2022-04-04 Mjf 22-002 M220058 Security Plan PSP RAI Cover
ML22132A272
Person / Time
Site: Vallecitos Nuclear Center, 07000754
Issue date: 04/04/2022
From: Feyrer M
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Material Safety and Safeguards
Hardesty D
References
EA-14-144, M220058
Download: ML22132A272 (2)


Text

GE Hitachi Nuclear Energy Matt Feyrer

  • HITACHI Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd.

Sunol CA 94586 Security-Related and Proprietary Information Notice USA to this letter contains GE-Hitachi Nuclear Energy security T (910) 233-6121 related and proprietary information to be withheld from public matt.feyrer@ge.com disclosure in accordance with 10 CFR 2.390. Enclosure 2 Contains Safeguards information pursuant to 10CFR73.21. Upon removal of enclosures the balance of this letter may be made public.

M220058 April 4, 2022 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852

Subject:

GEH Revised Vallecitos Nuclear Center (VNC) Site Physical Security Plan (PSP)

References:

1) NRG License R-33, Docket 05000073
2) NRG License SNM*960, Docket 07000754
3) NRC Confirmatory Order EA-14-144, 4/22/2015
4) Letter M.J. Feyrer (GEH) to Director, Office of Nuclear Safety and Safeguards, GEH Revised VNC Site Physical Security Plan (PSP), 3/20/2019
5) GEH Revised VNC Site Physical Security Plan {PSP), 12/16/2021
6) Telephone conversation between M. Takacs and D. Hardesty (NRG), and D.

Heckman (GEH) on 2/1/2022.

7) Letter D. Collins (NRC) to D. Turner (GEH), Site-Specific Security Assessment Reports, 12/11/2006 GE Hitachi Nuclear Energy Americas LLC (GEH) hereby submits a revised VNC Site Physical Security Plan (PSP). This 4/4/2022 revision includes edits to the PSP that was submitted on 12/16/2021 (Ref 5) for NRC approval pursuant to 10 CFR 50.90. These edits are benefited by NRC input as discussed by telephone on 2/1/2022 (Ref 6). This revision replaces in its entirety the previous plan dated 3/20/2019 (Ref 4).

Pursuant to 10 CFR 73.67(c)(2), GEH requests 60 days to fully implement this PSP from the date approved by the NRG.

This letter is submitted under oath or affirmation according to RIS 01-018. Upon removal of the enclosures this transmittal letter may be decontrolled. Enclosure 1 may be removed and treated as Security Related Information.

Director, NMSS U.S. NRC GEH Revised VNC Site Physical Security Plan M220058 Page 2 of 2 April 4, 2022 If you have any questions regarding this matter, please contact me.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

'1 7

>signature Executed On (Date)

Matt Feyrer, Site Manager Vallecitos Nuclear Center : GEH Physical Security Plan Table of Changes (Security-Related Information) : Revised VNC Site Physical Security Plan, April 4, 2022 (Safeguards Information) cc: NRC Region IV Administrator, Arlington, TX D. Hardesty, NRC NRR/DANU/UNPL (w/o enclosures)

MJF 22-002