Request for Approval of NextEra Energy Duane Arnold, Llc'S Quality Assurance Topical Report (FPL-3) Revision 0
ML20049A860
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/13/2020
From: Dean Curtland
NextEra Energy Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-20-0006
Download: ML20049A860 (67)


Text

NEXTera" ENERGY~

DUANE ARNOLD February 13, 2020 NG-20-0006 10 CFR 50.54(a)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Facility Operating License No. DPR-49 Request for Approval of NextEra Energy Duane Arnold, LLC's Quality Assurance Topical Report (FPL-3) Revision 0

Reference:

Letter, Moroney (NRG) to Stall (FPL), Florida Power and Light Company, FPL Energy Seabrook, LLC, and FPL Energy Duane Arnold, LLC -

Approval of Common Quality Assurance Topical Report, dated December 29, 2006 (ML063540197)

In the Reference letter, the NRG approved Quality Assurance Topical Report FPL-1 for use for several licensees, including NextEra Energy Duane Arnold, LLC (NEDA),

formerly FPL Energy Duane Arnold, LLC. In a letter dated January 18, 2019, NEDA provided formal notification of the intention to permanently cease power operations at the Duane Arnold Energy Center (DAEC) in the fourth quarter of 2020 (ML19023A196). To support the transition of DAEC to a decommissioning facility, NEDA has developed a site-specific DAEC Quality Assurance Topical Report (QATR) FPL-3 using the QATR FPL-1 as the basis. QATR FPL-1 will no longer be effective at DAEC following approval and implementation of QATR FPL-3.

NEDA hereby submits QATR FPL-3, Revision 0, for NRG approval, see Enclosure 1.

The adoption of QATR FPL-3, for 10 CFR 50 licensed activities, represents a reduction in commitment pursuant to 10 CFR 50 .54(a)(4) . In addition, NEDA also requests NRG review and approval to apply the program to 10 CFR 71 and 10 CFR 72 activities in accordance with 10 CFR 71.101 (f) and 10 CFR 72.140(d), respectively.

Enclosure 2 provides a comparison of the existing NRG-approved FPL-1 with the proposed FPL-3. As required by 10 CFR 50.54(a)(4)(ii), Enclosure 2 identifies changes considered to be reductions in commitment as defined by 10 CFR 50.54(a)(3), and provides a basis for concluding that FPL-3 continues to meet the 10 CFR 50, Appendix B requirements and the Safety Analysis Report quality assurance program description commitments previously accepted by the NRG. Because of the extensive NextEra En ergy Duane Arnold , LLC, 3277 DAEC Road , Palo , IA 52324

Document Control Desk NG-20-0006 Page 2 of 2 formatting differences involved, FPL considers that the combination of the QATR and the site comparison matrices included with this letter fulfill the requirement of 10 CFR 50.54(a)(4)(ii) to submit "all pages affected by that change." Enclosure 2 does not address changes that correct spelling, punctuation, or editorial items as allowed by 10 CFR 50.54(a)(4)(ii).

NEDA requests NRC review and approval by September 1, 2020. In recognizing that NRC review of this submittal may require more than the 60 days allotted in 10 CFR 50.54(a)(4)(iv), NEDA hereby waives its rights to acceptance of the QATR FPL-3 within 60 days after submittal absent an acceptance letter from the commission within the 60-day timeframe. NEDA requests that the NRC approval of QATR FPL-3 become effective upon docketing of the 10 CFR 50.82(a)(1) certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel. NEDA requests an implementation period of 60 days following the effective date.

This letter and FPL-3, Revision 0 are specific to NEDA and DAEC, and do not impact the other licensees listed in the Reference letter.

If you have any questions regarding this submittal, please contact Michael Davis, Licensing Manager at 319-851-7032.

Dean Curtland Site Director, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Enclosures cc: USNRC Regional Administrator Region Ill USNRC Project Manager, Duane Arnold Energy Center USNRC Resident Inspector, Duane Arnold Energy Center

Enclosure 1 to NG-20-0006 NextEra Energy Duane Arnold, LLC's Quality Topical Report (FPL-3) Revision 0 Submittal 49 pages follow

NEXTerae ENERGY .

NextEraTM Energy Duane Arnold, LLC Quality Assurance Topical Report FPL- 3 Revision O 1 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

POLICY ST ATEMENT NextEra Energy Duane Arnold, LLC shall maintain the shut-down Duane Arnold Energy Center in a manner that will ensure the health and safety of the public and workers. The facility shall be maintained in compliance with the requirements of the Code of Federal Regulations, the applicable Nuclear Regulatory Commission (NRC) Facility Licenses, and applicable laws and regulations of the state and local governments.

The Quality Assurance Program (QAP) described herein and associated implementing documents provide for control of activities that affect the quality of safety related nuclear plant structures, systems, and components (SSCs). The QAP is also applied to certain quality related equipment and activities where other regulatory or industry guidance establish program requirements.

The Quality Assurance Topical Report (QATR) is the top-level policy document that establishes the manner in which quality is to be achieved and presents our overall philosophy regarding achievement and assurance of quality. Implementing documents assign more detailed responsibilities and requirements and define the organizational interfaces involved in conducting activities within the scope of the QATR. Compliance with the QATR and implementing documents is mandatory for personnel directly or indirectly associated with implementation of the QAP.

Responsibility for developing, implementing, and verifying execution of the Quality Assurance Program is delegated to the Chief Nuclear Officer and authority for developing and verifying execution of the program to the Director Nuclear Assurance and Assessment.

Signed:

James L. Robo NextEra Energy Chairman and Chief Executive Officer Revision O 2 of49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Approved By:

F. A. Banks Director Nuclear Assurance and Assessment Date D. Moul Vice President and Chief Nuclear Officer Date M. K. Nazar President Nuclear Division Date Revision 0 3 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

TABLE OF CONTENTS POLICY STA TEMENT ...................................................................................................... 2 TABLE OF CONTENTS ................................................................................................... 4 INTRODUCTION ............................................................................................................... 5 A. MANAGEMENT .......................................................................................................... 6 A.1 Methodology ..................................................................................................... 6 A.2 Organization ...................................................................................................... 8 A.3 Responsibility ................................................................................................. 11 A.4 Authority .......................................................................................................... 12 A.5 Personnel Training and Qualification ........................................................... 12 A.6 Corrective Action ............................................................................................ 14 A.7 Regulatory Commitments .............................................................................. 14 A.8 Other General Guidance Documents ............................................................ 19 B. PERFORMANCE/VERIFICATION ............................................................................ 20 B.1 Methodology ................................................................................................... 20 B.2 Design Control ................................................................................................ 20 B.3 Design Verification ......................................................................................... 21 B.4 Procurement Control ...................................................................................... 21 B.5 Procurement Verification ............................................................................... 25 B.6 Identification and Control of Items ............................................................... 25 B. 7 Handling, Storage and Shipping ................................................................... 26 B.8 Test Control ..................................................................................................... 28 B.9 Measuring and Test Equipment Control ....................................................... 28 B.1 O Inspection, Test and Operating Status ..................................................... 29 B.11 Special Process Control ............................................................................. 29 B.12 Inspection .................................................................................................... 30 B.13 Corrective Action ........................................................................................ 30 B.14 Document Control ....................................................................................... 31 B.15 Records ........................................................................................................ 32 B.15 Records (CONTINUED) ............................................................................... 33 B.16 Plant Maintenance ....................................................................................... 33 B.17 Computer Software Control ....................................................................... 34 C. ASSESSMENT ......................................................................................................... 35 C.1 Methodology ................................................................................................... 35 C.2 Self-Assessment ............................................................................................. 35 C.3 Independent Assessment .............................................................................. 36 APPENDICES ................................................................................................................. 38 Appendix A: On-Site Review Group ..................................................................... 38 Appendix B: Procedures ........................................................................................ 41 Appendix C: Definitions ......................................................................................... 45 Appendix D: Administrative Controls .................................................................. 48 Appendix E: Organization Chart ........................................................................... 49 Revision 0 4 of49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

INTRODUCTION The Quality Assurance Topical Report (QATR) describes the methods and establishes quality assurance program and administrative control requirements which comply with the criteria of 10 CFR 50 Appendix B, and meets the requirements of Regulatory Guides and Industry Standards referenced in Section A.7 of this report. The Topical Quality Requirements and attached Policy Statement, together with Quality Instructions document the Program and Policy with regard to Quality Assurance at the shut-down Duane Arnold Energy Center (DAEC).

The requirements of the Quality Assurance Program shall apply to nuclear safety related structures, systems, and components as identified in the Safety Analysis Report or Q-List.

Additionally, the requirements of the Quality Assurance Program shall apply to all NextEra Energy, contractor, or consultant organizations performing activities affecting the quality of safety related structures, systems, and components of the nuclear power plant. Portions of the Quality Assurance Program requirements are also applicable to quality related items and services.

Those portions applicable to specific quality related items or services shall be delineated in appropriate instructions.

This QATR is organized and formatted to respond to NRC Standard Review Plan (NUREG-0800)

Section 17 .3 (Revision O- August 1990). This approach was chosen because it best represents the commitment to the philosophy that each individual, properly trained and motivated, achieves the highest quality of performance of which they are capable. In addition, this emphasis is used on individual performance to reinforce the importance of self-assessments (by the group responsible for the activity) and independent assessments (by groups not responsible for the activity) to achieving excellence.

Revision O 5 of49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A. MANAGEMENT A.1 Methodology The Quality Assurance Topical Report (QATR) is the top-level policy document that establishes quality policy and assigns major functional responsibilities for the DAEC. The following requirements apply to all organizations and positions that manage and perform activities within DAEC's scope. The organization is committed to implementing these requirements. Personnel engaged in supporting activities at the DAEC shall comply with the requirements of the Quality Assurance Program (OAP) described in this QATR. Contractors, or other supporting organizations, are required to comply with the OAP established by this QATR, or with their own programs having appropriate scope and controls in accordance with Section A.2. The facility shall comply with the applicable Code of Federal Regulations, NRC Licenses, and the applicable laws and regulations of the state and local governments in which the facility is located.

The OAP comprises those planned and systematic actions necessary to provide adequate confidence that structures, systems, and components will perform their intended functions. The OAP consists of the NRC approved regulatory document that describes the quality assurance program elements (the QATR) along with the associated quality instructions. Quality instructions establish responsibilities and authority for carrying out important functions; establish common practices for certain activities such that the activity is controlled and carried out in a manner that meets OAP requirements; and establish detailed implementation requirements and methods.

The OAP applies to activities affecting the performance of safety related structures, systems and components, including, but not limited to, design; procurement; fabrication; installation; modification; maintenance; repair; fuel handling; training; inspection; and tests. A list, or other means of identification, of safety related Systems, Structures, and Components (SSC) under the control of the OAP is established and maintained for the plant. The technical aspects of the items are considered when determining program applicability, including, as applicable, the item's design safety function, results of probabilistic safety analysis, the ASME Code and the other references cited in Section A.7.3 of this QATR. The OAP is also applied to certain activities where regulations other than 10CFR50 establish QA program requirements for activities within their scope. Thus, the QATR is applied to the "important to safety" activities of radioactive waste shipping and independent spent fuel storage, as defined in those NRC regulations, as allowed by 10CFR71.101.fand 10CFR72.140.d.

Revision O 6 of49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.1. Methodology (Continued)

It is NextEra Energy's policy to assure the health and safety of the public and its workers. To this end, selected elements of the Quality Assurance Program are also applied to certain quality related equipment and activities that are not safety related, but support other regulatory or industry guidance that establishes program requirements. This quality related classification is applied to selected equipment, components, structures and services designed to support and/or protect the safety function of safety related equipment. Additionally, selected elements of the Quality Assurance Program are applied to emergency preparedness, security, radiation protection, and fire protection activities. Implementing documents establish program element applicability.

Activities affecting quality are prescribed by and performed in accordance with documents (such as instructions, procedures or drawings) of a type appropriate to the circumstances and which, where applicable, include quantitative or qualitative acceptance criteria. Such documents are prepared and controlled according to Section B.14. In addition, means are provided for dissemination to plant staff of instructions of both general and continuing applicability (e.g.,

dealing with job turnover and relief, designation of confines of the control room, limitations on access to certain areas), as well as those of short-term applicability (e.g., dealing with short-term

'conditions, publications, personnel actions). Provisions are included for review, updating, and cancellation of such instructions.

In establishing, implementing and maintaining the QATR, NextEra Energy commits the DAEC to compliance with ASME NQA-1, 1994, Basic Requirement 2. QATR revisions are reviewed by senior management and approved by the Director Nuclear Assurance & Assessment and the Chief Nuclear Officer. Changes to this QATR will be governed by and made in compliance with 10CFR50.54(a).

In establishing procedural controls, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 5. In addition, as stated in Position C.1 of Regulatory Guide 1.33, Revision 2, NextEra Energy commits the DAEC to use Appendix A of Regulatory Guide 1.33 as guidance for establishing the types of procedures that are necessary to control and support plant de-commissioning activities. Requirements specific to procedures are also provided in Appendix B of this QATR.

Revision 0 7 of49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.2 Organization The organization structure responsible for implementation of the OAP is described below. The organizational structure includes corporate functions and onsite functions. Appendix E contains an organization chart depicting the organizational relationships for key management and functional groups. Implementing documents assign more specific responsibilities and duties, and define the organizational interfaces involved in conducting activities and duties within the scope of this OATR.

The Chief Nuclear Officer has overall responsibility for implementation of the quality program.

The authority to accomplish quality assurance functions is delegated to the staff as necessary to fulfill the identified responsibilities.

Personnel executing performance activities and those performing verification activities are functionally independent to the degree commensurate with the activity's relative importance to safety. The method and extent of verification is commensurate with importance of the activity to plant safety. The organization executing independent assessment activities maintains independence from the organization(s) performing the activity being assessed. Management positions are established both offsite and onsite for carrying out the independent assessment functions. Individuals filling these positions:

  • Have sufficient authority and organizational freedom to implement their assigned responsibilities, including authority to obtain access to records and personnel as needed to perform assessments.
  • Report to a sufficiently high management level to ensure that cost and schedule considerations do not unduly influence decision making.
  • Have effective lines of communication with persons in other senior management positions.
  • Have no unrelated duties or responsibilities that would preclude full attention to assigned responsibilities.

Responsible individuals or organizations may delegate any or all of their responsibility. When work is delegated to personnel or organizations outside of NextEra Energy the responsibility for the program effectiveness and the work is retained by NextEra Energy, and the delegation shall be identified and described such that:

  • The organizational elements responsible for the work are identified.
  • Management controls and lines of communication are established.
  • Responsibility for an appropriate OAP and extent of management oversight is established.
  • Performance of delegated work is formally evaluated by NextEra Energy.

Revision O 8 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.2 Organization (Continued)

In establishing its organizational structure, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 1 and Supplement 1S-1. Management gives careful consideration to the timing, extent and effects of organizational structure changes.

A.2.1 Corporate Organization The following positions have the described corporate functional responsibilities. Some titles and reporting relationships may vary between corporate and the site, but in all cases there is a designated position to carry out the defined responsibilities.

A.2.1.1 NextEra Energy Chairman and Chief Executive Officer (CEO)

This position is responsible for overall corporate policy and provides executive direction and guidance for the corporation as well as promulgates corporate policy through the Company's senior management staff. Responsibility for implementing the Quality Assurance Program is delegated to the Chief Nuclear Officer and authority for developing and verifying execution of the program is delegated to the Director Nuclear Assurance and Assessment.

A.2.1.2 Chief Nuclear Officer (CNO)

This position reports to the Chairman and CEO and has overall responsibility for the implementation of the OAP and for the Nuclear Division's activities including corporate responsibility for overall plant nuclear safety. This responsibility includes setting and implementing policies, objectives, and priorities to ensure activities are performed in accordance with OAP and other corporate requirements, and responsibility for ensuring that defects and non-compliances are reported to the NRC as required by 10CFR21.

A.2.1.2.a. Director Nuclear Assurance and Assessment This position reports to and has direct access to the CNO for resolution of any areas in question.

This position is responsible for the following:

  • Activities that include establishing, maintaining, and interpreting quality assurance practices and policies (including this QATR)
  • Managing independent assessment (Quality Assurance {QA}) and establishing quality control practices and policies for quality verification activities
  • Performance of receipt inspection, through the Nuclear Assurance Manager, to verify that purchased items comply with procurement documents.
  • Facilitating actions deemed necessary to prevent unsafe plant conditions or a significant violation of the OAP; including Stop Work authority at the sites and corporate offices
  • Periodically apprising the CNO of the status of the quality assurance program at the DAEC and immediately apprising senior management of significant problems affecting quality; and verifying implementation of solutions for significant conditions adverse to quality identified by Nuclear Assurance and Assessment.
  • Establishing the requirements for assessor and inspector certification; and providing for supplier evaluation
  • Conduct of supplier assessments or surveys; and verification that supplier quality assurance programs comply with NextEra Energy requirements Revision O 9 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.2 Organization (Continued)

A.2.1.3 Additional Support Organizations Additional support organizational activities such as emergency preparedness, licensing, calibrations, procurement, security, training, legal, communications, records and document control, information technology, business operations, and human resources may be provided by the station or by corporate or contracted organizations.

A.2.2 Site Organization The following site management positions describe the typical site OAP functional responsibilities, which may be delegated to others as established in this document. The on-site organization includes one or more individuals knowledgeable in the following fields: nuclear power plant systems; nuclear power plant mechanical, electrical and electronic systems; nuclear engineering; chemistry and radiochemistry; radiation protection; and quality assurance. Some functions, such as operating experience, document control, or records management, may be aligned under different groups. Site procedures provide detailed organizational descriptions.

A.2.2.1.a Decommissioning Director This position reports to the CNO and is responsible for the safe activities at the plant. The Decommissioning Director has control of the onsite resources necessary for the safe activities and maintenance regardless of organizational reporting.

In this position, the Decommissioning Director assures that activities at the plant are within the constraints of applicable regulatory requirements and the OAP. Functional areas of responsibility also include chemistry activities, environmental services, fuel handling (movement, and storage),

radiation protection, maintenance and work control, and related procedures and programs. The Onsite Review Group serves the Decommissioning Director in a technical capacity and provides review of plant safety and performance (see Appendix A).

A.2.2.1.b Licensing /Emergency Preparedness Manager This position reports to the Decommissioning Director and is responsible for site regulatory interfaces. This position is also responsible for maintaining and implementing the emergency plan for the station.

A.2.2.1.c Nuclear Assurance Manager This position reports to the Director Nuclear Assurance & Assessment (offsite) and is responsible for site quality activities. Significant safety or quality issues requiring escalated action are directed through this position to senior management, as necessary. Functional responsibilities include conducting independent assessments of line and support activities; monitoring and assessing day-to-day station activities; stop work authority at the site; periodic reporting on the status and adequacy of the quality program; and providing quality verification and inspections.

Revision O 10 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.2 Organization (Continued)

A.2.2.1.d Engineering Manager This position reports to the Decommissioning Director and has functional areas of responsibility that include authority for day-to-day engineering support activities, engineering administration, system engineering, and technical support.

A.2.2.1.e Security Manager This position reports to the Decommissioning Director and is responsible for implement of the site Security Plan.

A.2.2.1.f Operations Manager This position reports to the Decommissioning Director and is responsible for operating strategies that support nuclear and personal safety within the constraints of the decommissioning license and regulatory requirements.

A.3 Responsibility NextEra Energy retains and exercises the responsibility for the scope and implementation of an effective overall QAP. Positions identified in Section A.2 may delegate all or part of the activities of planning, establishing, and implementing the program for which they are responsible to others, but retain the responsibility for the program's effectiveness. Decisions affecting safety are made at the level appropriate for its nature and effect, and with any necessary technical advice or review.

Senior management is regularly apprised of assessment results evaluating the adequacy of implementation of the QAP through the assessment functions described in Section C.

NextEra Energy ensures that the QAP is properly documented, approved and implemented before an activity within the scope of the program is undertaken. Management is responsible to assure that processes and procedures comply with the QATR and other applicable requirements, and that employees comply with them. Individual managers ensure that personnel working under their management cognizance are provided the necessary training and resources to accomplish their assigned tasks. Managers and supervisors are responsible for timely and continuing monitoring of performance to verify that day-to-day activities are conducted safely and in accordance with applicable requirements.

As described in Section C.3, Nuclear Assurance is responsible to verify that processes and procedures comply with QATR and other applicable requirements, that such processes or procedures are implemented, and that management appropriately ensures compliance.

Documents that implement the quality program are approved by responsible management; distributed; and revised in accordance with procedures. Work within the scope of the QAP is accomplished in accordance with these documents.

In addition, personnel responsibilities include:

  • The responsibility to adhere to the plant's Technical Specifications and Certificates of Compliance associated with dry fuel storage.

Revision 0 11 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.3 Responsibility (Continued)

  • The responsibility to take action to minimize personnel injury or damage to the facility and to protect the health and safety of the public in the event of an emergency not covered by approved procedures.

In establishing OAP responsibilities, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 1 and Supplement 1S-1.

A.4 Authority When responsibility is delegated for planning, establishing, or implementing any part of the overall OAP, sufficient authority to accomplish the assigned responsibilities is delegated. Regardless of delegation, NextEra Energy retains overall responsibility.

Responsibility and authority to stop unsatisfactory work, as delineated in Section A.2, includes authority to control further processing, delivery, installation, operation or use of nonconforming items. This assures that cost and schedule considerations do not override safety considerations.

In establishing OAP authorities, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 1 and Supplement 1S-1.

A.5 Personnel Training and Qualification Personnel assigned to implement elements of the OAP must be capable of performing their assigned tasks. To this end, indoctrination and training programs are maintained for personnel performing, verifying or managing activities within the scope of the OAP to assure that suitable proficiency is achieved and maintained. Site and support staff minimum qualification requirements are as delineated in plant Technical Specifications. Other qualification requirements may be established but will not reduce those required by plant Technical Specifications. Sufficient managerial depth is provided to cover absences of incumbents. When required by code, regulation, or standard, specific qualification and selection of personnel is conducted in accordance with those requirements as established in the applicable procedures. Indoctrination may include the administrative and technical objectives, requirements of the applicable codes and standards, and the OAP elements to be employed.

The Certified Fuel Handler training program ensures that the qualifications of fuel handlers are commensurate with the tasks to be performed and the conditions *requiring response. The requirements of 10 CFR 50.120, "Training and Qualification of Nuclear Power Plant Personnel" requires training programs to be derived using a systems approach to training (SAT) as defined in 10 CFR 55.4. Although the requirements of 10 CFR 50.120 apply to holders of an operating license issued under Part 50, and the DAEC license no longer authorizes operation, the Certified Fuel Handler training program will, nonetheless, align with those requirements.

In establishing qualification and training programs, NextEra Energy commits the DAEC to compliance with NQA-1, Basic Requirement 2, Supplements 2S-1, 2S-2, 2S-3 and 2S-4, and Non-mandatory Appendix 2A-1 with the following clarifications and exceptions:

Revision O 12 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.5 Personnel Training and Qualification (Continued)

  • For Supplement 2S-1: Inspections, examinations or tests may be performed by individuals in the same organization as that which performed the work, provided that (a) the qualifications of the inspector for an activity are equal to or better than the minimum qualifications for persons performing the activity, (b) the work is within the skills of personnel and/or is addressed by procedures, and (c) if work involves breaching a pressure-retaining item, the quality of the work can be demonstrated through a functional test. When a, b and c are not met, inspections, examinations or tests are carried out by individuals certified in accordance with Supplement 2S-1. Individuals performing visual inspections required by the ASME Boiler and Pressure Vessel Code are qualified and certified according to Code requirements.
  • In lieu of being certified as Level I, II or Ill in accordance with Non-mandatory Appendix 2A-1 of NQA-1-1994, personnel performing independent quality verification inspections, examinations, measurements, or tests on material products or activities, that are in the same organization as that which performed the work, will be required to possess the same minimum level of qualification as that required for performing the task being verified. The verification shall be within the skills of these personnel and/or is addressed by procedures.

Individuals responsible for the planning of such quality verification inspections and tests (i.e. establishing hold points and acceptance criteria in procedures, or determining who will be responsible for performing the inspections) will meet qualification requirements equivalent to those contained in Appendix 2A-1 and suitably trained for the function.

  • In lieu of Supplement 2S-2, NextEra Energy will follow the applicable standard cited in the latest version(s) of Section XI of the ASME Boiler and Pressure Vessel Code approved by the NRC for qualification of nondestructive examination personnel.
  • For Supplement 2S-3: The requirement that prospective Lead Auditors have participated in a minimum of five (5) audits in the previous three (3) years is replaced by the following,

'The prospective lead auditor shall demonstrate his/her ability to properly implement the independent assessment (audit) process, as implemented by NextEra Energy according to Section C.3 of this QATR, to effectively lead an assessment team, and to effectively organize and report results, including participation in at least one nuclear independent assessment or audit within the year preceding the date of qualification." The term "audit" and "independent assessment" are synonymous and may be used interchangeably throughout the QAP. The demonstration process for prospective lead auditors is described in written procedures.

  • For Supplement 2S-3: A 90-day grace period may be applied to the requirement for a documented annual evaluation of lead auditor proficiency. When the grace period is applied, the next due date for the activity is based upon the original scheduled date.

However, in all cases the periodicity shall not exceed one year plus 90 days .

Revision O 13 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.6 Corrective Action Management, at all levels, fosters a non-punitive ("no-fault") attitude toward the identification of conditions adverse to quality. This includes failures, malfunctions, deficiencies, deviations, defective material and equipment, abnormal occurrences, nonconformances, and out-of-control processes, including the failure to follow procedures.

A corrective action program is implemented to promptly identify, control, document, classify, and correct conditions adverse to quality. In addition, for significant conditions adverse to quality, the program provides for cause evaluation and corrective actions to prevent recurrence. Provisions are also made to ensure that corrective actions for significant conditions adverse to quality are completed as intended and are not inadvertently nullified by subsequent actions. Results of evaluations of conditions adverse to quality are analyzed to identify trends. Significant conditions adverse to quality and significant adverse trends are documented and reported to responsible management.

Nonconforming items are reviewed and accepted, rejected, repaired, or reworked, and are identified and controlled to prevent their inadvertent test, installation or use. Nonconforming items may be conditionally released for installation, test, energization, pressurization, or use if the conditional release will not adversely affect nor preclude identification and correction of the nonconformance. Disposition of conditionally released items are resolved before the items are relied upon to perform their safety-related functions. Conditional release evaluations are documented, reviewed, and approved prior to implementation.

In establishing requirements for corrective action, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirements 15 and 16, and Supplement 15S-1.

A.7 Regulatory Commitments A.7.1 Through this QATR, NextEra Energy commits the DAEC to compliance with the following:

  • 10CFR50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants"
  • 10CFR Part 71, Subpart H, "Quality Assurance for Packaging and Transportation of Radioactive Material"
  • 10CFR Part 72, Subpart G, "Quality Assurance for Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste"

NextEra Energy Quality Assurance Topical Report (FPL-3)

A. 7 Regulatory Commitments (Continued)

A.7.2 When applicable, for Class 1, 2, and 3 items covered by Section Ill of the ASME Boiler and Pressure Vessel Code, the code Quality Assurance requirements are supplemented by the guidance of applicable regulatory guides (see Section A.7.3).

A.7.3 NextEra Energy also is committed to carrying out the prov1s1ons of certain nuclear quality assurance industry standards, other than ASME NQA-1. The extent of the commitment to each of the Regulatory Positions of related NRC Regulatory Guides and Generic Letters is specifically described below. Commitment to a particular Regulatory Guide does not constitute commitment to Regulatory Guides or other standards that may be referenced therein, unless otherwise noted.

- commitments regarding qualification and training of personnel are described in Section A.5 of this QATR, which states that staff qualification requirements are as delineated in plant Technical Specifications.

  • Safety/Regulatory Guide 1.26, Revision (site specific) "Quality Group Classifications and Standards for Water-, Steam-, and Radioactive Waste-Containing Components of Nuclear Power Plants" - Commitment to Safety/Regulatory Guide 1.26 is site specific, as required by the approved UFSAR/License at each site. Sites may use this guidance to assist in establishing the lists of equipment to which this OAP applies, or for other purposes.
  • Safety/Regulatory Guide 1.29, "Seismic Design Classification" - Some plants were designed, constructed and licensed based on criteria available prior to this Regulatory Guide being issued. The specific design criteria and seismic designations are reflected in the UFSAR, and in other docketed analysis.
  • Regulatory Guide 1.30, August 1972, "Quality Assurance Requirements for the Installation, Inspection and Testing of Instrumentation and Electric Equipment," (ANSI N45.2.4-1972/IEEE 336-1971) - NQA-1 1994, Subpart 2.4/IEEE 336-1985 is substituted for N45.2.4 in its commitment to Regulatory Guide 1.30. As noted in Regulatory Position C.1, Subpart 2.4 is being used in conjunction with NQA-1, Part 1, which replaced ANSI N45.2. As noted in Regulatory Position C.2, other industry standards may be referenced; the commitment in this QATR to NQA-1, Subpart 2.4 includes commitment to those standards to the extent necessary to implement Subpart 2.4 requirements. If NRC guidance applies to those referenced standards, it is followed. Regulatory Position C.3 indicates that the requirements of the endorsed standard should also be considered applicable during the operation phase of the nuclear power plant. This is addressed in Sections B.12 and B.16 of this QATR, which also establish any necessary exceptions or alternatives to the provisions of Subpart 2.4.

Revision O 15 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.7 Regulatory Commitments (Continued)

  • Regulatory Guide 1.33, Revision 2, February 1978, "Quality Assurance Program Requirements (Operation)" (N18.7) - NQA-1 contains quality assurance requirements equivalent to those of ANSI N-18.7, and NextEra Energy has included in this QATR the remaining "administrative controls" elements from N-18. 7 (1976). Therefore, NextEra Energy does not commit to compliance with the requirements of ANSI N-18.7. As recommended by Regulatory Position C.1, Appendix A of RG 1.33 is used as guidance in establishing the types of procedures required for plant operation and support. Regulatory Position C.2 is no longer considered valid, as the referenced standards and guidance have now been incorporated into ASME NQA-1 1994, or are addressed specifically in this section. NextEra Energy meets the guidance in Regulatory Position C.3 in that proposed changes to technical specifications or license amendments are reviewed by the independent review body, ORG, prior to submittal to the Commission for approval. In lieu of compliance with Regulatory Position C.4, assessment topics and frequencies are established as described in Section C.3 of this QATR. In lieu of compliance with Regulatory Position C.5, appropriate equivalent requirements have been established within this QATR.
  • Regulatory Guide 1.37, March 1973, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants," (ANSI N45.2.1-1973) - NQA-1 1994, Subpart 2.1 is substituted for N45.2.1 in its commitment to Regulatory Guide 1.37. As noted in Regulatory Position C.1, other industry standards may be referenced; the commitment in this QATR to NQA-1, Subpart 2.1 includes commitment to those standards to the extent necessary to implement Subpart 2.1 requirements. If NRC guidance applies to those referenced standards, it is followed. Regulatory Positions C.3, C.4 and C.5 recommend alterations to certain provisions of N45.2.1. The provisions of NQA-1, Subpart 2.1 establish requirements that are consistent with those recommendations. Regulatory Position C.2 indicates that the requirements of the endorsed standard should be used during the operations phase "when applicable." This is addressed in Sections B. 7 and B.16 of this QATR, which also establish any necessary exceptions or alternatives to the provisions of Subpart 2.1.

Revision O 16 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.7 Regulatory Commitments (Continued)

  • Regulatory Guide 1.38, Revision 2, May 1977, "Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants," (ANSI N45.2.2-1972) - NQA-1 1994, Subpart 2.2 is substituted for N45.2.2 in its commitment to Regulatory Guide 1.38. As noted in Regulatory Position C.1.a, other industry standards may be referenced; the commitment in this QATR to NQA-1, Subpart 2.2 includes commitment to those standards to the extent necessary to implement Subpart 2.2 requirements. If NRC guidance applies to those referenced standards, it is followed. Regulatory Position C.1.b modifies a provision of N45.2.2 such that the minimum load for dynamic testing to re-rate hoisting equipment for special lifts becomes 110% of the rated load. NextEra Energy takes exception to the Storage Areas section (6.2.4) of NQA-1 and commits the DAEC to "the use or storage of food, drinks, and salt tablet dispensers in any storage area shall be controlled and be limited to designated areas where such use or storage is not deleterious to stored items". The Handling section (7) of NQA-1, Subpart 2.2 defers to the provisions of Subpart 2.15.

NextEra Energy does not commit to Subpart 2.15, as there is no current NRC guidance regarding the other provisions of this part. For purposes of compliance to Regulatory Guide 1.38, Position C.1.b, NextEra Energy commits the DAEC to follow the guidance as stated (see Section B.7). Regulatory Positions C.1.c, C.1.e, C.2.a, C.2.b, C.2.c, C.2.d and C.2.e recommend alterations to certain provisions of N45.2.2. The provisions of NQA-1, Subpart 2.2 establish requirements that are consistent with those recommendations.

Regulatory Position C.1.d indicates that the requirements of the endorsed standard should be used during the operations phase "when applicable." This is addressed in Section B.7 of this QATR, which also establishes any necessary exceptions or alternatives to the provisions of Subpart 2.2.

  • Regulatory Guide 1.39, Revision 2, September 1977, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants," (ANSI N45.2.3-1973) - NQA-1 1994, Subpart 2.3 is substituted for N45.2.3 in its commitment to Regulatory Guide 1.39. As noted in Regulatory Position C.1, other industry standards may be referenced; the commitment in this QATR to NQA-1, Subpart 2.3 includes commitment to those standards to the extent necessary to implement Subpart 2.3 requirements. If NRC guidance applies to those referenced standards, it is followed. Regulatory Position C.2 indicates that the provisions of section 3.2.3 of N45.2.3 are not part of the Regulatory endorsement. As NQA-1, Subpart 2.3, section 3.2.3 has the same wording as N45.2.3, the Regulatory Position is applicable and will be followed in implementation of Subpart 2.3. Regulatory Position C.3 indicates that the endorsed standard is "applicable for housekeeping activities during the operations phase that are comparable to those occurring during construction." This is addressed in Section B. 7 of this QATR that also establishes any necessary exceptions or alternatives to the provisions of Subpart 2.3.

Revision 0 17 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.7 Regulatory Commitments (Continued)

  • Regulatory Guide 1.94, Revision 1, April 1976, "Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants," (ANSI N45.2.5-1974) - NQA-1 1994, Subpart 2.5 is substituted for N45.2.5 in its commitment to Regulatory Guide 1.94; however, Subpart 2.5 includes requirements for soils and foundations which were not included in N45.2.5, and the commitment to Subpart 2.5 herein does not include commitment to those requirements. As noted in Regulatory Position C.1, other industry standards may be referenced; the commitment in this QATR to NQA-1, Subpart 2.5 includes commitment to those standards to the extent necessary to implement Subpart 2.5 requirements. If NRC guidance applies to those referenced standards, it is followed.

Regulatory Position C.2 recommends using the general planning provisions of N45.2.5 in conjunction with Regulatory Guide 1.55, which has since been withdrawn; therefore, this position is no longer applicable. Regulatory Positions C.3 and C.4 recommend alterations to certain provisions of N45.2.5. The provisions of NQA-1, Subpart 2.5 are consistent with those recommendations. Applicability and use of Subpart 2.5 is addressed in Sections B.12 and B.16 of this QATR, which also establish any necessary exceptions or alternatives to the provisions of Subpart 2.5.

  • Regulatory Guide 1.97, Revision 3, May 1983, "Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident" (Table 1, paragraph 5) - In lieu of the Regulatory Guides listed in the Table, NextEra Energy commits the DAEC to the Regulatory Guidance and industry standards for quality assurance as described in this QATR. Commitment to the technical provisions of Regulatory Guide 1.97 are addressed in the UFSAR.
  • Regulatory Guide 1.116, Revision 0-R, May 1977, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems," (ANSI N45.2.8-1975) - NQA-1 1994, Subpart 2.8 is substituted for N45.2.8 in its commitment to Regulatory Guide 1.116. As noted in Regulatory Position C.1, other industry standards may be referenced; the commitment in this QATR to NQA-1, Subpart 2.8 includes commitment to those standards to the extent necessary to implement Subpart 2.8 requirements. If NRC guidance applies to those referenced standards, it is followed.

Regulatory Position C.3 recommends using section 5 of N45.2.8 in conjunction with Regulatory Guide 1.68 for pre-operational, cold functional, and hot functional testing.

While section 5 of NQA-1, Subpart 2.8 provides the same requirements, it is anticipated that NextEra Energy plants, since they are already beyond these tests, will not need to implement Regulatory Guide 1.68. If testing in accordance with Regulatory Guide 1.68 becomes necessary, NextEra Energy will comply with the guidance of the Regulatory Guide 1.116 position. Regulatory Position C.2 indicates that the endorsed standard should be "followed for those applicable operations phase activities that are comparable to activities occurring during the construction phase." This is addressed in Sections B.12 and B.16 of this QATR, which also establish any necessary exceptions or alternatives to the provisions of Subpart 2.8.

  • Regulatory Guide 1.143, Revision 2, November 2001, "Design Guidance for Radioactive Waste Management Systems, Structures and Components Installed in Light-Water-Cooled Nuclear Power Plants" (Position C. 7) - The intent of the quality assurance guidance cited in Position C. 7 is met. Compliance with the remainder of the [technical]

positions of Regulatory Guide 1.143 is addressed in the UFSAR.

Revision O 18 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

A.7 Regulatory Commitments (Continued)

Quality Assurance guidance cited in Position C.3.5, Appendix A is met. Compliance with Appendix B and the remainder of the [technical] positions of Regulatory Guide 1.155 is addressed in the UFSAR or License commitments.

  • Generic Letter 89-02/EPRl-NP-5652 (March 1988, and supplements through March 1993)

- NextEra Energy commits the DAEC to compliance with the endorsed industry guidance regarding selection and qualification of commercial grade suppliers and dedication of commercial grade items for use in safety related applications.

  • Generic Letter 91-05 (April 1991) - NextEra Energy commits the DAEC to compliance with the guidance regarding licensee commercial-grade procurement and dedication programs.
  • Regulatory Guide 4.15, Revision 1, February 1979, "Quality Assurance for Radiological Monitoring Programs (Normal Operations) - Effluent Streams and the Environment" -The intent of Regulatory Guide 4.15 is met.
  • Regulatory Guide 7.10, Revision 2, March 2005, "Establishing Quality Assurance Programs for Packaging Used in the Transport of Radioactive Material" - NextEra Energy commits the DAEC to implement the quality assurance guidance for activities related to the packaging and transport of radioactive material that are under its control. Quality Assurance for the design, fabrication and licensing of shipping containers is the responsibility of the container certificate holders.
  • Regulatory Issue Summary 2000-18, October 2000, "Guidance on Managing Quality Assurance Records in Electronic Media" - In instances when electronic media storage is chosen as a means of maintaining required records, NextEra Energy will comply with the guidance of this Regulatory Issue Summary.

A.8 Other General Guidance Documents

  • NUREG/CR-6407, "Classification of Transportation Packaging and Dry Spent Fuel Storage System Components According to Importance to Safety (2/96)".

Revision O 19 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCENERIFICATION B.1 Methodology Personnel who work directly or indirectly for NextEra Energy are responsible for the achievement of acceptable quality in the work covered by this QATR. This includes design, engineering, procurement, manufacturing, construction, installation, maintenance, and modifications.

Personnel performing verification activities are responsible for verifying the achievement of acceptable quality. Activities governed by the QAP are performed as directed by documented instructions, procedures and drawings that are of a detail appropriate for the activity's complexity and effect on safety. Instructions, procedures and drawings specify quantitative or qualitative acceptance criteria as applicable or appropriate for the activity, and verification is against these criteria. Provisions are established to designate or identify the proper documents to be used in an activity, and to ascertain that such documents are being used.

B.2 Design Control A program has been established and implemented to control the design of items that are subject to the provisions of this QATR (see Section A.1). The program includes provisions to control design inputs, processes, outputs, changes, interfaces, records and organizational interfaces.

These provisions assure that design inputs (such as design bases and the performance, regulatory, quality, and quality verification requirements) are correctly translated into design outputs (such as specifications, drawings, procedures, and instructions) such that the final design output can be related to the design input in sufficient detail to permit verification. The program defines the interface controls (internal and external between participating design organizations and across technical disciplines) necessary to control the development, review, approval, release, distribution and revision of design inputs and outputs.

Design processes provide for design verification (as described in Section B.3) that items and activities subject to the provisions of this QATR are suitable for their intended application, consistent with their effect on safety. Changes to final designs (including field changes) are subjected to these controls, which include measures commensurate with those applied to original plant design. Design changes and disposition of nonconforming items as "use as is" or "repair" are reviewed and approved by the responsible design organization.

Records are maintained sufficient to provide evidence that the design was properly accomplished.

These records include the final design output and any revisions thereto, as well as record of the important design steps (e.g., calculations, analyses and computer programs) and the sources of input that support the final output.

In addition, temporary design changes (temporary modifications), such as temporary bypass lines, electrical jumpers and lifted leads, and temporary trip-point settings, are controlled by procedures that include requirements for appropriate installation and removal verifications and status tracking.

In establishing its program for design control, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 3, and Supplement 3S-1, Sections 1, 2, 3, 5, 6, and 7.

Revision O 20 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

8. PERFORMANCE/VERIFICATION (CONTINUED) 8.3 Design Verification The design control program includes requirements for verifying the acceptability of design activities and documents, consistent with their effect on safety. This includes design inputs, design outputs and design changes. Design verification procedures are established and implemented to assure that an appropriate verification method is used, the appropriate design parameters to be verified are chosen, the acceptance criteria are identified, and the verification is satisfactorily accomplished and documented. Verification methods may include, but are not limited to, design reviews, alternative calculations and qualification testing. Testing used to verify the acceptability of a specific design feature demonstrates acceptable performance under conditions that simulate the most adverse design conditions expected for an item's intended use.

Design verification activities are completed before the design outputs are used by other organizations for design work, and before they are used to support other activities such as procurement, manufacture or construction. When such timing cannot be achieved, the unverified portion of the design is identified and controlled such that, in all cases, the design verification is completed before relying on the item to perform its intended safety function.

Design verification can be performed by the designer's immediate supervisor, provided (1) the supervisor did not specify a singular design approach or rule out certain design considerations and did not establish the design inputs used in the design, or (2) the supervisor is the only technically qualified individual capable of performing the verification, and (3) the need is individually documented and approved in advance by the supervisor's management. The frequency and effectiveness of the use of supervisors as design verifiers are independently verified to guard against abuse.

In establishing its program for design verification, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 3, and Supplement 3S-1, Section 4.

8.4 Procurement Control Controls are established and implemented to assure that purchased items (components, spares and replacement parts necessary for maintenance and modifications) and services are subject to quality and technical requirements at least equivalent to those specified for original equipment or specified by properly reviewed and approved revisions to assure the items are suitable for the intended service, and are of acceptable quality, consistent with their effect on safety. These controls include provisions such that:

  • Where original technical or quality assurance requirements cannot be determined, an engineering evaluation is conducted and documented by qualified staff to establish appropriate requirements and controls to assure that interfaces, interchangeability, safety, form, fit and function, as applicable, are not adversely affected or contrary to applicable regulatory requirements.

Revision O 21 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCENERIFICATION (CONTINUED) 8.4 Procurement Control (Continued)

  • Items are inspected (see Section 8.12) and identified and stored (see Sections 8.6 and 8.7) to protect against damage, deterioration or misuse.
  • Prospective suppliers of safety related items and services are evaluated to assure that only qualified suppliers are used. Qualified suppliers are periodically evaluated to assure they continue to provide acceptable products and services. Industry programs, such as those applied by ASME, NUPIC, or other established utility groups, are used as input or the basis for supplier qualification whenever appropriate. In addition, NextEra Energy commits the DAEC to Position C.3.2 of Regulatory Guide 1.28, Revision 3, for auditing and evaluation of suppliers, with an option to take exception for position C.3.2.2, where the information described therein is reviewed as it becomes available through its ongoing receipt inspection, operating experience, and supplier evaluation programs, in lieu of performing a specific evaluation on an annual basis. The results of the reviews are promptly considered for effect on a supplier's continued qualification and adjustments made as necessary (including corrective actions, adjustments of supplier audit plans, and input to third party auditing entities, as warranted). In addition, results are reviewed periodically to determine if, as a whole, they constitute a significant condition adverse to quality requiring additional action. Other 10CFR50 licensees, Authorized Nuclear Inspection Agencies, National Institute of Standards and Technology, or other state and federal agencies which provide items or services to the DAEC are not required to be evaluated or audited. A 90-day grace period may be applied to the requirement to audit suppliers on a triennial basis. When the grace period is applied, the next due date for the activity is based upon the original scheduled date. However, in all cases the periodicity shall not exceed three years plus 90 days.
  • Applicable technical, regulatory, administrative, quality and reporting requirements (such as specifications, codes, standards, tests, inspections, special processes, and 10CFR21) are invoked for procurement of items and services. Documentary evidence that an item conforms to these requirements is available at the site before relying on the item to perform its intended safety function. These documents are considered records according to Section 8.15.
  • Provisions are made for accepting purchased items and services, such as source verification, receipt inspection, pre- and post-installation tests, certificates of conformance, and document reviews. Acceptance actions are completed to ensure that procurement, inspection, and test requirements, as applicable, have been satisfied before relying on the item to perform its intended safety function.
  • Controls are imposed for the selection, determination of suitability for intended use (critical characteristics), evaluation, receipt and acceptance of commercial grade or "off-the-shelf' items to assure they will perform satisfactorily in service in safety related applications.

Revision 0 22 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED) 8.4 Procurement Control (Continued)

In establishing controls for procurement, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirements 4 and 7, and Supplements 4S-1and7S-1, with the following exceptions:

  • For Supplement 4S-1, Section 2.2 (which requires procurement documents to provide for identification of test, inspection, and acceptance requirements of the Purchaser for monitoring and evaluating the suppliers performance), and Supplement 7S-1, Section 5, for suppliers of commercial-grade calibration services with accreditation by a nationally-recognized accrediting body, a documented review of the supplier's accreditation may be used in lieu of inspection or tests following delivery or in-process surveillances during performance of the service. This review shall include, at a minimum, all of the following:
1. The accreditation encompasses ANSl/ISO/IEC 17025:2005, (or ANSl/ISO/IEC 17025:2017), "General Requirements for the Competence of Testing and Calibration Laboratories".
2. The accreditation body is recognized by the ILAC (International Laboratory Accreditation Cooperation) via a MRA (Mutual Recognition Agreement).
3. The published scope of the accreditation for the calibration laboratory covers the needed measurement parameters, ranges, and uncertainties.
4. For procurement of testing services, the published scope of accreditation for the test laboratory covers the needed testing services including test methodology and tolerances/uncertainty.
  • For Supplement 4S-1, Section 2.3 (which requires procurement documents to require a quality program that complies with NQA-1), when purchasing commercial-grade calibration/testing services from laboratories accredited by a domestic or international calibration and testing laboratory accredited by an ILAC MRA signatory, the accreditation process may be used in lieu of performing a commercial grade survey as part of the commercial grade dedication process. In such cases, accreditation may be accepted in lieu of imposing a QA Program consistent with NQA-1-1994, provided all the following are met
1) A review of the Supplier Accreditation is performed and includes verification of the following:

(a) The accreditation is to ANSl/ISO/IEC 17025:2005, (or ANSl/ISO/IEC 17025:2017),

"General Requirements for the Competence of Testing and Calibration Laboratories."

(b) The accrediting body is recognized by the ILAC (International Laboratory Accreditation Cooperation) via a MRA (Mutual Recognition Agreement).

Revision O 23 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED)

B.4 Procurement Control (Continued)

(c) For procurement of calibration services, the published scope of accreditation for the calibration laboratory covers the needed measurement parameters, ranges, and uncertainties.

(d) For procurement of testing services, the published scope of accreditation for the test laboratory covers the needed testing services including test methodology and tolerances/uncertainty.

2) Purchase order documents shall require:

(a) The service must be provided in accordance with the supplier's accredited ISO/IEC 17025:2005 (or ANSl/ISO/IEC 17025:2017) program and scope of accreditation.

(b) As-Found calibration data must be reported in the certificate of calibration when calibrated items are found to be out-of-tolerance (for calibration services only).

(c) Equipment/standards used to perform the calibration must be identified in the certificate of calibration (for calibration services only).

(d) The calibration/testing laboratory to notify the DAEC of any condition that adversely impacts the laboratory's ability to maintain the scope of accreditation.

(e) Any additional technical and quality requirements, as necessary, based upon a review of the procured scope of services, which may include, but are not necessarily limited to, tolerances, accuracies, ranges, and industry standards.

3) The receipt inspection shall validate the laboratory's document/certificate that:

(a) Certification that the calibration or test service has been performed in accordance with the ISO/IEC 17025:2005 program and that the test/calibration has been performed within their scope of accreditation and all purchase order requirements have been met.

  • For Supplement 4S-1, Section 2.3, which requires procurement documents to require a quality program that complies with NQA-1, other nationally recognized and NRC endorsed quality standards, such as N45.2, may be applied as appropriate to the circumstances of the procurement.
  • For Supplement 7S-1, Section 8.1, documentary evidence that items conform to procurement requirements need not be available at the site prior to item installation, but will be available at the site prior to placing reliance on the item for its intended safety function.
  • For Supplement 4S-1 and Supplement 7S-1, the guidance contained in Generic Letter 89-02/EPRI NP-5652 and Generic Letter 91-05 to procure Commercial Grade Items will be used in lieu of these requirements.

Revision 0 24 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

8. PERFORMANCE/VERIFICATION (CONTINUED) 8.4 Procurement Control (Continued)
  • The methodology for use of accreditation in lieu of commercial grade surveys for laboratory calibration and test services is defined in the Nuclear Energy Institute document NEI 14-05A and acknowledged by the NRC in RIS 2016-01 as acceptable for use by all holders of operating license under Title 10 of the Code of Federal Regulations (10 CFR)

Part 50. Requirements for applying this methodology are defined in RIS 2016-01.

Additionally, the NRC provided provisional acceptance of ISO/IEC 17025:2017 applicable during the transition period set to expire on November 30, 2020 to allow accredited laboratories to transition from the current 2005 edition as provided by ISO. The use of ISO/IEC 17025:2017 beyond the transition period requires NRC acceptance of the next revision to NEI 14-05A supporting this edition (ADAMS Accession Number ML19056A451 dated April 16, 2019 to Nuclear Energy Institute).

  • For commercial grade calibration services from a supplier that has been accredited by a nationally recognized accrediting body (NVLAP or other accrediting body recognized by ILAC via a Mutual Recognition Agreement {MRA}), the service may be accepted subject to the restrictions noted in Section B.4 above instead of Supplement 4S-1 and Supplement 7S-1.

8.5 Procurement Verification Measures are established and implemented to verify the quality of purchased items and services, whether purchased directly or through contractors, at intervals and to a depth consistent with the item's or service's importance to safety, complexity, quantity and the frequency of procurement.

Verification actions include testing, as appropriate, during design, fabrication and construction activities associated with plant maintenance or modifications. Verifications occur at the appropriate phases of the procurement process, including, as necessary, verification of activities of suppliers below the first tier.

In establishing procurement verification controls, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 7 and Supplement 7S-1.

8.6 Identification and Control of Items Provisions are established and implemented for the identification and control of items to prevent the use of incorrect or defective items. This includes controls for consumable materials and items with limited shelf life. The identification of items is maintained throughout fabrication, erection, installation and use so that the item can be traced to its documentation, consistent with the item's effect on safety. Identification locations and methods are selected so as not to affect the function or quality of the item.

In establishing provisions for identification and control of items, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 8 and Supplement 8S-1.

Revision O 25 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED) 8.7 Handling, Storage and Shipping Provisions are established and implemented to control the handling, storage, shipping, cleaning and preservation of items to prevent inadvertent damage, loss or deterioration. These provisions include specific procedures, when required to maintain acceptable quality, for cleaning, handling, storage, packaging, shipping and preserving items important to safety. Items are appropriately marked and labeled during packaging, shipping, handling and storage to identify, maintain and preserve the item's integrity and indicate the need for special controls. Special controls (such as containers, shock absorbers, accelerometers, inert gas atmospheres, specific moisture content levels and temperature levels) are provided when required to maintain acceptable quality.

In establishing provisions for handling, storage and shipping, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 13 and Supplement 13S-1. NextEra Energy also commits the DAEC to compliance with the requirements of NQA-1, 1994, Subpart 2.2, with the following exceptions:

  • Subpart 2.2, Section 2.2 establishes criteria for classifying items into protection levels.

Instead of classifying items into protection levels, plants may establish controls for the packaging, shipping, handling and storage of such items on a case-by-case basis with due regard for the item's complexity, use, and sensitivity to damage. Prior to installation or use, the items are inspected and serviced as necessary to assure that no damage or deterioration exists which could affect their function.

  • Subpart 2.2, Section 5.2.2 requires receiving inspections be performed in an area equivalent in environmental controls to those for the level of storage of the item. At NextEra Energy plants, receiving inspection area environmental controls may be less stringent than the storage environmental requirements for the item. Such inspections are performed in a manner and in an environment which does not endanger the required quality of the item.
  • Subpart 2.2, Section 6.2.4 states that the use or storage of food, drinks, and salt tablet dispensers in controlled storage areas shall not be permitted. Exception is taken to the wording of Section 6.2.4 and an alternate requirement substituted that the use or storage of food, drinks, and salt tablet dispensers in any storage area shall be controlled and be limited to designated areas where such use or storage is not deleterious to the stored items.
  • Subpart 2.2, Section 6.4.2 states that care of items in storage shall be exercised in accordance with the following: (h) Other maintenance requirements specified by the mahufacturer's instructions shall be performed. Exception is taken to the wording of Section 6.4.2 (h) and an alternate requirement substituted that "Care of items in storage shall be exercised in accordance with the following: Types of components that could require maintenance while in storage shall be identified and evaluated for specific maintenance requirements. Maintenance activities in Section 6.4.2 (h), listed in this requirement shall be considered during this evaluation and any deviations shall be documented."

Revision O 26 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED) 8.7 Handling, Storage and Shipping (Continued)

  • Subpart 2.2, Section 7.1 refers to Subpart 2.15 for requirements related to handling of items. The scope of Subpart 2.15 includes hoisting, rigging and transporting of items for nuclear power plants. This scope exceeds the scope of the NRC's original endorsement of ANSI N45.2.2 in Regulatory Guide 1.38, and establishes requirements for which there is no NRC regulatory position. In lieu of compliance with Subpart 2.15, Controls are established and implemented over hoisting, rigging and transport activities to the extent necessary to protect the integrity of the items involved, as well as potentially affected nearby structures and components. For re-rating of lifting equipment to allow "special lifts," NextEra Energy performs dynamic load testing over the full range of the lift using test loads at least 110% of the lift weight. Dynamic tests include raising, lowering, and traversing the load. Where required, NextEra Energy complies with applicable hoisting, rigging and transportation regulations and codes.

Housekeeping practices are established to account for conditions or environments that could affect the quality of structures, systems and components within the plant. This includes control of cleanness of facilities and materials, fire prevention and protection, disposal of combustible material and debris, control of access to work areas, protection of equipment, radioactive contamination control and storage of solid radioactive waste. Housekeeping practices assure that only proper materials, equipment, processes and procedures are used and that the quality of items is not degraded as a result. Necessary procedures or work instructions, such as for electrical bus and control center cleaning, cleaning of control consoles, and radioactive decontamination are developed and used.

In addition, NextEra Energy commits the DAEC to compliance with the requirements of NQA-1, 1994, Subpart 2.1, to establish appropriate provisions for the cleaning of fluid systems and associated components; and Subpart 2.3, to establish appropriate provisions for housekeeping; with the following exceptions:

  • Subpart 2.1, Sections 3.1 and 3.2 establish criteria for classifying items into cleanness classes and requirements for each class. Instead of using the cleanness level system of Subpart 2.1, plants may establish cleanness requirements on a case-by-case basis, consistent with the other provisions of Subpart 2.1. Appropriate cleanliness controls are established for work on safety related equipment to minimize introduction of foreign material and maintain systems/component cleanliness throughout maintenance or modification activities, including documented verification of absence of foreign materials prior to system closure.
  • Instead of the five-level zone designation in Subpart 2.3, control over housekeeping activities is based on a consideration of what is necessary and appropriate for the activity involved. The controls are effected through procedures or instructions that, in the case of maintenance or modification work, are developed on a case-by-case basis. Factors considered in developing the procedures and instructions include cleanliness control, personnel safety, fire prevention and protection, radiation control and security. The procedures and instructions make use of standard janitorial and work practices to the extent possible.

Revision 0 27 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

8. PERFORMANCE/VERIFICATION (CONTINUED) 8.8 Test Control Testing programs are established and implemented to demonstrate that items subject to the provisions of this QATR will perform satisfactorily in service, and that plant systems can be operated safely and as designed. These programs include criteria for determining when testing is required, such as proof tests before installation, pre-operational tests, post-maintenance tests, and post-modification tests to demonstrate that performance of plant systems is in accordance with design intent. Programs also include provisions for establishing and adjusting test schedules and maintaining status for periodic or recurring tests. Tests are performed according to applicable procedures that include, consistent with the effect on safety, (1) instructions and prerequisites to perform the test, (2) use of proper test equipment, (3) acceptance criteria, and (4) mandatory verification points as necessary to confirm satisfactory test completion. Test results are documented and evaluated by the organization performing the test and reviewed by the appropriate authority having responsibility for the item being tested. If acceptance criteria are not met, retesting is performed as needed to confirm acceptability following correction of the system or equipment deficiencies that caused the failure.

In establishing provisions for testing, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 11 and Supplement 11 S-1.

8.9 Measuring and Test Equipment Control Provisions are established and implemented to control the calibration, maintenance, and use of measuring and test equipment, including installed plant instrumentation, that provide information important to plant system operation. The provisions cover equipment such as indicating and actuating instruments and gages, tools, reference and transfer standards, and nondestructive examination equipment. The provisions assure that:

  • Measuring and test equipment is calibrated at specified intervals on the basis of the item's required accuracy, intended use, frequency of use, and stability characteristics or other conditions affecting its performance. Alternatively, equipment may be calibrated immediately before and after use if a defined interval is not appropriate.
  • Measuring and test equipment is labeled, tagged or otherwise controlled to indicate its calibration status and provide traceability to calibration test data or records.
  • Calibrations are performed against standards that have an accuracy of at least four times the required accuracy of the equipment being calibrated. When this is not possible, the standards have an accuracy that ensures the equipment being calibrated will be within the required tolerance.
  • Where possible, calibration standards are traceable to appropriate national standards.

Calibration standards have greater accuracy than the standards being calibrated, except where the same accuracy as the instruments being calibrated can be shown to be adequate for the service requirements.

Revision O 28 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

8. PERFORMANCE/VERIFICATION (CONTINUED) 8.9 Measuring and Test Equipment Control (Continued)
  • Measuring and test equipment found out of calibration is tagged or segregated and not used until it is successfully re-calibrated. An evaluation is performed to determine the acceptability of any items measured, inspected or tested with an out-of-calibration device from the time of the previous calibration.

In establishing provisions for control of measuring and test equipment, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 12, Supplement 12S-1 and Subpart 2.16 for establishing appropriate requirements for calibration and control of measuring and test equipment, including installed plant instrumentation, with the following exception:

  • Section 5.5 of IEEE 498-85 (NQA-1, Subpart 2.16) requires all M&TE to be labeled. As stated above, the DAEC may not label certain M&TE, such as installed instrumentation, but provide other means of identification so appropriate controls can be implemented.

This exception also applies to Section 7.2.1 of IEEE 336-85 (NQA-1, Subpart 2.4).

8.10 Inspection, Test and Operating Status Measures are established and implemented to identify the inspection, test and operating status of items and components subject to the provisions of this QATR in order to maintain personnel and safety and avoid unauthorized operation of equipment. Where necessary to preclude inadvertent bypassing of inspections or tests, or to preclude inadvertent operation, these measures require the inspection, test or operating status be verified before release, fabrication, receipt, installation, test or use. These measures also establish the necessary authorities and controls for the application and removal of status indicators or labels. Equipment control provisions for workmen's protection comply with applicable federal and state OSHA regulations.

In establishing measures for control of inspection, test and operating status, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 14.

8.11 Special Process Control Provisions are established and implemented to assure that special processes that require interim process controls to assure quality, such as welding, heat treating, chemical cleaning, and nondestructive examination, are controlled. These provisions include assuring that special processes are accomplished by qualified personnel using qualified procedures and equipment.

Special processes are performed in accordance with applicable codes, standards, specifications, criteria or other specially established requirements. Special processes are those where the results are highly dependent on the control of the process or the skill of the operator, or both, and for which the specified quality cannot be fully and readily determined by inspection or test of the final product.

In establishing measures for the control of special processes, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 9 and Supplement 9S-1, as well as the applicable ASME Boiler and Pressure Vessel Code provisions established via 10CFR50.55a.

Revision O 29 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

8. PERFORMANCE/VERIFICATION (CONTINUED) 8.12 Inspection Provisions are established and implemented for inspections to assure that items, services and activities affecting safety meet established requirements and conform to applicable documented instructions, procedures and drawings. Types of inspections may include those verifications related to procurement, as discussed in Sections B.4 and B.5, such as source, in-process, final, and receipt inspection, as well as maintenance, modification, in-service, and operational activities.

Inspections are carried out by properly qualified persons independent of those who performed or directly supervised the work.

Inspection planning (for those activities subject to inspection) identifies the characteristics and activities to be inspected, the inspection techniques, the acceptance criteria and the organization responsible for performing the inspection. Inspection planning identifies required hold points, beyond which work is not to proceed without the consent of the inspection organization.

Provisions for ASME Boiler and Pressure Vessel Code Authorized Inspections are included when required.

Inspection results are documented by the inspector and approved by authorized personnel. If acceptance criteria are not met, corrected areas are reinspected.

In establishing inspection requirements, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 10, Supplement 1OS-1 and Subpart 2.4. In addition, for situations comparable to original construction, NextEra Energy commits the DAEC to compliance with the requirements of Subparts 2.5 and 2.8 for establishing appropriate inspection requirements.

8.13 Corrective Action Provisions are established and implemented to assure that personnel have both the responsibility and authority to identify conditions adverse to quality, and the opportunity to suggest, recommend or provide solutions to resolve the condition. Provisions also include verification of resolution of significant issues (see also Section A.6).

Reworked, repaired and replacement items are inspected and tested to meet the original inspection or test requirements, or appropriately specified alternatives (see also Sections B.8 and B.12).

If evidence indicates that common components in safety related systems have performed unsatisfactorily, compensatory or corrective measures are planned prior to replacement or repair of such components. Replacement components receive adequate testing or are of a design for which experience indicates a high probability of satisfactory performance.

In establishing provisions for corrective action and control of nonconforming items, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirements 15 and 16, and Supplement 15S-1.

Revision O 30 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED) 8.14 Document Control Provisions are established and implemented to specify the format and content (see Appendix B for procedures), and control the development, review, approval, issue, use and revision, of documents that specify quality requirements or prescribe activities affecting quality or plant system operation to assure the correct documents are being employed. These provisions assure that specified documents are reviewed for adequacy, approved prior to use by authorized persons, and distributed according to current distribution lists and used at the location where the prescribed activity takes place. Procedures governing power plant activities (see Appendix B) are reviewed by qualified persons, other than the preparer, as designated by the Decommissioning Director. Such procedure reviews include a determination whether additional cross-discipline reviews are required and whether a Plant Technical Specification change or other NRC approval is required.

Only safety related procedures and procedures important to safety as used in 10CFR71 and 72 require this review. Provisions include establishing levels of use, such as requiring the document to be present at the work location. Documents subject to control provisions include, but are not limited to, drawings (design, as-built), engineering documents (calculations, analyses, specifications, computer codes, Safety Analysis Reports, Plant Technical Specifications), and procedures (administrative, operating, emergency operating, maintenance, calibration, surveillance, inspection, test). Other documents, such as those related to procurement, corrective actions, and assessments, are controlled as defined by the provisions and commitments cited in those sections of this QATR. Controlled copies of instructions and procedures are made available to and used by the persons performing the activity covered. New or revised controlled documents are made available in a timely fashion to support ongoing work and preclude use of incorrect information. Superseded documents are identified or removed from availability. The site maintains documentation that describes how implementing documents are maintained to assure that OAP requirements are met and are not inadvertently removed in later revisions.

Revisions to controlled documents are reviewed for adequacy and approved for release by the same organization(s) as originally did so, or by other designated organizations that are qualified and sufficiently knowledgeable of the requirements and intent of the original document.

Programmatic procedure preparation, review and usage controls are established that ensure procedures are technically and administratively correct. These controls ensure that procedures are reviewed when pertinent source material is revised (such as when Technical Specifications are revised), when unusual incidents occur, when plant modifications are made, and when significant deficiencies are identified. Procedures may also be reviewed because industry experience reviews, use during job execution or training, self-assessments or independent assessments identify deficiencies or opportunities for improvement. Revisions are made as necessary. Procedures which implement the emergency plan are exercised on the simulator or reviewed at least once every two years and revised as appropriate.

Site managers may designate specific procedures or classes of procedures in writing to be reviewed by qualified reviewers in lieu of review by the ORG. Review by qualified reviewers shall be in accordance with implementing procedures. In addition, 10 CFR 50.59 and/or 10 CFR 72.48 reviews are performed on designated procedures, including subsequent changes, to determine if NRC review and approval is required prior to implementing the procedures/changes.

Revision 0 31of49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED)

B.14 Document Control (CONTINUED)

Procedures required by Technical Specifications shall be approved by the Decommissioning Director or by cognizant managers or other supervisory personnel prior to implementation as specified by administrative requirements. The approval authority for specific procedures or classes of procedures shall be designated in writing by the Decommissioning Director.

Temporary changes to approved procedures that do not change the intent are approved by two members of plant staff knowledgeable in the areas affected by the procedure. Additionally for temporary changes to approved procedures identified in Appendix B of this QATR, at least one of the two approvers must be a Certified Fuel Handler. Temporary changes are documented, reviewed by the ORG or by a qualified reviewer, and approved by the designated approval authority within 14 days of implementation. If appropriate, temporary changes are incorporated in the next revision of the procedure.

In establishing provisions for document control, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 6 and Supplement 6S-1.

B.15 Records Provisions are established and implemented to ensure that sufficient records of items and activities affecting quality are generated and maintained to reflect completed work. Such records may include, but are not limited to, design, engineering, procurement, manufacturing, construction, inspection, test, installation, modification, operations, maintenance, corrective action, assessment, and associated reviews. The provisions establish requirements for records administration, including generation, receipt, preservation, storage, safekeeping, retrieval and final disposition. For activities governed by 10CFR71 or 72, these provisions address the specific requirements of sections 71.135 and 72.174. In establishing measures for the retention of security records, NextEra Energy commits the DAEC to compliance with NQA-1 1994, Basic Requirement 17 and Supplement 17S-1, as well as the applicable portions of 10 CFR 73 established via 10 CFR 73.55 (q) and 10 CFR 73.70.

The list of records in 10CFR71.135, 10CFR72.174, and Non-mandatory Appendix 17A-1, supplemented by the recommended retention times established in Regulatory Guide 1.28, Position C.2 (Table 1), are used to establish the types of records that will be created and retained.

Non-mandatory Appendix 17A-1 of NQA-1-1994 lists only those operations phase records having permanent (lifetime) retention; Regulatory Guide 1.28, Table 1, which provides for lifetime, 3, and 1O year (non-permanent) retention periods, does not specifically list operations phase record types. Appropriate retention times are established for non-permanent operations phase records based on similarity to the same record types identified in Table 1 of Regulatory Guide 1.28. Thus, non-permanent records are designated for 3 or 10 year retention, as required by NQA-1-1994, Supplement 17S-1, Sections 2.7 and 2.8. In cases where local or state retention requirements are more restrictive than the regulatory guidance, the local requirements are met. Records of the service lives of all snubbers including the date at which the service life commences and associated installation and maintenance records have lifetime retention.

In addition, when using optical or electronic records storage and retrieval systems, NextEra Energy complies with NRC guidance in RIS 2000-18.

Revision O 32 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

8. PERFORMANCE/VERIFICATION (CONTINUED) 8.15 Records (CONTINUED)

In establishing provisions for records, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 17 and Supplement 17S-1, with the following exception:

  • Supplement 17S-1, Section 4.2(b) requires records to be firmly attached in binders or placed in folders or envelopes for storage in steel file cabinets or on shelving in containers.

For hard-copy records maintained by plants, the records are suitably stored in steel file cabinets or on shelving in containers, except that methods other than binders, folders or envelopes may be used to organize the records for storage.

8.16 Plant Maintenance Controls are established for the maintenance or modification of items and equipment subject to this QATR to ensure quality at least equivalent to that specified in original design bases and requirements, such that safety related structures, systems and components are maintained in a manner that assures their ability to perform their intended safety function(s). Maintenance activities (both corrective and preventive) are scheduled and planned so as not to unnecessarily compromise the safety of the plant. Permission to release equipment or systems for maintenance is granted by designated operating personnel who are responsible to verify that the equipment or system can be released and determine how long it may be out of service. This includes attention to the potentially degraded degree of protection when one subsystem of a redundant safety system has been removed for maintenance. Release is documented. When equipment is ready to be returned to service, operating personnel place the equipment in operation and verify and document its functional acceptability. In completing maintenance and restoring equipment, attention is given to restoration of normal conditions, such as removal of jumpers or signals used in maintenance or testing, or such as returning valves, breakers or switches to proper operating positions.

In establishing controls for plant maintenance, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Subparts 2.16 and 2.18, with the following exceptions:

  • Section 5.5 of IEEE 498-85 (NQA-1, Subpart 2.16) requires all M&TE to be labeled. As stated in QATR Section B.9, plants may not label certain installed instrumentation, but provide other means of identification so appropriate controls can be implemented. This exception also applies to Section 7.2.1 of IEEE 336-85 (NQA-1, Subpart 2.4).
  • Subpart 2.18, Section 2.3.a requires cleanliness during maintenance to be in accordance with Subpart 2.1. Commitment to Subpart 2.1 is described in Section B.7.
  • Subpart 2.18, Section 2. 7 requires the application of Subparts 2.4, 2.5 and 2.8 for inspections of installation activities. Commitment to Subparts 2.5 and 2.8 is limited to activities comparable in nature and extent to those during original construction (see Section B.12). Inspections (verifications) of maintenance or modification activities are established, conducted and documented as required by Section B.12 to establish a suitable level of confidence in affected structures, systems, or components. The inspection criteria in Subparts 2.5 and 2.8 may be used in establishing required inspections for maintenance and minor modifications.

Revision O 33 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

B. PERFORMANCE/VERIFICATION (CONTINUED) 8.17 Computer Software Control Provisions are established and implemented to assure that computer software used in applications affecting safety is prepared, documented, verified and tested, and used such that the expected output is obtained and configuration control maintained. To this end, NextEra Energy commits the DAEC to compliance with the requirements of NQA-1 1994, Supplement 11 S-2 and Subpart 2. 7 to establish the appropriate provisions.

Revision O 34 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

C. ASSESSMENT C.1 Methodology Programs are established for reviews and assessments to verify that activities covered by this QATR are performed in compliance with the requirements established, review significant proposed plant changes or tests, verify that reportable events are promptly investigated and corrected, and detect trends which may not be apparent to the day-to-day observer. These programs are, themselves, reviewed for effectiveness as part of the overall assessment process, as described herein.

Self-assessment is used (performed by or for the group responsible for the activity being assessed) and independent assessment (performed by the Nuclear Assurance organization) to monitor overall performance, identify anomalous performance and precursors of potential problems, and verify satisfactory resolution of problems. Persons responsible for carrying out these assessments are cognizant of day-to-day activities such that they can act in a management advisory function with respect to the scope of the assessment. Both self-assessments and independent assessments are accomplished using instructions or procedures that provide detail commensurate with the assessed activity's complexity and importance to safety.

The DAEC maintains an on-site review groups to review overall plant performance and advise site management on matters related to nuclear safety. Appendix A establishes the requirements for this committee.

Independent reviews are periodically performed of matters involving the safe activities for the plant, with a minimum of one such review being conducted each year. The review addresses matters that plant and corporate management determine warrant special attention, such as plant programs, performance trends, employee concerns, or matters related to safe plant activities.

The review is performed by a team consisting of personnel with experience and competence in the activities being reviewed, but independent (from cost and schedule considerations) from the organizations responsible for those activities. The review is supplemented by outside consultants or organizations as necessary to ensure the team has the requisite expertise and competence.

Results are documented and reported to responsible management.

In establishing the independent assessment program, NextEra Energy commits the DAEC to compliance with NQA-1, 1994, Basic Requirement 18 and Supplement 188-1, with the following clarification:

  • The term "audit" and "independent assessment" are synonymous and may be used interchangeably.

C.2 Self-Assessment Self-assessments performed by or for the group responsible for the activity being assessed are used to identify anomalous performance and precursors of potential problems. When line organizations perform self-assessments, their focus is technically and performance oriented with focus on the quality of the end product as well as on compliance with procedures and processes.

The objective of self-assessment is to verify compliance, improve performance and achieve excellence. Results of self-assessments are reported in an understandable form and in a timely Revision O 35 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

C. ASSESSMENT (CONTINUED)

C.2 Self-Assessment (Continued) fashion to a level of management having the authority to effect corrective action and verify satisfactory resolution of problems.

C.3 Independent Assessment A program of planned and periodic performance-based independent assessments has been established to monitor performance and confirm that activities affecting quality comply with the QAP and that the QAP is effectively implemented. The organization performing independent assessment (Nuclear Assurance) is technically and performance oriented, with its focus on the quality of the end product and the effective implementation of procedures and processes.

Persons performing independent assessments do not have direct responsibility for any area being assessed, and do not report to a management position with immediate responsibility for the activity being assessed. Asses.sment resources may be supplemented with technical specialists as needed. The independent assessment program will be reviewed at least semiannually through one of the following: an Independent Evaluation of QA/QC, review by a designated management representative, or review by a designated management review body.

The independent assessment program provides comprehensive independent evaluations of activities and procedures. Planning for independent assessments identifies the characteristics and activities to be assessed and the relevant performance and/or acceptance criteria. As appropriate to the scope of an assessment, these criteria include related plant Technical Specification requirements. Independent assessments are then conducted using these predetermined criteria.

An independent biennial assessment includes an examination of selected procedures to verify that the procedure review and revision controls of Section B.14 are effectively implemented.

Results of independent assessments are reported in an understandable form and in a timely fashion to a level of management having the authority to effect c;:orrective action. Nuclear Assurance conducts timely follow-up action, including re-assessment of deficient areas, as necessary, to establish adequacy of corrective actions.

Independent assessment results are documented and reviewed by Nuclear Assurance management and by management having responsibility for the area assessed. In addition, Nuclear Assurance activities are periodically assessed for effectiveness. Results are documented and reported to responsible management.

Nuclear Assurance provides for assessment of work carried out under the requirements of the QAP that is delegated to other (non-NextEra Energy) entities.

Independent Assessments of Non-Regulatory topics are audited in accordance with site implementing procedures. Regulatory Topics, as listed in Table 1, receive independent assessments at frequencies established by related NRC rules. A grace period shall not be applied to these regulatory topics unless permitted by the NRC rule.

Table 1 Revision O 36 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Regulatory Topics Subject to Independent Assessment Topic1 Emerqencv Planninq Fitness For Duty and Access Authorization Security Cyber Security Independent Spent Fuel Storaqe

1. Topic titles in this table may vary; however, all program elements (i.e. applicable regulatory requirements and all 10 CFR 50 Appendix B criteria) will be covered as identified in implementing procedures.

Revision O 37 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

APPENDICES Appendix A: On-Site Review Group 1.0 General The On-Site Review Group (ORG) is responsible to the Decommissioning Director for advice on all plant-related matters concerning nuclear safety. The requirements for personnel, committee composition, meeting frequency, quorum and meeting records are identified in implementing procedures. A general description of these areas is included below.

In discharging its independent review responsibilities, the ORG shall keep safety considerations paramount when opposed to cost or schedule considerations. Should a voting member at a particular meeting have direct responsibility for an item under review where a conflict of such considerations is likely, that member shall be replaced (to fill the quorum) by another voting member not having such potential conflict.

2.0 Composition The ORG is comprised of a minimum number of members as designated by the Decommissioning Director and detailed in implementing procedures. All members are qualified in accordance with implementing procedure requirements that meet site Technical Specifications. Membership includes representation from at least the following disciplines: Operations, Maintenance, Engineering and Radiation Protection I Chemistry. The ORG collectively has, or has access to, the experience and competence necessary to review the areas of (1) nuclear power plant operations, (2) nuclear engineering, (3) chemistry and radiochemistry, (4) metallurgy, (5) nondestructive testing, (6) instrumentation and control, (7) radiological safety, (8) mechanical and electrical engineering, (9) administrative controls and quality assurance practices, and (10) other fields associated with the unique characteristics of the plant. Consultants may be utilized to provide expert advice as needed.

Alternate chairmen and members may be appointed by the Decommissioning Director to serve on a permanent or temporary basis.

3.0 Meetings The ORG meets commensurate with the scope of activities, but minimal frequency requirements are specified in procedures.

Rules for a quorum are established and adhered to.

Revision O 38 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix A: On-Site Review Group (Continued) 4.0 Review The ORG reviews at least the following:

(1) Changes to the Offsite Dose Calculation Manual (ODCM) and the Process Control Program (PCP).

(2) Proposed tests or experiments that affect nuclear safety.

(3) Proposed changes or modifications to plant systems or equipment that affect nuclear safety.

(4) Written 10CFR50.59/72.48 evaluations to verify that changes to the facility or procedures, tests or experiments do not involve a change in the Technical Specifications or require prior NRC review.

(5) Proposed changes to the License and Technical Specifications.

(6) Reports covering violations of applicable NRC statutes, codes, regulations, orders, Technical Specifications, license requirements or of internal documents having nuclear safety significance.

(7) Reports of special reviews and investigations as requested by the Decommissioning Director.

(8) Events reportable in writing to the NRC according to applicable regulations.

(9) Reports of significant abnormalities or deviations from the normal and expected performance of plant equipment or systems that affect nuclear safety.

(10) All recognized indications of an unanticipated deficiency in some aspect of design or operation of structures, systems, or components that could affect nuclear safety.

(11) Review of any accidental, unplanned, or uncontrolled radioactivity release.

(12) Any other matter related to nuclear safety requested by the Decommissioning Director, selected by ORG members, or referred to the ORG by other site or corporate organizations.

Reviews of Items (6) through (12) include results of any investigations made and recommendations resulting from such investigations to prevent or reduce the probability of recurrence of the event.

Revision O 39 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix A: On-Site Review Group (Continued) 5.0 Authority The ORG:

  • Recommends in writing to the Decommissioning Director approval or disapproval of items reviewed.
  • Renders determinations in writing with regards to whether Items (1) through (4), or changes thereto, require prior NRC approval in accordance with 10CFR50.59/72.48.
  • Provides written notification to level(s) above the Decommissioning Director of any disagreements between the ORG and the Decommissioning Director.

The ORG shall advise the Decommissioning Director on matters related to safe operation and overall performance. The ORG has authority to obtain access to records and personnel as needed to conduct reviews.

In carrying out its review responsibilities, the ORG may establish subcommittees or use designated organizational units to carry out the review. The subcommittees or organizational units must regularly report results of reviews for full committee consideration and may recommend items for full committee review as warranted.

6.0 Records The ORG maintains written minutes of each ORG meeting, to include identification of items reviewed, and decisions and recommendations of the Committee. Copies of the minutes are provided to the off-site management position(s) above the Decommissioning Director, and to other management responsible for the areas reviewed as necessary. ORG records are retained according to Section B.15.

Revision 0 40 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix B: Procedures Procedures are used to provide an approved, preplanned method of conducting activities affecting safety. As stated in Position C.1 of Regulatory Guide 1.33, Revision 2, NextEra Energy commits the DAEC to use Appendix A of Regulatory Guide 1.33 as guidance for establishing the types of procedures that are necessary to control and support site activities. Procedures are sufficiently detailed for a qualified individual to perform the required function without direct supervision, but may not provide a complete description of the system or plant process.

Guidance is established to identify the manner in which procedures are to be implemented, including identification of those tasks that require (1) the written procedure to be present and followed step by step while the task is being performed, (2) the user to have committed the procedure steps to memory, (3) verification of completion of significant steps, as by initials or signatures or use of check-off lists. Procedures that are required to be present and referred to directly are those developed for extensive or complex jobs where reliance on memory cannot be trusted, tasks that are infrequently performed, and tasks where steps must be performed in a specified sequence. When documentation of an action is specified, the necessary data is recorded as the task is performed.

The format of procedures may vary from plant to plant; however, procedures include the following elements, as appropriate to the purpose or task covered. These elements are not intended to imply a specific format is required:

Title/Status: Each procedure is given a title descriptive of the work or subject it addresses, and includes a revision number and/or date and an approval status.

Purpose/Statement of Applicability: The purpose for which the procedure is intended is clearly stated (if not clear from the title).

References:

Applicable references, including reference to appropriate Technical Specifications, are included. References are included within the body of the procedure when the sequence of steps requires other tasks to be performed (according to the reference) prior to or concurrent with a particular step.

Prerequisites: Identifies those independent actions or procedures that must be accomplished and plant conditions which must exist prior to performing the procedure. A prerequisite applicable to only a specific portion of a procedure is so identified.

Precautions: Alert the user to those important measures to be used to protect equipment and personnel, including the public, or to avoid an abnormal or emergency situation during performance of the procedure. Cautionary notes applicable to specific steps are included in the main body of the procedure and are identified as such.

Limitations and Actions: Limitations on the parameters being controlled and appropriate corrective measures to return the parameter to the normal control band are specified.

Revision O 41 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix B: Procedures (Continued)

Main Body: Contains the step-by-step instructions in the degree of detail necessary for performing the required function or task.

Acceptance Criteria: The quantitative or qualitative criteria against which the success or failure (as of a test-type activity) of the step or action would be judged.

Check-off Lists: Complex procedures use check-off lists (aka checklists) which may be included as part of the procedure or appended to it.

Individual plant terminology may vary from the following, and some procedure types may be combined. Sufficent procedures are maintained to provide appropriate direction for these activities. In amplification to the appropriate elements above, such procedures are further defined as follows:

Calibration and Test Procedures: Contain instructions for periodic calibration and testing of safety related instrumentation and control systems, and for periodic calibration of measuring and test equipment used in activities affecting the quality of these systems.

These procedures provide for meeting surveillance requirements and for assuring measurement accuracy adequate to keep safety related parameters within operational and safety limits.

Chemical-radiochemical Control Procedures: Contain instructions for chemical and radiochemical activities such as the nature and frequency of sampling and analyses; maintaining coolant quality within prescribed limits; limitations on concentrations of agents that could cause corrosive attack, foul heat transfer surfaces or become sources of radiation hazards due to activation; control, treatment and management of radioactive wastes and control of radioactive calibration sources, including shipping.

Emergency Plan Implementing Procedures: Contain instructions for activating the Emergency Response Organization and facilities, protective action levels, organizing emergency response actions, establishing necessary communications with local, state and federal agencies, and for periodically testing the procedures, communications and alarm systems to assure they function properly. Format and content of such procedures are such that requirements of the NRC approved Emergency Plan are met.

Emergency Procedures: Contain instructions for response to potential emergencies so that a trained operator will know in advance the expected course of events that will identify an emergency and the immediate actions that should be taken in response. Format and content of emergency procedures are based on regulatory and Owner's Group(s) guidance that identify potential emergency conditions and generally require such procedures to include a title, symptoms to aid in identification of the nature of the emergency, automatic actions to be expected from protective systems, immediate operator actions for operation of controls or confirmation of automatic actions, and subsequent operator actions to return the reactor to a normal condition or provide for a safe extended shutdown period under abnormal or emergency conditions.

Revision O 42 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix B: Procedures (Continued)

Fuel Handling Procedures: Contain instructions for accountability of fuel. Procedures are also provided fuel movements in the spent fuel storage areas. Fuel handling procedures include prerequisites to verify the status of systems required for fuel handling and movement; designation of proper tools, proper conditions for spent fuel movement, and proper conditions for fuel cask loading and movement. These procedures provide requirements for proper sequence, orientation and seating of fuel and components, rules for minimum operable instrumentation, actions for response to fuel damage, communications between the control room and the fuel handling station, independent verification of fuel and component locations, criteria for stopping fuel movements, and documentation of final fuel and component serial numbers and locations.

Maintenance Procedures: Contain instructions in sufficient detail to permit maintenance work to be performed correctly and safely, and include provisions for conducting and recording results of required inspections or tests. Appropriate referencing to other procedures or vendor manuals is provided. Instructions are also provided, although not necessarily in Maintenance Procedures, for equipment removal and return to service, and appropriate radiation protection measures (such as protective clothing and radiation monitoring).

Radiation Control Procedures: Contain instructions for implementation of program requirements necessary to meet regulatory commitments, including acquisition of data and use of equipment to perform necessary radiation surveys, measurements and evaluations for the assessment and control of radiation hazards. These procedures provide requirements for monitoring both external and internal exposures of employees, utilizing accepted techniques; routine radiation surveys of work areas; environmental monitoring in the vicinity of the plant; radiation monitoring of maintenance and special work activities, and for maintaining records demonstrating the adequacy of measures taken to control radiation exposures to employees and others.

System Procedures: Contain instructions for energizing, filling, venting, draining, starting up, shutting down, and other instructions appropriate for operations of systems related to the safety of the plant. Separate procedures may be developed for correcting off-normal conditions for those events where system complexity may lead to operator uncertainty.

System procedures contain check-off lists where appropriate.

Test and Inspection Procedures: Contain the objectives, acceptance criteria, prerequisites for performing the test or inspection, limiting conditions, and appropriate instructions for performing the test or inspection. These procedures also specify any special equipment or calibrations required to conduct the test or inspection and provide for appropriate documentation and evaluation by responsible authority to assure test or inspection requirements have been satisfied. Where necessary, hold or witness points are identified within the procedures and require appropriate approval for the work to continue beyond the designated point. These procedures provide for recording the date, identification of those performing the test or inspection, as-found condition, corrective actions performed (if any), and as-left condition, as appropriate for the subject test or inspection.

Revision O 43 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix B: Procedures (Continued)

While not specifically a procedure type, Temporary Procedures may be used to direct operations during testing, maintenance and modifications; to provide guidance in unusual situations not within the scope of normal procedures; and to insure orderly and uniform operations for short periods when the plant, a system, or a component of a system is performing in a manner not covered by existing detailed procedures, or has been modified or affected in such manner that portions of existing procedures do not apply. Temporary Procedures include designation of the period of time during which they may be used.

Revision 0 44 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix C: Definitions The definitions of terms as provided in Section 4 of the Introduction of NQA-1 1994 are used in interpreting the requirements of NQA-1 and other standards to which the QATR commits. In addition, definitions are provided for the following terms not covered in NQA-1:

Administrative Controls: Rules, orders, instructions, procedures, policies, practices and designations of authority and responsibility.

Emergency Procedures: See Appendix B.

Experiments: Performance of plant operations carried out under controlled conditions in order to establish characteristics or values not previously known.

Independent Assessment: Planned and documented activity performed to determine by investigation, examination, observation, or evaluation of objective evidence the adequacy of and compliance with established procedures, instructions, drawings, and other applicable documents, and to determine the effectiveness of implementation.

Independent Assessment, as used in this QATR, is considered equivalent to the term "audit".

Independent Review: Review completed by personnel not having direct responsibility for the work function under review whether they operate as part of an organizational unit or individual staff members (see Review).

Maintenance and Modification Procedures: Written procedures defining the policies and practices by which structures, mechanical, electrical and instrumentation and control systems, and components thereof, are kept in a condition of good repair or efficiency so that they are capable of performing their intended functions.

On-site Operating Organization: On-site personnel concerned with the operation, maintenance and certain technical services.

Operating Activities: Work functions associated with maintenance of the plant, and technical services routinely assigned to the on-site operating organization.

Operating Procedures: Written procedures defining the normal methods, means and limits of operation of, a plant system or systems, or processes, including actions to be taken by operating personnel for removal from and return to service equipment on which maintenance is to be or has been performed.

Quality Instruction: Any instruction or procedure that defines programmatic controls needed to implement the Quality Assurance Topical Report. These instructions and procedures consist of documents specifically identified as "Quality Instructions" and other equivalent administrative procedures and instructions. Quality Instructions do not include lower tier work procedures or instructions where the QA program controls are contained in other documents. For example, Quality Instruction includes the plant procedure or instruction that defines the programmatic requirements for control of M&TE but not the procedure for calibrating a particular piece of M&TE.

Revision O 45 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix C: Definitions (Continued)

Quality Related: This classification is applied to selected equipment, components, structures and services designed to support and/or protect the safety function of safety related equipment. Quality Assurance Program elements are applied with a graded approach to quality to an extent that is commensurate with the item's importance to safety.

Implementing documents establish program element. applicability.

These include those items or related services that are not safety related and are in one or more of the following categories:

1. Equipment, components and structures designed to meet seismic requirements or whose failure could:

(a) damage safety related equipment such that the equipment would be prevented from performing its safety function, or (b) result in releases exceeding the exposure guidelines of the Offsite Dose Calculation Manual.

2. Fire protection equipment, systems and features:

(a) that reasonable prevent fires from occurring that could result in a radiological hazard (b) that rapidly detect, control, and extinguish those fires that do occur and that could result in a radiological hazard; and (c) that ensure the risk of fire-induced radiological hazards to the public, environment and plant personnel is minimized.

The above definition addresses the minimum scope of Fire Protection Equipment that is classified as Quality Related.

3. A partial or total loss of function of a radioactive confinement system that could result in an accidental, unplanned, or uncontrolled release of radioactivity exceeding the Offsite Dose Calculation Manual limits.
4. Equipment whose failure under normal operating conditions or an anticipated transient, results in:

(a) exceeding a safety limit specified in the Technical Specifications, or (b) initiation of a UFSAR Design Basis Accident, or Revision O 46 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix C: Definitions (Continued)

5. Instrumentation, equipment, components, or structures required to be operable by the Technical Specifications.
6. Instrumentation that is essential to preventing or monitoring release of radioactive material to the environment which could exceed the guidelines of the Offsite Dose Calculation Manual.
7. Instrumentation used in post accident monitoring and classified as Category 3 in response to the requirements of Regulatory Guide 1.97. (Some Category 2 instruments may also be classified as Quality Related.)
8. Items or services that are subject to unique quality assurance requirements due to specific NRC imposed regulatory requirements.

Review: A deliberately critical examination, including observation of plant operation, evaluation of assessment results, procedures, certain comtemplated actions, and after-the-fact investigations of abnormal conditions.

Supervision: Direction of personnel activities or monitoring of plant functions by an individual responsible and accountable for the activities they direct or monitor.

Surveillance Testing: Periodic testing to verify that safety related structures, systems and components continue to function or are in a state of readiness to perform their functions, and to provide assurance that failures or substandard performance do not remain undetected and that the required reliability of safety related systems is maintained. Such functions include keeping parameters within normal bounds or acting to put the plant in a safe condition if they exceed normal bounds.

System: An integral part of nuclear power plant comprising components which may be operated or used as a separate entity to perform a specific function.

Revision O 47 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix D: Administrative Controls 1.0 Fire Protection 10 CFR 50.48(f) requires that licensees that have submitted the certification required under 50.82(a)(1) shall maintain a fire protection program to address the potential for fires that could cause the release or spread of radioactive materials. The Quality assurance program established for these fire protection SSCs ensures that design, procurement, instruction, procedures drawings, inspection, installation, testing, maintenance, operations, nonconforming items, corrective action, records, audits and administrative controls meet the applicable quality assurance guidelines as described in CMEB 9.5.1, Revision 2, Position C.4, "Quality Assurance Program" during decommissioning and permanent shutdown. Additionally, NRC Regulatory Guide 1.191 (May 2001) "Fire Protection Program for Nuclear Power Plants during Decommissioning and Permanent Shutdown" is used as guidance to implement 10 CFR 50.48(f). Engineering determines what fire protection SSCs are required to prevent fires, rapidly detect, control, and extinguish fires that do occur and could result in a radiological hazard and, minimize the risk to the public, environment, and plant personnel resulting from fires that could result in a release of radioactive materials. Engineering also establishes the requirements for the design, procurement, fabrication, installation and/or modification of these fire protection SSCs. All other fire protection equipment and supplies will be of commercial quality, in accordance with National Fire Protection Association (NFPA) guidelines.

Revision O 48 of 49 TBD

NextEra Energy Quality Assurance Topical Report (FPL-3)

Appendix E: Organization Chart ORGANIZATION RELATIONSHIPS OF KEY MANAGEMENT & FUNCTIONAL GROUPS (SITE) r*-*-*-*-*-*-* r*-*-*-*-*-*-*

Decommissioning .

I I

I Director Business *Nuclear Assurance 1 Operations Manager  !

. I L*-*-*-*-*-*J L*-*-*-*-*-*_;

RP/Chemistry

- Security Manager -

Manager Maintenance Engineering

- Manager Manager r * - * - * - * - * - * - * - * - * - * - * - * - * - * - * - * - * - * - * - * - *1

- Operations Manager Licensing/EP Manager

- i Denotes direct reporting relationship to corporate organization, i i but physically located at the site.  :

I L-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*j Certified Fuel Handlers Revision 0 49 of 49 May 28, 2019

Enclosure 2 to NG-20-0006 NextEra Energy Duane Arnold, LLC Quality T apical Report Change Summary 14 pages follow

t Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold . LLC 's Quality Assurance Topical Report (FPL-3) Revision 0 NextEra Energy Duane Arnold, LLC Quality Assurance Topical Report Change Summary February 2020 S ecific Chan es from Fleet QATR FPL-1 to Duane Arnold QATR FPL-3 Change(s) Evaluation and Justification This change identifies The policy statement's purpose No. The changes QATR FPL-3 as specific to and intent remains the same. reflect the the permanently shut down Changes to the Policy Statement permanently shut Duane Arnold Energy are considered editorial changes down condition and Center (DAEC) and that do not reduce the continue to provide clarifies that DAEC is no effectiveness or commitments to descriptive text for longer "operating." the technical requirements of the implementation of QATR. the Quality Assurance Program Throughout the QATR revision, (QAP) . Reference terms such as "unit", "operation", 10 CFR 50.54(a)(3).

which are typically associated with an operating reactor, have been replaced with terms such as "facility", "maintained" and "activities" to reflect the shut-down plant condition.

Section A.8 , "Other Changes to the Table of Contents No.

General Guidance are considered editorial changes Documents" added . that do not reduce the Appendix D was "Revision effectiveness or commitments to Summaries", changed to the technical requirements of the "Administrative Controls". QATR or regulatory and industry standards.

This change identified Changes to the Introduction are No.

QATR FPL-3 as specific to considered editorial changes that the permanently shut down do not reduce the effectiveness DAEC. or commitments to the technical re uirements of the QATR.

Removed reference to Aging Management Programs Yes, the removal of "non-safety related and license renewal reference to Aging structures and components commitments are described in Management subject to an Aging the Updated Final Safety Programs and Management Program Analysis Report (UFSAR) for license renewal (AMP) for license renewal." DAEC. These programs and commitments is 1

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold . LLC 's Quality Assurance Topical Report (FPL-3) Revision 0 commitments will continue to be considered a controlled by the 10 CFR 50 .59 reduction in process. Removing them from commitment and, in the QATR allows them to be accordance with 10 changed as necessary CFR 50.54(a)(4), will throughout the decommissioning need to be reviewed process in accordance with 10 and approved by the CFR 50 .59. NRG. The proposed revision continues to satisfy the criteria of 10 CFR 50 ,

Appendix B; 10 CFR 71, Subpart Hand 10 CFR 72, Subpart G.

Methodology was revised Changes to the Methodology No.

to indicate DAEC only and are considered editorial changes to clarify that the facility will that do not reduce the no longer be an "operating" effectiveness or commitments to facility, that refueling will the technical requirements of the no longer occur, and that QATR or regulatory and industry plant reliability and standards. Terms associated with availability will no longer an operating unit, such as apply to DAEC. "refueling" and "operation" are removed or replaced with terms such as "fuel handling" to reflect the shut-down status of DAEC.

Compliance commitments The changes lo.

reflect change from No.

in several QATR sections a fleet QATR to a DAEC only are changed from "NextEra QATR. Changes are considered commits to" to "NextEra editorial changes that do not commits the DAEC to." reduce the effectiveness or commitments to the technical Sections impacted: requirements of the QATR or A.1 Methodology regulatory and industry A.2 Organization standards.

A.3 Responsibility A.4 Authority A.5 Personnel Training and Qualification A.6 Corrective Actions A. 7 Regulatory Commitments B.2 Desi n Control 2

Enclosure to NG -~0-0006 Request for Approval of NextEra Energy Duane Arnold, LLC's Quality Assurance Topical Report (FPL-3) Revision O B.3 Design Verification B.4 Procurement Control B.5 Procurement Verification B.6 Identification and Control of Items B.7 Handling, Storage and Shipping B.8 Test Control B.9 Measuring and Test Equipment Control B.10 Inspection, Test and Operating Status B.11 Special Test Control B.12 Inspection B.13 Corrective Action B.14 Document Control B.15 Records B.16 Plant Maintenance B.17 Computer Software Control C.1 Methodology A endix B Procedures This is a complete rewrite Changes to the organization are No. The changes to reflect the plant shut- considered administrative and do reflect the down status in lieu of the not impact the reporting permanently shut fleet organization . A relationships with the Chief down condition and number of changes were Nuclear Officer (CNO). The continue to provide made by streamlining changes continue to provide descriptive text for organizational functions descriptive text for organizational implementation of and consolidating position titles and functions. The the QAP. Reference responsibilities. station top level management 10 CFR 50.54(a)(3).

These organizational position and corporate changes are also reflected management position for Nuclear in other sections of the Assurance continue to report to QATR. the CNO , which is consistent with previous organizational relationshi s for QATR functions .

Operating personnel The intent of the QATR is to No. The changes responsibilities were describe appropriate and reflect the reduced to reflect the sufficient requirements to permanently shut DAEC shutdown, establish how the QATR meets down condition and non-o eratin status. 10 CFR 50 A endix B while continue to rovide 3

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold, LLC's Quality Assurance Topical Report (FPL-3) Revision 0 allowing flexibility in the manner descriptive text for by which a requirement is met. implementation of This reduction reflects the the OAP. Reference change from operations 10 CFR 50.54(a)(3).

responsibilities from an operating to a shut-down lant.

Changes to this section After certifications of permanent No. The changes reflect the DAEC shut- cessation of operations and of reflect the down status and remove permanent removal of fuel from permanently shut requirements for training at the reactor vessel for DAEC, the down condition and an operating station . 10 CFR Part 50 license will continue to provide longer require licensed reactor descriptive text for operators to support plant implementation of operating activities. A Certified the OAP . Reference Fuel Handler Training Program 10 CFR 50.54(a)(3) .

was approved by the NRG by letter dated August 28, 2019 ML19204A287 .

Requirements for the new A Certified Fuel Handler Training Yes, the change in "Certified Fuel Handler" Program was approved by the requirements for the position applicable to the NRG by letter dated August 28, Certified Fuel shut-down DAEC are 2019 (ML19204A287). Handler is defined . considered a reduction in commitment and, in accordance with 10 CFR 50.54(a)(4),

must be reviewed and approved by the NRG . A Certified Fuel Handler Training Program was approved by the NRG by letter dated August 28 , 2019 ML19204A287 .

Removed "except Point These changes reflect the No.

Beach" and "operations applicability of FPL-3 to DAEC phase" from the section and the status of DAEC as a related to independent shut-down facility. Changes are quality verification. Also considered editorial changes that removed paragraph do not reduce the effectiveness specific to Point Beach. or commitments to the technical re uirements of the QATR.

4

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold , LLC 's Quality Assurance Topical Report (FPL-3) Revision 0 Regulatory Guide 1.8 After certifications of permanent Yes, the change in changes remove cessation of operations and of requirements for requirements related to permanent removal of fuel from training of positions training of positions the reactor vessel for DAEC the identified in identified in 10CFR50.120 10 CFR Part 50 license will 10CFR50.120 is that are accomplished longer require licensed reactor considered a according to programs operators to support plant reduction in accredited by the National operating activities. A Certified commitment and, in Nuclear Accreditation Fuel Handler Training Program accordance with 10 Board of the National was approved by the NRC by CFR 50.54(a)(4),

Academy for Nuclear letter dated August 28, 2019 must be reviewed Training. (ML19204A287). and approved by the NRC. A Certified Fuel Handler Training Program was approved by the NRC by letter dated August 28, 2019 ML19204A287 .

Regulatory Guide 1.28 was A review of the DAEC UFSAR No.

removed. found that Regulatory Guide 1.28 is listed as historical and is not considered a commitment at DAEC.

Regulatory Guide 1.36 was The fleet QATR made no generic No.

removed . commitment to Regulatory Guide 1.36 . A review of the DAEC UFSAR identified no commitment to Re ulator Guide 1.36.

Regulatory Guide 1.54 was The fleet QATR identified this as No.

removed . a site specific commitment. A review of the DAEC UFSAR identified no commitment to Re ulator Guide 1.54.

Regulatory Guide 1.97; This reference was included as No.

remove a sentence related clarification in the fleet QATR.

to "each plant UFSAR". This sentence is no longer required as a clarification in the stand alone DAEC QATR.

5

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold. LLC's Quality Assurance Topical Report (FPL-3) Revision 0 Regulatory Guide 1.143; This reference was included as No.

revise sentence to remove clarification in the fleet QATR.

fleet wording on site This sentence was revised to specific requirements. identify clarification in the stand alone DAEC QATR.

Regulatory Guide 1.152 The fleet QATR identified that No.

was removed. this may be used for plant modifications on a case-by-case basis. A review of the DAEC UFSAR identified no commitment to Regulatory Guide 1.152.

Regulatory Guide 1.155; This reference was included as No.

revise sentence to remove clarification in the fleet QATR.

fleet wording on site This sentence was revised to specific requirements. identify clarification in the stand alone DAEC QATR.

Branch Technical Position Refer to discussion for Appendix Yes, the removal of CMEB 9.5-1 paragraph D, "Administrative Controls", "1.0 reference to Branch has been removed. Fire Protection". Technical Position CMEB 9.5-1 is considered a reduction in commitment and, in accordance with 10 CFR 50.54(a)(4),

will need to be reviewed and approved by the NRC. The NRC is currently reviewing License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3}, Fire Protection, dated 9/25/2019.

(ML19290G447)

The paragraph "for plants Refer to discussion for Appendix Yes, the removal of with an NFPA 805 fire D, "Administrative Controls", reference to NFPA protection licensing "1.0 Fire Protection". 805 is considered a bases ... " reduction in commitment and, in 6

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold, LLC's Quality Assurance Topical Report (FPL-3) Revision 0 accordance with 10 CFR 50.54(a)(4),

will need to be reviewed and approved by the NRC. The NRC is currently reviewing License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection, dated 9/25/2019.

(ML19290G447)

Generic Letter 85-06 was Generic Letter 85-06 Yes, the removal of removed. requirements apply to an DAE C's operating station. In the defueled commitment to GL condition, these requirements no 85-06 is considered longer apply to DAEC. a reduction in commitment and, in accordance with 10 CFR 50.54(a)(4),

will need to be reviewed and approved by the NRC. Following permanent shut down, the proposed revision continues to satisfy the criteria of 10 CFR 50, Appendix B; 10 CFR 71, Subpart H and 10 CFR 72, Subpart G.

Confirmatory Order This statement included in the Yes, the removal of Number EA-08-172 was fleet QATR committed to a fleet DA'EC's removed. security organization for oversight commitment to of fleet facilities. This QATR is Order EA-08-172 is applicable to DAEC only and considered a does not take credit for the fleet reduction in security organization related to commitment and, in operating plants. accordance with 10 CFR 50.54(a)(4),

7

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold . LLC 's Quality Assurance Topical Report (FPL-3) Revision 0 will need to be reviewed and approved by the NRG. Following permanent shut down, the proposed revision continues to satisfy the criteria of 10 CFR 50, Appendix B; 10 CFR 71, Subpart H and 10 CFR 72, Subpart G.

The paragraph describing The requirements identified are No. The changes NextEra nuclear plants applicable to plants with a reflect the with a renewed Facility renewed operating license. In the permanently shut Operating License defueled condition, DAEC will no down condition and commitment to NUREG- longer maintain an operating continue to provide 1800 and/or NUREG-1801 license and the requirements descriptive text for elements was removed . related NUREG-1800 and/or implementation of NUREG-1801 elements no longer the QAP. Reference a I to DAEC. 10 CFR 50.54 a 3 .

"A.8 Other General NUREG/CR 6407 is already No. The changes Guidance Documents" was identified in DAEC Independent reflect the added to identify Spent Fuel Storage Installation permanently shut NUREG/CR-6407 as a implementing documents as a down condition and guidance document. guidance document and no continue to provide additional commitments are descriptive text for added. This is an administrative implementation of change. the QAP. Reference 10 CFR 50.54 a) 3 .

Removed "start-up" and This is an administrative change No. The changes "operations" from the to identify that "start-up" and reflect the paragraph. "operations" are no longer permanently shut applicable to the permanently down condition and shut down DAEC . continue to provide descriptive text for implementation of the QAP. Reference 10 CFR 50.54 a 3 .

This is an administrative change to identify that "plant operation" and "refuelin " are no Ion er 8

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold. LLC's Quality Assurance Topical Report (FPL-3) Revision 0 applicable to the permanently down condition and shut down DAEC. continue to provide descriptive text for implementation of the QAP. Reference 10 CFR 50.54 a 3 .

Removed "during normal This is an administrative change No. The changes operations and to identify that "normal operations reflect the maintenance activities, and maintenance activities, permanently shut including refueling" from including refueling" no longer down condition and the paragraph on apply to the DAEC in the continue to provide housekeeping practices. permanently shut down condition. descriptive text for implementation of the QAP . Reference 10 CFR 50.54(a)(3) .

Removed wording related This is an administrative change No. The changes to "operation of the plant" to identify that "operation of the reflect the and "inservice tests, and plant" and "inservice tests, and permanently shut operational tests". operational tests" are no longer down condition and applicable to the permanently continue to provide shut down DAEC. descriptive text for implementation of the QAP. Reference 10 CFR 50.54 a 3.

Removed "Inspections These inspection requirements No. The changes may also be applied to apply to an operating station. In reflect the items, services and the permanently shut down permanently shut activities affecting plant condition, these inspection down condition and reliability." requirements no long apply to continue to provide DAEC. descriptive text for implementation of the QAP. Reference 10 CFR 50.54 a 3.

Removed: "Consideration The sentence refers to long term Yes, this change is is given to phased replacement of components. considered a replacement to permit Supplement to License reduction in inservice performance to Amendment Request (TSCR- commitment and, in be evaluated and minimize 183) Application to Revise accordance with 10 the possibility of systemic Technical Specifications for the CFR 50.54(a)(4),

failure." Permanent! Defueled Condition, will need to be 9

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold. LLC's Quality Assurance Topical Report (FPL-3) Revision 0 dated 9/12/2019, (ML19261A141) reviewed and proposed that lnservice testing in approved by the accordance with 10 CFR 50 .55a NRC . The NRC is will no longer be required once currently reviewing the reactor is permanently shut Supplement to down and defueled. License Amendment Request (TSCR-183) Application to Revise Technical Specifications for the Permanently Defueled Condition, dated 9/12/2019, ML19261A141 Several revisions were These administrative changes No. The changes incorporated to clarify were incorporated to clarify the reflect the operation conditions and shut-down versus operating permanently shut new organization titles for status of DAEC and identify down condition and the permanently shut down system versus plant operation continue to provide DAEC. and positions identified for post descriptive text for shut down. implementation of the QAP. Reference 10 CFR 50.54 a 3 .

Review of emergency The number and complexity of Yes, the removal of operating procedures and emergency operating procedures DAEC's biennial off-normal procedures and off-normal procedures is review of every two years was greatly reduced following emergency removed. permanent shutdown of the operating DAEC . Due to the small procedures and off-numbers of these procedures and normal procedures their reduced complexity, a is considered a biennial comprehensive review is reduction in no longer necessary. commitment and, in accordance with 10 CFR 50.54(a)(4),

will need to be reviewed and approved by the NRC . Following permanent shut down, the proposed revision continues to satisfy the criteria of 10 CFR 50, 10

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold. LLC's Quality Assurance Topical Report (FPL-3) Revision 0 Appendix B; 10 CFR 71, Subpart Hand 10 CFR 72, Subpart G.

The words "in support of DAEC will not be in operation No.

plant operation" were following shut down and records removed. will not be dependent on the operational status . This is considered an editorial chan Wording describing Words were revised to indicate No. The changes "plants" and "committees" applicability of the QATR to the reflect the and "operation" revised . shut-down DAEC only. This is permanently shut considered an administrative down condition and change . continue to provide descriptive text for implementation of the OAP . Reference 10 CFR 50.54 a 3.

The listing of non- Non-regulatory independent Yes, the removal of regulatory independent assessments are subject to non-regulatory assessments and their change following DAEC independent periodicity requirements shutdown . Requirements for assessments and are removed from Table 1 performance and periodicity for their periodicity and will be performed per non-regulatory independent requirements is procedural requirements. assessments will be controlled by considered a Regulatory independent procedures and are not required reduction in assessments are now to be identified in the QATR. commitment and, in listed in Table 1. Table 2 Assessment of Appendix B accordance with 10 was removed . requirements contained within CFR 50 .54(a)(4) ,

non-regulatory programs will will need to be continue to be assessed. reviewed and Independent assessment of approved by the regulatory topics remains NRC. Following unchanged. permanent shut down, the proposed revision continues to satisfy the criteria of 10 CFR 50, Appendix B; 10 CFR 71, Subpart Hand 10 CFR 72, Subpart G.

11

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold. LLC's Quality Assurance Topical Report (FPL-3) Revision O Wording was revised to These changes are No. The changes remove reference to fleet administrative and reflect the reflect the sites, to include DAEC shut-down status of DAEC. permanently shut shutdown organizational Wording was revised to reflect down condition and positions, and to remove applicability of this OATR continue to provide reference to DAEC to DAEC only, to include DAEC

  • descriptive text for operation . shut-down organizational implementation of positions, and to reflect the non- the OAP. Reference operation, shutdown status of 10 CFR 50.54(a)(3) .

DAEC.

Wording was revised to These changes are No. The changes remove reference to fleet administrative and reflect the reflect the sites and to remove shut-down status of DAEC. permanently shut reference to DAEC Wording was revised to reflect down condition and operation. applicability of this OATR continue to provide to DAEC only and to reflect the descriptive text for non-operation, shutdown status implementation of of DAEC. the OAP. Reference 10 CFR 50.54 a 3 .

Wording of the "Fuel Following DAEC shutdown, No. The changes Handling Procedures" fuel handling procedures will not reflect the section was revised to be required for refueling or permanently shut remove references to certain operational requirements. down condition and DAEC operation. The procedure requirements continue to provide reflect only those activities descriptive text for required for fuel handling in and implementation of removal from the spent fuel pool. the OAP. Reference 10CFR50.54a 3.

Removed sections on Power Operation and Load No. The changes Power Operation and Load Handling Procedures, Process reflect the Handling Procedures, Monitoring Procedures, permanently shut Process Monitoring Shutdown Procedures, and Start- down condition and Procedures, Shutdown up Procedures are required only continue to provide Procedures, and Start-up for plant operation. These descriptive text for Procedures. procedures are not required implementation of during DAEC shut-down . the OAP. Reference 10 CFR 50.54 a 3.

Definitions for "Nuclear The changes reflect the change No. The changes Power Plant", "Off Normal of DAEC from an operating reflect the Condition Procedures" and nuclear power plant to a permanently shut "Operational Phase" were shutdown facility. Removed down condition and removed. The definition for definitions are not re uired durin continue to rovide 12

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold, LLC's Quality Assurance Topical Report (FPL-3) Revision 0 "Operating Activities" was the shutdown phase. descriptive text for revised to remove implementation of references to nuclear the OAP. Reference power plant and normal 10 CFR 50.54(a)(3).

o eration.

The definition of "Quality The revisions reflect the change Yes, the revision of Related" pertaining to fire of requirements pertaining to "Quality Related" protection equipment, DAEC as a shutdown facility pertaining to fire systems and features was instead of an operational nuclear protection revised . plant. More detail is included in equipment, systems changes to Appendix D and features is discussed below. considered a reduction in commitment and, in accordance with 10 CFR 50.54(a)(4),

will need to be reviewed and approved by the NRC . The NRC is currently reviewing License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3) , Fire Protection, dated 9/25/2019.

ML192908447 Appendix D General The OAP will be applied to the Yes, the revision of Administrative Fire Protection program "Quality Related" Requirements. implemented at the permanently pertaining to fire This section was not shut down DAEC in accordance protection previously contained in the with 10 CFR 50.48(f) and equipment, systems QATR FPL-1. This new Regulatory Guide 1.191. and features is section contains considered a

  • requirements for Fire reduction in Protection, describing commitment and, in program requirements for accordance with 10 a decommissioning facility. CFR 50.54(a)(4), will need to be reviewed and approved by the NRC. The NRC is 13

Enclosure to NG-20-0006 Request for Approval of NextEra Energy Duane Arnold, LLC 's Quality Assurance Topical Report (FPL-3) Revision 0 License Amendment Request (TSCR-186): Removal of License Condition 2.C.(3), Fire Protection, dated 9/25/2019. -

ML19290G447 Fleet and operational Changes to the organization are No. The changes phase typical site considered administrative and do reflect the organizational charts were not impact the reporting permanently shut replaced with the relationships with the Chief down condition and Organizational Chart for Nuclear Officer (CNO). The continue to provide the shut-down DAEC. station top level management descriptive text for position and corporate implementation of management position for Nuclear the QAP. Reference Assurance continue to report to 10 CFR 50.54(a)(3).

the CNO .