ND-21-0296, ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.iii.b (Index Number 804)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 3.3.00.07d.iii.b (Index Number 804)
ML22209A008
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/28/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-21-0296
Download: ML22209A008 (6)


Text

Jamie M. Coleman 7825 River Road Regulatory Affairs Director

._ Southern Nuclear Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6926 tel JUL 2 8 2022 Docket No.: 52-025 ND-21-0296 10 CFR 52.99(c)(1)

U.S . Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.0?d.iii .b (Index Number 804]

Ladies and Gentlemen :

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Comm ission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.0?d .iii.b (Index Number 804] . This ITAAC verified that physical separation is maintained between Class 1E divisions and between Class 1E divisions and non-Class 1E cables inside the non-radiologically controlled area of the auxiliary building. The closure process for this ITAAC is based on the guidance described in NEl-08-01 , "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52 ," which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Fede ral Register per 10 CFR 52 .99.

If there are any questions, please contact Kelli Roberts at 706-848-6991 .

Respectfully submitted ,

~cd,~

Jamie M. Coleman Regulatory Affairs Directo r Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.0?d.iii.b (Index Number 804]

JMC/CMK/sfr

U.S. Nuclear Regulatory Commission ND-21-0296 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. Pitts Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR .01 .02.06 Nuclear Regulatory Commission Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C . Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-21-0296 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W . Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W . R. Jacobs, Jr., Ph.D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-21-0296 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-21-0296 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 3.3.00.07d.iii.b [Index Number 804]

U.S. Nuclear Regulatory Commission ND-21-0296 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 7.d) Physical separation is maintained between Class 1E divisions and between Class 1E divisions and non-Class 1E cables.

Inspections, Tests, Analyses Inspections of the as-built raceways that route Class 1E cables will be performed to confirm that the separation between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables is consistent with the following:

iii) Where minimum separation distances are not maintained , the circuits are run in enclosed raceways or barriers are provided.

Acceptance Criteria Results of the inspection will confirm that the separation between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables is consistent with the following:

iii.b) Where minimum separation distances are not met inside the non-radiologically controlled area of the auxiliary building, the circuits are run in enclosed raceways or barriers are provided.

ITAAC Determination Basis Multiple ITAAC are performed to ensure that physical separation is maintained between Class 1E divisions and between Class 1E divisions and non-Class 1E cables. In accordance with this ITAAC, physical separation for circuits that do not meet the separation distance criteria of ITAAC 3.3.00.0?d.ii.b may be provided by enclosed raceways or barriers . For circuits requiring enclosed raceways or barriers, the subject ITAAC requires inspections of the raceways that route Class 1E cables and raceways that route non-Class 1E cables inside the non-radiologically controlled area of the auxiliary building to confirm that circuits are run in enclosed raceways or have barriers provided. The Class 1E cables and raceways and non-Class 1E cables inside the non-radiologically controlled area of the auxiliary building are designed to be appropriately separated in accordance with APP-GW-E1-001 (Reference 1). Installation specifications provided to the constructor identify the separation criteria, consistent with the ITAAC commitment.

Class 1E electrical cables, raceways, and barriers were installed in accordance with design drawings. Installation specifications issued for construction , and work package requirements.

Completed raceway installation, in-progress and completed cable installation, completed cable terminations, and barriers were inspected to ensure the separation installation specifications are satisfied. Inspections were performed in accordance with the Construction Quality Verification Program, 26139-000-4MP-T81C-N7101 (Reference 2), or the Quality Control Inspection Program, ND-EN-VNP-020 (Reference 5). The completed inspection records document the satisfactory separation between raceways that route Class 1E cables of different

U.S. Nuclear Regulatory Commission ND-21-0296 Enclosure Page 3 of 3 divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables.

Additional inspections were performed and documented following completion of Class 1E raceway in each room to confirm that separation requirements between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1E cables and raceways that route non-Class 1E cables are met. Reference 3 identifies the inspections performed and confirms that the separation between raceways that route Class 1E cables of different divisions, and between raceways that route Class 1 E cables and raceways that route non-Class 1E cables is consistent with the following :

Where minimum separation distances are not maintained inside the non-radiologically controlled area of the auxiliary building, the circuits are run in enclosed raceways or barriers are provided.

Exceptions to the subject ITAAC are not included within the scope of this ITAAC and are addressed within the scope of ITAAC 3.3.00.0?d .iv.b or ITAAC 3.3.00.0?d .v.b.

The Cable Separation Report (Reference 3) is available for NRC inspection as part of the Unit 3 ITAAC 3.3.00.0?d.iii.b Completion Package (Reference 4).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of all lTAAC findings and associated corrective actions.

This review found no relevant ITAAC findings associated with this ITAAC and is documented in Reference 4.

ITAAC Completion Statement Based on the above information , SNC hereby notifies the NRC that ITAAC 3.3.00.0?d .iii .b was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components ve rified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. APP-GW-E1 -001, Electrical Systems Design Criteria
2. 26139-000-4MP-T81 C-N7101 , Construction Quality Verification Program
3. SV3-1200-ITR-AUXNRD , Unit 3 Cable Separation Report for the Non-Radiologically Controlled Area of the Auxil iary Building
4. 3.3.00.07d .iii.b-U3-CP-Rev0 , ITAAC Completion Package
5. ND-EN-VNP-020 , Quality Control Inspection Program