PNO-I-99-028, on 990608,Susquehanna Unit 2 Automatically Shut Down from 100% Power,Due to Failure in a Main Transformer. Region I Public Affairs Prepared to Respond to Media Inquires.Resident Inspectors on-site & Responded

From kanterella
Jump to navigation Jump to search
PNO-I-99-028:on 990608,Susquehanna Unit 2 Automatically Shut Down from 100% Power,Due to Failure in a Main Transformer. Region I Public Affairs Prepared to Respond to Media Inquires.Resident Inspectors on-site & Responded
ML20195D943
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/09/1999
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-99-028, PNO-I-99-28, NUDOCS 9906100090
Download: ML20195D943 (1)


r

\

l June 9. 1999 fEELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-I-99-028 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is I known by Region I staff in King of Prussia. Pennsylvania on this date.-

Facility- Licensee Emeroency Classification

' Pennsylvania Power & Light Co. Notification of Unusual Event Susquehanna 2 Alert Allentown, Pennsylvania Site Area Emergency Dockets: 50-388 General Emergency X Not Applicable

Subject:

SUS 0VEHANNA UNIT 2 AUTOMATIC REACTOR SHUTDOWN - MEDIA INTEREST At 12:06 p.m. on June 8, 1999, Susquehanna Unit 2 automatically shut down from 100 percent power due to a failure in the "A" main transformer. All control rods fully inserted. Two safety relief valves automatically d opened for a short time and closed as designed. No emergency core cooling system initiation was required. All major plant equipment operated as designed following the. shutdown. The unit is in a cold shutdown cordition. Cold shutdown is defined by reactor vessel water temperature less than 200 degrees Fahrenheit and reactor pressure equal to atmospheric pressure. The cause of the 'A' main transformer failure is still being investigated. PP&L plans to repair or replace the ' A' main transformer prior to restarting the unit.

The Region I Public Affairs is prepared to respond to media inquiries.

The resident inspectors were on-site and responded to the shutdown.

The resident inspectors continue to follow PP&L's actions since the event.

The Commonwealth of Pennsylvania has been notified.

PP8L issued a press release concerning this event.

This information is current as of 8:00 a.m. on June 9. 1999 Cortact: COWGILL..CURTIS (610)337-5233 990610oo90 990609 fg E-rM-oas PDR j