Letter Sequence Other |
---|
|
|
MONTHYEARML20141L6202020-05-22022 May 2020 Request for Withholding Information from Public Disclosure in Holtec International March 19, 2020, Submittal of Thermal Topical Report on the HI-STORM 100 and HI-STORM FW Systems Project stage: Withholding Request Acceptance ML20141L6212020-05-22022 May 2020 Acceptance for Review of Holtec International Thermal Topical Report on the HI-STORM 100 and HI-STORM Systems Project stage: Acceptance Review ML20202A6582020-06-29029 June 2020, 17 July 2020 July 17, 2020 Holtec Topical Report Review Public Meeting Project stage: Request ML20244A0232020-09-0101 September 2020 September 9, 2020 - Regulatory Audit Plan for Holtec International (Holtec) Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems (EPID L-2020-TOP-0018) Ltr Project stage: Other ML20282A5252020-11-0202 November 2020, 3 November 2020 Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-StormFW Systems Project stage: Request ML20282A5262020-11-0202 November 2020 Transmittal Letter for Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems Project stage: Other ML20282A5272020-11-0303 November 2020 Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-StormFW Systems (EPID: L-2020-TOP-0018)(Non-Proprietary) Project stage: Other ML21034A5962021-02-17017 February 2021 Transmittal of Draft Safety Evaluation for Holtec International Topical Report HI220034, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems Project stage: Draft Approval PMNS20210234, Closed Meeting with Holtec International (Holtec) and the U.S. Nuclearregulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems2021-02-26026 February 2021 Closed Meeting with Holtec International (Holtec) and the U.S. Nuclearregulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems Project stage: Request ML21092A1652021-04-0202 April 2021 Attachment 3: Responses to NRC Staff'S Open Items Project stage: Request ML21092A1622021-04-0202 April 2021 Submittal of Holtec Proprietary Information Review and Response to Open Items on the Thermal Topical Report on the HI-STORM 100 and HI-STORM FW Systems Project stage: Request ML21082A0852021-04-0909 April 2021 Summary of Closed Meeting with Holtec International and U.S. Nuclear Regulatory Commission Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems Project stage: Meeting ML21125A1862021-09-14014 September 2021 Final Safety Evaluation for Holtec International Topical Report HI-2200343 Revision 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW Systems Project stage: Request ML21125A1912021-09-14014 September 2021 Transmittal Letter U.S. NRC Final Safety Evaluation for Holtec International Topical Report HI-2200343 Revision 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW Systems Project stage: Approval ML21216A1812021-09-14014 September 2021 Non-Proprietary Enclosure 1 U.S. NRC Final Safety Evaluation for Holtec International Topical Report HI-2200343 Revision 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW Systems Project stage: Approval ML21302A1482021-09-29029 September 2021 Attachment 3: Affidavit Pursuant to 10CFR2.390 Project stage: Other ML21302A1452021-09-29029 September 2021 Submittal of Topical Report HI-200343 - a Version Project stage: Other ML21302A1472021-10-29029 October 2021 Attachment 2: HI-2200343-A Topical Report for Allowance of Heat Load Patterns in HI-STORM and HI-STORM FW Systems (Non-Proprietary Version) Project stage: Other ML21336A4582021-12-16016 December 2021 NRC 896 Form for the U.S. Nuclear Regulatory Commission Staff -A Verification of the HI-2200343, Rev 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW (Flood Wind) Systems Project stage: Other ML21336A4502021-12-17017 December 2021 Transmittal Email of NRC 896 Form for U.S. Nuclear Regulatory Commission Staff -A Verification of the HI-2200343, Rev 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW (Flood Wind) Systems Project stage: Other 2021-12-16
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML20282A5272020-11-0303 November 2020 Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-StormFW Systems (EPID: L-2020-TOP-0018)(Non-Proprietary) ML20282A5262020-11-0202 November 2020 Transmittal Letter for Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems 2020-11-03
[Table view] Category:Letter
MONTHYEARML24016A1902024-01-30030 January 2024 International, Inc. - Notice of Violation; the U.S. Nuclear Regulatory Commission Inspection Report 07201014/2022201 ML24018A1992024-01-18018 January 2024 International, Administrative Change to HI-2200343-A ML23363A0312024-01-0404 January 2024 Application for HI-STORM 100 Cask System, Amendment No. 19 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23361A1622024-01-0404 January 2024 Application for HI-STORM Flood/Wind Multipurpose Storage System, Amendment No. 9 - Acknowledgement of Withdrawal and Notification of the U.S. Nuclear Regulatory Commission Staff Efforts Closure ML23355A0842023-12-21021 December 2023 International, Withdrawal of HI-STORM I00 Multipurpose Canister Storage System Amendment ML23355A0812023-12-21021 December 2023 International - Withdrawal of HI-STORM FW Multipurpose Canister Storage System Amendment 9 ML23324A0952023-12-0606 December 2023 Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multi-purpose Canister Storage System - Request for Additional Information ML23328A0052023-12-0505 December 2023 Issuance of Renewed Certificate of Compliance No. 1014, Amendment No. 17 for the Hi-Storm 100 Cask System (Cac/Epid 001028/L-2021-LLA-0140) ML23338A3052023-12-0404 December 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23334A1912023-11-30030 November 2023 International, Submittal of Topical Report HI-2210161-A Version ML23321A2172023-11-17017 November 2023 International, Responses to NRC Questions Form EA-23-044 Pre-Decisional Enforcement Conference ML23321A2462023-11-17017 November 2023 HI-STORM FW Amendment 7 RAI Response Clarifications (Part 3) JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use ML23310A0362023-11-0909 November 2023 International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 07201014/2023201 ML23283A1262023-11-0202 November 2023 Letter - Second Request for Additional Information - HI-STORM 100 Amd 18 ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23289A2132023-10-16016 October 2023 International - Schedule for Responses to HI-STORM FW Amendment 9 Requests for Additional Information ML23229A5172023-10-0404 October 2023 Amendment No. 9 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Request for Additional Information ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23263B1232023-09-20020 September 2023 HI-STORM 100 Amendment 16 Responses to Second Round Requests for Additional Information ML23234A1572023-09-14014 September 2023 Letter to Holtec International Final Safety Evaluation for Hi-2210161, Revision No. 4, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems ML23145A1752023-09-12012 September 2023 NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) ML23251A2512023-09-0808 September 2023 International, Submittal of Supplement to RAI Responses on HI-STORM 100 Amendment 18 ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel ML23230B1582023-08-28028 August 2023 Amendment 16 to Certificate of Compliance 1014 for HI-STORM 100 Multipurpose Canister Storage System Request for Additional Information Second Round ML23227A2492023-08-15015 August 2023 International, HI-STORM FW Amendment 7 RAI 3-10 Response Clarification Call Action Items NL-23-0620, ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use2023-08-0303 August 2023 ISFSI, and Edwin I. Hatch Nuclear Plant ISFSI, Registration of Spent Fuel Cask Use ML23135A7582023-07-20020 July 2023 Letter to Holtec - Draft SE for HI-2210161, Revision No. 4, Topical Report ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23195A0382023-07-14014 July 2023 U.S. Nuclear Regulatory Commission Inspection Report No. 72-1014/2023-201 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use ML23192A0322023-07-11011 July 2023 International, HI-STORM FW Amendment 7 RAI Responses Part 5 Clarification Corrected Attachments 4 and 5 ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23184A1392023-07-0303 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-295, -296, -297) ML23181A1932023-06-30030 June 2023 International HI-STORM FW Amendment 7 RAI Responses Part 5 Clarification Call Action Items ML23068A3852023-06-29029 June 2023 1. Transmittal Letter, Renewal of CoC No. 1014, HI-STORM 100 Cask System ML23163A1402023-06-23023 June 2023 Acceptance Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel ML23167A0352023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use ML23163A1782023-06-12012 June 2023 Registration of Use of Cask to Store Spent Fuel (MPC-292, -293, -294) ML23146A1392023-05-26026 May 2023 International - Submittal of RAI Responses on HI-STORM 100 Amendment 18 ML23128A3032023-05-0808 May 2023 International - HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 5 SVP-23-016, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2023-04-20020 April 2023 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2024-01-04
[Table view] |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION November 2, 2020 Kimberly Manzione, Director Licensing Manager Holtec International 1 Holtec Boulevard Camden, NJ 08104
SUBJECT:
AUDIT REPORT REGARDING THE SEPTEMBER 9, 2020, REGULATORY AUDIT FOR HOLTEC INTERNATIONAL TOPICAL REPORT FOR ALLOWANCE OF HEAT LOAD PATTERNS IN HI-STORM 100 AND HI-STORM FW SYSTEMS (EPID: L-2020-TOP-0018)
Dear Ms. Manzione:
By letter dated March 19, 2020 (Agencywide Documents Access Management System (ADAMS) Package Accession No. ML20101N174), Holtec International submitted for U.S.
Nuclear Regulatory Commission (NRC) staff review and approval Topical Report [(TR)] for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems.
The NRC staff conducted a virtual regulatory audit on September 9, 2020, to gather information and to resolve questions pertaining to the Method of Evaluation, Incorporation by Reference, Screening Evaluation for Limited Calculations, Implementation Strategy and Notification of Implementation for the TR approval. The audit report documents the audit results, provides additional information to support the NRC staff safety evaluation (SE) of the TR, and will be referenced in the SE. Information regarding the audit plan can be found in ADAMS Package Accession No. ML20244A020. The audit report is enclosed.
If you have any questions, please contact me at (301) 415-2375 or Lesile.Perkins@nrc.gov.
Sincerely,
/RA/
Leslie Perkins, Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Enclosures:
- 1. Audit Report (Non-Proprietary)
- 2. Audit Report (Proprietary)
Docket Nos. 72-1014 and 72-1032 Project No. 5014 NOTICE: The Enclosure transmitted herewith contains Official Use Only - Proprietary Information. When separated from the Enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
Cover Letter- ML20282A526 Audit Report (Non-Proprietary)- ML20282A527 Audit Report (Proprietary)- ML20282A528 Package- ML20282A525
- Concurrence by email OFFICE NRR/DORL/LLPB/PM* NRR/DORL/LLPB/LA* NMSS/DFM/CTCFPB/BC NRR/DORL/LLPB/PM*
NAME LPerkins* DHarrison* MDiaz LPerkins*
DATE 10/21/2020 10/21/2020 11/02/2020 11/02/2020