MONTHYEARML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23089A4022023-03-30030 March 2023 Annual Operating Report ML22179A3102022-06-22022 June 2022 Connecticut, Inc - 2021 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirement of 10 CFR 50.46 ML22090A2402022-03-31031 March 2022 Annual Operating Report ML21140A3692021-05-20020 May 2021 (Vcsn), Unit 1 - 10 CFR 72.48 Biennial Report ML21118A8432021-04-27027 April 2021 Annual Radioactive Effluent Release Report ML21118B0652021-04-27027 April 2021 Annual Radiological Environmental Operating Report for the Operating Period January 1, 2020 - December 31, 2020 ML21090A0852021-03-30030 March 2021 Annual Operating Report ML20181A5392020-06-29029 June 2020 Submittal of 2019 Annual Report of Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML20091K3952020-03-31031 March 2020 Submittal of Annual Operating Report ML19151A3842019-05-29029 May 2019 Submittal of Emergency Core Cooling System Evaluation Model Revisions Annual Report ML19088A2112019-03-28028 March 2019 Submittal of 2018 Annual Operating Report ND-18-0005, 10 CFR 50.46 Annual Report2018-05-14014 May 2018 10 CFR 50.46 Annual Report ML18086B7242018-03-27027 March 2018 Annual Operating Report ND-18-0001, (VCSNS) Units 2 and 3, Reporting of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Section VI 11 Departures2018-02-0101 February 2018 (VCSNS) Units 2 and 3, Reporting of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Section VI 11 Departures RC-17-0033, Annual Operating Report for 20162017-03-23023 March 2017 Annual Operating Report for 2016 RC-16-0048, Submittal of Annual Operating Report for 20152016-03-30030 March 2016 Submittal of Annual Operating Report for 2015 ML15092A1622015-03-26026 March 2015 Annual Operating Report ML14099A2132014-04-0404 April 2014 V C Summer, Unit 1 - Submittal of Annual Radiological Environmental Operating Report RC-13-0170, Virgil S. Summer Nuclear Station (Vcsns), Unit 1, 10 CFR 50.59 Biennial Report2013-12-31031 December 2013 Virgil S. Summer Nuclear Station (Vcsns), Unit 1, 10 CFR 50.59 Biennial Report ML13169A0542013-06-13013 June 2013 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Report ML13091A0772013-03-27027 March 2013 Annual Operating Report for 2012 ML12160A3542012-06-0606 June 2012 ECCS Evaluation Model Revisions Report ML12121A3072012-04-24024 April 2012 Annual Radioactive Effluent Release Report for January 1 Through December 31, 2011 ML12093A2522012-03-30030 March 2012 2011 Annual Operating Report ML11159A2102011-06-0606 June 2011 ECCS Evaluation Model Revisions Report RC-11-0050, 2010 Annual Operating Report2011-03-31031 March 2011 2010 Annual Operating Report ML1009902402010-04-0707 April 2010 Annual Radioactive Effluent Release Report for Period of January 1 Through December 31, 2009 ML1009200632010-03-30030 March 2010 2009 Annual Operating Report ML1009200542010-03-26026 March 2010 Submittal of Property Insurance Annual 10CFR50354(w)(3) Report ML0908902892009-03-25025 March 2009 Submittal of 2008 Annual Operating Report RC-08-0043, V. C. Summer, Unit 1 - Transmittal of the 2007 Annual Operating Report2008-03-27027 March 2008 V. C. Summer, Unit 1 - Transmittal of the 2007 Annual Operating Report ML0708603352007-03-23023 March 2007 Annual Operating Report for 2006 ML0609402762006-03-31031 March 2006 Annual Operating Report ML0409704062004-03-31031 March 2004 Annual Operating Report RC-03-0220, 10CFR50.54(a)(3) / 10CFR50.59 Biennial Report2003-10-29029 October 2003 10CFR50.54(a)(3) / 10CFR50.59 Biennial Report ML0309905892003-03-28028 March 2003 Annual Operating Report ML0209903812002-03-28028 March 2002 Annual Operating Report for Virgil C. Summer Nuclear Station for 2001 2023-06-26
[Table view] Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
,.
George A. Lippard Vice President, Nuclear Operations 803.345.4810 March 30 , 2016 A SCA NA C OM PA N Y U. S. Nuclear Regulatory Commission Attn : Document Control Desk Wash ington , DC 20555
Dear Sir/Madam :
Subject:
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO . NPF-12 ANNUAL OPERATING REPORT Enclosed is the 2015 Annual Operating Report for the South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Unit No. 1. This report is being subm itted in accordance with Technical Specification 6.9.1.4.
If there are any questions, please call at your convenience .
Very truly yours, SBR/GAL/ts Attachment c: K. 8 . Marsh K. M. Sutton S. A. Byrne J. C. Mellette J.B. Archie C. Logan (ANI)
N. S. Carns Marsh USA, Inc.
J. H. Hamilton NRC Resident Inspector J. W . Williams NSRC W. M. Cherry RTS (LTD 292)
C. Haney File (818 .02-10 , RR 8225)
S. A. Williams PRSF (RC-16-0048)
M. L. Thomas V. C. Summer Nuclear Station* P. 0. Box 88
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 2015 ANNUAL OPERATING REPORT
Document Control Desk LTD 292 RC-16-0048 Page 2 of 5 PREFACE The 2015 Annual Operating Report for the Virgil C. Summer Nuclear Station Unit 1 is hereby submitted in accordance with Technical Specification 6.9.1.4 under Docket Number 50/395 and Facility Operating License NPF-12.
Document Control Desk LTD 292 RC-16-0048 Page 3 of 5 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Introduction 4 2.0 Operational Data 4 3.0 Operating Summary 4 4.0 Failed Fuel 5
Document Control Desk LTD 292 RC-16-0048 Page 4 of 5
1.0 INTRODUCTION
The Virgil C. Summer Nuclear Station (VCSNS) utilizes a pressurized water reactor rated at 2900 MWT. The maximum dependable capacity is 966 MWe.
The station is located approximately 26 miles northwest of Columbia, South Carolina.
2.0 OPERATIONAL DATA For the reporting period of January 1 through December 31, 2015, the station operated at a capacity factor of 84.1 % (using maximum dependable capacity) and a unit availability of 83.3%.
The reactor was critical for a total of 7337.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the generator remained on line 7301.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and the total gross electrical energy generated for 2015 was 7,397,220 MWH.
3.0 OPERATING
SUMMARY
The Virgil C. Summer Nuclear Station (VCSNS) Unit No.1 operated at 100% power from January 1st through January 3rd. On January 3rd power was reduced to 86.7% in order to isolate one set of high pressure feedwater heaters to repair a steam leak. The repair was completed on January 8th and the feedwater heaters were restored to service. Power was restored to 100%
on January 8th.
VCSNS operated at 100% power from January 8th to January 16th. On January 16th power was reduced to approximately 93% to support planned main turbine valve testing. Reactor power was restored to 100% on January 17th.
VCSNS operated at 100% power from January 17th to April 24th. On April 24th power was reduced to approximately 91 % to support planned main turbine valve testing. Reactor power was restored to 100% on April 25th.
VCSNS operated at 100% power from April 25th to June 26th. On June 26th power was reduced to approximately 90% to support planned main turbine valve testing. Power was restored to 100% on June 27th..
VCSNS operated at 100% power from June 27th to September 30th. On September 30th power was reduced to approximately 91 % to allow planned testing of the reheat steam safety valves.
On October 1st power was reduced to 85% to support planned testing of the main steam safety valves.
Power reduction for VCSNS Unit 1 Refueling Outage Twenty-Two (RF-22) started on October 2nd at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br /> and concluded on October 3rd at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> when the Main Generator Breaker was opened. The reactor was manually tripped October 3rd at 0231 hours0.00267 days <br />0.0642 hours <br />3.819444e-4 weeks <br />8.78955e-5 months <br /> to begin the scheduled refueling outage.
Document Control Desk LTD 292 RC-16-0048 Page 5 of 5 The outage was originally planned through November 27th, however fuel transfer equipment problems, reactor coolant pump seal modification delays and weather related delays (e.g.
Hurricane Joaquin) resulted in an unplanned extension of five and one-half days. The unit remained shutdown for the refueling outage until December 1st when the reactor was returned to criticality and synchronized to the grid on December 2nd. Reactor power was restored to 100%
on December 5th. The plant operated at 100% power for the remainder of 2015.
Refueling Outage 22 Summary The main generator breaker was opened at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> on October 3rd for Refueling Outage 22.
The outage duration was originally planned through November 27th, however several plant issues resulted in an unplanned extension of five days and one half days.
Major work included:
- Fukushima FLEX modifications
- Reactor Water Storage Tank piping changes
- Main Generator Field replacement
- Reactor lncore Thimble replacement
- Reactor Building Cooling Unit piping changes Refueling Outage 22 duration was 60.7 days. Outage business plan duration was 55 days.
Personnel exposure in 2015 due to the outage was approximately 77.1 Rem, based on electronic dosimeters.
Forced Power Reduction >20% Exceeding 4 Hours None 4.0 FAILED FUEL VCSNS did not have any indications of failed fuel in 2015.
George A. Lippard Vice President, Nuclear Operations 803.345.4810 March 30 , 2016 A SCA NA C OM PA N Y U. S. Nuclear Regulatory Commission Attn : Document Control Desk Wash ington , DC 20555
Dear Sir/Madam :
Subject:
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO . NPF-12 ANNUAL OPERATING REPORT Enclosed is the 2015 Annual Operating Report for the South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Unit No. 1. This report is being subm itted in accordance with Technical Specification 6.9.1.4.
If there are any questions, please call at your convenience .
Very truly yours, SBR/GAL/ts Attachment c: K. 8 . Marsh K. M. Sutton S. A. Byrne J. C. Mellette J.B. Archie C. Logan (ANI)
N. S. Carns Marsh USA, Inc.
J. H. Hamilton NRC Resident Inspector J. W . Williams NSRC W. M. Cherry RTS (LTD 292)
C. Haney File (818 .02-10 , RR 8225)
S. A. Williams PRSF (RC-16-0048)
M. L. Thomas V. C. Summer Nuclear Station* P. 0. Box 88
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 2015 ANNUAL OPERATING REPORT
Document Control Desk LTD 292 RC-16-0048 Page 2 of 5 PREFACE The 2015 Annual Operating Report for the Virgil C. Summer Nuclear Station Unit 1 is hereby submitted in accordance with Technical Specification 6.9.1.4 under Docket Number 50/395 and Facility Operating License NPF-12.
Document Control Desk LTD 292 RC-16-0048 Page 3 of 5 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 Introduction 4 2.0 Operational Data 4 3.0 Operating Summary 4 4.0 Failed Fuel 5
Document Control Desk LTD 292 RC-16-0048 Page 4 of 5
1.0 INTRODUCTION
The Virgil C. Summer Nuclear Station (VCSNS) utilizes a pressurized water reactor rated at 2900 MWT. The maximum dependable capacity is 966 MWe.
The station is located approximately 26 miles northwest of Columbia, South Carolina.
2.0 OPERATIONAL DATA For the reporting period of January 1 through December 31, 2015, the station operated at a capacity factor of 84.1 % (using maximum dependable capacity) and a unit availability of 83.3%.
The reactor was critical for a total of 7337.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the generator remained on line 7301.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and the total gross electrical energy generated for 2015 was 7,397,220 MWH.
3.0 OPERATING
SUMMARY
The Virgil C. Summer Nuclear Station (VCSNS) Unit No.1 operated at 100% power from January 1st through January 3rd. On January 3rd power was reduced to 86.7% in order to isolate one set of high pressure feedwater heaters to repair a steam leak. The repair was completed on January 8th and the feedwater heaters were restored to service. Power was restored to 100%
on January 8th.
VCSNS operated at 100% power from January 8th to January 16th. On January 16th power was reduced to approximately 93% to support planned main turbine valve testing. Reactor power was restored to 100% on January 17th.
VCSNS operated at 100% power from January 17th to April 24th. On April 24th power was reduced to approximately 91 % to support planned main turbine valve testing. Reactor power was restored to 100% on April 25th.
VCSNS operated at 100% power from April 25th to June 26th. On June 26th power was reduced to approximately 90% to support planned main turbine valve testing. Power was restored to 100% on June 27th..
VCSNS operated at 100% power from June 27th to September 30th. On September 30th power was reduced to approximately 91 % to allow planned testing of the reheat steam safety valves.
On October 1st power was reduced to 85% to support planned testing of the main steam safety valves.
Power reduction for VCSNS Unit 1 Refueling Outage Twenty-Two (RF-22) started on October 2nd at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br /> and concluded on October 3rd at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> when the Main Generator Breaker was opened. The reactor was manually tripped October 3rd at 0231 hours0.00267 days <br />0.0642 hours <br />3.819444e-4 weeks <br />8.78955e-5 months <br /> to begin the scheduled refueling outage.
Document Control Desk LTD 292 RC-16-0048 Page 5 of 5 The outage was originally planned through November 27th, however fuel transfer equipment problems, reactor coolant pump seal modification delays and weather related delays (e.g.
Hurricane Joaquin) resulted in an unplanned extension of five and one-half days. The unit remained shutdown for the refueling outage until December 1st when the reactor was returned to criticality and synchronized to the grid on December 2nd. Reactor power was restored to 100%
on December 5th. The plant operated at 100% power for the remainder of 2015.
Refueling Outage 22 Summary The main generator breaker was opened at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> on October 3rd for Refueling Outage 22.
The outage duration was originally planned through November 27th, however several plant issues resulted in an unplanned extension of five days and one half days.
Major work included:
- Fukushima FLEX modifications
- Reactor Water Storage Tank piping changes
- Main Generator Field replacement
- Reactor lncore Thimble replacement
- Reactor Building Cooling Unit piping changes Refueling Outage 22 duration was 60.7 days. Outage business plan duration was 55 days.
Personnel exposure in 2015 due to the outage was approximately 77.1 Rem, based on electronic dosimeters.