1-13-2017 | On 11/17/2016 at 1859 with Unit 1 in Mode 1 at 99 percent power, the plant initiated a shutdown in accordance with Limiting Condition for Operation (LCO) 3.0.3 for having no operable steam flow channels for the C Steam Generator ( SG). The two steam flow channels did not meet acceptance criteria for Technical Specification (TS) 3.3.2. The shutdown was completed and the plant entered Mode 3 as required by LCO 3.0.3. This is reportable as a plant shutdown required by Technical Specifications in accordance with 10 CFR 50.73(a)(2)(i)(A). This is also reportable as an event or condition that could have prevented fulfillment of a Safety Function needed to mitigate the consequences of an accident, in accordance with 10 CFR 50.73(a)(2)(v)(D).
This condition was discovered during an engineering verification of beginning of cycle full power scaling values for steam flow normalization. New scaling data was calculated and the channels were rescaled and restored to operable status. The cause of this event has not yet been determined. A supplemental LER will be submitted upon the completion of the causal analysis, and the cause and corrective actions will be provided at that time. |
---|
Letter Sequence Request |
---|
EPID:L-2017-LLA-0428, Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters, LER 16-007-01 for Joseph M. Farley, Unit 1, Regarding Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters (Approved, Closed) |
|
MONTHYEAR05000348/LER-2016-0072017-06-0707 June 2017 Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters, LER 16-007-01 for Joseph M. Farley, Unit 1, Regarding Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters Project stage: Request NL-17-0611, Units 1 and 2, License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow2017-12-21021 December 2017 Units 1 and 2, License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow Project stage: Request ML18018B0382018-01-18018 January 2018 NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Regarding TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Acceptance Review ML18087A1462018-05-0101 May 2018 Request for Additional Information TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: RAI NL-18-0733, Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information2018-06-0707 June 2018 Supplement to License Amendment Request for Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow and Response to Request for Additional Information Project stage: Supplement ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow Project stage: Approval 2018-01-18
[Table View] |
|
---|
Category:Letter
MONTHYEARML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation ML23221A3062023-08-0909 August 2023 Notification of NRC Supplemental Inspection (95002) and Request for Information (Cover Letter) NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis IR 05000348/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal ML23164A2182023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Letter NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 IR 05000348/20234402023-05-0505 May 2023 Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover IR 05000348/20230012023-05-0404 May 2023 Integrated Inspection Report 05000348/2023001 and 05000364/2023001 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 2024-01-30
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000364/LER-2017-0052018-01-11011 January 2018 Power Range Nuclear Instrument Inoperable Due to Poor Connection of High Voltage Cable Connector, LER 17-005-00 for Joseph M. Farley Nuclear Plant, Unit 2, Regarding Power Range Nuclear Instrument Inoperable Due to Poor Connection of High Voltage Cable Connector 05000364/LER-2017-0042017-12-22022 December 2017 I OF 3, LER 17-004-00 for Joseph M. Farley Nuclear Plant, Unit 2 Regarding Turbine-Driven Auxiliary Feedwater Pump Steam Admission Valve Air Leak Resulted in a Condition Prohibited by Technical Specifications 05000364/LER-2017-0032017-12-20020 December 2017 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits, LER 17-003-00 for Joseph M. Farley, Unit 2, Regarding Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits 05000364/LER-2017-0022017-12-19019 December 2017 Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits, LER 17-002-00 for Joseph M. Farley, Unit 2, Regarding Main Steam Safety Valve Lift Pressure Outside of Technical Specifications Limits 05000364/LER-2017-0012017-08-21021 August 2017 2B Emergency Diesel Generator Rendered Inoperable Due to a Jacket Water Leak without Makeup Capability, LER 17-001-00 for Farley, Unit 2, Regarding 28 Emergency Diesel Generator Rendered Inoperable Due to a Jacket Water Leak without Makeup Capability 05000348/LER-2016-0072017-06-0707 June 2017 Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters, LER 16-007-01 for Joseph M. Farley, Unit 1, Regarding Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters 05000348/LER-2016-0092017-02-0202 February 2017 Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications, LER 16-009-00 for Joseph M. Farley Nuclear Plant, Units 1 and 2 Regarding Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications 05000348/LER-2016-0082017-01-23023 January 2017 Manual Reactor Trip Due to Generator Voltage Swings, LER 16-008-00 for Farley, Unit 1, Regarding Manual Reactor Trip Due to Generator Voltage Swings 05000348/LER-2016-0052016-12-28028 December 2016 Toxic Gas Event, LER 16-005-00 for Joseph M. Farley Nuclear Plant, Unit 1, Regarding Toxic Gas Event 05000348/LER-2016-0042016-12-19019 December 2016 Unapproved Environmental Qualification Material Caused Inoperability of One Containment Cooling Train, LER 16-004-00 for Joseph M. Farley Nuclear Plant, Unit 1, Regarding Unapproved Environmental Qualification Material Caused lnoperability of One Containment Cooling Train 05000348/LER-2016-0062016-12-19019 December 2016 Manual Reactor Trip due to Loss of Speed Control on 1A Steam Generator Feed Pump, LER 16-006-00 for Joseph M. Farley Nuclear Plant, Unit 1 Regarding Manual Reactor Trip due to Loss of Speed Control on 1A Steam Generator Feed Pump 05000348/LER-2016-0032016-12-12012 December 2016 Pressurizer Safety Valve Setpoint Pressure Outside of Technical Specification Tolerance Band, LER 16-003-00 for Farley, Unit 1, Regarding Pressurizer Safety Valve Setpoint Pressure Outside of Technical Specification Tolerance Band 05000348/LER-2016-0022016-11-30030 November 2016 Automatic Reactor Trip and Safety Injection Due to Closure of Main Steam Isolation Valve, LER 16-002-00 for Joseph M. Farley Nuclear Plant, Unit 1 Regarding Automatic Reactor Trip and Safety Injection Due to Closure of Main Steam Isolation Valve 05000348/LER-2016-0012016-06-0909 June 2016 Condition Prohibited by Technical Specifications Due to 600V Load Center Inoperable Longer than Allowed by Technical Specifications, LER 16-001-00 for Farley, Unit 1, Regarding Condition Prohibited by Technical Specifications Due to 600V Load Center Inoperable Longer than Allowed by Technical Specifications 05000364/LER-2015-0012016-01-13013 January 2016 Turbine Driven Auxiliary Feedwater Pump in a Condition Prohibited by Technical Specifications due ,to a Design Issue, LER 15-001-01 for Farley, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump in a Condition Prohibited by Technical Specifications Due to a Design Issue NL-13-1525, Special Report 13-001-00 for Joseph M. Farley, Unit 2, Regarding Nonfunctional Radiation Monitor R-60B2013-07-26026 July 2013 Special Report 13-001-00 for Joseph M. Farley, Unit 2, Regarding Nonfunctional Radiation Monitor R-60B NL-11-2445, LER 11-S01-00 for Joseph M. Farley, Unit 1 Regarding Loss of Power to Security Systems2012-01-0909 January 2012 LER 11-S01-00 for Joseph M. Farley, Unit 1 Regarding Loss of Power to Security Systems NL-08-0756, Special Report 2008-002-00, Inoperable Radiation Monitor R-60B2008-05-0909 May 2008 Special Report 2008-002-00, Inoperable Radiation Monitor R-60B NL-08-0659, Special Report 2008-001-00, Inoperable Radiation Monitor R-29B2008-04-25025 April 2008 Special Report 2008-001-00, Inoperable Radiation Monitor R-29B NL-05-2234, Special Report No. 2005-001-00 for Joseph M. Farley Nuclear Plant - Unit 1 Re Inoperable Radiation Monitor R-60B2005-12-0606 December 2005 Special Report No. 2005-001-00 for Joseph M. Farley Nuclear Plant - Unit 1 Re Inoperable Radiation Monitor R-60B 2018-01-11
[Table view] |
Reported lessons learned are incorporated into the licensing process and ted back to industry.
Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503.1f a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
Joseph M. Farley Nuclear Plant, Unit 1 05000- 348
A. PLANT AND SYSTEM IDENTIFICATION
Westinghouse - Pressurized Water Reactor
B. DESCRIPTION OF EVENT
On 11/17/2016 at 1859 with Unit 1 in Mode 1 at 99 percent power, the plant initiated a shutdown in accordance with Limiting Condition for Operation (LCO) 3.0.3 for having no operable steam flow channels [FT] for the C Steam Generator [SG]. The two steam flow channels on the 1C SG did not meet acceptance criteria for Technical Specification (TS) 3.3.2.
During full power engineering verification of beginning of cycle full power scaling values for steam flow normalization it was discovered that three steam flow transmitters were outside the acceptance criteria required by site procedures. The variance was in the non-conservative direction and would allow steam flow to exceed the TS 3.3.2 engineered safety features actuation system [JE] trip setpoint prior to a main steam isolation occurring. TS 3.3.2 requires two steam flow channels per steam line. Two inoperable steam flow transmitters on the 1C SG caused the plant to enter LCO 3.0.3. The shutdown was completed and the plant entered Mode 3 as required by LCO 3.0.3.
C. UNIT STATUS AT TIME OF EVENT
Mode 1, 99 percent power
D. CAUSE OF EVENT
The cause of this event has not yet been determined. A supplemental LER will be submitted upon the completion of causal analysis, and the cause will be provided at that time.
E. REPORTABILITY ANALYSIS AND SAFETY ASSESSMENT
This event is reportable as the completion of a plant shutdown required by Technical Specifications in accordance with 10 CFR 50.73(a)(2)(i)(A).
Steam flow channels perform a safety function by providing a high steam flow input to main steam line isolation logic circuitry. Each of the three steam generators is equipped with two redundant steam flow transmitters. A high steam flow signal from one of the two steam flow transmitters on two of the three steam generators coincident with a low-low reactor coolant system (RCS) average temperature signal from two of three RCS temperature channels generates a main steam line isolation signal that causes closure of all main steam line isolation valves. This signal is to mitigate the consequences of a main steam line break accident and the resulting rapid depressurization. Having both of the steam flow channels inoperable for the 1C SG caused a loss of safety function for this signal. Therefore this is also reportable as an event or condition that could have prevented fulfillment of a Safety Function needed to mitigate the consequences of an accident, in accordance with 10 CFR 50.73(a)(2)(v)(D).
Reported lessons learned are incorporated into the licensing process and fed back to industry Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503.1f a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
Joseph M. Farley Nuclear Plant, Unit 1 05000- 348
NO
Two additional means of providing a main steam line isolation in the event of a steam line break were available. One is the low-steam-pressure main steam line isolation signal, and the other is the containment pressure signal. These functions remained fully capable of performing the main steam line isolation function during the periods that the steam flow channels were known to be out of tolerance.
Additional means of providing the necessary protection against a steam pipe rupture were maintained.
One of these was safety injection (SI) system actuation from low pressurizer pressure signals, high steam line differential pressure, low main steam line pressure, or high containment pressure signals. Another means available was the overpower reactor trips and the reactor trip occurring in conjunction with receipt of the SI signal. A third was the redundant isolation of the main feedwater lines to prevent sustained high feedwater flow which would cause additional cooldown.
The loss of the main steam line isolation from the high steam flow and low-low RCS average temperature signal was determined to be of low risk due to redundant trips for mitigation of a steam line break remaining operable.
F. CORRECTIVE ACTION
The steam flow transmitters were restored to operable status. New scaling data was calculated and the channels were rescaled. Further corrective actions will be determined upon completion of the causal analysis and will be scheduled to ensure timeliness of implementation before the next refueling outage.
G. ADDITIONAL INFORMATION
1) Previous Similar Events:
Joseph M. Farley Unit 2 LER 2013-001-00 was submitted on July 26, 2013 to report two instances of a condition prohibited by Technical Specifications due to the untimely renormalization of Steam Flow Transmitter FT-494 at the beginning of two operating cycles.
Joseph M. Farley Unit 1 LER 2013-003-00 was submitted on January 3, 2014 to report a condition prohibited by Technical Specifications due to the untimely renormalization of Steam Flow Transmitter FT-495 at the beginning of an operating cycle.
Joseph M. Farley Units 1 and 2 LER 2014-003-00 was submitted on June 2, 2014 for scaling errors that resulted in inoperable steam flow channels for durations longer than allowed by Technical Specifications.
2) Commitment Information: This report does not create any licensing commitments
|
---|
|
|
| | Reporting criterion |
---|
05000364/LER-2016-001 | Manual Reactor Trip due to High Steam Generator Level | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000348/LER-2016-001 | Condition Prohibited by Technical Specifications Due to 600V Load Center Inoperable Longer than Allowed by Technical Specifications LER 16-001-00 for Farley, Unit 1, Regarding Condition Prohibited by Technical Specifications Due to 600V Load Center Inoperable Longer than Allowed by Technical Specifications | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000348/LER-2016-002 | Automatic Reactor Trip and Safety Injection Due to Closure of Main Steam Isolation Valve LER 16-002-00 for Joseph M. Farley Nuclear Plant, Unit 1 Regarding Automatic Reactor Trip and Safety Injection Due to Closure of Main Steam Isolation Valve | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000348/LER-2016-003 | Pressurizer Safety Valve Setpoint Pressure Outside of Technical Specification Tolerance Band LER 16-003-00 for Farley, Unit 1, Regarding Pressurizer Safety Valve Setpoint Pressure Outside of Technical Specification Tolerance Band | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000348/LER-2016-004 | Unapproved Environmental Qualification Material Caused Inoperability of One Containment Cooling Train LER 16-004-00 for Joseph M. Farley Nuclear Plant, Unit 1, Regarding Unapproved Environmental Qualification Material Caused lnoperability of One Containment Cooling Train | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000348/LER-2016-005 | Toxic Gas Event LER 16-005-00 for Joseph M. Farley Nuclear Plant, Unit 1, Regarding Toxic Gas Event | 10 CFR 50.73(a)(2)(x) | 05000348/LER-2016-006 | Manual Reactor Trip due to Loss of Speed Control on 1A Steam Generator Feed Pump LER 16-006-00 for Joseph M. Farley Nuclear Plant, Unit 1 Regarding Manual Reactor Trip due to Loss of Speed Control on 1A Steam Generator Feed Pump | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000348/LER-2016-007 | Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters LER 16-007-01 for Joseph M. Farley, Unit 1, Regarding Plant Shutdown Required by Technical Specifications due to Inoperable Steam Flow Transmitters | 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown | 05000348/LER-2016-008 | Manual Reactor Trip Due to Generator Voltage Swings LER 16-008-00 for Farley, Unit 1, Regarding Manual Reactor Trip Due to Generator Voltage Swings | 10 CFR 50.73(a)(2)(iv)(A), System Actuation | 05000348/LER-2016-009 | Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications LER 16-009-00 for Joseph M. Farley Nuclear Plant, Units 1 and 2 Regarding Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications | 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
|