Forwards Emergency Operating Procedures Insp Repts 50-317/89-80 & 50-318/89-80 on 890515-25.Potential Restart Issue Concerns Noted
ML20248A603
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/02/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20248A608 List:
References
NUDOCS 8908080346
Download: ML20248A603 (2)


See also: IR 05000317/1989080

Text

,,,,---____

., .

o e

[r uog% UNITED STATES

f% #

f $ NUCLEAR REGULATORY COMMISSION l

,j l

p j REGION l l

  • 475 ALLENDALE ROAD  !

KING Oc .# RUSSIA, PENNSYLVANIA 19406

.....

Docket Nos. 50-317 - 1

50-318 l

l

Baltimore Gas & Electric Company {

ATTN: Mr. George C. Creel

Vice President-Nuclear Energy  ;

Calvert Cliffs Nuclear Power Plant j

MD Rts 2 & 4

P. 6. Box 1535 l

Lusby, Maryland 20657 {

i

Gentlemen: >

SUBJECT: INSPECTION NOS. 50-317/39-80 AND 50-318/89-80

l

During the period of May 15 through May 25, 1989, the NRC I

conducted an inspection of the Emergency Operating Procedures at j

the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. l

l

At the conclusion of the inspection, the preliminary findings  ;

were discussed with those members of your staff identified in the i

enclosed report. Within the context of this report, the term

Emergency Operating Procedures includes the EOPs, AOPs, and any  ;

procedure referenced within the EOPs and/or AOPs. )

l

During the inspection, two concerns were identified as. potential '

restart issues. These concerns are (1) the philosophy that the

EOPs were to be used as a guideline vice verbatim procedural

compliance, and (2) the adequacy of the flowchart in EOP-0 used

to determine which of the EOPs should be entered to mitigate the

event (paragraphs 2.0 and 4.3.a of the enclosed inspection

report, respectively).

You are requested to respond, in writing, to the above concerns

within thirty days of receipt of this letter identifying those

actions taken r; planned. Your response should contain the

specifics of how the changes will be made, and a schedule of when

the changes will be implemented, including training on the

changes. As discussed in paragraph 9.0 of the enclosed

inspection report, we understand that the response to the two

concerns will be provided to the NRC prior to restart of either

unit.

In addition, Attachment 4 to the enclosed inspection report

identifies several other weaknesses relative to implementation of

the EOPs. You are requested to respond to the identified

weaknesses within sixty days of receipt of this latter.

890808034k$$0

PDR sDOC bob 17

PDC

k

I\ '{H

- - _ - -

d

_ _ _ _ _ _ _ _ _ _ _ - -

-

.. .

e

i s

e

Baltimore Gas & Electric Company 2

The responses requested by this letter are not subject to the

clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10CFR2.790 of the Commission's regulations, a

copy of this letter and its enclosure will be placed in the NRC

Public Document Room.

Should you have any questions regarding the commitments

identified in this letter or the enclosed report, please contact

me.

Sincerely,

Crigiral Signod Byi

Robert M. Gallo, Chief

Operations Branch

Division of Reactor Safety

Enclosure: Inspection Report Nos. 50-317/89-80 and 50-318/89-80

,

w/ Attachments 1, 2, 3, and 4

1

cc w/ enclosure and attachments 1, 2, 3, and 4:

l L. Russell, Manager, Nuclear Power Department

K. Nietman, General Supervisor Nuclear Training

Senior Resident Inspector

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

l State of Maryland (2)

bec w/ enclosure and attachments 1, 2, 3, and 4:

R. M. Gallo, Chief OPS, DRS

P. W. Eselgroth, Chief, PWR, DRS

B. S. Norris, PWR, DRS

G. W. Lapinsky, NRR

bec w/ enclosure but w/o attachments:

S. B. Sun, NRR

D. T. Moy, STP, ENG, DRS Region I Docket Room (w/ concurrences)

" E. Yachimiak, DRS

A. B. Sutthoff, SAZC DRS Files (2)

L. J. Defferding, PNL

R. D. Warner, PNL

occ U/o encl. or attchnts. Qd

l'anagement Assistant, DRMA fv

Norris Es - '

th D f qr o

RI/DRS R' $ RI/DRS

07/ 3 /89 07/f7/89 0 89