Press Release-IV-10-018, NRC to Hold Open House to Discuss 2009 Performance of Callaway Nuclear Plant

From kanterella
Jump to navigation Jump to search
Press Release-IV-10-018: NRC to Hold Open House to Discuss 2009 Performance of Callaway Nuclear Plant
ML101160122
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/26/2010
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-10-018
Download: ML101160122 (1)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Telephone: (817) 860-8128 No. IV-10-018 April 26, 2010

Contact:

Victor Dricks (817) 860-8128 E-Mail: opa4@nrc.gov Lara Uselding (817) 276-6519 NRC TO HOLD OPEN HOUSE TO DISCUSS 2009 PERFORMANCE OF CALLAWAY NUCLEAR PLANT The Nuclear Regulatory Commission staff will hold an open house in Fulton, Mo., on May 27, with representatives of AmerenUE, to discuss the agency=s 2009 assessment of safety performance for the Callaway nuclear power plant.

The open house will begin at 5 p.m. at the Burton Business Building, Classroom 6, William Woods University, One University Ave., in Fulton.

At the open house, members of the public will have an opportunity to meet informally with the NRC staff, ask questions and learn about the agencys role in ensuring safe plant operation.

AThe NRC continually reviews the performance of Callaway and the nation=s other commercial nuclear power facilities,@ NRC Region IV Administrator Elmo E. Collins said. AThis informal meeting will provide members of the public with an opportunity to learn about our annual assessment of safety performance at the plant.@

The NRC said Callaway operated safely during 2009 and will receive the detailed inspection regime during 2010 used by the NRC for plants that are operating well. Inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.

A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2009. It is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/call_2009q4.pdf.

Current performance information for Callaway is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/CALL/call_chart.html.

NRC news releases are available through a free list serve subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.