Letter Sequence Request |
---|
EPID:L-2018-RNW-0012, Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: CLI-22-04, Change Letter to Peach Bottom Subsequent Renewed Licenses March 17 2022 Rev 1, ML18179A457, ML18214A383, ML18282A029, ML19007A282, ML19007A326, ML19029B121, ML19142A369, ML19182A112, ML19205A206, ML19240A300, ML22096A298
|
MONTHYEARML18193A6892018-07-10010 July 2018, 31 July 2018 Application for Subsequent Renewed Operating Licenses Project stage: Request ML18191B2802018-08-27027 August 2018 Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing Project stage: Request ML18179A4572018-08-27027 August 2018 FRN Notice of Availabity and Request for Hearing Project stage: Other ML18191B0852018-08-27027 August 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Exelon Generation Company, LLC, Application for Subsequent License. Project stage: Acceptance Review ML18214A3832018-09-0505 September 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other NRC-2016-0078, Comment (1) of Alan Harris on Behalf of Entergy Louisiana, LLC and Entergy Operations, Inc. on Entergy Operations, Inc; Waterford Steam Electric Station, Unit 32018-10-0303 October 2018 Comment (1) of Alan Harris on Behalf of Entergy Louisiana, LLC and Entergy Operations, Inc. on Entergy Operations, Inc; Waterford Steam Electric Station, Unit 3 Project stage: Request ML18299A2132018-10-0909 October 2018 Comment (3) of Cheryl T. Seager on Behalf of Us Environmental Protection Agency (Epa)On the Draft Environmental Impact Statement (NUREG-1437,Supplement 59) for the License Renewal of Waterford Steam Electric Station Unit 3 ML18282A0292018-10-16016 October 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18323A1032018-11-30030 November 2018 NUREG-1437, Suppl. 59, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford Steam Electric Station, Unit 3 - Final Report Project stage: Acceptance Review ML19007A2822018-12-0404 December 2018 Fws to NRC, Peach Bottom Subsequent License Renewal Ipac Trust Resources List of Endangered Species, Migratory Birds, and Wetlands Project stage: Other ML18354B1132018-12-20020 December 2018 Response to NRC Request for Additional Information, Dated November 23, 2018, Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application, Environmental Requests for Additional Information Project stage: Request ML19007A3352019-01-0707 January 2019 Map of Conowingo Pond Showing Location of Stations in Trawl Zones 405, 406 and 408 - Figures Project stage: Request ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study Project stage: Request ML19007A3262019-01-0707 January 2019 Response to Request Dated December 7, 2018 for Docketing of Additional Documents to Support Nrc'S Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML19023A0152019-01-23023 January 2019 Supplement No. 2 - Changes to the Subsequent License Renewal Application Project stage: Supplement ML19042A1312019-02-11011 February 2019 Supplement No. 3 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19029B1212019-02-26026 February 2019 and 3 - Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19065A0082019-03-0505 March 2019 Response to Nrg Audit Review Information Request - Application for Subsequent Renewed Operating Licenses Section 4.6 Primary Containment Fatigue Analyses Project stage: Request ML19077A2532019-03-18018 March 2019 Supplement No. 4 - Changes to the Subsequent License Renewal Application Project stage: Supplement ML19114A2652019-04-0808 April 2019 Submittal of Revision 27 to Updated Final Safety Analysis Report and Revision 22 to Fire Protection Program and Reference Drawings Project stage: Request ML19108A4272019-04-10010 April 2019 Request for Additional Information for Peach Bottom 2 and 3 Subsequent License Renewal Application - Set 1 Project stage: Request ML19122A2892019-05-0202 May 2019 Response to NRC Requests for Additional Information, Set 1, Dated April 10, 2019 Related to Plant Subsequent License Renewal Application Project stage: Response to RAI ML19253D2922019-05-0707 May 2019 Request for Clarification of Information on Peach Bottom Water Chemistry Program Project stage: Request ML19150A2972019-05-30030 May 2019 Revised Responses to NRC Requests for Additional Information, Fire Water System, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19255F7822019-06-0303 June 2019, 27 September 2019 Public Clarification Calls with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue, (RAI) B.2.1.25-1, and Potential License Renewal Aging Management Issues Project stage: Request ML19157A0092019-06-0606 June 2019 Response to NRC Request for Additional Information, Dated May 15, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19142A3692019-06-0606 June 2019 Revised Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19163A2222019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Buried Pipe, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19163A2212019-06-12012 June 2019 Supplement No. 5 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19163A2232019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Core Shroud Support Fatigue Analysis Reevaluation, Related to the Subsequent License Renewal Application Project stage: Response to RAI ML19182A1122019-07-0101 July 2019 First 10 CFR 54.21 (B) Annual Amendment to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML19193A0062019-07-12012 July 2019 Supplement No. 7 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19205A4332019-07-24024 July 2019 NRC061 - Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (Final Report), NUREG-2192 (July 2017) Project stage: Approval ML19206A1802019-07-25025 July 2019 Supplement No. 8 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19199A1132019-07-31031 July 2019, 1 August 2019 Notice of Availability of Draft Supplement 10, Second Renewal to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 Project stage: Request ML19210C5712019-07-31031 July 2019 Schedule Revision for the Review of the Peach Bottom Atomic Power Station Units 2 & 3 Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0012/L-2018-RNW-0013) Project stage: Approval ML19210D4532019-07-31031 July 2019 NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3 Project stage: Acceptance Review ML19225B9762019-08-13013 August 2019 Response to NRC Request for Clarification of Information, Dated August 1, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Request ML19268B3512019-09-12012 September 2019 Transcript of Peach Bottom Subsequent License Renewal Draft SEIS Public Meeting Held 12 Sep 2019 Project stage: Draft Approval ML19205A2062019-09-24024 September 2019 Summary Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19238A3032019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue Project stage: RAI ML19240A3002019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Questions on Their Coatings and Linings of Certain Components Aging Management Program and Their Inspection of Buried and Underground Piping and Tanks Aging Management Program for SLR Project stage: Other ML19246A1452019-09-27027 September 2019 Clarification Call to Discuss Exelon'S Response to NRC Requests for Additional Information (RAI) 3.3.2.1.1-1 Project stage: RAI ML19280B2552019-10-0707 October 2019 SLRA Revision to BWR Vessel Internals Program Enhancement 1 Project stage: Request ML19275E9682019-10-0707 October 2019 Issuance Letter - Safety Evaluation Report Related to the Subsequent License Renewal of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML19280D8202019-10-31031 October 2019 Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML20063L3242020-02-28028 February 2020 EPA Comments on NUREG-1437, Supplemental 10, Second Renewal, Final (Peach Bottom Project stage: Request ML20024G4292020-03-0404 March 2020 Record of Decision - Issuance of Subsequent Renewed Facility Operation License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML20010F2852020-03-0505 March 2020 Transmittal Letter - Issuance of Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Station Units 2 and 3 Project stage: Approval ML22055A5572022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-04) Project stage: Request 2019-04-08
[Table View] |
|
---|
Category:Legal-Order
MONTHYEARML22154A2172022-06-0303 June 2022 Commission Memorandum and Order (CLI-22-07) ML22055A5262022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-03) ML22055A5572022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-04) ML22045A4782022-02-14014 February 2022 Commission Memorandum and Order (CLI-22-01) ML21280A3622021-10-0707 October 2021 Order (Granting Joint Motion for the Issuance of a Third Amendment to the Protective Order) ML21187A2852021-07-0606 July 2021 Order (Granting Combined Motions to Extend Deadlines to Answer Hearing Requests) ML21180A4212021-06-29029 June 2021 Order (Providing Second Amended Protective Order and Establishing Hearing Request Deadline for the State of Illinois) ML21173A2992021-06-22022 June 2021 Order (Stay of Hearing Request Deadline for the State of Illinois) ML21168A3302021-06-17017 June 2021 Exhibit B - Order ML21165A1242021-06-14014 June 2021 Order (Granting Extension of Time for the Environmental Law and Policy Center, and State of Illinois) ML21168A3292021-06-0909 June 2021 Exhibit a - Order ML21160A2312021-06-0909 June 2021 Order (Granting Joint Motion to Amend Protective Order) ML21144A1252021-05-24024 May 2021 Order (Granting Motion to Extend Hearing Requests Deadline) ML21139A3252021-05-19019 May 2021 (Corrected) Order (Granting Joint Motion for Entry of a Protective Order) ML21137A3142021-05-17017 May 2021 Order (Granting Joint Motion for Entry of a Protective Order) ML20317A1102020-11-12012 November 2020 Commission Memorandum and Order (CLI-20-11) ML19270G0142019-09-27027 September 2019 Order (Granting Motions for Extension of Time) ML19171A1592019-06-20020 June 2019 Memorandum and Order (Denying Beyond Nuclear'S Petition to Intervene) (LBP-19-05) ML19123A1972019-05-0303 May 2019 Notice and Order (Scheduling Briefing on Beyond Nuclear'S Motion to Amend Its Petition and the Board'S Issuance of Order on Standing and Contention Admissibility) ML19119A2922019-04-29029 April 2019 Memorandum to the Petitioners Regarding Commissioner Wright'S Upcoming Site Visit ML19107A4622019-04-17017 April 2019 Order (Granting Joint Motion for Transcript Corrections) ML19071A2082019-03-12012 March 2019 Notice and Order (Providing Instructions for Oral Argument) ML19066A3872019-03-0707 March 2019 Memorandum and Order (Denying Motion for Reconsidering Location of Oral Argument and Granting Motion to Webcast Oral Argument) ML19059A4042019-02-28028 February 2019 Order (Scheduling Oral Argument) ML19059A4462019-02-28028 February 2019 Order (Revising Time of Argument to Reflect Daylight Saving Time) ML18345A2602018-12-11011 December 2018 Establishment of Atomic Safety and Licensing Board ML18341A1562018-12-0707 December 2018 Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board ML18305B3722018-11-0101 November 2018 Order of the Secretary ML0603105332006-05-30030 May 2006 Order Approving Transfers of Licenses and Conforming Amendments Relating to Peach Bottom Atomic Power Station, Unit Nos. 2 and 3, Hope Creek Generating Station, and Salem Nuclear Generating Station, Unit Nos. 1 and 2 RS-04-137, Letter to Office of the Secretary from Jeffrey A. Benjamin, Listed Npps; Answer to Issuance of Order to Modify License Associated with Access Authorization2004-09-0707 September 2004 Letter to Office of the Secretary from Jeffrey A. Benjamin, Listed Npps; Answer to Issuance of Order to Modify License Associated with Access Authorization 2022-06-03
[Table view] |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:
Christopher T. Hanson, Chairman Jeff Baran David A. Wright In the Matter of EXELON GENERATION COMPANY, LLC Docket Nos. --SLR
--SLR (Peach Bottom Atomic Power Station, Units and )
CLI--
MEMORANDUM AND ORDER In considering the pending motions of Beyond Nuclear, Inc. for leave to file a new contention and to reopen the record, we have the opportunity to reconsider the Commissions decision in CLI--, which applied the reasoning in CLI-- in the Turkey Point proceeding to this case.1 Today, we reversed CLI--, which held that C.F.R. § .(c)() applied to a subsequent license renewal applicants preparation of an environmental report,2 and now 1 See Beyond Nuclear, Inc.s Motion for Leave to File New Contention Based on Draft Supplement to Generic Environmental Impact Statement for Subsequent License Renewal of Peach Bottom Operating License (Sept. , ; corrected Sept. , ); Beyond Nuclear, Inc.s Motion to Reopen the Record For Purposes of Considering and Admitting a New Contention Based on Draft Supplement to Generic Environmental Impact Statement For Subsequent License Renewal of Peach Bottom Operating License and Request For Consideration of Some Elements of the Motion Out of Time (Sept. , ); CLI--, NRC
(); Florida Power & Light Co. (Turkey Point Nuclear Generating Units and ),
CLI--, NRC ().
2 See Florida Power & Light Co. (Turkey Point Nuclear Generating Units and ), CLI--,
NRC __ (Feb. , ) (slip op.).
reverse the portion of CLI-- related to Contention A, in which Beyond Nuclear claimed that the environmental report failed to address accident risks posed by aging reactor equipment during a second license renewal term.
BACKGROUND The Atomic Safety and Licensing Board (Board) terminated the proceeding for the subsequent license renewal application of Exelon Generation Company, LLC,3 for Peach Bottom Atomic Power Station, Units and .4 Beyond Nuclear appealed, seeking reversal of the Boards decision on Contention , which challenged the adequacy of Exelons environmental report.5 In CLI--, the Commission affirmed the Boards decision and, with respect to Contention A, relied, in large part, on the decision in CLI--.6 After the NRC staff (Staff) issued its draft supplement to the generic environmental impact statement for license renewal for Peach Bottom,7 Beyond Nuclear filed motions for leave to file a new contention and to reopen the record in the proceeding.
3 On February , , Exelon Generation Company, LLC completed a license transfer and corporate reorganization. Peach Bottoms parent company is now Constellation Energy Generation, LLC, and it is no longer affiliated with Exelon Corporation. See Exelon Generating Co., (Braidwood Station, Units and ), CLI--, NRC __, __ (Feb. , ) (slip op. at ).
4 LBP--, NRC , ().
5 CLI--, NRC at -. The Board evaluated Contention as three separate environmental challenges and designated them as Contentions A, B, and C. Id. at .
6 Id. at , . Commissioner Baran and Commissioner Hanson dissented with respect to Contention A, conclud[ing] that applying C.F.R. § .(c)() to subsequent license renewals is at odds with the regulation and the agencys obligations under [the National Environmental Policy Act (NEPA)]. Id. at .
7 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement
, Second Renewal, Regarding the Subsequent License Renewal for Peach Bottom Atomic Power Station Units and (Draft Report for Comment), NUREG-, Supplement (July
) (ADAMS accession no. MLD).
DISCUSSION In todays related decision in the Turkey Point proceeding, CLI--, we held that C.F.R. § .(c)() only applies to an initial license renewal applicants preparation of an environmental report and that the Generic Environmental Impact Statement for License Renewal of Nuclear Plants8 did not address subsequent license renewal. For the reasons explained in CLI--, we conclude that the Staff did not conduct an adequate NEPA analysis before issuing Exelon licenses for the subsequent license renewal period for Peach Bottom.9 As we have motions pending before us and the proceeding remains open,10 we can modify, suspend, or revoke Exelons licenses, as appropriate.11 While Exelons subsequently renewed licenses became immediately effective upon issuance,12 the environmental analysis associated with the previous licenses analyzed the impacts of operating until and for Units and , respectively. We conclude that it is appropriate for Exelon to maintain its current subsequently renewed licenses at this time, but with shortened terms to match the end dates of the previous licenses (i.e., August , , and July , , for Units and , respectively) until completion of the NEPA analysis. Accordingly, we direct the Staff to amend the licenses to this effect.
8 Generic Environmental Impact Statement for License Renewal of Nuclear Plants (Final Report), NUREG-, rev. , vols. - (June ) (MLA, MLA, MLA) ( GEIS).
9 Because the GEIS did not cover the period of subsequent license renewal, Exelon cannot solely rely on incorporation by reference of the GEIS to address Category issues.
10 The hearing record, however, closed after the Board resolved Contentions and . See Virginia Electric and Power Co. (North Anna Power Station, Unit ), CLI--, NRC ,
().
11 Amergen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI--, NRC ,
() (A license renewal may be set aside (or appropriately conditioned) even after it has been issued, upon subsequent administrative or judicial review.).
12 See C.F.R. § .(c).
Consistent with this order, we will also separately direct the Staff to update the GEIS to cure the NEPA deficiency by addressing the subsequent license renewal period.13 Given the timeframe involved, we fully expect that the Staff will be able to evaluate the environmental impacts prior to Exelon entering the subsequent license renewal period.
CONCLUSION For the reasons described above, we reverse the portion of CLI-- related to Contention A. We leave the licenses in place and direct the Staff to modify the expiration dates for Units and to and , respectively. We further direct the parties to submit their views on the practical effects of () the subsequent renewed licenses continuing in place and () the previous licenses being reinstated by March , . The parties responses are due by March , . After considering briefing on the issue, we will issue a subsequent order to provide additional direction, if any, to the parties regarding the status of the licenses.
We address the pending motions in a separate order issued today on the dockets of all subsequent license renewal proceedings.14 IT IS SO ORDERED.
For the Commission Annette L. Digitally signed by Annette L. Vietti-Cook Vietti-Cook Date: 2022.02.24 10:44:49 -05'00' Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this th day of February .
13 We provide our direction for addressing the NEPA deficiency discussed in this order in Staff Requirements---SECY--"Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses - Environmental Review (RIN -AK; NRC--) (Feb. ,
) (MLA).
14 Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units , , and ), CLI--, NRC
__ (Feb. , ) (slip op.).
Commissioner Wright, dissenting in part I disagree with my colleagues rationale and holding reversing our previous decision in CLI--. As discussed in my partial dissent to Turkey Point, I continue to agree with our previous interpretation in CLI--. Moreover, I view the majoritys decision to reverse direction now as arbitrary, inconsistent with the NRCs Principles of Good Regulation, and contrary to the agencys goals of clear communication and transparent decision-making. This reversal, based only on information and arguments previously considered and rejected, undermines the NRCs role as an effective and credible regulator. The majoritys decision makes it impossible for stakeholders to rely on our statements and positions. It also short-circuits the agencys well-established and predictable adjudicatory process.
But here, as in Turkey Point, while I strongly disagree with the majoritys approach procedurally and substantively, I join my colleagues on the limited issue of the status of the licenses and the path forward. Given the majoritys decision, I agree that an equitable and efficient solution is to leave in place the subsequently renewed licenses while the Staff works to update its environmental analysis to comply with the majoritys new holding.1 I expect that the Staff will work to update the GEIS as expeditiously as possible.
1 This approach imposes the least impact possible on stakeholders that understandably relied on our previous statements and CLI-- and appropriately places the burden of curing the purported NEPA deficiency on the agency. Leaving the licenses in place also avoids jeopardizing any safety or environmental improvements that the licensee may have put in place to comply with subsequently renewed licenses.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
EXELON GENERATION COMPANY, LLC ) Docket Nos. 50-277 and 50-278-SLR
)
(Peach Bottom Atomic Power Station )
Units 2 and 3)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-22-04) have been served upon the following persons by Electronic Information Exchange.
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16B33 Mail Stop: O-16B33 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop - O-14A44 Washington, DC 20555-0001 Washington, DC 20555-0001 Tison Campbell, Esq.
Michael M. Gibson, Chair Kayla Gamin, Esq.
Administrative Judge Brian Harris, Esq.
David Roth, Esq.
Dr. Michael F. Kennedy Susan Vrahoretis, Esq.
Administrative Judge Brian Newell, Senior Paralegal Georgiann Hampton, Paralegal Dr. Sue H. Abreu E-mail: tison.campbell@nrc.gov Administrative Judge kayla.gamin@nrc.gov brian.harris@nrc.gov david.roth@nrc.gov susan.vrahoretis@nrc.gov E-mail: michael.gibson@nrc.gov brian.newell@nrc.gov michael.kennedy@nrc.gov georgiann.hampton@nrc.gov sue.abreu@nrc.gov Exelon Generation Company, LLC Donald Ferraro, Esq.
Assistant General Counsel 200 Exelon Way, Suite 305 Kennett Square, PA 19348 E-mail: donald.ferraro@exeloncorp.com
Peach Bottom, Units 2 & 3, Docket Nos. 50-277 & 50-278-SLR COMMISSION MEMORANDUM AND ORDER (CLI-22-04)
Counsel for Beyond Nuclear Counsel for Exelon Diane Curran, Esq. Pillsbury Winthrop Shaw Pittman LLP Harmon, Curran, Spielberg and Eisenberg David Lewis, Esq.
1725 DeSales Street NW, Suite 500 Anne Leidich, Esq.
Washington, DC 20036 1200 17th St. NW E-mail: dcurran@harmoncurran.com Washington, DC 20036-3006 E-mail: david.lewis@pillsburylaw.com anne.leidich@pillsburylaw.com Herald M. Digitally signed by Herald M.
Speiser Speiser Date: 2022.02.24 11:09:54 -05'00' Office of the Secretary of the Commission Dated at Rockville, Maryland, this 24th day of February 2022.
2