Transmittal of Duke Energy Carolinas (DEC) Physical Security Plan Revision 25 and Duke Energy Progress (DEP) Physical Security Plan Revision 11ML17293A032 |
Person / Time |
---|
Site: |
Oconee, Mcguire, Catawba, Harris, Brunswick, Robinson, McGuire, 07200006, 07200040, 07200003, 07200060 |
---|
Issue date: |
10/17/2017 |
---|
From: |
Nolan M Duke Energy Carolinas |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
---|
References |
---|
RA-17-0046 |
Download: ML17293A032 (8) |
|
Similar Documents at Oconee, Mcguire, Catawba, Harris, Brunswick, Robinson, McGuire, 07200006, 07200040, 07200003, 07200060 |
---|
Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] |
Text
M. *Christopher Nolan 526 South Church Street SAFEGUARDS INFORMATION
- Charlotte, NC 28202 When separated, this page is decontroiled.
Mailing Address:
Mail Code. EC2ZF IP. 0. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 50.'4 10 CFR 50.54(p) 10 CFR 72.44(e) 10 CFR 72.186(bj..
Serial: RA-17-0046 October 17, 2017 U.S. Nuclear Regulatory Attn: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS .. 1AND2 DOCKET NOS. 50-325 AND 50-324 /RENEWED LICENSE NOS. DPR-71 AND DPR~62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 CATAWBA NUCLEAR STATION, UNITS 1AND2 DOCKET NOS. 50-413 AND 50-414 /,RENEWED LICENSE NOS. NPF-35 AND NPF-52 CATAWBA NUCLEAR STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-45 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2
.DOCKET NO. 50-261 I RENEWED LICENSE NO. DPR-23
.H.B. ROBINSON INDEPE~DENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 I LICENSE NO. SNM-2502
- H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS: 50-369 AND 50-370 I RENEWED LICENSE NOS. NPF-9 AND NPF-17 MCGUIRE NUCLEAR STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-38 SoDI OCONEE NUCLEAR STATION, UNIT NOS ..1, 2 AND 3 DOCKET NOS .. 50-269,*50-270 AND 50-287 / RENEWED LICENSE NOS. DPR-38, DPR-47 ~;JJ55Z(p AND DPR-55 SAFEGUARDS INFORMATION . ;JJJ155
- if~~
When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-17-0046 Page 2 of 6 OCONEE NUCLEAR STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION
- DOCKET NO. 72-04/ LICENSE NO. SNM-2503 OCONEE NUCLEAR STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-40 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 I RENEWED LICENSE NO. NPF-63 SubjeGt: TRANSMITTAL OF DUKE ENERGY CAROLINAS (DEC) PHYSICAL SECURITY PLAN REVISION 25 AND DUKE ENERGY PROGRESS (DEP)
PHYSICAL SECURITY PLAN REVISION 11 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy provides notification that Brunswick' Steam Electric Plant, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2, H. B. Robinson Steam Electric Plant Unit 2, McGuire Nuclear Station, Units 1 and 2, Oconee Nuclear Station, Units 1, 2 and 3 and Shearon Harris Nuclear Power Plant, Unit 1, Physical Security Plans, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security
- Programs have been revised. The effective date of implementation for Revisions 25 and .11, respectively, were August 31, 2017.
This letter includes three enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance With 10 CFR 73.21. Enclosure 1 contains a summary 'description of the Physical Security Plan revision changes. Enelosure 2 contains a copy of Duke Energy Carolinas - Catawba, McGuire and Oconee Nuclear Plants Physical Security Plan and Independent Spent Fuel Storage Installation Security Program and the Duke Energy Progress - Brunswick, Harris and Robinson Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Pfan and Independent Spent Fuel Storage Installation Security Program.
Enclosure 3 contains the 10 CFR 50.Q4(p) Evaluations.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-17-0046 Page 3 of 6 This document contains no new regulatory commitments. Please refer any questions regarding this submittal to Mr. Art Zaremba at 98"0-373-2062.
Sincerely, M. Christopher Nolan Director - Nuclear Regulatory Affairs
Enclosures:
- 1. Summary Description of Changes [SAFEGUARDS INFORMATION]
- 2. Copy of Duke Energy Carolinas - Catawba, McGuire and .Oconee Plants Physical Security Plan and Independent Spent Fuel Storage Installation Security Program (composite) and the Duke Energy Progress - Brunswick, Harris and Robinson Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program
[SAFEGUARDS INFORMATiON]
- 3. 10 CFR 50.54(p) Evaluations SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-17-0046 4of6
- xc: (w/ Enclosures) [SAFEGUARDS INFORMATION]
C. Haney, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 xc: (w/o Enclosures)
AL. Hon, Project Manager (BSEP)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike
- Rockville, MD 20852-2738 J.D. Austin, Project Manager (CNS)
U. S. Nuclear Regulator)i Commission One White Flint North 11555.Rockville Pike Rockville, MD 20852.:2738 M.C. Barillas, Project Manager (SHNPP)
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 G.A Hutto, Project Manager (MNS)
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockvifle Pike Rockville, MD 20852-2738 AL. Klett, Senior Project Manager (ONS)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike
!Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-17-0046 .
5 of 6 xc: (w/o enclosures, continued)
G. Smith NRC Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 J.D. Austin NRC Senior Resident Inspector Catawba Nuclear Station G.R. Eatmon NRC Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 G.A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station E.L. Crowe NRC Senior Resident lnspecfor Oconee Nuclear Station
- Mark Riches NRC Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATiON.
When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-17-0046 Page 6of6 bxc: (w/out enclosures):
Lee Grzeck Bill Murray (For BSEP Licensing/Nuclear Records)
C.A. *Fletcher NCMPA PMPA NCEMC CNS Master File 801.01 - CN04DM T. S. Lowery (For CNS Licensing/Nuclear Records).
B.K. Jones J.N. Robertson Christine Magner (For SHNPP Licensing/Nuclear Records)
C.J. Thomas MNS Master File 801.01 - MG02DM P.T. Howell (For MNS Licensing/Nuclear Records)
D.M. Hubbard C.J. Wasik Michele Shealy (For ONS Licensing/Nuclear Records)
I I
. I
- G. Sherman T. Pila Heidi Walters (For HBRSEP Licensing/Nuclear Records)
. M.C. Nolan A.H. Zaremba .
,E.T. O'Neil T.W. King T.J. Wadsworth A. Young ELL File: (Corporate)
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-17-0046 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.
- SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission
. RA-17-0046 Enclosure 2 Copy of Duke Energy Carolinas - Catawba, McGuire and Oconee Plants Physical Security Plan and Independent Spent Fuel Storage Installation Security Program (composite) and the Duke Energy Progress - Brunswick, Harris and Robinson Nuclear Plants Physical Security Plan, Security Training and Qualiffcation Plan, Safeguards*
Contingency Plan and Independent Spent Fuel Storage Installation Security Program SAFEGUARDS INFORMATION When separated, this page is decontrolled.