RA-19-0185, Onsite Property Insurance Coverage

From kanterella
Jump to navigation Jump to search
Onsite Property Insurance Coverage
ML19091A197
Person / Time
Site: Oconee, Mcguire, Catawba, Harris, Brunswick, Crystal River, Robinson, McGuire  Duke energy icon.png
Issue date: 04/01/2019
From: Catherine Nolan
Duke Energy Carolinas, Duke Energy Florida, Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-19-0185
Download: ML19091A197 (4)


Text

d_-, DUKE

~ ENERGY M. Christopher Nolan 526 South Church Street Charlotte, NC 28202 Mailing Address:

Mail Code EC07H /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 Serial: RA-19-0185 April 1, 2019 10 CFR 50.54(w)(3)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 And 50-324 / Renewed License Nos. DPR-71 and DPR-62 Catawba Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-413 and 50-414 / Renewed License Nos. NPF-35 and NPF-52 McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-369 and 50-370 I Renewed License Nos. NPF-9 and NPF-17 Oconee Nuclear Station, Unit Nos. 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 I Renewed License Nos. DPR-38, DPR-47, And DPR-55 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400 / Renewed License No. NPF-63 H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 / Renewed License No. DPR-23 Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 I License No. DPR-72

Subject:

Onsite Property Insurance Coverage Pursuant to 10 CFR 50.54(w)(3) regarding onsite property damage insurance, Duke Energy Carolinas, LLC, Duke Energy Progress, LLC, and Duke Energy Florida, LLC hereby submit information regarding the present level and source of onsite property damage insurance for the Catawba Nuclear Station (CNS), McGuire Nuclear Station (MNS), Oconee Nuclear Station (ONS), Shearon Harris Nuclear Power Plant (SHNPP), Brunswick Steam Electric Plant (BSEP),

H.B. Robinson Steam Electric Plant (HBRSEP), and Crystal River Unit 3 Nuclear Generating Plant. This information is required to be submitted to the United States Nuclear Regulatory Commission by April 1 of each year.

U.S. Nuclear Regulatory Commission Page2 Insured Site - Brunswick Company: Nuclear Electric Insurance Limited Policy No.: P18-003 (renewal date August 1, 2019)

Limits: $1,500,000,000 (Primary)

Company: Nuclear Electric Insurance Limited Policy No.: BX18-013 (renewal date August 1, 2019)

Limits: $1,250,000,000 (Blanket Excess)

Insured Site - Catawba Company: Nuclear Electric Insurance Limited Policy No.: P18-044 (renewal date August 1, 2019)

Limits: $1,500,000,000 (Primary) -

Company: Nuclear Electric Insurance Limited Policy No.: X18-057 (renewal date August 1, 2019)

Limits: $1,250,000,000 (Excess)

Insured Site - Crystal River Company: Nuclear Electric Insurance Limited Policy No.: P18-081 (renewal date August 1, 2019)

Limits: $50,000,000 (Primary)

Insured Site - Shearon Harris Company: Nuclear Electric Insurance Limited Policy No.: P18-004 (renewal date August 1, 2019)

Limits: $1,500,000,000 (Primary)

Company: Nuclear Electric Insurance Limited Policy No.: BX18-013 (renewal date August 1, 2019)

Limits: $1,250,000,000 (Blanket Excess)

Insured Site - McGuire Company: Nuclear Electric Insurance Limited Policy No.: P18-018 (renewal date August 1, 2019)

Limits: $1,500,000,000 (Primary)

Company: Nuclear Electric Insurance Limited Policy No.: BX18-013 (renewal date August 1, 2019)

Limits: $1,250,000,000 (Blanket Excess)

Insured Site - Oconee Company: Nuclear Electric Insurance Limited Policy No.: P18-019 (renewal date August 1, 2019)

Limits: $1,500,000,000 (Primary)

Company: Nuclear Electric Insurance Limited Policy No.: BX18-013 (renewal date August 1, 2019)

Limits: $1,250,000,000 (Blanket Excess)

U.S. Nuclear Regulatory Commission Page3 Insured Site - Robinson Company: Nuclear Electric Insurance Limited Policy No.: P18-005 (renewal date August 1, 2019)

Limits: $1,500,000,000 (Primary)

Company: Nuclear Electric Insurance Limited Policy No.: BX18-013 (renewal date August 1, 2019)

Limits: $1,250,000,000 (Blanket Excess)

Please address any comments or questions regarding this matter to Art Zaremba at (980) 373-2062.

Sincerely, M. Christopher Nolan Vice President, Nuclear Regulatory Affairs, Policy & Emergency Prep

U.S. Nuclear Regulatory Commission Page4 xc:

Catherine Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-125 7 David Lew, Region I Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Audrey Klett, NRR Project Manager (ONS)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Michael Mahoney, NRR Project Manager (CNS and MNS)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Martha Barillas, NRR Project Manager (SHNPP)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Nate Jordan, NRR Project Manager (HBRSEP)

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, 'MD 20852-2738 John Hickman, NMSS Project Manager (Crystal River Unit 3 Nuclear Generating Plant)

U.S. Nuclear Regulatory Commission 11545 Rockville Pike Rockville, MD 20852-2738 Dennis Galvin, NRR Project Manager (BSEP)

U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 G. Smith, USNRC Senior Resident Inspector (BSEP)

D. Retterer, USNRC Senior Resident Inspector (SHNPP)

G. Eatmon, USNRC Senior Resident Inspector (HBRSEP)

J.D. Austin, USNRC Senior Resident Inspector (CNS)

G.A. Hutto, USNRC Senior Resident Inspector (MNS)

E.L. Crowe, USNRC Senior Resident Inspector (ONS)