Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations
ML22175A066
Person / Time
Site: Kewaunee  Dominion icon.png
Issue date: 06/17/2022
From: Sauger J
EnergySolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
ES-2022-011
Download: ML22175A066 (3)


Text

PERSONALLY IDENTIFIABLE INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390

. ~


ENERGYSOLUTIONS=================

June 17, 2022 ES-2022-011 U.S. Nuclear Regulatory Commission AT1N: Document Control Desk Washington, DC 20555-0001

Subject:

Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations Kewaunee Power Station NRC License No. DPR-43 NRC Docket Nos. 50-305 and 72-64

References:

1) Letter from Stoddard, D.G. (Dominion Energy Kewaunee, Inc.), and Robuck, K. W.

(EnergySolutions LLC), "Application for Order Approving Transfer of Control of KPS License and Conforming License Amendments," dated May 10, 2021.

2) NRC Order EA-07-195, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Certain Spent Fuel Storage Licensees - Kewaunee Power Station Independent Spent Fuel Storage Installation, dated January 28, 2008.
3) Letter from van Noordennen, G. (EnergySolutions LLC)," Designation of Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations."

dated January 5, 2022.

4) Letter from Wharton, L. Raynard, USNRC to Gerry van Noordennen, ZionSolutions, LLC, "Acknowledgement of Reviewing Official Related to Order (EA-11-268)

Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Zion Nuclear Power Station Independent Spent Fuel Storage Installation,"

dated October 27, 2015.

Dominion Energy Kewaunee, Inc. (DEK) and EnergySolutions, LLC, (EnergySolutions) submitted an "Application for Order Approving Transfer of Control ofKPS License and Conforming License Amendments" for Kewaunee Power Station (KPS) to the U.S. Nuclear Regulatory Commission (NRC) for review in a letter dated May 10, 2021 (Reference 1).

In accordance with the Order referenced above (Reference 2) and 10 CFR Part 3 7 Program, EnergySolutions has designated Ms. Eileen Moore (Security Manager) to be the reviewing official for information from background investigations for access authorization at the KPS Independent Spent Fuel Storage Installation (ISFSI) upon transfer of the license from DEK to UPON SEPARATION OF THE ATTACHMENT, ;J!'j5SZ~

THIS LETTER IS DECONTROLLED

v/'-fS S

EnergrSolutions ES-2022-011 Page 2 of2 EnergySolutions. The letter requesting approval of Ms. Moore to act as a reviewing official for the KPS ISFSI and the 10 CFR Part 37 Program was submitted on January 5, 2022 (Reference 3).

EnergySolutions, further requests the approval of Marie Boothe-Anderson (currently designated as a reviewing official for the Zion Nuclear Power Station ISFSI, Reference 4) as an additional reviewing official at KPS. EnergySolutions, consistent with their 10 CFR 73.56 Access Authorization Program, will approve the above individual for unescorted access at the KPS ISFSI and for the Part 3 7 Program.

The attachment contains personally identifiable information for Ms. Boothe-Anderson; accordingly, EnergySolutions requests that the Attachment be withheld from public disclosure in accordance with 10 CFR 2.390 (a)(6).

EnergySolutions requests a response to this letter by June 27, 2022, indicating whether this individual is accepted to act as a reviewing official for the KPS ISFSI and the 10 CFR Part 3 7 Program.

If there are questions regarding this matter, please contact J. R. Lynch at (508) 728-1421.

I declare under penalty of perjury that the foregoing is~&'~~~ Executed on this 13 th day of June 2022. ,,,, h...~~-***** G/ L--..,,.,...., . ~ vnJ

'~ c..r-**

.:, /

-~ ** ** s,/1..,. ******

,-,,7:: \

~C\

\J'.

0,:.

~-:. ~ .

A

  • rt Qi- * -? - (I\_,

~

§ { NN0N£ss1:1:

-o-.

- '

  • p Tl'Ry ,...

r ~~---

i

§ ~f '{)_,,/7,/)}JJ.3 ft

~ &**** uauc /\ ~

~ ** ,t....._ '

John T. Sauger  ; , ,'A VQ**Ji **********

I .

...._X_, , ,'

\),\._

CQ ,,,

President and Chief Nuclear Officer 1,,,0,.,,,,,,

'11 'V

Attachment:

Designated Reviewing Official (Personally Identifiable Information :.. Withhold Under 10 CFR 2.390) cc: w/o Attachment Mr. Karl Sturzebecher NRC Project Manager- Kewaunee Power Station U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

EnergySolutions ES-2022-011 Page 3 of2 NRC Region III Administrator U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission AT1N: Source Management and Protection Branch Washington, DC 20555-0001