PNP 2021-023, Biennial Update License Termination Plan

From kanterella
Jump to navigation Jump to search
Biennial Update License Termination Plan
ML21139A035
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 05/19/2021
From: Corbin D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
PNP 2021-023
Download: ML21139A035 (2)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269-764-2000 Darrell W. Corbin Site Vice President 10 CFR 50.71(e)

PNP 2021-023 May 19, 2021 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Biennial Update - Big Rock Point License Termination Plan Big Rock Point NRC Dockets 50-155 and 72-043 Facility Operating License No. DPR-6

References:

1. Entergy Nuclear Operations, Inc. letter, PNP 2013-030, Big Rock Point, "Big Rock Point License Termination Plan," Revision 3, (ADAMS Accession No. ML13204A012), dated July 17, 2013 In accordance with 10 CFR 50.71, "Maintenance of records, making of reports," paragraph (e),

Entergy Nuclear Operations, Inc. hereby submits the results of its biennial review of the Big Rock Point (BRP) License Termination Plan (LTP). The review concluded that there were no changes to the BRP LTP during the preceding two years and that Revision 3 of the LTP, as submitted in Reference 1, is the latest revision of the LTP.

This letter contains no new commitments and no revisions to existing commitments.

Should you have any questions concerning this letter, or require additional information, please contact Jim Miksa at 269-764-2945.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May 19, 2021.

Darrell W. Corbin DWC/jpm

PNP 2021-023 Page 2 of 2 cc: NRC Region Ill Regional Administrator NRC BRP Decommissioning Inspector NRC NMSS Project Manager Michigan Department of Environmental Quality