U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285)
ML22265A026
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/26/2022
From: Jack Parrott
Reactor Decommissioning Branch
To: Uehling T
Omaha Public Power District
Jack Parrott, 301-415-6634
References
Download: ML22265A026 (3)


Text

September 26, 2022 Timothy S. Uehling Senior Director Decommissioning Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-4 9610 Power Lane Blair, NE 68008

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF OMAHA PUBLIC POWER DISTRICTS DECOMMISSIONING FUNDING STATUS REPORT FOR FORT CALHOUN STATION, UNIT NO. 1, DOCKET NO. 50-285

Dear Timothy Uehling:

By letter dated March 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) received your decommissioning funding status (DFS) report (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22090A078 (Non-Public)) for Fort Calhoun Station, Unit No. 1 (Fort Calhoun).

The NRC has reviewed and analyzed the site-specific decommissioning cost estimate, as required in Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(4)(i), Termination of license - For power reactor licensees, and the amount(s) stated within the licensees decommissioning trust fund, as of December 31, 2021, for the above plant, as well as earnings assumptions. Based on the reported decommissioning trust balance, together with earnings credits specified under NRC regulations, the NRC has determined that as of December 31, 2021, Omaha Public Power District (OPPD), is providing a total amount of decommissioning funding assurance in the amount of $519,701,336 for Fort Calhoun.

This letter confirms the correspondence, described above, regarding DFS reports for permanently shut down power reactors as required under 10 CFR 50.82(a)(v) - (vi). As of the date of this letter, considering the available information, the NRC has determined that OPPD has satisfied the decommissioning funding assurance requirements of 10 CFR 50.82 for Fort Calhoun on December 31, 2021.

In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC website at https://www.nrc.gov/reading-rm/adams.html.

T. Uehling If you have any questions in this matter, please call me at (301) 415-6634 or e-mail me at Jack.Parrott@nrc.gov.

Sincerely, Signed by Parrott, Jack on 09/26/22 Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-285 Cc:

Andrea K. Barker, OPPD abarker@oppd.com Fort Calhoun ListServ

Ltr ML22265A026 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME JParrott JP SAnderson SA JParrott JP DATE Sep 22, 2022 Sep 26, 2022 Sep 26, 2022