Letter Sequence Request |
---|
TAC:ME4030, Technical Specifications End States, NEDC-32988-A (Approved, Closed) |
|
|
|
---|
Category:Letter type:RS
MONTHYEARRS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 22021-03-23023 March 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 RS-21-028, Fitness for Duty Performance Data Reports - Annual 20202021-02-26026 February 2021 Fitness for Duty Performance Data Reports - Annual 2020 RS-21-032, Amended Decommissioning Trust Agreements2021-02-25025 February 2021 Amended Decommissioning Trust Agreements RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-21-005, Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-01-20020 January 2021 Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping 2023-09-07
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21188A0202021-08-11011 August 2021 Issuance of Amendment No. 239 One-Time Extension of Containment Type a Integrated Leakage Rate Test Frequency RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-053, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2020-04-30030 April 2020 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)2019-08-23023 August 2019 License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-06-18018 June 2019 Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RS-18-116, Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 12018-09-28028 September 2018 Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 1 RS-18-105, License Amendment Request to Recapture Low-Power Testing Time2018-09-17017 September 2018 License Amendment Request to Recapture Low-Power Testing Time RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2018-04-25025 April 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML18053A1822018-01-31031 January 2018 Enclosure 3 - Clinton Power Station, Unit 1 - Evaluation of Proposed Changes RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements ML18053A1702018-01-31031 January 2018 Attachment 3A - Clinton Power Station, Unit 1 - Marked-up Emergency Plan EP-AA-1000 Pages ML18053A1712018-01-31031 January 2018 Attachment 3B - Clinton Power Station, Unit 1 - Clean Emergency Plan EP-AA-1000 Pages RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation2018-01-0909 January 2018 License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements RS-17-076, License Amendment Request to Revise Spent Fuel Pool Level2017-07-18018 July 2017 License Amendment Request to Revise Spent Fuel Pool Level RS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations2017-05-0404 May 2017 License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-16-211, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 12016-11-0404 November 2016 License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition - Supplement 1 ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-143, Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition2016-08-11011 August 2016 Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition RS-16-143, License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition2016-08-11011 August 2016 License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition ML16229A2792016-08-11011 August 2016 Attachments 1 - 7: Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition RS-16-153, License Amendment Request for Proposed Change to Technical Specifications Section 5.0, Administrative Controls for Permanently Defueled Condition2016-07-28028 July 2016 License Amendment Request for Proposed Change to Technical Specifications Section 5.0, Administrative Controls for Permanently Defueled Condition ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. 2023-08-21
[Table view] Category:Technical Specifications
MONTHYEARRS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21193A1302021-07-14014 July 2021 Correction to Amendment No. 238 Issued June 28, 2021, Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML18303A3132019-01-0303 January 2019 Issuance of Amendment 221 Regarding Revised Alternative Source Term Dose Calculation RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15251A5842015-12-18018 December 2015 Issuance of Amendment Concerning Revision to Integrated Leak Test Intervals (TAC No. MF5291)(RS-14-308) ML15280A2582015-10-22022 October 2015 Issuance of Amendment Related to One-Time Extension of Completion Time for Shutdown Service Water (TAC No. MF6705)(RS-15-264) RS-15-260, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time2015-09-30030 September 2015 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time RS-15-246, Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time2015-09-10010 September 2015 Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) RS-15-121, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2015-04-21021 April 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training RS-14-308, License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2014-11-17017 November 2014 License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process ML1122319432011-10-0404 October 2011 Issuance of License Amendment No. Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Values to Licensee Control RS-11-117, License Amendment Request to Modify Technical Specifications Section 3.8.1, AC Sources - Operating.2011-08-15015 August 2011 License Amendment Request to Modify Technical Specifications Section 3.8.1, AC Sources - Operating. RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies.2011-06-13013 June 2011 License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies. ML1109702192011-05-0606 May 2011 Correction to Issuance of License Amendments Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a License-controlled Program RS-10-050, License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing2010-10-28028 October 2010 License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing RS-10-148, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2010-10-0808 October 2010 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-10-131, License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System2010-09-23023 September 2010 License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System RS-10-039, License Amendment Request to Administratively Revise Technical Specifications2010-06-0404 June 2010 License Amendment Request to Administratively Revise Technical Specifications RS-10-093, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B2010-05-21021 May 2010 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML1002000052010-01-15015 January 2010 License Amendment, Modify CPS License Condition 2.B.(6) and Create New License Conditions 1.J, 2.B.(7) and 2.C.(25) as Part of a Pilot Program to Irradiate Cobalt (Co)-59 Target to Produce Co-60 RS-09-074, License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies2009-06-26026 June 2009 License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies ML0907108682009-04-0202 April 2009 Licensed Amendment, Adopted TSTF-2, Relocate the 10-year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML0829400102008-10-30030 October 2008 Issuance of Amendment Technical Specification Change as Part of Implementation of TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil ML0826103082008-09-12012 September 2008 Tech Spec Pages for Amendment 181 License Amendment to Increase the Interval Between Local Power Range Monitor ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0819601482008-06-30030 June 2008 Tech Spec Page for Amendment 179 Regarding TS Changes Related to Surveillance Frequency for Scram Discharge Volume Water Level Float Switch RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0731003892007-10-31031 October 2007 Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability. RS-07-133, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process2007-09-27027 September 2007 Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0718704782007-07-0505 July 2007 Technical Specifications, Clipp, Revised Control Rod Scram Time Testing 2023-08-30
[Table view] |
Text
Exelon Generation Company, LLC www.exeloncorp.com 4300 Winfield Road Nuclear Warrenville, l L 60555 10 CFR 50.90 RS-10-039 June 4,2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
License Amendment Request to Administratively Revise Technical Specifications In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit," Exelon Generation Company, LLC (EGC) is requesting an amendment to Facility Operating License No. NPF-62 for Clinton Power Station, Unit 1 (CPS). The proposed amendment removes a time-related item from the Technical Specifications (TS). The time-related item has expired, is no longer applicable, and no longer needs to be maintained in the TS. Additionally, the proposed amendment provides correction of typographical errors introduced into the TS in previous license amendments.
This request is subdivided as follows:
Attachment 1 provides an evaluation of the proposed changes.
Attachment 2 includes TS pages with the proposed changes indicated.
Attachment 3 includes TS Bases pages with the proposed changes indicated. The TS Bases pages are provided for information only, and do not require NRC approval.
EGC requests approval of the proposed change by June 4,201 1, with the amendment being implemented within 30 days of issuance.
The proposed amendment has been reviewed by the CPS Plant Operations Review Committee and approved by the Nuclear Safety Review Board in accordance with the requirements of the EGC Quality Assurance Program.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," EGC is notifying the State of Illinois of this application for a change to the TS by sending a copy of this letter and its attachments to the designated State Official.
There are no regulatory commitments associated with the changes proposed by this request.
Should you have any questions about this letter, please contact Mr. Mitchel A. Mathews at (630) 657-2819.
U. S. Nuclear Regulatory Commission June 4,2010 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 4thday of June 2010. : Evaluation of Proposed Changes : Markup of Proposed Technical Specifications Changes : Markup of Proposed Technical Specifications Bases Changes (For Information Only)
ATTACHMENT 1 Evaluation of Proposed Changes Page 1 of 7 CONTENTS
1.0 DESCRIPTION
2.0 PROPOSED CHANGE
S
3.0 BACKGROUND
4.0 TECHNICAL ANALYSIS
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6.0 ENVIRONMENTAL CONSIDERATION
7.0 REFERENCES
ATTACHMENT 1 Evaluation of Proposed Changes Page 2 of 7
1.0 DESCRIPTION
In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit," Exelon Generation Company, LLC (EGC) is requesting an amendment to Facility Operating License Nos. NPF-62 for Clinton Power Station, Unit 1 (CPS). The proposed amendment removes one time-related item and several typographical errors from the Technical Specifications (TS). The time-related item has expired and no longer needs to be maintained in the TS.
2.0 PROPOSED CHANGE
S TS 3.0, "SR Applicability" Correct an administrative issue in TS 3.0, "SR Applicability," Page 3.0-5. The proposed change corrects an editorial issue related to the format of page 3.0-5. The proposed change removes the single line and parenthetical "(continued)" at the bottom of Page 3.0-5, and inserts a double line to indicate the end of the section. This administrative error was introduced into the TS during the implementation of Amendment 163 (Reference 1).
TS 3.3.5.1, "ECCS Instrumentation" In order to correct an administrative issue in TS 3.3.5.1, "ECCS Instrumentation," EGC is requesting the indentation of the Logical Connector "OR" between TS 3.3.5.1, Required Actions D.2.1 and D.2.2. The indentation of this logical connector will provide clarity regarding compliance with the LCO. Specifically, the referenced channel must be placed in the trip condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or alternatively, the High Pressure Core Spray pump suction must be aligned to the Suppression Pool within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This error was introduced into the CPS TS in Amendment 95 (Reference 2), which converted the CPS TS to the Improved Technical Specifications format.
TS 3.6.5.1, "Drywell" Revise TS 3.6.5.1, "Drywell," SR 3.6.5.1.3. EGC is requesting deletion of Note 1 from SR 3.6.5.1.3, as the allowance provided by this Note which was added in TS Amendment 160 (Reference 3) has expired. This SR is being met, and no longer needs to be modified by this Note.
ATTACHMENT 1 Evaluation of Proposed Changes Page 3 of 7 TS 3.6.5.6, "Drywell Post-LOCA Vacuum Relief System" In order to correct an administrative issue in TS 3.6.5.6, "Drywell Post-LOCA Vacuum Relief System," EGC is requesting the addition of the words "not met" at the end of Condition D.
These words were erroneously omitted from the markups of the TS pages that were submitted in the request that led to Amendment 187 (Reference 4).
TS 3.8.4, "DC Sources-Operating" In order to correct an administrative issue in TS 3.8.4, "DC Sources-Operating," EGC is requesting the insertion of a new TS Page 3.8-24b. An additional TS Page (i.e., Page 3.8-24a) was inserted in the TS during the implementation of TS Amendment 187 (Reference 4). Since the CPS TS are double-sided, an additional blank page should have accompanied Page 3.8-24a during the implementation of Amendment 187. The purpose of the blank page is to maintain the pagination on the pages subsequent to the newly inserted TS page.
3.0 BACKGROUND
All the identified issues are the result of the expiration of a time-related requirement or administrative errors that were introduced into the TS during the license amendment request or implementation process. None of these issues is of a technical nature.
ATTACHMENT 1 Evaluation of Proposed Changes Page 4 of 7
4.0 TECHNICAL ANALYSIS
All proposed changes are administrative in nature and require no technical analysis.
5.0 REGULATORY ANALYSIS
5.1 No Significant Hazards Consideration In accordance with 10 CFR 50.90, "Application for amendment of license or construction permit," Exelon Generation Company, LLC (EGC) is requesting an amendment to Facility Operating License No. NPF-62 for Clinton Power Station, Unit 1 (CPS). The proposed amendment provides for the administrative removal of a time-related requirement that has expired and the correction administrative errors from the Technical Specifications (TS). The time-related item is no longer applicable, and therefore, no longer needs to be maintained in the TS.
According to 10 CFR 50.92, "Issuance of amendment," paragraph (c), a proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety.
In support of this determination, an evaluation of each of the three criteria set forth in 10 CFR 50.92 is provided below regarding the proposed license amendment.
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The initial conditions and methodologies used in the accident analyses remain unchanged. The proposed changes do not change or alter the design assumptions for the systems or components used to mitigate the consequences of an accident. Therefore, accident analyses results are not impacted.
All changes proposed by EGC in this amendment request are administrative in nature, and include the removal a time-related requirement that has been satisfied and the correction of typographical-type administrative errors. There are no physical changes to the facilities, nor any changes to the station operating procedures, limiting conditions for operation, or limiting safety system settings.
Based on the above discussion, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
ATTACHMENT 1 Evaluation of Proposed Changes Page 5 of 7
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No None of the proposed changes affect the design or operation of any system, structure, or component in the plant. The safety functions of the related structures, systems, or components are not changed in any manner, nor is the reliability of any structure, system, or component reduced by the revised surveillance or testing requirements. The changes do not affect the manner by which the facility is operated and do not change any facility design feature, structure, system, or component. No new or different type of equipment will be installed. Since there is no change to the facility or operating procedures, and the safety functions and reliability of structures, systems, or components are not affected, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Based on this evaluation, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No The proposed changes to the TS are administrative in nature and have no impact on the margin of safety of any of the TS. There is no impact on safety limits or limiting safety system settings. The changes do not affect any plant safety parameters or setpoints.
Based on this evaluation, the proposed changes do not involve a significant reduction in a margin of safety.
Therefore, EGC concludes that the proposed changes do not involve a significant hazards consideration under the criteria set forth in 10 CFR 50.92(c).
ATTACHMENT 1 Evaluation of Proposed Changes Page 6 of 7 5.2 Applicable Regulatory Requirements/Criteria 10 CFR 50.36, "Technical specifications," details the information that must be included in each station's TS. The proposed changes modify a time-related requirement that is no longer applicable and correct errors that are administrative in nature. The proposed changes have no impact on current Safety Limits, Limiting Safety System Settings, Limiting Control Settings, Limiting Conditions for Operation, Surveillance Requirements, Design Features, or Administrative Controls. Therefore, EGC concludes that the methods used to comply with 10 CFR 50.36 are not modified by the proposed changes, and the requirements continue to be met.
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
EGC has evaluated this proposed license amendment consistent with the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10 CFR 51.21, "Criteria for and identification of licensing and regulatory actions requiring environmental assessments." EGC has determined that this proposed change meets the criteria for categorical exclusion set forth in paragraph (c)(9) of 10 CFR 51.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review," and has determined that no irreversible consequences exist in accordance with paragraph (b) of 10 CFR 50.92, "Issuance of amendment." This determination is based on the fact that this change is being processed as an amendment to the license issued pursuant to 10 CFR 50, "Domestic Licensing of Production and Utilization Facilities," which changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, "Standards for Protection Against Radiation," or which changes an inspection or surveillance requirement and the amendment meets the following specific criteria:
(i) The amendment involves no significant hazards consideration.
As demonstrated in Section 5.1 above, "No Significant Hazards Consideration," the proposed change does not involve any significant hazards consideration.
(ii) There is no significant change in the types or significant increase in the amounts of any effluent that may be released offsite.
The proposed changes will delete an expired time-related requirement and correct administrative errors in the Clinton Power Station Technical Specifications (TS).
These proposed changes will not result in an increase in power level, nor will the proposed changes increase the production or alter the flow path or method of disposal of radioactive waste or byproducts; therefore, there will be no change in the amounts of radiological effluents released offsite.
ATTACHMENT 1 Evaluation of Proposed Changes Page 7 of 7
7.0 REFERENCES
- 1. Letter from K. R. Jury (AmerGen Energy Company, LLC (AmerGen)) to U. S. NRC, "Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process," dated April 30, 2004
- 2. Letter from J. S. Perry (Illinois Power) to U. S. NRC, "Clinton Power Station Proposed Amendment of Facility Operating License No. NPF-62," dated October 26, 1993
- 3. Letter from K. R. Jury (AmerGen) to U. S. NRC, "Request for Amendment to Technical Specifications 3.6.5.1, 'Drywell' and 5.5.13, 'Primary Containment Leakage Rate Testing Program,'" dated January 29, 2003
- 4. Letter from J. L. Hansen (EGC) to U. S. NRC, "Additional Information Supporting Requests for License Amendments to Adopt TSTF-423, 'Technical Specifications End States, NEDC-32988-A,'" dated January 30, 2009
ATTACHMENT 2 Markup of Proposed Technical Specifications Changes Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 License Amendment Request to Administratively Revise Technical Specifications Technical Specifications Pages 3.0-5 3.3-34 3.6-54b 3.6-69 3.8-24b
SR Applicability 3.0 3.0 SR APPLICABILITY (continued)
SR 3.0.3 When the Surveillance is performed within the delay period (continued) and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4. This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
(continued)
CLINTON 3.0-5 Amendment No. 163
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. As required by D.1 --------NOTE--------
Required Action A.1 Only applicable if and referenced in HPCS pump suction is Table 3.3.5.1-1. not aligned to the suppression pool.
Declare HPCS System 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from inoperable. discovery of loss of HPCS initiation capability AND D.2.1 Place channel in 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> trip.
OR D.2.2 Align the HPCS pump 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> suction to the suppression pool.
(continued)
CLINTON 3.3-34 Amendment No. 95
Drywell 3.6.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.5.1.3 Verify bypass leakage is less than or 24 months equal to the bypass leakage limit. following 2 However, during the first unit startup consecutive following bypass leakage testing tests with performed in accordance with this SR, the bypass leakage acceptance criterion is 10% of the greater than drywell bypass leakage limit. the bypass leakage limit until 2 consecutive tests are less than or equal to the bypass leakage limit AND 48 months following a test with bypass leakage greater than the bypass leakage limit AND
NOTES-----
- 1. The next required performance of this SR may be delayed to November 23, 2008.
- 2. SR 3.0.2 is not applicable for extensions
> 12 months.
120 months (continued)
CLINTON 3.6-54b Amendment No. 160
Drywell Post-LOCA Vacuum Relief System 3.6.5.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Two or more drywell C.1 Restore drywell post- 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> post-LOCA vacuum LOCA vacuum relief relief subsystems subsystems to inoperable for reasons OPERABLE status.
other than Condition A.
D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A. AND D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> not met E. Required Action and ------------NOTE------------
associated Completion LCO 3.0.4.a is not Time of Condition B or applicable when entering C not met. MODE 3.
E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CLINTON 3.6-69 Amendment No. 187
DC Sources-Operating 3.8.4 Insert new page 3.8-24b.
This page intentionally left blank.
CLINTON 3.8-24b Amendment No.
ATTACHMENT 3 Markup of Proposed Technical Specifications Bases Changes (For Information Only)
Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 License Amendment Request to Administratively Revise Technical Specifications Technical Specifications Bases Pages B 3.6-105a
Drywell B 3.6.5.1 BASES SURVEILLANCE SR 3.6.5.1.3 REQUIREMENTS The analyses in Reference 1 are based on a maximum drywell bypass leakage. This Surveillance ensures that the actual drywell bypass leakage is less than or equal to the acceptable A / k design value of 1.0 ft2 assumed in the safety analysis. As left drywell bypass leakage, prior to the first startup after performing a required drywell bypass leakage test, is required to be 10% of the drywell bypass leakage limit. At all other times between required drywell leakage rate tests, the acceptance criteria is based on the design A / k . At the design A / k the containment temperature and pressurization response are bounded by the assumptions of the safety analysis. One drywell air lock door is left open during each drywell bypass leakage test such that each drywell air lock door is leak tested during at least every other drywell bypass leakage test. This ensures that the leakage through the drywell air lock is properly accounted for in the measured bypass leakage and that each air lock door is tested periodically.
This Surveillance is performed at least once every 10 years (120 months) on a performance based frequency. The Frequency is consistent with the difficulty of performing the test, risk of high radiation exposure, and the remote possibility that sufficient component failures will occur such that the drywell bypass leakage limit will be exceeded.
This Frequency is modified by a note that allows for a one-time deferral of this surveillance until November 23, 2008.
If during the performance of this required Surveillance the drywell bypass leakage is determined to be greater than the leakage limit, the Surveillance Frequency is increased to at least once every 48 months. If during the performance of the subsequent consecutive Surveillance the drywell bypass leakage is determined to be less than or equal to the drywell bypass leakage limit, the 10-year Frequency may be resumed. If during the performance of the subsequent consecutive Surveillance the drywell bypass leakage is determined to be greater than the drywell bypass leakage limit, the Surveillance Frequency is increased to at least once every 24 months. The 24-month Frequency must be maintained until the drywell bypass leakage is determined to (continued)
CLINTON B 3.6-105a Revision No. 9-2