Category:Letter type:RS
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs 2023-08-04
[Table view] |
Text
Exelon Generation wwwexeloncorp .com Exel6n 4300 Winfield Road Nuclear Warrenville, IL 60555 10 CFR 50 .90 RS-09-135 October 28, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Additional Information Supporting the License Amendment to Technical Specification 3 .5.1, "Emergency Core Cooling Systems (ECCS) Operating"
References:
1 . Letter from P. R. Simpson (Exelon Generation Company, LLC) to U .S. NRC, "Request for a License Amendment to Technical Specification 3 .5.1,
'Emergency Core Cooling Systems (ECCS) Operating'," dated March 26, 2009
- 2. Letter from C. S . Goodwin (U.S. NRC) to C. G . Pardee, "LaSalle County Station, Units 1 and 2 - Request for Additional Information Related to Request for a License Amendment to Technical Specification 3.5.1,
'Emergency Core Cooling Systems (ECCS) Operating (TAC Nos. ME0994 and ME0995)'," dated October 2, 2009 In Reference 1, Exelon Generation Company, LLC (EGC), requested an amendment to Appendix A, Technical Specifications (TS), of Facility Operating License Nos. NPF-11 and NPF-18 for LaSalle County Station (LSCS), Units 1 and 2. Specifically, the proposed change will revise TS 3.5.1, "Emergency Core Cooling Systems (ECCS) Operating," to delete the existing allowance associated with the Automatic Depressurization System (ADS) accumulator backup compressed gas system that currently allows a Completion Time (CT) of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore bottle pressure to ? 500 psig .
In Reference 2, the NRC requested additional information to complete the review of the proposed license amendment. In response to this request, EGC is providing the attached information.
The information provided in this letter and attachment does not affect the No Significant Hazards Consideration, or the Environmental Consideration provided in Attachment 1 of the original Reference 1 license amendment request.
October 28, 2009 U .S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments in this letter . Should you have any questions concerning this letter, please contact Ms. Alison Mackellar at (630) 657-2817 .
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of October 2009.
Patrick R. Simpson Manager - Licensing Attachment : Response to Request for Additional Information
ATTACHMENT Response to Request for Additional Information NRC Request 1 "Please clarify how the existing deficiency in the LSCS TS was first identified as it relates to TS 3.5.1, concerning the common pneumatic supply utilized to support the Low-Low Setpoint (LLS) function of the Safety Relief Valves (SRVs) and the ADS function of the SRVs . Is there any precedence of similar deficiency that existed in other plants?"
Response
The deficiency was identified by LaSalle County Station (LSCS) personnel in June 2006 during a review of the design basis of the Automatic Depressurization System (ADS). Exelon Generation Company, LLC (EGC) is not aware of another plant having the same deficiency .
NRC Request 2 "Out of the seven SRVs that utilizes the ADS function, how many are credited in the analysis-of-record for LSCS for the limiting loss of coolant accident (LOCA) for Peak Central [Cladding]
Temperature (PCT)."
Response
As documented in the LSCS Updated Final Safety Analysis Report (UFSAR) Chapter 15.0, "Accident Analyses," Section 15.6.5, the design basis LOCA is a complete circumferential piping break in one of two recirculation loops. For this event, the break causes a rapid depressurization of the reactor pressure vessel and therefore no SRVs are required .
LSCS Units 1 and 2 employ a mixed core design containing co-resident GE and AREVA NP fuel . The LSCS 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors," analysis of record (Reference 3) for the GE fuel defines the limiting break as a 0.08 ftz recirculation pump suction line break with failure of the High Pressure Core Spray Diesel Generator. The net peak cladding temperature is 1470°F. The 10 CFR 50 .46 analysis of record (Reference 3) for AREVA NP fuel defines the limiting break as a double-ended guillotine of the recirculation pump suction piping with failure of the Low Pressure Coolant Injection Diesel Generator. The net peak cladding temperature is 1729°F.
The above referenced analyses were performed assuming only six of the seven ADS valves were operable . This supports operation with one SRV out-of-service as permitted by Technical Specification (TS) 3.5.1, "Emergency Core Cooling Systems (ECCS) Operating." In the case of a single active failure of one ADS valve, five valves are assumed (Refer to LSCS UFSAR Table 6.3-3 and Table 6 .3-6) .
NRC Request 3 "In page 8 of Attachment 1 of the submittal, it is stated, 'This event involves a specific loss-of-coolant-accident (LOCA) inside the primary containment with a concurrent loss of offsite power and a random failure that results in the inoperability of one of the two ADS bottle banks.'
Please clarify the following:
- a. Is the above mentioned event the limiting LOCA for PCT, and the most limiting single-failure being the random failure that results in the inoperability of one of the two ADS bottle banks? If not, then describe the limiting LOCA with the most limiting single-failure for LSCS . Is the limiting LOCA a small or large break LOCA?
ATTACHMENT Response to Request for Additional Information
- b. Were there any other postulated transients or accidents which were impacted by the existing deficiency in the TS? If there were, then describe the events ."
Response
a . The limiting PCT LOCAs are not the limiting LOCA for the ADS/LLS interface issue.
The most limiting scenario for the ADS/LLS interface issue is a small break LOCA in the High Pressure Core Spray (HPCS) injection piping concurrent with a single failure that prevents one of the ADS bottle banks from being capable of refilling the ADS accumulators it serves . This hypothetical HPCS injection piping LOCA would be a small break LOCA . This particular small break LOCA would be large enough to cause HPCS to be inoperable but not large enough to rapidly depressurize the reactor pressure vessel . The break is limiting with respect to the subject ADS/LLS interface . This break size would be included within the complete spectrum of postulated break sizes and locations considered in the evaluation of Emergency Core Cooling System (ECCS) performance .
- b. Yes, the Main Steam Line Break outside containment (UFSAR 15.6.4) with a single failure of the HPCS System and no operator action is the LSCS licensing basis event that establishes the maximum number of SRV actuations prior to ADS.
NRC Request 4 "It was stated in the submittal that with the backup compressed gas system bottle pressure of > 500 psig, or the reserve bottle pressure of > 1100 psig, there is sufficient nitrogen available for any postulated event involving LLS actuation and a subsequent need for ADS .
Please explain how these numeric values of minimum required pressure (500 psig for backup and 1100 psig for reserve bottles), were determined to be sufficient pressure in order to perform its intended safety function ."
Response
The required volume of compressed nitrogen was determined as follows :
Urequired = (Nactuations)(Vconsumed/actuation) + Design Leakage Where:
Urequired = Volume of usable compressed nitrogen the bottle(s) must provide Nactuations = Number of required SRV actuations for LLS Vconsumed/actuation = Volume of gas consumed per actuation Two models were used to determine the volume consumed per actuation, the isothermal model and the adiabatic model . When the compressed nitrogen stored in an ADS accumulator rushes into the SRV's pneumatic actuator, the compressed nitrogen will rapidly expand. If no heat is transferred to the nitrogen its temperature will decrease . The isothermal model assumes the temperature of the compressed nitrogen remains constant (i .e., heat is transferred from the drywell ambient environment to the piping, accumulator, and actuator) . The adiabatic model assumes no heat is transferred to the compressed nitrogen . In reality, heat will be transferred to the compressed nitrogen, so the actual response will be closer to an isothermal model . Since the adiabatic model yields more conservative results, the results are used in determining Vrequired-
ATTACHMENT Response to Request for Additional Information The required pressure in each backup compressed gas system bottle bank (consisting of four bottles per bottle bank) of 2 500 psig or the reserve bottle pressure of >_ 1100 psig yields the required volume and assures the ADS accumulators remain pressurized to 150 psig .
NRC Request 5 "In page 4 of Attachment 1 of the submittal, it is stated, 'The safety-related portion, referred to as the ADS accumulator backup compressed gas system, maintains the ADS accumulators pressurized following a loss of the normal non-safety related pneumatic supply .' This statement implies that the backup compressed gas system is considered safety-grade . Since the reserve compressed gas system installed at LSCS will also perform safety-related function, please clarify whether that system will be maintained as safety-grade system. If not, then explain why not."
Response_
The piping and components associated with the reserve bottle are part of the backup compressed gas system . The ADS accumulator backup compressed gas system is classified as safety-related and there are no current plans to change its classification .
NRC Request 6 "In page 4 of Attachment 1 of the submittal, it is stated, 'A control room alarm is also annunciated for low pressure in the ADS nitrogen bottle banks supply headers to indicate that the pressure in a bottle bank is approaching the bottle change-out pressure .' Please clarify whether low pressure in the reserve bottles can also be detected through control room alarm. If not, then explain why it is not necessary."
Response
A pressure indicator is installed locally at the location where the reserve bottle is connected.
This pressure indicator allows the operator to verify pressure in the reserve bottle before it is valved-in and after it is valved-in. The TS minimum bottle pressure of 21100 psig assures should the worst-case scenario occur during bottle bank change-out activities that the reserve bottle will contain sufficient compressed nitrogen to support the required number of SRV actuations (i.e., 15 actuations) and design leakage.
A low-pressure alarm is not provided for the reserve bottle . The reserve bottle is intended for use only during bottle bank change-out activities . These activities are typically of short duration . Therefore, the reserve bottle is for limited use only and is not intended as the normal supply for the ADS backup compressed gas system.
References :
1 . Letter from P. R . Simpson (Exelon Generation Company, LLC) to U .S. NRC, "Request for a License Amendment to Technical Specification 3.5.1, 'Emergency Core Cooling Systems (ECCS) Operating'," dated March 26, 2009
- 2. Letter from C. S. Goodwin (U .S. NRC) to C. G . Pardee, "LaSalle County Station, Units 1 and 2 - Request for Additional Information Related to Request for a License Amendment Page 3 of 4
ATTACHMENT Response to Request for Additional Information to Technical Specification 3.5.1, 'Emergency Core Cooling Systems (ECCS) Operating (TAC Nos. ME0994 and ME0995),' dated October 2, 2009
- 3. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S . NRC, "Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report," dated March 27, 2009