.

(continued)

SR Applicability B 3.0 CLINTON B 3.0-11 Revision No. 0 BASES SR 3.0.1 Upon completion of maintenance, appropriate post maintenance (continued) testing is required to declare equipment OPERABLE. This includes ensuring applicable Surveillances are not failed

and their most recent performance is in accordance with

SR 3.0.2. Post maintenance testing may not be possible in

the current MODE or other specified conditions in the

Applicability due to the necessary unit parameters not

having been established. In these situations, the equipment

may be considered OPERABLE provided testing has been

satisfactorily completed to the extent possible and the

equipment is not otherwise believed to be incapable of

performing its function. This will allow operation to

proceed to a MODE or other specified condition where other

necessary post maintenance tests can be completed. Some

examples of this process are:

a. Control rod drive maintenance during refueling that requires scram testing at 950 psig. However, if other appropriate testing is satisfactorily completed

and the scram time testing of SR 3.1.4.3 is satisfied, the control rod can be considered OPERABLE. This

allows startup to proceed to reach 950 psig to perform

other necessary testing.

b. Reactor Core Isolation Cooling (RCIC) maintenance during shutdown that requires system functional tests

at a specified pressure. Provided other appropriate

testing is satisfactorily completed, startup can

proceed with RCIC considered OPERABLE. This allows

operation to reach the specified pressure to complete

the necessary post maintenance testing.

SR 3.0.2 SR 3.0.2 establishes the requirements for meeting the specified Frequency for Surveillances and any Required

Action with a Completion Time that requires the periodic

performance of the Required Action on a "once per..."

interval.

SR 3.0.2 permits a 25% extension of the interval specified in the Frequency. This extension facilitates Surveillance

scheduling and considers plant operating conditions that may

not be suitable for conducting the Surveillance (e.g.,

transient conditions or other ongoing Surveillance or

maintenance activities).

(continued)

SR Applicability B 3.0 CLINTON B 3.0-12 Revision No. 7-5 BASES SR 3.0.2 The 25% extension does not significantly degrade the (continued) reliability that results from performing the Surveillance at its specified Frequency. This is based on the recognition

that the most probable result of any particular Surveillance

being performed is the verification of conformance with the

SRs. The exceptions to SR 3.0.2 are those Surveillances for

which the 25% extension of the interval specified in the

Frequency does not apply. These exceptions are stated in

the individual Specifications. The requirements of

regulations take precedence over the TS. Therefore, when a

test interval is specified in the regulations, the test

interval cannot be extended by the TS, and the TS will then

include a Note stating, "SR 3.0.2 is not applicable." An

example of an exception when the test interval is not

specified in the regulations is the Note in the Primary

Containment Leakage Rate Testing Program, "SR 3.0.2 is not

applicable." This exception is provided because the program

already includes extension of test intervals.

As stated in SR 3.0.2, the 25% extension also does not apply to the initial portion of a periodic Completion Time that

requires performance on a "once per..." basis. The 25%

extension applies to each performance after the initial

performance. The initial performance of the Required

Action, whether it is a particular Surveillance or some

other remedial action, is considered a single action with a

single Completion Time. One reason for not allowing the 25%

extension to this Completion Time is that such an action

usually verifies that no loss of function has occurred by

checking the status of redundant or diverse components or

accomplishes the function of the inoperable equipment in an

alternative manner.

The provisions of SR 3.0.2 are not intended to be used repeatedly merely as an operational convenience to extend

Surveillance intervals (other than those consistent with

refueling intervals) or periodic Completion Time intervals

beyond those specified.

SR 3.0.3 SR 3.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable

outside the specified limits when a Surveillance has not

been completed within the specified Frequency. A delay

period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified

Frequency, whichever is greater , applies from the point in time that it is discovered that the Surveillance has not

been performed in accordance with SR 3.0.2, and not at the

time (continued)

SR Applicability B 3.0 CLINTON B 3.0-13 Revision No. 7-5 BASES SR 3.0.3 that the specified Frequency was not met. This delay period (continued) provides adequate time to complete Surveillances that have been missed. This delay period permits the completion of a

Surveillance before complying with Required Actions or other

remedial measures that might preclude completion of the

Surveillance.

The basis for this delay period includes consideration of unit conditions, adequate planning, availability of

personnel, the time required to perform the Surveillance, the safety significance of the delay in completing the

required Surveillance, and the recognition that the most

probable result of any particular Surveillance being

performed is the verification of conformance with the

requirements.

When a Surveillance with a Frequency based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, SR 3.0.3 allows for the full delay period of up to the specified Frequency to perform the surveillance.

However, since there is not a time interval specified, the missed Surveillance should be performed at the first reasonable opportunity. SR 3.0.3 provides a time limit for, and allowances for the performance of, Surveillances that become applicable as a consequence of MODE changes imposed by Required Actions.

Failure to comply with specified Frequencies for SRs is expected to be an infrequent occurrence. Use of the delay

period established by SR 3.0.3 is a flexibility which is not intended to be used as an operational convenience to extend Surveillance intervals. While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified Frequency is provided to perform the missed Surveillance, it is expected that the missed Surveillance will be performed at the first reasonable opportunity. The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the Surveillance as well as any plant configuration changes required or shutting the plant down to perform the Surveillance) and impact on any analysis assumptions, in addition to unit conditions, planning availability of personnel, and the time required to perform the Surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants." This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management actions up to an including plant shutdown. The

(continued)

SR Applicability B 3.0 CLINTON B 3.0-14 Revision No. 10-3 BASES SR 3.0.3 missed Surveillance should be treated as an emergent (continued) condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended

methods. The degree of depth and rigor of the evaluation

should be commensurate with the importance of the component.

Missed Surveillances for important components should be

analyzed quantitatively. If the results of the risk

evaluation determine the risk increase is significant, this

evaluation should be used to determine the safest course of

action. All missed Surveillances will be placed in the

Clinton Power Station Corrective Action Program.

If a Surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the

variable then is considered outside the specified limits and

the Completion Times of the Required Actions for the

applicable LCO Conditions begin immediately upon expiration

of the delay period. If a Surveillance is failed within the

delay period, then the equipment is inoperable, or the

variable is outside the specified limits and the Completion

Times of the Required Actions for the applicable LCO

Conditions begin immediately upon the failure of the

Surveillance.

Completion of the Surveillance within the delay period allowed by this Specification, or within the Completion Time

of the ACTIONS, restores compliance with SR 3.0.1.

SR 3.0.4 SR 3.0.4 establishes the requirement that all applicable SRs must be met before entry into a MODE or other specified condition in the Applicability.

This Specification ensures that system and component OPERABILITY requirements and variable limits are met before entry into MODES or other specified conditions in the Applicability for which these systems and components ensure safe operation of the unit. The provisions of this Specification should not be interpreted as endorsing the failure to exercise the good practice of restoring systems or components to OPERABLE status before entering an associated MODE or other specified condition in the Applicability.

A provision is included to allow entry into a MODE or other specified condition in the Applicability when an LCO is not met due to Surveillance not being met in accordance with LCO 3.0.4. (continued)

SR Applicability B 3.0 CLINTON B 3.0-15 Revision No. 10-3 BASES SR 3.0.4 However, in certain circumstances, failing to meet an SR (continued) will not result in SR 3.0.4 restricting a MODE change or other specified condition change. When a system, subsystem, division, component, device, or variable is inoperable or outside its specified limits, the associated SR(s) are not required to be performed, per SR 3.0.1, which states that surveillances do not have to be performed on inoperable equipment. When equipment is inoperable, SR 3.0.4 does not apply to the associated SR(s) since the requirement for the SR(s) to be performed is removed. Therefore, failing to perform the Surveillance(s) within the specified Frequency does not result in an SR 3.0.4 restriction to changing MODES or other specified conditions of the Applicability.

However, since the LCO is not met in this instance, LCO 3.0.4 will govern any restrictions that may (or may not) apply to MODE or other specified condition changes. SR 3.0.4 does not restrict changing MODES or other specified conditions of the Applicability when a Surveillance has not been performed within the specified Frequency, provided the requirement to declare the LCO not met has been delayed in accordance with SR 3.0.3.

The provisions of SR 3.0.4 shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS. In addition, the provisions of SR 3.0.4 shall not prevent changes in MODES or other specified conditions in the Applicability that result from any unit shutdown. In this context, a unit shutdown is defined as a change in MODE or other specified condition in the Applicability associated with transitioning from MODE 1 to MODE 2 or 3, MODE 2 to MODE 3, and MODE 3 to MODE 4.

The precise requirements for performance of SRs are specified such that exceptions to SR 3.0.4 are not necessary. The specific time frames and conditions necessary for meeting the SRs are specified in the Frequency, in the Surveillance, or both. This allows performance of Surveillances when the prerequisite condition(s) specified in a Surveillance procedure require entry into the MODE or other specified condition in the Applicability of the associated LCO prior to the performance or completion of a Surveillance. A Surveillance that could not be performed until after entering the LCO's Applicability, would have its Frequency specified such that it is not "due" until the specific conditions needed are met. Alternately, the Surveillance may be stated in the form of a Note, as not required (to be met or performed) until a particular event, condition, or time has been reached. Further discussion of the specific formats of SRs' annotation is found in Section 1.4, Frequency.