ML20245F249

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-317/89-12 & 50-318/89-12 on 890501-05 & Notice of Violation
ML20245F249
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/16/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20245F253 List:
References
NUDOCS 8906280070
Download: ML20245F249 (2)


See also: IR 05000317/1989012

Text

_

_ _- -

- - - -- - ~ - --

7--- =

N

.

,

.

,

.

g)

o . *
,

[

} h_ . ' N. ;

'

J. ; , -

-

l

t

v, . -

L ~JUN 161989

l

9' Docket No.'50-317,

150-318-

Baltimore Gas.and Electric Company

-

ATTN:1 Mr. George C. Creel-

Vice President'

. Nuclear Energy

. Calvert Cliffs Nuclear Power Plant-

L .MD Rts 2 & 4,.P.O. Box 1535

Lusby, Maryland 20657f

iJ Gentlemen:

f Subject: NRC Inspection No. 50-317/89-12 and 50-318/89-12

i This letter refers to the routine safety; inspection conducted by Mr.'R. K. Mathew:

of this office _on.May 1-5, 1989, at the Calvert Cliffs Units 1 and 2, Lusby,_

Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to

,

the discussions of o'ur findings held by Mr. Mathew with Mr. L.: Russell at the.-

conclusion of the. inspection.

' '

Peas.' examined during this inspection are described in the NRC Region 1

,

inspection Report which is enclosed with this letter. Within.these areas, the

L inspection' consisted of selective examinations ~of procedures and~ representative

L . records,. interviews with personnel, and observations by the. inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance _with NRC requirements,'as set

forth in.the Notice of Violation, enclosed herewith as' Appendix A. These vio--

lations~have been categorized by severity. level in iccordance'with the " General

. Statement of Policy and Procedure for NRC Enforcement Actions, "10 CFR Part 2,

Appendix C (Enforcement Policy)." You are required tn respond to this letter

and in preparing your response, you should follow the instructions in Appendix A.

In addition, it is important that proper management attention be given to the

MOV maintenance program deficiencies identified in this report. We understand

th'at you are in- the process of implementing a new program to address current

deficiencies. During the inspection, your staff agreed to provide the NRC a

written description of plans to upgrade the MOV maintenance programs.

L

'

OFFICIAL RECORD COPY CIR CC 89-12 - 0001.0.0

06/16/89

9906280070 890616 lI

gDR ADOCK0500g7 3'.Q l

c .- .

_ _ _ . __ __ _ _ l

.

- . _ _ _ _ _ _ _ _ ._ _ __ _ _ .

_ _ _ _ _ _ _ _ _ _ -

..,

,

. 'JUN 161989

<

' Baltimore Gas'and Electric Company 2

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

Jcck R. Strosnider

Jacque P. Durr, Chief

Engir.eering Branch

Division of Reactor Safety

Enclosures:

1. Appendix A, Notice of Violation

2. Combined NRC Region I Inspection Report Number 50-317/89-12 and

50-318/89-12

cc w/ enc 1:

W. J. Lippold, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

J. Wiggins, DRP

L. Tripp, DRP

D. Limroth, DRP

P. Wilson, DRP

R. Bores, DRSS

S. McNeil, NRR

PA0 (14) SALP Reports Only

(, $bl Cf

RI: RS RI:DRS RI:DRS

Matbew/geb/rw Anderson Durr

6//G'/89 6//4/89 6/ /k89

0FFICIAL RECORD COPY CIR CC 89-12 - 0001.1.0

06/16/89

!