MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML22326A2962022-11-22022 November 2022 Clarification on STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML22244A1152022-09-0101 September 2022 Response to NRC Comments on Relief Request RR-ENG-3-25 ML22231A4692022-08-19019 August 2022 STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML22091A3082022-04-0101 April 2022 Supplement to Request for Exemption from Certificate of Compliance (CoC) Inspection Requirement for One Multipurpose Canister ML21308A6032021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML21067A7722021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing ML20154K7652020-06-0202 June 2020 Supplemental Response Regarding Bulletin 2012-01 NOC-AE-20003735, Supplemental Response Regarding Bulletin 2012-012020-06-0202 June 2020 Supplemental Response Regarding Bulletin 2012-01 NOC-AE-20003733, Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-05-18018 May 2020 Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) ML20139A2162020-05-18018 May 2020 Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping NOC-AE-19003673, Response to Request for Additional Information for South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-00782019-06-25025 June 2019 Response to Request for Additional Information for South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078 NOC-AE-19003637, Supplement to South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078)2019-05-16016 May 2019 Supplement to South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078) NOC-AE-18003602, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating)2018-12-0606 December 2018 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003574, Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 55.472018-05-21021 May 2018 Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 55.47 NOC-AE-17003441, Revised Response Request for Additional Information for the Review of the South Texas Project License Renewal Application2017-02-0909 February 2017 Revised Response Request for Additional Information for the Review of the South Texas Project License Renewal Application NOC-AE-17003434, Response to Request for Additional Information on Revised Applicability Matrix for Questions Regarding Risk-Informed GSI-191 Licensing Application2017-01-19019 January 2017 Response to Request for Additional Information on Revised Applicability Matrix for Questions Regarding Risk-Informed GSI-191 Licensing Application NOC-AE-17003435, Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-2502017-01-19019 January 2017 Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-250 IR 05000498/20164072017-01-19019 January 2017 South Texas Project, Units 1 and 2 - Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-250 NOC-AE-16003428, Response to Request for Additional Information for the Review of License Renewal Application2017-01-12012 January 2017 Response to Request for Additional Information for the Review of License Renewal Application NOC-AE-16003429, Response to Requests for Additional Information for Review License Renewal Application - RAI 82.1.8-32017-01-0505 January 2017 Response to Requests for Additional Information for Review License Renewal Application - RAI 82.1.8-3 NOC-AE-16003427, Revised Applicability Matrix for Response to Request for Additional Information Questions APLA-1a and APLA-1b Regarding STP Risk-Informed GSl-191 Licensing Application2016-12-0707 December 2016 Revised Applicability Matrix for Response to Request for Additional Information Questions APLA-1a and APLA-1b Regarding STP Risk-Informed GSl-191 Licensing Application ML16321A4072016-11-0909 November 2016 Response to Request for Additional Information Regarding Sensitivity Studies for STPNOC Risk-Informed Pilot GSl-191 Application NOC-AE-16003356, Flooding Mitigating Strategies Assessment (MSA) Report Submittal2016-09-29029 September 2016 Flooding Mitigating Strategies Assessment (MSA) Report Submittal NOC-AE-16003404, Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives2016-09-27027 September 2016 Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives NOC-AE-16003412, Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application2016-09-12012 September 2016 Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003394, Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)2016-07-28028 July 2016 Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937) ML16230A2322016-07-21021 July 2016 Responses to Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application NOC-AE-16003395, Third Set of Responses to Requests for Additional Information STP Risk-Informed GSI-191 Licensing Application2016-07-21021 July 2016 Third Set of Responses to Requests for Additional Information STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003368, Third Sets of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application2016-07-18018 July 2016 Third Sets of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003328, Second Supplement to Response to RAI for Information Pursuant to 10 CFR 50.54(f) Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Phase 2 Staffing Assessment2016-06-30030 June 2016 Second Supplement to Response to RAI for Information Pursuant to 10 CFR 50.54(f) Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Phase 2 Staffing Assessment NOC-AE-16003367, Second Set of Responses to April 11, 2016 Requests for Additional Information Regarding Risk-Informed GSI-191 Licensing Application2016-06-16016 June 2016 Second Set of Responses to April 11, 2016 Requests for Additional Information Regarding Risk-Informed GSI-191 Licensing Application NOC-AE-16003380, Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937)2016-05-19019 May 2016 Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) NOC-AE-16003366, First Set of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application2016-05-11011 May 2016 First Set of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application NOC-AE-16003357, Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To..2016-04-13013 April 2016 Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To.. NOC-AE-16003347, Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2016-03-17017 March 2016 Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program NOC-AE-16003348, Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937)2016-03-10010 March 2016 Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937) NOC-AE-15003320, Response to Request for Additional Information Set 34 for the Review of the License Renewal Application2015-12-17017 December 2015 Response to Request for Additional Information Set 34 for the Review of the License Renewal Application NOC-AE-15003318, Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0909 December 2015 Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003303, Response to Request for Additional Information for the Review of the License Renewal Application - Set 322015-11-12012 November 2015 Response to Request for Additional Information for the Review of the License Renewal Application - Set 32 NOC-AE-15003296, Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-10-0808 October 2015 Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program ML15251A2492015-10-0505 October 2015 Summary of Telephone Conference Call Held on August 6, 2015, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 32, Pertaining to the South Texas Project, Lic ML15246A1282015-08-20020 August 2015 Attachment 1-5 Response to 2009 RAIs Through 1-6 Responses to Round 2 RAIs NOC-AE-15003278, Response to Request for Additional Information for the Review of License Renewal Application - Set 312015-07-29029 July 2015 Response to Request for Additional Information for the Review of License Renewal Application - Set 31 NOC-AE-15003276, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-17 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Butt Welds2015-07-22022 July 2015 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-17 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Butt Welds NOC-AE-15003255, Supplement to Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Phase 2 Staffing Assessment2015-07-0202 July 2015 Supplement to Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Phase 2 Staffing Assessment 2022-09-01
[Table view] |
Text
South Texas Project Electric Generating Station P.Q Box 289 Wadsworth. Texas 77483 June 30, 2016 NOC-AE-16003328 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Second Supplement to Response to Request for Information Pursuant to 10 CFR 50.54(f)
Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Phase 2 Staffing Assessment (TAC Nos. MF5379 and MF5380)
References:
- 1. Letter from A. Capristo, STPNOC, to NRC Document Control Desk, "Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- Phase 2 Staffing Assessment", November 25, 2014 (NOC-AE-14003189).
- 2. Letter from E.J. Leeds, NRC, to All Power Reactor Licensees, "Request for ____ * -
Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident", March 12, 2012 (AE-NOC-12002269)(ML12053A340)
- 3. Letter from G.T. Powell, STPNOC, to NRC Document Control Desk, "Supplement to Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insight$ from the Fukushima Dai-lchi Accident - Phase 2 Staffing Assessment", July 2, 2015 (NOC-AE-15003255) .
- 4. STPNOC Procedure, OPOP12-ZO-FSG06, "Alternate AWFST Makeup", Revision 1, November 10, 2015 (STI 34237577)
- 5. Letter from G.T. Powell, STPNOC, to NRC Document Control Desk, "Notification of Full Compliance with Order EA-12-049 for Mitigation Strategies for Beyond Design Basis External Events and Update for Order EA-12-051 for Reliable Spent Fuel Pool Instrumentation", February 17, 2016 (NOC-AE-15003311)(ML16067A088)
STI: 34263704
NOC-AE-16003328 Page 2 of 4 On November 25, 2014, South Texas Project Nuclear Operating Company {STPNOC) submitted the Phase 2 Staffing Assessment to the NRC (Reference 1) in response to the 10 CFR 50.54(f) request for information regarding Near-Term Task Force {NTTF)
Recommendation 9.3 for Emergency Preparedness Programs (Reference 2). STPNOC performed a revalidation of the assessment results using the final validated FLEX Support Guidelines (FSGs) and any applicable new procedures that were not complete when the staffing assessment tabletop was performed and submitted the results on July 2, 2015 (Reference 3).
During the implementation outage for Unit 1 in October 2015, STP determined that an additional personnel action was needed for one of the FLEX strategies. In an event such as a flood from an embankment breach of the Main Cooling Reservoir that leads to onsite flooding, the Trailer-Mounted Diesel-Driven Pumps {TMDDPs) may not be able to be used to transfer water to the Auxiliary Feedwater Storage Tank (AFWST) until later in the event. In this case, STP FLEX Support Guideline FSG-06, "Alternate AFWST Makeup", directs operators to use the Condensate Deaerator (DA) Storage Tank as a makeup water source to the AFWST until flood waters recede (Reference 4).
FSG-06 directs operators to connect hoses between the DA and the Auxiliary Feed Pump Test Line Drain Valve as an alternate method for supplying makeup water to the AFWST. Prior to opening the drain valve, STP determined that the DA must be vented for at least seven hours to preclude the release of two-phase water into the transfer hoses. Given this time constraint, the venting action should be performed within the first two hours from the start of the event. Steam suits and hearing protection have been staged in the Turbine Generator Building {TGB) that can be used for completing this venting action (Reference 4).
Note that this strategy will only be used in the case of significant flooding onsite.
FSG-06 was revised to include the DA venting actions, however, these actions were not included in the Phase 2 staffing assessment.
STP reviewed the results of the revalidated Phase 2 Staffing Assessment (Reference 3) and determined that there would be a staff member in each unit who could perform this task, if needed, among the on-shift staff available. These personnel, designated as Fire Brigade 1 and 2 (FB1/FB2) in the Staffing Assessment, were initially tasked with performing support roles during the time period needed to perform the venting action. This action was also being performed by maintenance personnel at the same time, so FB1 and FB2 can assume this duty without adversely impacting the results of the staffing assessment.
No additional staff are needed to support this change. The current minimum on-shift staff plus the two additional IMT maintenance personnel identified in the revalidated Phase 2 Staffing Assessment (Reference 3), and the augmented Emergency Response Organization (ERO) are sufficient for executing all required initial and any necessary transition phase actions for the FLEX strategies without the assignment of collateral duties that would adversely affect the ability to execute required Emergency Plan functions. No change to the Emergency Plan on-shift staffing level or augmented ERO is required.
Completing this venting action supports the revised FLEX Sequence of Events timeline included as part of the STPNOC Full Compliance Letter and Final Integrated Plan for Order EA-12-049 (Reference 5).
NOC-AE-16003328 Page 3 of 4 An update to the revised task implementation timeline from the Phase 2 Staffing Assessment revalidation that includes the actions to open the vent valve and install hoses to support the alternate AFWST fill strategy is provided in Enclosure 1. As shown in Enclosure 1, no collateral duties were identified. A revised timeline of key plant operator and maintenance activities is provided in Enclosure 2 as additional supporting information for the implementation timeline.
The status of the commitments listed in the Phase 2 Staffing Assessment (Reference 3) are included in Enclosure 3. There are no new commitments in this letter.
If there are any questions regarding this letter, please contact Wendy Brost at (361) 972-8516 or me at (361) 972-7697.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on ---:G">l< ~
~~~~~~~~~~-
1 '2.ol_$-
Date
~*~
A. Capristo Executive Vice President and Chief Administrative Officer web
Enclosures:
- 1. Update to Revised Task Implementation Timeline from Phase 2 Staffing Assessment Revalidation
- 2. Revised Timeline of Key Plant Operator and Maintenance Activities
- 3. Status of Commitments
NOC-AE-16003328 Page 4 of 4 cc:
(Paper Copy) (Electronic Copy)
Regional Administrator, Region IV Morgan. Lewis & Bockius LLP U. S. Nuclear Regulatory Commission Steve Frantz, Esquire 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Milton Valentin Senior Project Manager U.S. Nuclear Regulatory Commission NRG South Texas LP One White Flint North (08H04) Chris O'Hara 11555 Rockville Pike Jim van Suski!
Rockville, MD 20852 Skip Zahn NRC Resident Inspector CPS Energy U. S. Nuclear Regulatory Commission Kevin Pollo P. 0. Box 289, Mail Code: MN116 Cris Eugster Wadsworth, TX 77483 L. D. Blaylock Crain Caton & James, P.C.
Peter Nemeth City of Austin Elaina Ball John Wester Texas Dept. of State Health Sen/ices Richard A. Ratliff Robert Free
Enclosure 1 NOC-AE-16003328 Enclosure 1 Update to Revised Task Implementation Timeline from Phase 2 Staffing Assessment Revalidation
Enclosure 1 NOC-AE-16003328 Page 1 of 7 Revised Task Implementation Timeline from Phase 2 Staffing Assessment Revalidation The following task implementation timeline has been revised to show the change in tasks for Fire Brigade 1 and 2 (FB1 and FB2) for performing the DA venting actions as well as optional tasks for Plant Operator 2 in each Unit (U1 P02 and U2 P02) to assist with the alternate AFWST fill strategy. FB1 and FB2 were previously listed as performing support functions (as needed) in the Isolation Valve Cubicle (IVC) -this action was also being performed by maintenance personnel at the same time . In this revised timeline, FB1 and FB2 are instead sent to the roof of the Turbine Generator Building (TGB) to perform the DA venting actions and then remain in the TGB and continue performing their previously assigned tasks. As shown in this revised timeline , U 1 P02 and U2 P02 could start installing hoses to support filling the AFWST from the DA eight hours into the event, if necessary, but additional personnel arriving on site will also be available by that time .
Task Shift Manager (U1 SM) 1. 0.0-0.5 1. Assume duties of Emergency Director. Classify event as Site Area No Emergency. Block open Control Room door to kitchen .
- 2. 0.5-1 .0 2. Upgrade event to General Emergency. Make Protective Action Recommendations (PARs).
- 3. 1.0-6.0 3. Contact National SAFER Response Center (NSRC). Continue executing the duties of Emergency Director until relieved by augmented ERO.
2 Shift Manager (U2 SM) 1. 0.0-6.0 1. Assess Unit 2 status. Assist Unit Supervisor as needed. No Commun icate with Unit 1 as required.
Unit Supervisor (U1 US) 1. 0.0-6.0 1. Direct and supervise performance of Emergency Operating No Procedures (EOPs) and Fukushima Support Guidelines (FSGs) in Unit 1.
2 Unit Supervisor (U2 US) 1. 0.0-6.0 1. Direct and supervise performance of Emergency Operating No Procedures (EOPs) and Fukushima Support Guidelines (FSGs) in Unit 2.
Reactor Operator 1 (U1 R01) Perform OPOP05-EO-ECOO (Reference 1) and FSG actions as directed No throughout event including the following :
- 1. 0.0-0.5 1. Perform post-trip immediate actions. Dispatch U1 Plant Operator (PO) to strip sequencers.
- 2. 0.5-1.0 2. Monitor primary system parameters. Establish hand switch lineup.
- 3. 1.0-3.0 3. Support plant cooldown . Monitor primary system parameters.
- 4. 3.0-6.0 4. Stabilize plant at 405 psig secondary pressure.
- 5. 7.5-8.0 5. Isolate accumulators.
Enclosure 1 NOC-AE-16003328 Page 2 of 7 Collateral Unit Position Time {hrs} Task Out~?
2 Reactor Operator 1 (U2 R01) Perform OPOP05-EO-ECOO and FSG actions as directed throughout No event including the following:
- 1. 0.0-0.5 1. Perform post-trip immediate actions; Dispatch PO to strip sequencers
- 2. 0.5-1.0 2. Monitor primary system parameters; Establish hand switch lineup
- 3. 1.0-3.0 3. Support plant cooldown; Monitor primary system parameters
- 4. 3.0-6.0 4. Stabilize plant at 405 psig secondary pressu_re
- 5. 7.5-8.0 5. Isolate accumulators 1 Reactor Operator 2 (U1 R02) Perform OPOP05-EO-ECOO and FSG actions as directed throughout No event including the following:
- 1. 0.0-0.5 1. Dispatch PO to restore steam generator (SG) Power-Operated Relief Valve (PORV) control to the Control Room; Dispatch PO to cross-connect SGs
- 2. 0.0-1.0 2. Establish SG PORV pressure control
- 3. 0.5-1.0 3. Commence plant cooldown to 405 psig secondary pressure
- 4. 3.0-6.0 4. Stabilize plant at 405 psig secondary pressure 2 Reactor Operator 2 (U2 R02) Perform OPOP05-EO-ECOO and FSG actions as directed throughout No event including the following:
- 1. 0.0-0.5 1. Dispatch PO to restore SG PORV control to the Control Room; Dispatch PO to cross-connect SGs
- 2. 0.0-1.0 2. Establish SG PORV pressure control
- 3. 0.5-1.0 3. Commence plant cooldown to 405 psig secondary pressure
- 4. 3.0-6.0 4. Stabilize plant at 405 psig secondary pressure 1 Plant Operator 1 (U1 P01 )1 1. 0.0-0.5 1. Transfer station blackout (SBO) switches; Perform load shedding per No site emergency procedure OPOP05-EO-ECOO
- 2. 0.5-2.0 2. Perform deep load shedding per FSG-04 (Reference 2)
- 3. 2.0-3.0 3. Continue performing actions in FSG-04 and support Isolation Valve Cubicle (IVC) operations as necessary
- 4. 3.0-4.0 4. Perform electrical lineup and start FLEX diesel generator (DG)
- 5. 4.0-4.5 5. Load initial FLEX power to lighting panels onto FLEX DG as power becomes available
- 6. 4.5-5.0 6. Energize A-Train battery charger and exhaust fan
- 7. 5.0-5.5 7. Energize C-Train battery charger and exhaust fan
- 8. 5.5-6.0 8. Load communications equipment onto FLEX DG if available
- 9. 7.0-7.5 9. Align breakers for accumulator isolation 1 Typically Electrical Auxiliary Building (EAB) watch Operator
Enclosure 1 NOC-AE-16003328 Page 3 of 7 Collateral Unit Position Time {hrs} Task Out){:?
2 Plant Operator 1 (U2 P01 )1 1. 0.0-0.5 1. Transfer SBO switches. Perform load shedding per site emergency No procedure OPOP05-EO-ECOO
- 2. 0.5-2.0 2. Perform deep load shedding per FSG-04
- 3. 2.0-3.0 3. Continue performing actions in FSG-04 and support IVC operations as necessary
- 4. 3.0-4.0 4. Perform electrical lineup and start FLEX DG
- 5. 4.0-4.5 5. Load initial FLEX power to lighting panels onto FLEX DG as power becomes available
- 6. 4.5-5.0 6. Energize A-Train battery charger and exhaust fan
- 7. 5.0-5.5 7. Energize C-Train battery charger and exhaust fan
- 8. 5.5-6.0 8. Load communications equipment onto FLEX DG, if available
- 9. 7.0-7.5 9. Align breakers for accumulator isolation 1 Plant Operator 2 (U1 P02) 2 1. 0.0-0.5 1. Cross-connect Auxiliary Feedwater (AFW) in Unit 1 IVC No
- 2. 0.5-1.5 2. Align RWST and Volume Control Tank (VCT) charging and Reactor Coolant Pump (RCP) seal valves and verify spent fuel pool (SFP) level and temperature
- 3. 1.5-2.5 3. Perform Addendum 17 of FSG-05 (Reference 3) to support FLEX cable installation
- 4. 2.5-4.0 4. Perform valve lineup for PDP from FSG-05, Addendums 5 and 6
- 5. 4.0-4.5 5. Start and control Chemical and Volume Control System (CVCS)
Positive Displacement Pump (PDP)
- 6. 4.5-7.0 6. Support IVC operations as necessary
- 7. 7.0-8.0 7. Support Maintenance installing hoses and swapping spectacle flange for Reactor Coolant System (RCS) Makeup
- 8. 8.0-9.0 8. Assist with hose installation to support AWFST fill from the DA (if needed in the event of on-site flooding) 2 Plant Operator 2 (U2 P02) 2 1. 0.0-0.5 1. Cross-connect AFW in IVC No
- 2. 0.5-1.5 2. Align RWSTNCT charging and RCP seal valves and verify SFP level and temperature
- 3. 1.5-2.5 3. Perform Addendum 17 of FSG-05 to support FLEX cable installation
- 4. 2.5-4.0 4. Perform valve lineup for PDP from FSG-05, Addendums 5 and 6
- 5. 4.0-4.5 5. Start and control eves PDP
- 6. 4.5-7.0 6. Support IVC operations as necessary
- 7. 7.0-8.0 7. Support Maintenance installing hoses and swapping spectacle flange for RCS Makeup
- 8. 8.0-9.0 8. Assist with hose installation to support AWFST fill from the DA (if needed in the event of on-site flooding) 2 Typically Mechanical Auxiliary Building (MAB) watch Operator
Enclosure 1 NOC-AE-16003328 Page 4 of 7 Collateral Unit Position Time {hrs} Task Dut)l?
1 State and County Communicator (X01 )3 1. 0.0-1.0 1. Perform state and county notifications No
- 2. 1.0-1.5 2. Assist in performing deep load shedding for Unit 1 per FSG-04
- 3. 1.5-2.0 3. Perform state and county follow-up notifications
- 4. 2.5-3.0 4. Perform state and county follow-up notifications
- 5. 3.0-3.5 5. Transfer satellite telephone to Unit 1 Control Room per FSG-05
- 6. 3.5-4.0 6. Perform state and county follow-up notifications
- 7. 4.5-5.0 7. Perform state and county follow-up notifications
- 8. 5.5-6.0 8. Perform state and county follow-up notifications
- 9. 6.0-7.0 9. Turn over Communicator duties to augmented ERO
- NRC Communicator (X02)4 1. 0.0-0.5 1. Perform ERO callout and Emergency Notification System (ENS) No
- 2. 0.5-6.0 communications
- 2. Perform ENS communications 1 Maintenance 1 (M1 )5 1. 0.0-0.5 1. Perform setup of the Unit 1 Operations Support Center (OSC) No
- 2. 0.5-2.0 2. Assist Operator in Unit 1 IVC
- 3. 2.0-3.0 3. Connect cables to Unit 1 MCC E1A2 per FSG-05
- 4. 3.0-4.0 4. Connect cables to Unit 1 MCC E1 C2 per FSG-05
- 5. 4.0-5.0 5 Connect cables to Unit 1 MCC E1A4 per FSG-05
- 6. 5.0-6.0 6. Connect cables to Unit 1 MCC E184 per FSG-05
- 7. 6.0-7.0 7. Connect cables to Unit 1 MCC E1C4 per FSG-05 2 Maintenance 2 (M2) 5 1. 0.0-0.5 1. Perform setup of the Unit 2 OSC No
- 2. 0.5-2.0 2. Assist Operator in Unit 2 IVC
- 3. 2.0-3.0 3. Connect cables to Unit 2 MCC E2A2 per FSG-05
- 4. 3.0-4.0 4. Connect cables to Unit 2 MCC E2C2 per FSG-05
- 5. 4.0-5.0 5 Connect cables to Unit 2 MCC E2A4 per FSG-05
- 6. 5.0-6.0 6. Connect cables to Unit 2 MCC E2B4 per FSG-05
- 7. 6.0-7.0 7. Connect cables to Unit 2 MCC E2C4 per FSG-05 1 Maintenance 3 (M3)6 1. 1.0-2.0 1. Connect SG Makeup pump hoses per FSG-05 (in Unit 1) No
- 2. 2.0-7.0 2. Assist in connecting MCC cables
- 3. 7.0-8.0 3. Connect hoses and swap spectacle blind for RCS Makeup per FSG-05 2 Maintenance 4 (M4 )6 1. 1.0-2.0 1. Connect SG Makeup pump hoses per FSG-05 (in Unit 2) No
- 2. 2.0-7.0 2. Assist in connecting MCC cables
- 3. 7.0-8.0 3. Connect hoses and swap spectacle blind for RCS Makeup per FSG-05 3 Plant Operator in either unit 4 Reactor Operator 5 These tasks can be performed by a mechanic, electrician, or l&C technician 6 These tasks can be performed by a mechanic, electrician, or l&C technician
Enclosure 1 NOC-AE-16003328 Page 5 of 7 Collateral Unit Position Time {hrs} Task Out}!?
1 Senior Radiation Protection Technician 1. 0.0-6.0 1. Assume duties of Acting Radiological Manager in Unit 1 Control No (SRPT) Room 1 Radiation Protection Technician 1 (RPT1) 1. 0.0-0.5 1. Support opening/blocking doors to access Control Room No
- 2. 0.5-6.0 2. Provide access control for Unit 1 MAB and job coverage for operators or maintenance as needed 2 Radiation Protection Technician 2 (RPT2) 1. 0.0-0.5 1. Support opening/blocking doors to access Control Room No
- 2. 0.5-6.0 2. Provide access control for Unit 2 MAB and job coverage for operators or maintenance as needed
- Chemistry Technician (CT1) 1. 0.0-1.0 1. Secure secondary sample panel valve lineups No
- 2. 1.0-6.0 2. Perform site surveys.
1 Fire Brigade 1 (FB1 )7 1. 0.0-1.0 1. Check and attempt local start of Unit 1 Emergency DGs and No Technical Support Center (TSC) DG, fail closed the Main Steam Isolation Valves (MS IVs) per FSG-04
- 2. 1.0-3.0 2. Open DA vent valve to support gravity feed to AFWST; Depressurize Main Generator if required and assess plant conditions per FSG-05
- 3. 3.0-4.5 3. Provide IVC support including aligning valves for using FLEX SG makeup pump
- 4. 4.5-6.0 4. Prepare for fill of FLEX DG Fuel Oil Storage Tank (FOST) per FSG-19 (Reference 4)
- 5. 6.5-7.5 5. Fill Unit 1 FLEX DG FOST.
- 6. 8.0-9.0 6. Start Unit 1 FLEX SG makeup pump per FSG-03 (Reference 5)
- 7. 9.0-9.5 7. Secure Unit 1 Turbine-Driven AFW (TDAFW) pump per FSG-09 (Reference 6) 2 Fire Brigade 2 (FB2) 1. 0.0-1.0 1. Check and attempt local start of Unit 2 Emergency DGs and TSC DG, No fail closed the MS IVs per FSG-04
- 2. 1.5-3.0 2. Open DA vent valve to support gravity feed to AFWST; Depressurize Main Generator if required and assess plant conditions per FSG-05
- 3. 3.0-4.5 3. Provide IVC support including aligning valves for using FLEX SG makeup pump
- 4. 4.5-6.0 4. Prepare for fill of FLEX DG FOST per FSG-19
- 5. 6.5-7.5 5. Fill Unit 2 FLEX DG FOST
- 6. 8.0-9.0 6. Start Unit 2 FLEX SG makeup pump per FSG-03
- 7. 9.0-9.5 7. Secure Unit 2 TDAFW pump per FSG-09 7 Typically Turbine Generator Building (TGB) watch Operator
-,. ** j
Enclosure 1 NOC-AE-16003328 Page 6 of 7 Collateral Unit Position Time {hrs} Task Out~?
1 Fire Brigade 3 (FB3)8 1. 0.0-1.0 1. Perform AFW cross-connect lineup for Unit 1 No
- 2. 1.0-1.5 2. Perform Unit 1 breaker alignments in preparation for Addendum 17 of FSG-05
- 3. 1.5-2.5 3. Assist maintenance personnel in connecting hoses for Unit 1 SG makeup pump per FSG-05.
- 4. 2.5-3.5 4. Perform Unit 1 MCC load shedding per FSG-05
- 5. 3.5-4.0 5. Perform initial Unit 1 battery charger breaker alignments per FSG-04
- 6. 4.5-6.0 6. Prepare for fill of FLEX DG FOST per FSG-19
- 7. 6.0-6.5 7. Move portable radios and chargers from OSC break room to Unit 1 Control Room per FSG-05.
- 8. 6.5-7.5 8. Fill Unit 1 FLEX DG FOST per FSG-19
- 9. > 7.5 9. Continue filling Unit 1 FLEX DG FOST per FSG-19 every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2 Fire Brigade 4 (FB4) 1. 0.0-1.0 1. Perform AFW cross-connect lineup for Unit 2 No
- 2. 1.0-1.5 2. Perform Unit 2 breaker alignments in preparation for Addendum 17 of FSG-05
- 3. 1.5-2.5 3. Assist maintenance personnel in connecting hoses for Unit 2 SG makeup pump per FSG-05
- 4. 2.5-3.5 4. Perform Unit 2 MCC load shedding per FSG-05
- 5. 3.5-4.0 5. Perform initial Unit 2 battery charger breaker alignments per FSG-04.
- 6. 4.5-6.0 6. Prepare for fill of FLEX DG FOST per FSG-19
- 7. 6.0-6.5 7. Move portable radios and chargers from OSC break room to Unit 2 Control Room per FSG-05
- 8. 6.5-7.5 8. Fill Unit 2 FLEX DG FOST per FSG-19
- 9. > 7.5 9. Continue filling Unit 2FLEX DG FOST per FSG-19 every 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2 Fire Brigade 5 (FB5) 1. 0.0-1.0 1. Assist maintenance personnel and plant operators and perform other No activities as directed by the Unit Supervisor or reactor operators
- 2. 1.0-1.5 2. Assist in performing deep load shedding for Unit 2 per FSG-04
- 3. 1.5-3.0 3. Assist maintenance personnel and plant operators and perform other activities as directed by the Unit Supervisor or reactor operators
- 4. 3.0-3.5 4. Tram;;fer satellite telephone to Unit 2 Control Room per FSG-05
- 5. > 3.0 5. Assist maintenance personnel and plant operators and perform other activities as directed by the Unit Supervisor or reactor operators 8 Typically Yard Watch Operator
Enclosure 1 NOC-AE-16003328 Page 7 of 7 Maintenance 5 (M5)9 1. > 6.0 1. Trailer mounted pumps and hose trailer activities. N/A Maintenance 6 (M6)9 1. > 6.0-24.0 1. Trailer mounted pumps and hose trailer activities N/A
- 2. > 24.0 2. Connect NSRC generators to Engineered Safety Feature (ESF) buses.
Radiation Protection Technician 3 (RPT3) 1. > 6.0 1. Provide job coverage for Unit 1 FLEX makeup pump hose team N/A 2 Radiation Protection Technician 4 (RPT4) 1. > 6.0 1. Provide job coverage for Unit 2 FLEX makeup pump hose team N/A Radiation Protection Technician 5 (RPT5) 1. > 6.0 1. Conduct offsite and onsite surveys, provide job coverage N/A Radiation Protection Technician 6 (RPT6) 1. > 6.0 1. Conduct offsite and onsite surveys , provide job coverage N/A Note: see Enclosure 2 which supplements the information in this timeline .
References
- 1. STPNOC Procedure, OPOP05-EO-ECOO, "Loss of All AC Power" (STI 34264231)
- 2. STPNOC Fukushima Support Guideline, OPOP12-ZO-FSG04, "ELAP DC Bus Load Shed I Management" (STI 34237578)
- 3. STPNOC Fukushima Support Guideline, OPOP12-ZO-FSG05, "Initial Assessment and FLEX Equipment Staging" (STI 34236725)
- 4. STPNOC Fukushima Support Guideline, OPOP12-ZO-FSG019, "480V FLEX Diesel Generator Operation" (STI 34237393)
- 5. STPNOC Fukushima Support Guideline, OPOP12-ZO-FSG03, "Alternate Low Pressure Feedwater" (STI 34236715)
- 6. STPNOC Fukushima Support Guideline, OPOP12-ZO-FSG09, "Low Decay Heat Temperature Control" (STI 34237571) 9 Task can be performed by the maintenance personnel onsite as part of the IMT or by maintenance staff arriving onsite with the augmenting ERO
Enclosure 2 NOC-AE-16003328 Enclosure 2 Revised Timeline of Key Plant Operator and Maintenance Activities
Enclosure 2 NOC-AE-16003328 Page 1of1 Time from Event start (in hours) 0 ~ W Ll W ~ W ~ W ~ ~ ~ M ~ W ~ M ~ ~
I II II II I II 11 II II II II I II II I II I II II II II II II II II II II II II I II II II II II 1111 II I II II II I I II II II II II II Energize Energize Align Transfer Plant Operator 1 SBO Continue with FSG- load light A-Train C-Train Load breakers switches, 04 and support !VC Electrlcal lineup and panels battery battery r:omms. for SI (U1/U2P01}
kladshed Deep load shedding . activities start FLEX 00 , onto DG , charger , charger , onto DG 9
Plant Operator 2 Cross- Align eves and seal Perform Addendum 17 Start and Install hoses to (Ul/U2P02) connect valves, check SFP level of FSG-05 for MCC control Support installing support DA fill to AFW , and temperature , PDP valve lineup eves PDP Support IVC operations as necessary hoses for RCS makeup 1 AFWST I I I I -
Fire Brigade 1/2 Attemptstart on ESF Open DA vent valvi!' (wlthin 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of flooding
_ {FB1/FB2) and TSC DGs, close event due to a re.sel'Vllir breach), assess plant lVC support, align valves for SG Start FLEX SG makeup d::! MSlVs conditions and depressurizi!' main generator makeup Prepare for fill oHLEX FOST Fill FOST pump
- .c to?
c lilitial 2c Fire Brigade 3/4 Breaker battery
.9 (FB3/FB4) align for Assist with SG makeup Perform MCC load charger Relocate Continue filling 06 FOST every 6
'!ii Cross-connect AFW FSG-05 hose connections shecldlng alillJlment Pre pare for fill of FLEX FOST radios FiUFOST hours
~
Transfer l Assist Maintenance Assist with satellite 6 Fire Brigade 5 (FBS) personnel and Plant deep !oild Assist Maintenance personnel and phone to
~
Ci. Operators shedding Plant Operators CR Assist Maintenance personnel and Plant Operators
....c Q.
Maintenance 1/2 Cable installation: Cable installation: Cable installation: Cable installation: cable lnsta!fatlon:
(M1/M2) MCC E1A2/E2A2 {Unit MCC E1C2/E2C2 {Unit MCC E1A4/E2A4 (Unit MCC E1B4/E2B4 {Unit MCC E1C4/E2C4 {Unit SetupOSC Assist with llfC operations 1/Unit2J 1/Unit2} 1/Unit2) 1/Unit2) 1/Unit2)
Maintenance 3/4
{M3/M4) Connect SG makeup Install RCS makeup hoses Assist with cable installation hoses Transfer State and County Perform State and Assktvlith satellite Communicator (X01) Ctlunty deep toad Perform State and County phone to Tum over duties to
, m.mmunications . shedding communications CR Perform State and County communications EOF c I t I I
Enclosure 3 NOC-AE-16003328 Enclosure 3 Status of Commitments
Enclosure 3 NOC-AE-16003328 Page 1of1 Status of Commitments The following table identifies the status of the actions to which STPNOC had previously committed. No new commitments have been added as a result of this supplement letter.
Scheduled Due Condition Commitments Date Report Procedures and/or training programs will be revised to ensure that Chemistry Technicians Completed retain the ability to perform on-site surveys. 12-11657-36 April 30, 2015 Action will be completed prior to the end of 2RE17.
Revise Section 5.4.1.2 of IMT-0001, "Integrated Maintenance Team Guideline" to note that the Completed 12-11658-584 minimum staffing listed in this section must be September 3, 2015 maintained in order to implement FLEX strategies