ML22129A132

From kanterella
Jump to navigation Jump to search
10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report
ML22129A132
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/09/2022
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML22129A132 (14)


Text

Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 May , 2022 10 CFR 50.59 10 CFR 72.48 10 CFR 50.71 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report

Reference:

TVA letter to NRC, 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report, dated November 2, 2020.

In accordance with 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2), Enclosure 1 is the Sequoyah Nuclear Plant (SQN), Units 1 and 2, Summary Report regarding the implemented changes, tests, and experiments for which evaluations were performed in accordance with 10 CFR 50.59(c) and 10 CFR 72.48(c). The summarized evaluations provided in the enclosure were implemented since the Reference Letter through April 14, 2022.

Since last reported in the Reference Letter, SQN has revised a regulatory commitment in accordance with NEI 99-04, the Nuclear Energy Institute's "Guidelines for Managing NRC

[Nuclear Regulatory Commission] Commitment Changes," as endorsed in NRC Regulatory Issue Summary 2000-17. The commitment change summary is provided in the Enclosure 2.

U.S. Nuclear Regulatory Commission Page 2 May , 2022 There are no new commitments contained in this letter. If you have any questions concerning this submittal, please contact Mr. Jeffrey Sowa, SQN Licensing Manager at (423) 843-8129.

Respectfully, Marshall, Thomas Digitally signed by Marshall, Thomas B.

B. Date: 2022.05.09 12:53:49 -04'00' Thomas Marshall Site Vice President Sequoyah Nuclear Plant Enclosures 1. 10 CFR 50.59, and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report

2. Commitment Change Report cc (Enclosures):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Fuel Management, Office of Nuclear Material Safety and Safeguards

ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT 10 CFR 50.59 AND 10 CFR 72.48 CHANGES, TESTS, AND EXPERIMENTS

SUMMARY

REPORT

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES 23396 This design change issues design output from Sequoyah None of the changes were determined to:

including PIC Nuclear Plant (SQN) Calculation SQS20110 Revision 24. - result in more than a minimal increase in the frequency of the 23529 & SQS20110, Emergency and Abnormal Operating Procedure occurrence of an accident because the changes provide for 23696 Setpoints, is a collector calculation to assemble process Operator actions after an accident.

parameters, instrument setpoints, and instrument uncertainty values as contained in existing design documents into a single - result in more than a minimal increase in the likelihood of the calculation to provide the basis for the SQN plant-specific occurrence of a malfunction of a structure, system, and Emergency Operating Procedure (EOP) setpoints. component (SSC) important to safety as the changes do not physically modify SSCs. TCAs were validated to ensure no The system process parameters provided in this design change more than a minimal increase in the likelihood of the are taken from existing issued design documents and do not occurrence of a malfunction of an SSC important to safety.

result in changes to system pressures, temperatures, conditions, Stopping and starting certain emergency core cooling system or requirements. pumps were determined not to increase the likelihood of malfunctions causing the pumps and the support SSCs to not The following Pressurized Water Reactor Owner's Group restart when call upon. Evaluations found peak clad (PWROG) Direct Work documents were used to revise temperature during suction swap evolution for a small-break SQS20110: loss of cooling accident, remain within 10 CFR 50.46 limits and x DW-06-014 - calculate nitrogen expansion in the cold leg no hot fuel pin rupture was predicted. Removal of verification accumulators using a different factor of containment sump level prior to restarting pumps with x DW-04-009 - enhancements to Steam Generator [S/G] suction aligned to the sump during LOCA and non-LOCA Tube Rupture event to allow terminating Reactor Coolant accidents, would not likely have a minimal increase in the System (RCS) depressurization using sprays earlier occurrence of a malfunction of an SSC important to safety (prior to RCS and ruptured S/G pressures being because analysis indicates sufficient water level is available.

completely equalized) to prevent the pressurizer level from dropping below the just on span value requiring - result in more than a minimal increase in the consequences Safety Injection (SI) re-initiation after SI is terminated of an accident or a malfunction of an SSC important to safety, x DW-10-007 provides steps in Abnormal Response because the current dose analyses remain unchanged for the Guideline that, as written, could result in aligning the actions being taken and accidents evaluated.

suction of the charging pumps to the Volume Control Tank (VCT) even if charging flow is high and the VCT - create the possibility for an accident of a different type makeup capacity is not sufficient to maintain VCT level because the changes only affect actions that Operators would x DW-11-004 - guidance and evaluations tripping the take as a response to an accident. No new accidents were reactor coolant pumps (RCPs) after a small break loss of identified for these changes.

coolant accident (SBLOCA) when the RCP trip criteria E1-1 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES have been met. This results in an existing operator - create the possibility for a malfunction of an SSC important manual action becoming a Time Critical Action (TCA) to safety with a different result because the addition of the TCA to trip the RCP was already an early option in the emergency Other setpoints were modified or created for the following: operating procedure. Design analysis shows that a sufficient x Information in setpoints B05 and B06 was updated and water level is in the containment sump; therefore, deleting level separated into injection and recirculation setpoints verification prior to starting Containment Spray Pumps will not x Creation of the M12 setpoint allows Operations to align result in a malfunction of an SSC important to safety.

procedures with the current technical specification (TS) values - result in a design basis limit for a fission product barrier x Setpoint U92 was expanded to include loss of sump being exceeded or altered because the peak clad temperature recirculation limit of 10 CFR 50.46 remains satisfied.

Post Issuance Change (PIC) 23529, created Revisions 25 and It was concluded that the proposed change may be 26 of SQS20110. This resulted in modifying UFSAR Section implemented in accordance with plant procedures without 15.3 (Small Break LOCA) to include discussion that at least 5 obtaining a License Amendment and without prior NRC minutes are available to manually trip the RCPs from a loss of approval.

subcooling or from an SI signal before Peak Clad Temperature (PCT) limits are exceeded. NRC Information Notice 97-60 regarding the increase in the likelihood of occurrence of a malfunction of equipment important to safety with respect to Emergency Core Cooling System (ECCS) Pump operation/swapover is considered in the evaluation.

PIC 23696, created Revision 27 of SQS20110. The changes are to the details of Operator TCAs related to verifying containment sump level prior to restarting Containment Spray pumps with suction aligned to the sump. This PIC also creates a new TCA related to the failure of a Residual Heat Removal (RHR) block valve to close. This PIC documents an increase in PCT, and it removes a procedural barrier which protects the Containment Spray Pumps against operation with inadequate sump level.

23780 This design change permanently removes the A-AUTO, The proposed changes from design change 23780 cannot (Implemented STANDBY feature for the Emergency Gas Treatment System initiate an accident, do not increase the probability of a on Unit 2 at (EGTS) Air Cleanup Subsystem isolation dampers. The control malfunction of an SSC, do not involve any changes to a Design this time) logic is modified to remove the close signal of the isolation Basis Limit for a Fission Product Barrier, or create the E1-2 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES dampers in A-AUTO generated for abnormal pressure. The possibility for an accident of a different type than already handswitches are modified to remove the A-AUTO, STANDBY analyzed in the UFSAR. In addition, the increase in dose position which would open the dampers. Both EGTS air cleanup consequences due to the new configuration where a single exhaust/recirculation flow paths will therefore operate in the A- failure of a controller could result in an EGTS air cleanup AUTO mode by modification of control room panel handswitches. exhaust damper in full-open and the inclusion of a 30 cfm The resultant design provides for control, detection, and alarm leakage past the decay cooling line isolation valves is not more for abnormal annulus differential pressure (dP), but no automatic than minimal. This change may be implemented in downstream isolation of control dampers in either EGTS air accordance with plant procedures and does not require a cleanup flow path. License Amendment Request.

Procedures are also revised to reflect the handswitch control positions due to removing power to auxiliary (swap over) relays.

The scope of this proposed modification also includes a change to the Loss of Coolant Accident (LOCA) analysis to include a postulated leakage of 30 cfm past the decay cooling line isolation valves. These valves are used to provide a flow path from the suction of the in-service EGTS filter bank to the suction of the opposite Trains EGTS fan, around the inactive EGTS filter bank, for decay heat cooling purposes when the high-efficiency particulate air (HEPA) filters and adsorbers in the inactive train are loaded with radioactive material.

23874 The Fuel Transfer System (FTS) is upgraded with a new control The existing control system consists of a relay-based motor system (analog to digital) with new removable control panels, control system that utilizes programmable limit switches for conveyor car (or transfer car), push arm, sheaves, winch/motor frame and conveyor car position inputs. The replacement assemblies, and load weighing assemblies. These upgrades control system consists of a programmable logic controller enable the FTS to operate at a higher conveyor car speed. (PLC)-based platform with touch-screen displays and VFDs.

A shock arresting system is installed on the support frame The touch-screen displays were designed to replicate the assembly to protect the fuel assembly and conveyor car. The existing control panel operator interfaces to the extent new conveyor car/push arm assembly will have remotely practical. The HMI has been reviewed and accepted by FTS replaceable wheels. The new control system will utilize operating personnel. The operation of the FTS, as described programmable logic controllers with touch-screen human- in the UFSAR, remains unchanged. The design functions, machine interfaces (HMIs) and variable frequency drives (VFDs). interlocks and other features of the FTS are retained and are New emergency stop buttons are added. The existing Sound not adversely impacted by the proposed activity.

Powered Telephone System will be spared (no longer used).

E1-3 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES Based on a review of Nuclear Energy Institute (NEI) 01-01 Digital device quality assurance measures include: 1) software Guideline on Licensing Digital Upgrades, some of the control quality assurance activities as described in the project specific function changes are considered potentially adverse on the software quality assurance plan, 2) performance of critical ability of the FTS to perform is design function, including the digital reviews of the control system, 3) performance of a addition of software/firmware and combining interlock functions failure modes and effects analysis (FMEA) of the replacement into one digital device. The introduction of the HMI touch-screen control system, and 4) extensive acceptance testing. The use is considered potentially adverse. of these quality assurance methods provides reasonable assurance that the use of digital controls in the FTS does not increase the probability or the consequences of any Fuel Handling Accident (FHA) described in the UFSAR, nor will it introduce the possibility of a new type of accident not previously considered. The assumptions and conclusions of the existing FHA analyses remain valid. No reductions in the existing margins of safety are created by implementing this modification. The existing shutdown margins during refueling operations are maintained. The existing submergence limits and radiation shielding margins are retained. No changes to the TSs or their Bases are required.

In order to ensure that this 50.59 Evaluation sufficiently addresses issues related to digital upgrades, the questions in Appendix A of NEI 01-01 were listed and answered with the corresponding 50.59 Evaluation question.

It was concluded that this proposed modification may be implemented in accordance with plant procedures and does not require a License Amendment Request.

SQN-19-336 The existing Main Turbine Analog Electrohydraulic (AEH) control The change from analog to digital controls for turbine and MSR (Unit 1) system and Moisture Separator Reheater (MSR) controls at SQN controls; the use of the new HMI displays for turbine control, are obsolete and are being replaced with a new Digital MSR control, testing, and maintenance functions; the SQN-19-337 Electrohydraulic (DEH) control system, including both hardware introduction of new software/firmware; and turbine trip logic (Unit 2) and software. The DEH System incorporates the control, changes are considered adverse for performing design protective, and monitoring functions of the existing main turbine functions.

AEH system and Moisture Separator Reheater (MSR) controls E1-4 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES with enhancements designed to improve fault tolerance and This evaluation has determined that the EHC Turbine Control alleviate a number of single point vulnerabilities. and Turbine Protection Systems (TGCPS) will continue to meet its design requirements following the implementation of the The scope of the design changes also includes the removal of proposed modification that converts to a digital control system.

the Turbine Trip Auto-Stop Header which is replaced with a new The use of the new Turbine Control System (TCS) HMI four-valve trip block assembly connected to the high pressure displays will not adversely impact any turbine control functions Electrohydraulic Control System (EHC) Emergency Trip Header. or create additional operator burden. The design functions of the existing DCS Nuclear Steam Supply System An associated EHC design change, SQN-19-339, resulted in TS (NSSS)/Balance of Plant (BOP) and Auxiliary Control change request SQN-TS-19-04 that was submitted to revise the applications are not changed or modified. The use of the low oil pressure switches trip setpoints in TS Limiting Condition existing Distributed Control System (DCS) HMI displays will not for Operation (LCO) 3.3.1, Table 3.3.1-1 (ADAMS adversely impact any control functions or create additional ML17075A229). NRC approved the TS change request on operator burden.

November 12, 2020 (ADAMS ML20262H026).

Since the new DEH System and DCS components are more reliable than the existing components and no new system level failure mode effects are introduced, the proposed modification does not result in more than a minimal increase in the frequency of occurrence of an accident or transient previously evaluated in the SQN UFSAR.

The new equipment being installed will not result in any component malfunctions that could increase the potential for a turbine trip or transient. Any malfunction will not result in an increase in the potential for a required protective function to be performed (tripping the turbine). Therefore, the modification does not result in more than a minimal increase in the likelihood of occurrence of a malfunction of a System, Structure, or Component (SSC) important to safety previously evaluated in the UFSAR.

Performance requirements associated with core cooling are unaltered such that fuel integrity will be maintained and the UFSAR analysis of radiological consequences remains bounding. The new equipment will not initiate any new E1-5 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES accidents. The modification will not impair or prevent the ECCS from mitigating the consequences of any design basis accidents. Therefore, this activity does not result in more than a minimal increase in the consequence of an accident previously evaluated in the UFSAR.

Failure or malfunction of the new equipment will not prevent or affect the ability of safety related systems or systems important to safety to respond to the accidents describe in the UFSAR.

Therefore, implementation of the proposed modification does not result in more than a minimal increase in the consequences of a malfunction of an SSC important to safety previously evaluated in the UFSAR. The potential malfunctions of the modified equipment are bounded at a system level in the UFSAR. Therefore, the possibility for an unanalyzed malfunction of an SSC important to safety or an accident of a different type than any previously evaluated in the UFSAR is not created.

As described in the UFSAR accident analysis, no malfunction of the TGCPS or the DCS can cause a transient sufficient to damage the fuel barrier or exceed the nuclear limits as required by the safety design basis. Therefore, the possibility for an unanalyzed malfunction of an SSC important to safety that can challenge a fuel barrier or an accident of a different type than any previously evaluated in the UFSAR is not created.

The new digital equipment does not necessitate a revision or replacement of any currently used evaluation methodology.

The modification does not result in a departure from the method of evaluation described in the UFSAR in establishing the design bases or in the safety analyses.

E1-6 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES Guidance for evaluation of digital upgrades is contained in NEI 01-01, Guideline on Licensing Digital Upgrades, March 2002.

NRC Information Notice (IN) 2010-10 stated the NRC expectation that all the questions in Appendix A of NEI 01-01 should be considered in a 50.59 Evaluation for systems that could cause a plant trip or reactivity transient. In the 10 CFR 50.59 Evaluation for the proposed modification, the questions in Appendix A of NEI 01-01 are addressed.

The 50.59 Evaluation concludes that implementation of the proposed modification does not require a TS change and that implementation of the modification does not require a License Amendment Request (LAR), and therefore may proceed without NRC approval.

SQN-20-1909 This Design Change increases the design stroke time limit (both The Pressurizer (PZR) PORV block valves are normally open & close directions) for pressurizer power operated relief operated in the OPEN position to allow PZR PORV operation.

valve (PORV) block valves 1,2-FCV-68-332 & 1,2-FCV-68-333. However, the block valves may be operable when closed to The design stroke time is being increased from 10 seconds to 20 isolate the flow path of an inoperable PZR PORV that is seconds due to low margin between the block valves stroke capable of being manually cycled (e.g., as in the case of times and the required action range. This margin is too low to excessive PZR PORV leakage). Therefore, it is possible for a account for any additional potential response time that could block valve to be required to open in order to provide a flow occur during the normal testing method of an Operator using a path to its associated PZR PORV during a Steam Generator stop watch. Tube Rupture (SGTR) accident. On the other hand, the PZR PORV block valves may be required to close during an The 10-second design stroke time limit is a condition under Accidental Depressurization of the RCS event due to a PZR which the intended function is required to be performed; PORV being stuck open. The proposed activity increases the therefore, the increase in design stroke time is considered design stroke time limit of the PZR PORV block valves from 10 adverse and is Evaluated further. seconds to 20 seconds to perform the above safety functions.

It is important to note that the stroke time for the block valves to perform the aforementioned safety functions is not credited or utilized in the Safety Analyses. The only event where the increased stroke time could potentially have an effect is during a SGTR. However, it is shown that sufficient margin exists to accommodate an increased block valve stroke time. The PZR PORV block valves are not being physically altered, RCS E1-7 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES system conditions remain unchanged, and no RCS SSCs are affected by this change. No new accident initiating events are created by this change, and there is no increase to the frequency of previously evaluated accidents.

The block valves are the only components directly affected by this change. The malfunction to be evaluated is the inability for the block valves to open or close when required to allow PORV operation or isolate a leaking/stuck open PORV, or failure of a block valve to meet the In-Service Testing (IST) stroke time requirement during the TS required quarterly valve strokes.

There is no increase in the likelihood of a malfunction due to this change as no new failure modes are introduced by the proposed activity. Hence, the change does not increase the consequences of any accident described in Chapter 15 of the UFSAR. In addition, this change does not create the possibility of an accident not already described by the UFSAR and will not result in the design basis limit for any fission product barrier being exceeded or altered. Therefore, it is acceptable to implement the proposed activity per plant procedures without obtaining a License Amendment.

SQN-21-017 Design Change SQN-21-017 proposes to cut and cap the R-8 The Incore Thermocouple System must function to aid with the Thermocouple in SQN Unit 1 core exit thermocouple nozzle mitigation of the consequences of the following events:

assembly (CETNA) location R-11. The cut is to be just below the 1. Loss of Coolant Accident current pressure boundary compression fitting. The 2. Main Steamline Break Inside Containment thermocouple is to physically remain in the reactor vessel but will 3. Feedwater Line Break Inside Containment be out of scan due to the cable being cut. Inside the tube, the 4. RHR Line Break Inside Containment stainless steel thermocouple sheath is to be crimped on the 5. Chemical and Volume Control System Line Break Inside exposed/cut end to preclude RCS water from entering the Containment.

mineral insulation around the thermocouple wire. It is to then be capped with a new compression fitting that will be of the same The activity does not increase the frequency of occurrence of American Society of Mechanical Engineers (ASME) classification any of the above described accidents evaluated in the UFSAR as the original. The remaining tubing is to be restrained to because the core exit thermocouples are not initiators of any of prevent movement and to allow for proper installation of the the accidents analyzed in the UFSAR. Although the activity bullet-nose. does reduce the number of available thermocouples to monitor E1-8 of E1-9

DESIGN DESCRIPTION SAFETY ANALYSIS CHANGES core temperatures, it does not result in more than a minimal The TS Bases is to be revised to update the number of available increase in the likelihood of a malfunction of the Incore thermocouples for Unit 1 (TS B 3.3.3 - Post Accident Monitoring Instrumentation System, as well as any other SSC evaluated in Instrumentation). the UFSAR. The reduction of one additional thermocouple also does not increase the expected Main Control Room (MCR) Operator onsite (mission) dose or offsite radiological releases already analyzed in the UFSAR. This activity also does not cause any new accident that was not previously analyzed in the UFSAR as any malfunction of any SSC that would cause results of any UFSAR analyses to change or diverge in such a manner would place this facility in an unanalyzed condition. In addition, this activity will not cause any design basis limit for a fission product barrier being exceeded or altered.

This activity may be implemented per plant procedures without obtaining a License Amendment.

DOCUMENT NUMBER/72.48 EVALUATION DESCRIPTION SAFETY ANALYSIS TRACKING NUMBER None E1-9 of E1-9

ENCLOSURE 2 SEQUOYAH NUCLEAR PLANT COMMITMENT CHANGE REPORT

Commitment Evaluation No./ Source Summary of Summary of Basis/Justification Commitment Document Original Commitment Commitment Changes for Changes Tracking No.

NCO970024004 TVA letter to SQN will implement the program For continued compliance with In accordance with NRC letter to NRC dated April elements described in Topical Generic Letter (GL) 96-05 TVA dated January 3, 2000, 28, 1998 Report MPR-1807, Revision 2. requirements, the SQN Motor TVA is required to develop a Deviations identified during the Operated Valve (MOV) Program long term MOV periodic implementation of this program will includes, in addition to the verification program for MOVs be justified. current program, an alternate outside the scope of the JOG periodic verification program for Program. Flow control valve, 2-valves outside the scope of FCV-070-0133 has been applicability of the Joint Owners identified as a JOG Class D Group (JOG) Program. Valves in valve, making it outside the JOG Class D status are scope of the JOG Program.

considered out-of-scope and Therefore, an alternate program includes: 2-FCV-070-0133. is required to verify periodically the design-basis capability of the safety-related MOV. TVA report JOG Class D Evaluation for Gate Valve 2-FCV-070-0133, Doc No. 3959C by Kalsi Engineering documents the valve degradation aspect and justification for a periodic verification interval by application of Technical Report BWROG-TP-09-033, Generic Methodology for JOG MOV Periodic Verification (PV)

Program - Category D MOV Evaluations, Rev. 1, December 22, 2009. The alternate program is identified in the MOV Program implementing procedure.

E2-1 of E2-1