| Start date | Site | Title |
---|
IR 05000317/2023004 | 1 February 2024 | Calvert Cliffs | Integrated Inspection Report 05000317/2023004 and 05000318/2023004 |
IR 05000321/2023004 | 31 January 2024 | Hatch | Integrated Inspection Report 05000321/2023004 and 05000366/2023004 |
IR 05000352/2023003 | 27 October 2023 | Limerick | Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 |
IR 05000528/2023003 | 17 October 2023 | Palo Verde | Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 |
ML23292A144 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 15, Section 15.2, Increase in Reactor Pressure |
ML23292A157 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15A, Nuclear Safety Operational Analysis (Nsoa) |
ENS 56759 | 27 September 2023 15:41:00 | Monticello | Actuation of Reactor Protection and Containment Isolation Systems |
IR 05000277/2023002 | 8 August 2023 | Peach Bottom | Integrated Inspection Report 05000277/2023002 and 05000278/2023002 |
ML23212B236 | 31 July 2023 | Limerick | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents |
IR 05000346/2023002 | 27 July 2023 | Davis Besse | Integrated Inspection Report 05000346/2023002 |