Category:Annual Operating Report
MONTHYEARML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-020, Submittal of Annual Report of Changes in Emergency Core Cooling System Models2019-04-0808 April 2019 Submittal of Annual Report of Changes in Emergency Core Cooling System Models ML19094B0782019-04-0303 April 2019 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2018-021, Submittal of 2017 Annual Non-Radiological Environmental Operating Report2018-04-20020 April 2018 Submittal of 2017 Annual Non-Radiological Environmental Operating Report PNP 2018-022, Annual Report of Changes in Emergency Core Cooling System Models2018-04-0909 April 2018 Annual Report of Changes in Emergency Core Cooling System Models ML18347B2982018-04-0303 April 2018 1997 Annual Non-Radiological Environment Operating Report ML18347B2992018-04-0303 April 2018 1996 Annual Non-Radiological Environmental Operating Report PNP 2017-060, Report of Changes, Tests and Experiments and Summary of Commitment Changes2017-10-12012 October 2017 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2017-023, Annual Report of Changes in Emergency Core Cooling System Models2017-05-24024 May 2017 Annual Report of Changes in Emergency Core Cooling System Models PNP 2016-030, Annual Report of Changes in Emergency Core Cooling System Models2016-04-20020 April 2016 Annual Report of Changes in Emergency Core Cooling System Models PNP 2015-082, Report of Changes, Tests and Experiments and Summary of Commitment Changes2015-10-14014 October 2015 Report of Changes, Tests and Experiments and Summary of Commitment Changes CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-031, Report of Changes in Emergency Core Cooling System Models2013-04-11011 April 2013 Report of Changes in Emergency Core Cooling System Models CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0914002032009-05-20020 May 2009 Submittal of Annual Report of Changes in Emergency Core Cooling System Models and 30-Day Report for Large and Small Break LOCA ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0910602482009-04-15015 April 2009 Annual Non-Radiological Environmental Operating Report CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ML0810805412008-04-17017 April 2008 2007 Nonradiological Environmental Operating Report ML0809804222008-04-0707 April 2008 Generator Tube Inspection Report ML0617301082006-06-21021 June 2006 Annual Report of Changes in Emergency Core Cooling System Models ML0435102052004-12-0808 December 2004 Annual Report of Changes in Emergency Core Cooling System Models ML18347A5031995-09-11011 September 1995 1994 Annual Report of Facility Changes, Tests and Experiments. ML18347B1911986-04-15015 April 1986 1985 Radiological Environmental Monitoring Report 2022-04-14
[Table view] Category:Environmental Monitoring Report
MONTHYEARPNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report ML21111A1792021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report PNP 2020-017, 2019 Annual Non-Radiological Environmental Operating Report2020-04-15015 April 2020 2019 Annual Non-Radiological Environmental Operating Report PNP 2020-012, 2019 Radiological Environmental Operating Report2020-04-15015 April 2020 2019 Radiological Environmental Operating Report PNP 2019-016, & Big Rock Point - 2018 Annual Radioactive Effluent Release and Waste Disposal Report2019-04-24024 April 2019 & Big Rock Point - 2018 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2019-019, Annual Non-Radiological Environmental Operating Report2019-03-26026 March 2019 Annual Non-Radiological Environmental Operating Report PNP 2018-058, Independent Spent Fuel Storage Installation Radioactive Effluent Release2018-12-10010 December 2018 Independent Spent Fuel Storage Installation Radioactive Effluent Release ML18187A0302018-07-23023 July 2018 Cooling Tower Retrofit Is Feasible and Cost-Effective PNP 2017-029, Transmittal of 2016 Radiological Environmental Operating Report2017-05-10010 May 2017 Transmittal of 2016 Radiological Environmental Operating Report PNP 2017-027, Submittal of 2016 Annual Non-Radiological Environmental Operating Report2017-04-28028 April 2017 Submittal of 2016 Annual Non-Radiological Environmental Operating Report PNP 2017-009, Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report2017-04-28028 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2016-063, Mitigating Strategies Assessment for Flooding Submittal2016-12-19019 December 2016 Mitigating Strategies Assessment for Flooding Submittal ML16139A0492016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 1 of 4 ML16139A0532016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 4 of 4 PNP 2016-032, 2015 Radiological Environmental Operating Report. Part 2 of 42016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 2 of 4 ML16139A0522016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 3 of 4 PNP 2016-031, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report PNP 2016-024, Transmittal of 2015 Annual Radioactive Effluent Release and Waste Disposal Report2016-04-25025 April 2016 Transmittal of 2015 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2015-028, 2014 Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Radiological Environmental Operating Report PNP 2015-027, Submittal of 2014 Annual Non-Radiological Environmental Operating Report2015-04-27027 April 2015 Submittal of 2014 Annual Non-Radiological Environmental Operating Report PNP 2015-029, Annual Radioactive Effluent Release and Waste Disposal Report2015-04-27027 April 2015 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2014-040, 2013 Radiological Environmental Operating Report2014-05-15015 May 2014 2013 Radiological Environmental Operating Report PNP 2014-044, & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report2014-04-30030 April 2014 & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2014-037, 2013 Personnel Exposure and Monitoring Report2014-04-10010 April 2014 2013 Personnel Exposure and Monitoring Report PNP 2013-043, Radiological Environmental Operating Report, January 1, 2012 Through December 31, 20122013-05-0606 May 2013 Radiological Environmental Operating Report, January 1, 2012 Through December 31, 2012 PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report2013-04-23023 April 2013 2012 Annual Radioactive Effluent Release and Waste Disposal Report ML12215A3362012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Attachment 4 Through End PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML12179A3022012-05-14014 May 2012 Radiological Environmental Operating Report for 2011 PNP 2012-032, & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report2012-04-26026 April 2012 & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report ML12121A0082012-04-26026 April 2012 Submittal of 2011 Annual Non-radiological Environmental Operating Report PNP 2011-038, 2010 Annual Radioactive Effluent Release and Waste Disposal Report2011-05-0202 May 2011 2010 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1015303032010-05-14014 May 2010 Submittal of 2009 Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0912006752009-04-29029 April 2009 Palisade - Submittal of 2008 Personnel Exposure and Monitoring Report ML0813002532008-04-29029 April 2008 2007 Annual Radioactive Effluent Release and Waste Disposal Report ML0714303492007-05-10010 May 2007 2006 Radiological Environmental Operating Report ML0712903512007-04-26026 April 2007 Submittal of 2006 Annual Radioactive Effluent Release and Waste Disposal Report ML0708608042007-03-27027 March 2007 Nonradiological Environmental Operating Report 2023-04-25
[Table view] Category:Letter type:PNP
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 2TT80 Blue Star Memorial Highway Covert, Ml 49043 Tel 269 764 2000 Barbara E. Dotson Regulatory Assurance Manager (Acting)
PNP 2021-022 April 27, 2021 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
2020 Annual Non-Radiological Environmental Operating Report Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20 Entergy Nuclear Operations, Inc (ENO) is providing the Palisades Nuclear Plant (PNP)
Annual Non-Radiological Environmental Operating Report for 2020. This report was prepared in accordance with the PNP Renewed Facility Operating License, Appendix B, section 5.4.1. The attached report describes the implementation of the Environmental Protection Plan from January 1, 2020, through December 31, 2020.
This letter contains no new commitments and no revisions to existing commitments.
Respectfully, BED/mrp
Attachment:
- 1. 2020 Annual Non-Radiological Environmental Operating Report
- 2. Herbicide and Pesticide Treatments cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ATTACHMENT 1 2020 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT
1.0 BACKGROUND
Appendix B of the Renewed Facility Operating License for the Palisades Nuclear Plant (PNP) requires the submittal of an annual environmental operating report to the Nuclear Regulatory Commission (NRC), describing the implementation of the Environmental Protection Plan (EPP) during the previous year. The reporting period is January 1, 2020, through December 31, 2020.
The PNP operated for 7,557.05 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and produced a net total of 5,994,427 MWHe during 2020. This represents 85% of the net demonstrated capacity of the design electric rating of 805 MWe.
2.0 ENVIRONMENTAL IMPACT EVALUATIONS During 2020, there were two projects that were reviewed in the Environmental Review process in accordance with EN-EV-115. The Engineering Changes are as follows:
Engineering Change (EC), EC-85392 was performed to replace M-8, plant heating boiler. The fuel oil burner for M-8 was aging, was slightly oversized for the required heating loads, and a higher turn down ratio was desired. The new burner is more efficient than the existing burner and while the Michigan Department of Environmental Quality (MDEQ) was notified of the upgrades, a permit was not required. The EC and the work were completed in 2020.
Engineering Change, EC-85640 was performed for temporary cooling for the main transformer by supplying cold air to the back of the transformer and removing heat and liberating it to the surrounding air. The modification consisted of two 100-ton chillers, two 120-ton air handling units, two 300-gpm chilled water pumps, two 300 kW diesel generators, two 1200A or 800A distribution panels, and associated feeder cables. Run times, percent load and fuel consumption were inventoried and reported to Department of Environment, Great Lakes and Energy (EGLE). The EC and the work were completed in 2020.
There were no additional changes, tests, or experiments that involved un-reviewed environmental questions or EPP changes.
3.0 ADDITIONAL ACTIVITIES AUTHORIZED UNDER NPDES In accordance with the Department of EGLE requirements, a National Pollutant Discharge Elimination System (NPDES) permit application renewal was applied for and verified as being received by the State of Michigan prior to required due date. PNP's new NPDES permit has not been received from the State of Michigan at this time; however, by submitting by the required due date, in accordance with the process, PNP is still covered under the old NPDES permit. No changes at this time are expected to the permit. No additional activities were authorized under the NPDES permit.
Page 1 of 2
The Air Operating Permit renewal application package was submitted and received by the State of Michigan prior to the required due date in accordance with Article 11, Chapter 1, Part 55 (Air Pollution Control) of P.A.451 of 1994, and the federal Clean Air Act of 1990. PNP has received the new approved Air Operating Permit.
4.0 UNUSUAL ENVIRONMENTAL EVENTS No unusual environmental events occurred during 2020.
5.0 ENVIRONMENTAL MONITORING TruGreen and the Buildings and Grounds work group treated areas of the property for vegetation management during 2020. Rose Pest Solutions treated areas of the property for tick and pest control. Herbicides were not applied to the transmission line exit corridor in 2020.
The application of herbicides and pesticides is documented in Attachment 2.
6.0 NON-ROUTINE REPORTS In September 2020, PNP had one reportable spill when the operations group noted that the condensate storage tank (T-2) level was unexplainably lowering at approximately 7 gpm during outage activities. The leakage was stopped through the closure of isolation valve MV-CD146 (T-2 condensate return from boilers & blowdown demineralizers). It was determined that the reportable spill threshold for hydrazine was exceeded based on concentrations of T-2 and the approximate volume lost prior to isolation of the leak. Calculations indicate approximately 2.7 pounds of hydrazine were spilled or released to the ground. The reportable quantity (RQ) for hydrazine is one pound. Therefore, because this leak was to the ground/groundwater and not captured by any plant systems, it was determined that notification to an outside agency was required. The required initial notification to the State of Michigan was performed by the Site Environmental Supervisor. Additional details are captured in site corrective action documentation.
Page 2 of 2
ATTACHMENT 2 HERBICIDE AND PESTICIDE TREATMENTS Company: TruGreen 9077 Portage Industrial Portage, Michigan 49024-9935 Date & Treatment Amounts:
June 03, 2020 (495 pounds applied)
June 03, 2020 (0.77 gallons applied)
June 08, 2020 (6.51 gallons applied)
July 14, 2020 (495 pounds applied)
July 14, 2020 (1.54 gallons applied)
July 30, 2020 (2.96 gallons applied)
August27,2020 (248 pounds applied)
August 27, 2020 (0.79 gallons applied)
October 02, 2020 (248 pounds applied)
October 02, 2020 (0.06 gallons applied)
October 28, 2020 (208 pounds applied)
October 28, 2020 (0.03 gallons applied)
November 25, 2020 (495 pounds applied)
- Liquid volumes are the active chemicals used and do not include the dilution water.
Commercial Names of Products in Solution: TruPower 3, Oust XP, Tri-Power, Sureguard SC, Finale, Drive XLR8 Chemical Name of Products:
TruPower 3- Triisopropanolamine Salt of 2, 4-Dichlorophenoxyacetic Acid, Dimethylamine Salt of
(+)-R-2-(2-Methyl-4-Chlorophenoxy), Propionic acid, Dicamba Acid FINALE- (GLUFOSINATE-AMMONIUM)
SUREGUARD SC HERBICIDE- (FLUMIOXAZIN)
DRIVE XLR8- (QUINCLORAC)
Tripower: Dimethyliamine salt of 2- methyl 4-chloicophenoxy acid, Dimethalyne salt of (+)-R-2-(2-methl-4-chlorophynoxy)proprionic acid, Dimethylamine salt of Dicamba (3,6-Dichloro-o-anisic acid)
Oust XP- Sulfometuron methyl {Methyl2-(((((4,6-dimethyl-2-pyrimidinyl ) amino J-carbony IJamino J-sulfonyl)benzoate }
Page 1 of 5
Concentration of Active Ingredient in Field Use Mix:
One solution was mixed together that contained the following:
52 oz. per 11 gallons per acre (TruPower 3) applied to 1.9 acres Diluting Substance: Water for wet applications No dilutions for dry applications Rate of Application:
Liquid: 11 gallons per acre liquid application (TruPower 3, Tripower, Drive XLR8) 88 gallons per acre liquid application (Finale, Sureguard SC, Oust XP, TruPower 3)
Dry: 3 lbs. per 1000 ft2 applied (fertilizer)
Total Amount Used: 12.66 Gallons total volume used for liquid treatment***
2189 Pounds total volume used for dry treatment
- Liquid volumes are the active chemicals used and do not include the dilution water.
Method of Application: Hand sprayer for liquids Broadcast spreader for dry application Frequency of Application: Throughout the year as needed Location: Along and near roadways, fence lines, walkways, parking lots, containment areas, substations, cooling towers, protected area, and microwave zones.
Purpose of Treatment: Fertilize, and control of weed species, crabgrass, nuisance vegetation, broadleaf vegetation Page 2 of 5
Company: Entergy - Palisades Building and Grounds 27780 Blue Star Memorial Highway Covert, Michigan 49043 Date of Treatment: May 15, 2020 (1 gallon applied)
June 23, 2020 (1 gallon applied)
September 10, 2020 (1 gallon applied)
September 20, 2020 (1 gallon applied)
Commercial Names of Products in Solution: Roundup Ready-To-Use Extended Control Weed &
Grass Killer Plus Weed Preventer II Chemical Names of Products:
Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer 11-Nonanoic and related fatty acids; {Pelargonic and related fatty acids}
lsopropylamine salt of N-(phosphonomethyl)glycine; {lsopropylamine salt of glyphosate}
Ammonium salt of 2-[4,5-dihydro-4-methyl-4-( 1-methyl)-5-oxo-1 H-imidazol-2-yl]-5-methyl pyridinecarboxylic acid; {Ammonium salt of imazapic}
Concentration of Active Ingredient in Field Use Mix:
One solution was mixed together that contained the following:
1 gallon of (Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer II) applied to 235 square feet Diluting Substance: No dilution is performed as product is purchased in ready to use concentrations Rate of Application: 1 gallon per 235 square feet liquid application (Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer II)
Total Amount Used: 4 Gallons total volume used for liquid treatment Method of Application: Hand sprayer for liquids Frequency of Application: Throughout the year spot treatments between TruGreen applications as needed Location: Along and near roadways, fence lines, walkways, parking lots, containment areas, substations, cooling towers, protected area, and microwave zones.
Purpose of Treatment: Fertilizer, control of weed species, crabgrass, nuisance vegetation, nuisance broadleaf vegetation Page 3 of 5
Company: Rose Pest Solutions 2714 South 11th St. Ste B Niles, Michigan 49120-4420 Date of Treatment: Jan 13, 2020 (340 grams applied)
Feb 10,2020 (100 grams applied)
Feb 24, 2020 (160 grams applied)
Mar 9, 2020 (140 grams applied)
April 2, 2020 (4 gallons applied)
April 15, 2020 (520 grams applied)
April 27, 2020 (540 grams applied)
May 4, 2020 (4 gallons applied)
May 11, 2020 (360 grams applied)
May 26, 2020 (100 grams applied)
May 26, 2020 (1 gallon applied)
June 02, 2020 (6 gallons applied)
June 08, 2020 (320 grams applied)
June 08, 2020 (1 gallon applied)
June 11, 2020 (4 gallons applied)
June 22, 2020 (300 grams applied)
June 22, 2020 (2 gallons applied)
July 13, 2020 (400 grams applied)
July 13, 2020 (3. 75 gallons applied)
July 27, 2020 (160 grams applied)
July 27, 2020 (5 gallons applied)
Aug 04, 2020 (4 gallons applied)
Aug 10, 2020 (240 grams applied)
Aug 10, 2020 (0.25 gallons applied)
Aug 21, 2020 (5 gallons applied)
Aug 24, 2020 (260 grams applied)
Aug 27, 2020 (2.5 gallons applied)
Sept. 14, 2020 (580 grams applied)
Sept14,2020 (4 gallons applied)
Sept. 28, 2020 (380 grams applied)
Sept. 28, 2020 (4 gallons applied)
Oct. 09, 2020 (4 gallons applied)
Oct. 12, 2020 (60 grams applied)
Oct. 26, 2020 (140 grams applied)
Oct. 26, 2020 (4 gallons applied)
Nov.09,2020 (180 grams applied)
Nov.23,2020 (320 grams applied)
Dec. 14,2020 (580 grams applied)
Dec.28,2020 (280 grams applied)
Page 4 of 5
Commercial Names of Products in Solution: Final All-Weather Blox and Talstar Pro Chemical Names of Products:
Final AW Blox - Brodifacoum [3-[3-(4'-Bromo-[1, 1'-biphenyl]-4-yl)-1,2,3,4-tetrahydro naphthalenyl]-4-hydroxy-2H-1-benzopyran-2-one]
Talstar Pro - Bifenthrin (2-methyl [1, 1'-biphenyl]-3-yl)methyl 3-(2-chloro-3,3,3-trifluoro-1-propenyl)-
2,2-dimethylcyclopropanecarboxylate Concentration of Active Ingredient in Field Use Mix:
One solution was mixed together that contained the following:
1.00 fluid oz. of the chemicals per gallon of water Diluting Substance: No dilutions for dry applications Total Amount Used (active ingredient amounts):
6460 Grams total volume used for dry treatment 58.5 Gallons total volume used for liquid treatment Method of Application: Bait Station Installation for dry application Hand sprayer for liquids Frequency of Application: Throughout the year as needed Location: Along and near roadways, fence lines, walkways, and the protected area.
Purpose of Treatment: Tick, Mice and Roach control Page 5 of 5