Forwards Safety Evaluation Accepting Licensee Responses to Generic Ltr 83-28,Item 4.5.3, Reactor Trip Reliability - On-Line Functional Testing of Reactor Trip Sys. Testing Intervals Consistent W/Achieving Trip Sys Availability
ML20245E851
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/22/1989
From: Mcneil S
Office of Nuclear Reactor Regulation
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20245E855 List:
References
GL-83-28, TAC-53969, TAC-53970, NUDOCS 8906270477
Download: ML20245E851 (2)


Text

. . _ . _ _ _ _ _ _ -

1 j

June 22,.1989 t .

)

'i.

Docket Nos. 50-317 DISTRIBUTION and 50 318 YGeoctet4He R NRC & Local PDRs PDI.1 Rdg SVarga j!

Mr. G. C. Creel BBoger Vice President - Nuclear Energy CVogan Baltimore Gas and Electric Company RCapra Calvert Cliffs Nuclear Power Plant .SMcNeil MD Rtes. 2 & 4 OGC P.O. Box 1535 EJordan-Lusby, Maryland 20657 BGrimes i ACRS (10).

Dear Mr. Creel:

LTripp-

SUBJECT:

SAFETY EVALUATION FOR GENERIC LETTER 83 28, ITEM 4.5.3, REACTOR TRIP RELIABILITY . OH-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (UNIT 1 TAC 53969; UNIT 2 TAC 53970).

Generic Letter 83 28, Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.

By letters dateo aovember 5, 1983, February 29,1984, April 2,1985 and July 12, 1985, you submitted responses to Generic Letter 83 28, Item 4.5.3. Therein you-indicated your endorsement of the C.E Owners' Groups Report CE NPSD.277, as being applicable to Calvert Cliffs. The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, hac reviewed your responses and the C-E Owners Group's report. We conclude that the existing intervals for on-line functional testing at Calvert Cliffs are consistent with achieving high reactor trip system availability.

The enclosed safety evaluation and contractor's report (EGG-NTA 8341) provide the details and basis for our conclusion. Therefore, we consider Generic Letter 83 28, Item 4.5.3 to be complete.

Sincerely, ,

Do t I co o UQ ??f Scott Alexander McNeil, Project Manager i r,. x Project Directorate I-1  ;

I Q8 Division of Reactor Projects I/II i oc j 7

Enclosures:

L As stated j)pp  ;

cc w/ enclosures:

See next page 1

[SAFETYEVALUATION 53969,53970]

UFC :PDI.1 :PDI-1 :PDI-L

.....:.........p..:.....

NAME :CVogan CA>

SMcN
7. . : . . .f /./.:: . . . . . : . .: . . . . _ _ _ . . . : .. . _ _ _ . . . . _ _

ah :RCapra DATE:6/%/89 :6/2//89 :6/&/89  :  : -

OFFICIAL. RECORD COPY l

Mr. G. C. Creel Raltimore Gas & Electric Company Calvert Cliffs kuclear Power Plant I

cc: l l

Mr. William T. Bowen, President Calvert County Board of ,

Commissioners  !

Prince Frederick, Maryland 20768

]

D. A. Brune. Esq. )

General Counsel i Baltimore Gas and Electric Company P. O. Box 1475 Raltimore, Maryland 21203 )

Mr. Jay E. Silberg, Eso.

Shaw, Pittman, Potts and Trowbridge 1 1800 M Street, NW j Washington, DC 20036

]

Mr. W. J. Lippold, General Supervisor Technical Services Engineering ,

Calvert Cliffs Nuclear Power Plant l us ary and b6 Resident Inspector c/o U.S. Nuclear Regulatory Comission P. O. Box 437 Lusby, Maryland ?0657 Department of Natural Resources Energy Administration, Pcwer Plant Siting Program ATTN: Mr. T. Magette Tawes State Office Building Annapolis, Maryland 21204  ;

)

Regional Administrator, Region I l U.S. Nuclear Regulatory Comission .

475 Allendale Road I King of Prussia, Pennsylvania 19406 1

i

.