Forwards Change/Rev 31 to Haddam Neck Plant Updated FSAR Dtd Mar 1998,including FSAR Approved Change Requests 97-CY-50, 52,53,98-CY-1,3,4,6,8,several Administrative Changes & up- Dated Drawings.W/Insert Instructions & Effective Pages ListML20217F149 |
Person / Time |
---|
Site: |
Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
---|
Issue date: |
04/08/1998 |
---|
From: |
Sarver S CONNECTICUT YANKEE ATOMIC POWER CO. |
---|
To: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
---|
Shared Package |
---|
ML20217F153 |
List: |
---|
References |
---|
NL-CY-98-029, NL-CY-98-29, NUDOCS 9804280078 |
Download: ML20217F149 (28) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195F9011999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations ML20207E9031999-06-0202 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Mt Masnik Will Be Section Chief for Haddam Neck.Organization Chart Encl ML20207B9301999-05-25025 May 1999 Responds to 990114 Correspondence Re Changes to Plant Defueled Physical Security Plan Rev 1 Submitted Under 10CFR50.54(p).Implementation of Changes Subj to Insp to Confirm Changes Have Not Decreased Security Plan ML20207G1761999-05-21021 May 1999 Forwards Insp Rept 50-213/99-01 on 980119-990419 & Closure of CAL 1-97-010.No Violations Noted.Conduct of Activities Associated with Control of Radiological Work at Haddam Neck Generally Characterized as Careful & Thorough ML20206R7221999-05-12012 May 1999 Refers to Investigation 1-97-031 on 970616-0718 & Forwards Nov.Investigation Found That Recipient Deliberately Did Not Follow Radiation Protection Procedures,Falsified Documents & Provided Incomplete & Inaccurate Info to NRC ML20206R8051999-05-12012 May 1999 Responds to 3 Investigations,Repts 1-97-031,008 & 1-98-008 Between 970314 & 980722 as Well as Insp Conducted Between 980720 & 1102.Forwards Synopsis of 3rd OI Investigation ML20206R7021999-05-12012 May 1999 Refers to Investigation 1-97-008 Conducted by Region I & Forwards Notice of Violation.Investigation Found That Recipient Deliberately Attempted to Conceal Release of Contaminated Video Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206C8631999-04-28028 April 1999 Forwards Amend 194 to License DPR-61 & Safety Evaluation. Amend Authorizes Relocation of Requirements Related to Seismic Monitoring Instrumentation from TSs to Technical Requirements Manual ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl ML20205J7931999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20207B6641999-02-26026 February 1999 Forwards Insp Rept 50-213/98-06 on 981103-990118 & Notice of Violation Re Locked High Radiation Area Doors That Were Found Unlocked by Staff.Security Program Was Also Inspected ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors ML20203H9621999-02-17017 February 1999 Responds to to Dk Rathbun Which Forwarded Number of Questions from Constituent Re Spent Fuel Decommissioned Nuclear plants.NUREG-1628, Staff Responses to Frequently Asked Questions Re Decommissioning of NPPs Encl.W/O Encl CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS CY-99-023, Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol1999-01-28028 January 1999 Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 ML20206R6051999-01-11011 January 1999 Ack Receipt of Submiting Sf Mgt Plan.Staff Has Reviewed Plan & Notes Plan to Store Sf in SFP Until DOE Takes Physical Possession of Fuel DD-98-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 9812221998-12-22022 December 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 981222 CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included ML20198R1321998-12-21021 December 1998 Forwards Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted.Insp Completes Review of Licensee Actions Described in ,In Response to NOV & Proposed Imposition of Civil Penalties ML20198K8651998-12-21021 December 1998 Ack Receipt of ,Requesting Corrected Pages to Be Issued for License Amend 193,issued on 980630.Informs That Inconsistencies Found When Comparing Corrected Pages Submitted on 981030 & License Amend Application CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20195J3571998-11-19019 November 1998 Forwards Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.Exemption Submitted in Response to 971007 Application & Suppls & 1218,requesting Reduction in Amount of Insurance Required for Facility 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARCY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs CY-98-191, Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.471998-11-0505 November 1998 Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.47 CY-98-140, Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual1998-11-0202 November 1998 Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual CY-98-183, Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr1998-10-30030 October 1998 Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr CY-98-199, Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager1998-10-30030 October 1998 Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager CY-98-062, Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items1998-10-28028 October 1998 Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items CY-98-154, Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE1998-10-28028 October 1998 Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE CY-98-129, Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated1998-10-14014 October 1998 Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated CY-98-186, Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl1998-10-0202 October 1998 Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl CY-98-153, Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment1998-09-30030 September 1998 Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment CY-98-157, Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl1998-09-28028 September 1998 Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl B17440, Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 19971998-09-24024 September 1998 Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 1997 CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct1998-09-21021 September 1998 Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct ML20153G3891998-09-14014 September 1998 Informs That Union of Concerned Scientists Fully Supports Citizens Awareness Network Petition Filed Pursuant to 10CFR2.206,seeking to Revoke or Suspend License for Haddam Neck Nuclear Plant ML20154J9861998-09-11011 September 1998 Forwards for Service Upon Lj Callan,Jc Hoyle & Commission, Request for NRC to Revoke Connecticut Yankee Atomic Power Co License to Operate Haddam Neck Reactor Pursuant to 10CFR2.206 ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 B17420, Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d)1998-08-31031 August 1998 Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d) CY-98-107, Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated1998-08-25025 August 1998 Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated B17384, Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr1998-08-20020 August 1998 Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr CY-98-141, Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments1998-08-13013 August 1998 Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments CY-98-145, Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 9808171998-08-13013 August 1998 Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 980817 CY-98-132, Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers1998-07-31031 July 1998 Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers CY-98-127, Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid1998-07-30030 July 1998 Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid CY-98-118, Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented1998-07-21021 July 1998 Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented CY-98-121, Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed1998-07-16016 July 1998 Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed ML20151Z0221998-07-10010 July 1998 Informs That R Bassilakis & Gejdenson Share Same Concerns Re Recent Incidents at Connecticut Yankee Reactor in Haddam Neck,Ct & Hope That NRC Address Concerns Promptly ML20236P0971998-07-0909 July 1998 Inquires About Truth of Cyap Having No Shift Compliment of Licensed Operators at Haddam Neck Reactor ML20239A0651998-07-0707 July 1998 Discusses 980620 Inadvertent Radwaste Discharge from Plant Reactor.Team of NRC Inspectors,Completely Independent of Region I,Requested to Investigate Region I Ability to Regulate Effectively 1999-09-02
[Table view] |
Text
!
c Corn:cticut Ycnkte Atomic Pow:r Comp:ny Date of Distribution: 04-22-98
~
Notice of Receipt of Plant Procedure UFSAR Change No.: 98-1 NRC Region 1 Office To:
Copy No.: COPY # 197 Please revise your controlled copy per instructions below:
INSERT: Change No. 31 into your controlled manual according to the instructions provided.
l ATTACli:
REMOVE:
REPLACE the spine labels with the attached labels. They have a new controlled copy number, which is consistent with the controlled number assigned to you by Administration.
I have read and am aware of the provisions of the above listed documents. This acknowledges receipt of the revisions listed above. In addition, all superseded pages have been removed and destroyed. U Signature: Date:
0 \{
. 0 0 01 Please Return This Sheet to the Administrative Office, Connecticut Yankee Within Thirty (30) Days.
Reference:
(Emergency Plan Procedures) ACP 1.2-61 10CFR$0 4 (t)($) Rev.IB 9804280078 980408 PDR ADOCK t'5000213 K PDR
/
l Connecticut Connecticut Connecticut Yankee Yankee Yankee Atomic Atomic Atomic Power Power Power Company Company Company l
U U U l F F F S S S :
A A A R R R VOLUME 1 VOLUME 2 VOLUME 3
- opy No.19: :opy No.191
CONNECTICUT YANKEE ATOMIC POWER COMPANY
/^) HADDAM NECK PLANT 362 INJUN HOLLOW ROAD = EAST HAMPTON CT 06424-3099 April 8,1998 NL/CY-98-029 To: Controlled Copyholders Haddam Neck Plant Updated Final Safety Analysis Report From: S. J. Sarver,. /. Mcpwe4/
Nuclear Licensi g Extension 3936
Subject:
Distribution of Change No. 31 to the Haddam Neck Plant Updated Final Safety Analysis Report (UFSAR)
Attached, please find the subject change, dated March 1998, for insertion in your copy of the Haddam Neck Plant UFSAR. This change includes approved FSARCRs 97-CY-50,97-CY-52, 97-CY-53, 98-CY-1, 98-CY-3, 98-CY-4, 98-CY-6, 98-CY-8, several administrative changes, and updated drawings.
')
Also included are new spines for the manual. These spines should replace those presently existing. The copy number on the new spine should match the one appearing on the attached receipt form.
Please complete and return the attached receipt acknowledgment form to CY Administration acknowledging that you have received and have incorporated this change into your controlled copy of the UFSAR.
All obsolete pages should be removed and revised or new pages should be inserted in accordance with the attached insertion instruction to ensure compatibility with the List of Effective Pages.
SJS/jmc ATTACHMENT cc: (w/o attachments)
J. Burdick G. P. van Noordennen Nuclear Records Il CY NL Memo File LJ l 1
HADDAM NECK PLANT UFSAR INSERT INSTRUCTIONS (CHANGE NO.31 MARCH 1998)
O v
Location - Remove Page - cinsert Page 1 FSARCR Volume 1-:
UFSAR Figure to Drawing Matrix Pages 1 through 5 FD-1 through FD-9 Administrative Drawing to UFSAR Figure Matrix Pages 1 through 5 DF-1 through DF-9 Administrative List of Effective Pages N/A EP-1 through EP-7 Administrative Sununary Table of Contents Pages i through iv Pages i through iv Administrative l Location : Remove Page : Insert Page < FSARCR .
- Volume 1, Chapter 1 1.1-1 1.1-1 98-06 1.1-2 1.1-2 98-06 Chapter 3 3.7-12 3.7-12 Administrative Figure 3.8-10 Sheet 1 Figure 3.8-10 Sheet 1 Administrative Chapter 4 4-i 4-i Administrative 4-iii 4-iii Administrative 4.3-1 4.3-1 Administrative 4.5-1 4.5-1 Administrative 4.5-3 4.5-3 Administrative Figure 4.5-5 N/A Administrative
(~ Chapter 5 5-iii 5-iii Administrative 5.1-4 5.1-4 Administrative Figure 5.1-1 Sheet 1 Figure 5.1-1 Sheet 1 98-01 Figure 5.1-2 (Sheets 1 through 6) N/A Administrative 5.3-1 5.3-1 Administrative
- Volume.2 Chapter 6 6.4-2 6.4-2 98-06 6.4-3 6.4-3 Administrative Figure 6.3-1 Figure 6.3-1 98-01 Figure 6.4-1 Figure 6.4-1 98-06 Chapter 7 7.7-1 7- 1
. Administrative Chapter 8 Figure 8.3-4 Sheet 1 Figure 8.3-4 Sheet 1 Administrative Figure 8.3-5 Figure 8.3-5 97-52 Chapter 9 9.1-4 9.1-4 Administrative 9.1-6 9.1-6 Administrative Figure 9.2-1 Sheet 1 Figure 9.2-1 Sheet 1 98-08 N/A Figure 9.2-5 Sheet 3 Administrative N/A Figure 9.2-5 Sheet 4 Administrative N/A Figure 9.2-5 Sheet 5 Administrative N/A Figure 9.2-5 Sheet 6 Administrative Figure 9.2-8 Sheet 2 Figure 9.2-8 Sheet 2 98-01 O
v Figure 9.3-1 Sheet 1 Figure 9.3-2 Sheet 4 Figure 9.3-1 Sheet 1 Figure 9.3-2 Sheet 4 97-50 98-01 Figure 9.3-2 Sheet 5 Figure 9.3-2 Sheet 5 98-01 Page 11-1 of11-2 March 1998 ,
1 J
HADDAM NECK PLANT UFSAR INSERT INSTRUCTIONS l (CHANGE NO.31 MARCH 1998)
Location - - Remove Page - Insert Page FSARCR I Figure 9.3-2 Sheet 6 Figure 9.3-2 Sheet 6 98-01 Figure 9.3-2 Sheet 7 Figure 9.3-2 Sheet 7 98-01 Figure 9.3-2 Sheet 8 Figure 9.3-2 Sheet 8 98-01 Figure 9.3-4 Sheet 1 Figure 9.3-4 Sheet 1 98-01 Figure 9.3-7 Sheet 1 Figure 9.3-7 Sheet 1 98-01 Figure 9.3-7 Sheet 2 Figure 9.3-7 Sheet 2 98-01 Figure 9.3-7 Sheet 3 Figure 9.3-7 Sheet 3 98-01 Figure 9.3-7 Sheet 4 Figure 9.3-7 Sheet 4 98-01 Figure 9.3-8 Sheet 1 Figure 9.3-8 Sheet 1 98-01 Figure 9.3-8 Sheet 2 Figure 9.3-8 Sheet 2 98-01 Figure 9.3-8 Sheet 3 Figure 9.3-8 Sheet 3 98-01 Figure 9.3-8 Sheet 4 Figure 9.3-8 Sheet 4 98-01 9.4- 1 9.4-1 Administrative 9.4-2 9.4-2 98-03 9.4-3 through 9.4-6 9.4-3 through 9.4-6 Administrative Figure 9.5-1 Sheet 1 Figure 9.5-1 Sheet 1 97-53 Volume 3 - :
Chapter 10 10.4-1 10.4-1 Administrative Figure 10.4-2 Sheet 1 Figure 10.4-2 98-08 Figure 10.4-4 Figure 10.4-4 Administrative Chapter 11 11.2-2 11.2-2 Administrative Figure 11.3-1 Sheet 3 Figure 11.3-1 Sheet 3 98-01 11.5-3 11.5-3 98-06 11.5-5 11.5-5 98-06 11.5-6 11.5-6 Administrative
- 1.5-7 11.5-7 98-06 Chapter 12 12-i through 12-ii 12-i through 12-ii 98-04 12.1-1 12.1-1 98-04 12.3-1 12.3-1 98-04 12.5-1 through 12.5-11 12.5-1 through 12.5-7 98-04 Table 12.5-1 Table 12.5-1 98-04 Table 12.5-2 Table 12.5-2 98-04 Chapter 13 13.2-1 13.2-1 98-04 Chapter 15 15.5-1 15.5-1 Administrative 15.5-3 15.5-3 Administrative Chapter 16 N/A Tab 16 Administrative O
Page 11-2 of11-2 March 1998
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX Figure Drawing Number Sheet Number Sheet Revision 1.2-1 01 16103-26000 04 14 1.2-1 02 16103-26000 05 2 1.2-1 03 16103-26000 06 8 2.1-1 01 N/A 00 0 2.1-2 01 N/A 00 0 2.1-3 01 N/A 00 0 2.1-4 01 16103-10000 00 1 2.1-5 00 N/A 00 0 2.1-6 01 N/A 00 0 2.3-1 01 N/A 00 0 2.4-1 01 N/A 00 0 2.5-1 01 16103-11004 00 1 2.5-2 01 16103-11003 01 2 l 2.5-3 01 16103-11003 02 2 2.5-4 01 16103-11003 03 1 3.7 1 01 N/A 00 0 3.7-2 01 N/A 00 0 3.7-3 01 N/A 00 0 3.7-4 01 N/A 00 0 3.7-5 01 N/A 00 0 3.7-6 01 N/A 00 0 FD-1 of FD-9 March 1998 l
HADDAM NECK PLANT UFSAR i
UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX (v) Figure Drawing Number Sheet Number Sheet Revision 3.7-7 01 N/A 00 0 3.8-1 01 16103-27002 00 14 3.8-2 01 16103-27003 00 7 3.8-3 01 16103-27004 01 11 3.8-4 01 16103-27005 00 11 3.8-5 01 16103-27006 00 11 3.8-6 01 16103-27007 00 7 3.8-7 01 16103-27042 01 17 3.8-8 01 16103-27042 02 11 3.8-9 01 16103-27036 00 12 3.8-10 01 16103-22027 02 7 4.2-1 01 N/A 00 0 4.2-1 02 N/A 00 0 4.2-2 01 16103-29696 44 5 4.2-2 02 N/A 00 0 4.2-3 01 16103-29696 47 1 4.2-3 02 N/A 00 0 4.2-4 01 B & W-100117BE 00 0 4.2-5 01 16103-29696 27 7 4.2-5 02 N/A 00 0 4.2-5 03 N/A 00 0 FD-2 of FD-9 Harch 1998
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX O
V Figure Drawing Number Sheet Number Sheet Revision 4.5-1 01 N/A 00 0 4.5-2 01 N/A 00 0 4.5-3 01 N/A 00 0 4.5-4 01 N/A 00 0 i'
5.1-1 01 16103-26007 01 32 5.1-1 02 16103-26007 02 28 l
5.1-1 03 16103-26007 03 32 l 1
5.3-1 01 N/A 00 0 5.4-1 01 N/A 00 0 (q/
5.4-2 01 N/A 00 0 6.2-1 01 N/A 00 0 6.3-1 01 16103-26028 00 37 6.3-2 01 16103-26010 01 13 ,
I 6.3-2 02 16103-26010 02 5 6.4-1 01 N/A 00 0 8.1-1 01 16103-30002 00 38 8.2-1 01 16103-33004 00 9 8.3-1 01 16103-30003 00 30 8.3-2 01 16103-30011 00 29 8.3-3 01 16103-33002 00 19 8.3-3 02 16103-27084 03 2 FD-3 of FD-9 March 1998 I
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX Figure Drawing Number Sheet Number Sheet Revision 8.3-4 01 16103-27075 01 6 8.3-5 01 16103-26020 01 24 8.3-6 01 16103-26020 02 12 8.3-7 01 16103-30008 01 26 8.3-7 02 16103-30008 02 7 9.1 1 01 16103-26049 01 24 9.1-2 00 N/A 00 0 9.2-1 01 16103-26014 01 25 9.2-1 02 16103-26014 02 31 9.2-1 03 16103-26014 03 20 9.2-1 04 16103-26014 04 13 9.2-1 05 16103-26014 05 23 9.2-1 06 16103-26014 06 25 9.2-1 07 16103-26014 07 22 9.2-1 08 16103-26014 08 7 9.2-1 09 16103-26014 09 6 9.2-2 01 16103-26008 03 13 9.2-2 02 16103-26008 04 12 9.2-2 03 16103-26008 05 20 9.2-2 04 16103-26008 06 4
( 9.2-2 05 16103-26008 07 2 FD-4 of FD-9 March 1998
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX Figure Drawing Number Sheet Number Sheet Revision 9.2-3 01 16103-26027 01 8 9.2-3 02 16103-26027 02 11 9.2-4 01 16103-26003 01 25 9.2-4 02 16103-26003 02 16 9.2-5 01 16103-26067 01 2 9.2-5 02 16103-26067 02 1 9.2-5 03 16103-26067 03 1 9.2-5 04 16103-26067 04 1 9.2-5 05 16103-26067 05 1 9.2-5 06 16103-26067 06 1 9.2-6 01 16103-26047 00 12 9.2-7 01 16103-26055 01 16 9.2-8 01 16103-26046 Ol' 19 9.2-8 02 16103-26046 02 14 9.2-8 03 16103-26046 03 1 9.3-1 01 16103-26051 01 13 9.3-1 02 16103-26051 02 7 l
9.3-1 03 16103-26051 03 8 9.3-1 04 16103-26051 04 2 9.3-2 01 16103-26052 01 29 l 9.3 2 02 16103-26052 02 19 FD-5 of FD-9 March 1998 J
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX (Q Figure Drawing Number Sheet Number Sheet Revision 9.3-2 03 16103-26052 03 13 9.3-2 04 16103-26052 04 16 9.3-2 05 16103-26052 05 8 9.3 2 06 16103-26052 06 18 9.3-2 07 16103-26052 07 3 9.3-2 08 16103-26052 08 6 9.3-2 09 16103-26052 09 1 9.3-3 01 16103-26054 00 20 9.3-4 01 16103-26009 01 9 r" 9.3-4 02 16103-26009 02 5 9.3-5 01 16103-26057 00 12 l
9.3-6 01 16103-26055 03 5 9.3-7 01 16103-26018 01 24 9.3-7 02 16103-26018 02 26 9.3-7 03 16103-26018 03 26 9.3-7 04 16103-26018 04 30 9.3-7 05 16103-26018 05 15 l
9.3-7 06 16103-26018 06 16 {
9.3-8 01 16103-26004 01 17 9.3-8 02 16103-26004 02 9 9.3-8 03 16103-26004 03 8 FD-6 of FD-9 March 1998 i
IIADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX Figure Drawing Number Sheet Number Sheet Revision 9.3-8 04 16103-26004 04 4 i
9.4-1 01 16103-26024 01 14 9.4 1 02 16103-26024 02 21 9.4-1 03 16103-26024 03 8 9.4-1 04 16103-26024 04 8 9.4-1 05 16103-26024 05 13 9.4-2 01 16103-26063 01 2 9.4-2 02 16103-26063 02 5 9.5-1 01 16103-26056 01 31 9.5-1 02 16103-26056 02 9 9.5-1 03 16103-26056 03 5 l
9.5-1 04 16103-26056 04 6 9.5-1 05 16103-26056 05 4 9.5-1 06 16103-26056 06 3 9.5-1 07 16103-26056 07 2 9.5-1 08 16103-26056 08 4 9.5-1 09 16103-26056 09 2 9.5-1 10 16103-26056 10 5 9.5-1 11 16103-26056 11 4 j 9.5-1 12 16103-26056 12 2 9.5-1 13 16103-26056 13 5 FD-7 of FD-9 March 1998 l
)
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX Figure Drawing Number Sheet Number Sheet Revision 9.5-1 14 16103-26056 14 3 9.5-1 15 16103-26056 15 1 9.5-1 16 16103-26056 16 1 10.2 1 01 16103-26055 02 14 10.3-1 01 16103-26012 01 26 10.3-1 02 16103-26012 02 20 10.3-1 03 16103-26012 03 15 4
10.3-1 04 16103-26012 04 9 10.3-1 05 16103-26012 05 10 10.3-1 06 16103-26012 06 5 10.3-1 07 16103-26012 07 9 10.3-1 08 16103-26012 08 17 10.3-1 09 16103-26012 09 14 10.3-1 10 16103-26012 10 9 10.3-1 11 16103-26012 11 7 10.3-2 01 16103-26068 00 5 1
10.4-1 01 16103-26017 00 29 10.4-2 01 16103-27058 01 12 l 10.4-3 01 16103-27058 02 6 10.4-4 00 16103-10008 00 9 10.4-5 01 16103-26013 01 52 FD-8 of FD-9 March 1998
HADDAM NECK PLANT UFSAR UFSAR FIGURE NUMBER TO DRAWING NUMBER MATRIX Figure Drawing Number Sheet Number Sheet Revision 10.4-5 02 16103-26013 02 22 10.4-5 03 16103-26013 03 19 10.4-5 04 16103-26013 04 12 10.4-5 05 16103-26013 05 16 10.4-5 06 16103-26013 06 13 10.4-5 07 16103-26013 07 8 l 10.4-5 08 16103-26013 08 7 10.4-5 09 16103-26013 09 19 10.4-5 10 16103-26013 10 16 l 10.4-5 11 16103-26013 11 14 10.4-5 12 16103-26013 12 11 1
10.4-5 13 16103-26013 13 14 i
10.4-6 01 16103-26016 01 27 11.2-1 01 16103-26030 01 19 11.2-1 02 16103-26030 02 26 11.2-1 03 16103-26030 03 5 11.2-1 04 16103-26030 04 18 11.2-1 05 16103-26030 05 4 11.3-1 01 16103-26031 01 13 11.3-1 02 16103-26031 02 16 11.3-1 03 16103-26031 03 6 FD-9 of FD-9 March 1998 l
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure Number Sheet Revision Number Sheet N/A 00 0 2.1-1 01 N/A 00 0 2.1-2 01 N/A 00 0 2.1 -3 01 N/A 00 0 2.1-5 00 N/A 00 0 2.1-6 01 i
N/A 00 0 2.3-1 01 N/A 00 0 2.4-1 01 N/A 00 0 3.7-1 01 ,
{
N/A 00 0 ~
3.7-2 01 1 1
N/A 00 0 l
[- 3.7-3 01 k
N/A 00 0 3.7-4 01 N/A 00 0 3.7-5 01 )
N/A 00 0 3.7-6 01 N/A 00 0 3.7-7 01 N/A 00 0 4.2-1 01 N/A 00 0 4.2-1 02 N/A 00 0 4.2-2 02 N/A 00 0 4.2-3 02 N/A 00 0 4.2-5 02 N/A 00 0 4.2-5 03 N/A 00 0 4.5-1 01 DF-1 of DF-9 March 1998 i
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure ]
Number Sheet Revision Number Sheet j N/A 00 0 4.5-2 01
{
I N/A 00 0 4.5-3 01 N/A 00 0 4.5-4 01 l l
N/A 00 0 5.3-1 01 N/A 00 0 5.4-1 01 N/A 00 0 5.4-2 01 N/A 00 0 6.2-1 01
/
N/A 00 0 6.4-1 01 N/A 00 0 9.12 00 16103-10000 00 1 2.1-4 01 16103-10008 00 9 10.4-4 00 16103-11003 01 2 2.5-2 01 16103-11003 02 2 2.5-3 01 16103-11003 03 1 2.5-4 01 16103-11004 00 1 2.5-1 01 16103-22027 02 7 3.8-10 01 16103-26000 04 14 1.2-1 01 16103-26000 05 2 1.2-1 02 16103-26000 06 8 1.2-1 03 i
16103-26003 01 25 9.2-4 01 16103-26003 02 16 9.2-4 02 ,
DF-2 of DF-9 March 1998
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX 3 r\ l
() Drawing Figure j Number _. Sheet Revision Number Sheet i 16103-26004 01 17 9.3-8 01 16103-26004 02 9 9.3-8 02 l
16103-26004 03 8 9.3-8 03 16103-26004 04 4 9.3-8 04 16103-26007 01 32 5.1-1 01 16103-26007 02 28 5.1-1 02 16103-26007 03 32 5.1-1 03
)
16103-26008 03 13 9.2-2 01 l
16103-26008 04 12 9.2-2 02 l 16103-26008 05 20 9.2-2 03 O 16103-26008 06 4 9.2-2 04 l 16103-26008 07 2 9.2-2 05 !
16103-26009 01 9 9.3-4 01 16103-26009 02 5 9.3-4 02 16103-26010 01 13 6.3-2 01 16103-26010 02 5 6.3-2 02 16103-26012 01 26 10.3-1 01 16103-26012 02 20 10.3-1 02 16103-26012 03 15 10.3-1 03 16103-26012 04 9 10.3-1 04 16103-26012 05 10 10.3-1 05 DF-3 of DF-9 March 1998 l
J
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX l Drawing Figure Number Sheet Revision Number Sheet 16103-26012 06 5 10.3 1 06 l
16103-26012 07 9 10.3-1 07 16103-26012 08 17 10.3-1 08 16103-26012 09 14 10.3-1 09 16103-26012 10 9 10.3-1 10 16103-26012 11 7 10.3-1 11 16103-26013 01 52 10.4-5 01 16103-26013 02 22 10.4 5 02 l
16103-26013 03 19 10.4-5 03 1 16103-26013 04 12 10.4-5 04 ,
16103-26013 05 16 10.4-5 05 I 16103-26013 06 13 10.4-5 06 16103-26013 07 8 10.4-5 07 16103-26013 08 7 10.4-5 08 16103-26013 09 19 10.4-5 09 16103-26013 10 16 10.4-5 10 16103-26013 11 14 10.4-5 11 16103-26013 12 11 10.4-5 12 16103-26013 13 14 10.4-5 13 16103-26014 01 25 9.2-1 01 16103-26014 02 31 9.2-1 02 DF-4 of DF-9 March 1998
IIADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure Number Sheet Revision Number Sheet 16103-26014 03 20 9.2-1 03 16103-26014 04 13 9.2-1 04 16103-26014 05 23 9.2-1 05 16103-26014 06 25 9.2-1 06 16103-26014 07 22 9.2-1 07 16103-26014 08 7 9.2-1 08 1
16103-26014 09 6 9.2-1 09 1
16103-26016 01 27 10.4-6 01 16103-26017 00 29 10.4-1 01 16103-26018 01 24 9.3-7 01 O 16103-26018 02 26 9.3-7 02 16103-26018 03 26 9.3-7 03 16103-26018 04 30 9.3-7 04 16103-26018 05 15 9.3-7 05 16103-26018 06 16 9.3-7 06 16103-26020 01 24 8.3-5 01 16103-26020 02 12 8.3-6 01 16103-26024 01 14 9.4-1 01 16103-26024 02 21 9.4-1 02 16103-26024 03 8 9.4-1 03 16103-26024 04 8 9.4-1 04 DF-5 of DF-9 March 1998
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure Number Sheet Revision Number Sheet 16103-26024 05 13 9.4-1 05 16103-26027 01 8 9.2-3 01 16103-26027 02 11 9.2-3 02 16103-26028 00 37 6.3-1 01 16103-26030 01 19 11.2-1 01 16103-26030 02 26 11.2-1 02 16103-26030 03 5 11.2-1 03 16103-26030 04 18 11.2-1 04 16103-26030 05 4 11.2-1 05 16103-26031 01 13 11.3-1 01 16103-26031 02 16 11.3-1 02 16103-26031 03 6 11.3-1 03 16103-26046 01 19 9.2-8 01 j
l 16103-26046 02 14 9.2-8 02 16103-26046 03 1 9.2-8 03 16103-26047 00 12 9.2-6 01 16103-26049 01 24 9.1-1 01 16103-26051 01 13 9.3-1 01 16103-26051 02 7 9.3-1 02 16103-26051 03 8 9.3-1 03
( 16103-26051 04 2 9.3-1 04 DF-6 of DF-9 March 1998
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure
. Number Sheet Revision Number Sheet 16103-26052 01 29 9.3-2 01 16103-26052 02 19 9.3-2 02 16103-26052 03 13 9.3-2 03 16103-26052 04 16 9.3-2 04 16103-26052 05 8 9.3-2 05 16103-26052 06 18 9.3-2 06 16103-26052 07 3 9.3-2 07 16103-26052 08 6 9.3-2 08 16103-26052 09 1 9.3-2 09 16103-26054 00 20 9.3-3 01 O 16103-26055 01 16 9.2-7 01 16103-26055 02 14 10.2-1 01 16103-26055 03 5 9.3-6 01 16103-26056 01 31 9.5-1 01 16103-26056 02 9 9.5-1 02 16103-26056 03 5 9.5-1 03 16103-26056 04 6 9.5-1 04 16103-26056 05 4 9.5-1 05 16103-26056 06 3 9.5-1 06 16103-26056 07 2 9.5-1 07 16103-26056 08 4 9.5-1 08 DF-7 of DF-9 March 1998
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure Number Sheet Revision Number Sheet 16103-26056 09 2 9.5-1 09 16103-26056 10 5 9.5-1 10 16103-26056 11 4 9.5-1 11 16103-26056 12 2 9.5-1 12 16103-26056 13 .5 9.5-1 13 16103-26056 14 3 9.5-1 14 16103-26056 15 1 9.5-1 15 16103-26056 16 1 9.5-1 16 16103-26057 00 12 9.3-5 01 16103-26063 01 2 9.4-2 01 16103-26063 02 5 9.4-2 02 16103-26067 01 2 9.2-5 01 16103-26067 02 1 9.2-5 02 16103-26067 03 1 9.2-5 03 16103-26067 04 1 9.2-5 04 16103-26067 05 1 9.2-5 05 16103-26067 06 1 9.2-5 06 16103-26068 00 5 10.3-2 01 16103-27002 00 14 3.8-1 01 16103-27003 00 7 3.8-2 01 16103-27004 01 11 3.8-3 01 i
DF-8 of DF-9 March 1998 ,
l l
HADDAM NECK PLANT UFSAR DRAWING NUMBER TO UFSAR FIGURE NUMBER MATRIX Drawing Figure Number Sheet Revision Number Sheet 16103-27005 00 11 3.8-4 01 16103-27006 00 11 3.8-5 01 16103-27007 00 7 3.8-6 01 16103-27036 00 12 3.8-9 01 16103-27042 01 17 3.8-7 01 !
16103-27042 02 11 3.8-8 01 16103-27058 01 12 10.4-2 01 16103-27058 02 6 10.4-3 01 16103-27075 01 6 8.3-4 01 q 16103-27084 03 2 8.3-3 02 U
16103-29696 27 7 4.2-5 01 16103-29696 44 5 4.2-2 01 16103-29696 47 4.2-3 1 01 16103-30002 00 38 8.1-1 01 16103-30003 00 30 8.3-1 01 16103-30008 01 26 8.3-7 01 16103-30008 02 7 8.3-7 02 16103-30011 00 29 8.3-2 01 16103-33002 00 19 8.3-3 01 16103-33004 00 9 8.2-1 01 B & W-100117BE 00 0 4.2-4 01 DF-9 of DF-9 March 1998
HADDAM NECK PLANT UFSAR LIST OF EFFECTIVE PAGES O Page, Table or Figere Front Mutter Revision Date Pages FD-1 through FD-9 March 1998 Pages DF-1 through DF-9 March 1998 Pages EP-1 through EP-7 March 1998 Pagesi throughiv March 1998 Title Page 0 Page, Table or Figure Chapter 1 Revision Date Pages 1-i through 1-iii January 1998 Pages 1.1-1 through 1.1-2 March 1998 Page 1.1-3 January 1998 Table 1.1-1 January 1998 Pages 1.2-1 through 1.2-8 January 1998 Figure 1.2-1 (Sheets 1 through 3) January 1998 Page 1.3-1 January 1998 Pages 1.4-1 through 1.4-2 January 1998 Pages 1.5-1 through 1.5-2 January 1998 Page 1.6-1 January 1998 Pages 1.7-1 through 1.7-2 January 1998 Pages 1.8-1 through 1.8-2 January 1998 Page, Table or Figure Chapter 2 Revision Date Pages 2-i through 2-v January 1998 i Pages 2.1-1 through 2.1-8 January 1998 Tables 2.1-1 through 2.1-25 January 1998 Figures 2.1-1 through 2.1-6 January 1998 Pages 2.2-1 through 2.2-4 January 1998 Pages 2.3-1 through 2.3-10 January 1998 Tables 2.3-1 through 2.3-2 January 1998 Figure 2.3-1 January 1998 Pages 2.4-1 through 2.4-11 January 1998 i Tables 2.4-1 through 2.4-3B January 1998 Figure 2.4-1 January 1998 Pages 2.5-1 through 2.5-26 January 1998 Tables 2.5-1 through 2.5-3 January 1998 Figures 2.5-1 through 2.5-4 January 1998 O
EP-1 of EP-7 March 1998
l IIADDAM NECK PLANT UFSAR 1 LIST OF EFFECTIVE PAGES t
Page, Table or Figure - Chapter 3 Revision Date Pages 3-i through 3-iv January 1998 Pages 3.1-1 through 3.1-6 January 1998 Pages 3.2-1 through 3.2-4 January 1998 Tables 3.2-1 through 3.2-2 January 1998 Pages 3.3-1 through 3.3-3 January 1998 Pages 3.4 . .hrough 3.4-3 January 1998 Pages 3.5-1 through 3.5-4 January 1998 Pages 3.6-1 through 3.6-2 January 1998 Pages 3.7-1 through 3.7-11 January 1998 Page 3.7-12 March 1998 Pages 3.7-13 through 3.7-28 January 1998 Tables 3.7-1 througn 3.7-6 January 1998 Figures 3.7-1 through 3.7-7 January 1998 j Pages 3.8-1 through 3.8-13 January 1998 !
Table 3.8-1 January 1998 Figures 3.8-1 through 3.8-10 January 1998 )
Pages 3.9-1 through 3.9-3 January 1998 Pages 3.10-1 through 3.10-2 January 1998 Page 3.11-1 January 1998 O
V i Page, Table or Figure Chapter 4 Revision Date l Pages 4-i and 4-iii March 1998 Page 4-ii January 1998 Page 4.1-1 January 1998 Table 4.1-1 January 1998 Pages 4.2-1 through 4.2-7 January 1998 Figure 4.2-1 (Sheets 1 and 2) January 1998 Figure 4.2-2 (Sheets 1 and 2) January 1998 Figure 4.2-3 (Sheets 1 and 2) January 1998 Figure 4.2-4 (Sheet 1) January 1998 Figure 4.2-5 (Sheets 1,2 and 3) January 1998 i Page 4.3-1 March 1998 l Pages 4.3-2 through 4.3-3 January 1998 Page 4.4-1 January 1998 Page 4.5-1 March 1998 Page 4.5-2 January 1998 Page 4.5-3 March 1998 ,
Figures 4.5-1 through 4.5-4 January 1998 Page 4.6-1 January 1998 i O
O EP-2 of EP-7 March 1998
HADDAM NECK PLANT UFSAR LIST OF EFFECTIVE PAGES O
U Page Table or Figure Chapter 5 Revision Date Pages 5-i through 5-ii January 1998 Page 5-iii March 1998 Pages 5.1-1 through 5.1-3 January 1998 Page 5.1-4 March 1998 Page 5.1-5 January 1998 Table 5.1-1 January 1998 Figure 5.1-1 (Sheet 1) March 1998 Figure 5.1-1 (Sheets 2 and 3) January 1998 Pages 5.2-1 through 5.2-3 January 1998 Tables 5.2-1 through 5.2-2 January 1998 Page 5.3-1 March 1998 Page 5.3-2 January 1998 Tables 5.3-1 through 5.3-3 January 1998 Figure 5.3-1 January 1998 Pages 5.4-1 through 5.4-8 January 1998 Tables 5.4-1 through 5.4-4 January 1998 Figures 5.4-1 through 5.4-2 January 1998 Page, Table or Figure Chapter 6 Revision Date O- Pages 6-i through 6-iii January 1998 January 1998 Pages 6.1-1 Table 6.1-1 January 1998 Pages 6.2-1 through 6.2-5 January 1998 Table 6.2-1 January 1998 Figure 6.2-1 January 1998 Pages 6.3-1 through 6.3-4 January 1998 Figure 6.3-1 March 1998 Figure 6.3-2 (Sheets 1 and 2) January 1998 Page 6.4-1 January 1998 Pages 6.4-2 through 6.4-3 March 1998 !
Pages 6.4-4 through 6.4-5 January 1998 Tables 6.4-1 through 6.4-2 January 1998 Figure 6.4-1 March 1998 Page 6.5-1 January 1998 Page 6.6-1 January 1998 O
EP-3 of EP-7 March 1998
HADDAM NECK PLANT UFSAR LIST OF EFFECTIVE PAGES Page, Table or Figure Chapter 7 Revision Date Page 7-i January 1998 Pages 7.1-1 through 7.1-2 January 1998 Page 7.2-1 January 1998 Page 7.3-1 January 1998 Page 7.4-1 January 1998 Page 7.5-1 January 1998 Pages 7.6-1 through 7.6-2 January 1998 Page 7.7-1 March 1998 Page, Table or Figure Cliapter 8 Revision Date Pages 8-i through 8-iii January 1998 Pages 8.1-1 through 8.1-2 January 1998 Table 8.1-1 January 1998 Figure 8.1-1 January 1998 Pages 8.2-1 through 8.2-2 January 1998 Figure 8.2-1 January 1998 Ptges 8.3-1 through 8.3-21 January 1998 Tables 8.3-1 through 8.3-2 January 1998 Figux 8.3-1 (Sheet 1) January 1998 J Figure 8.3-2 (Sheet 1) January 1998 Figure 8.3-3 (Sheets 1 and 2) January 1998 Figure 8.3-4 (Sheet 1) January 1998 Figure 8.3-5 March 1998 Figure 8.3-6 January 1998 Figure 8.3-7 (Sheets 1 and 2) January 1998 Page, Table or Figure Chapter 9 Revision Date Pages 9-i through 9-iv January 1998 Pages 9.1-1 through 9.1-3 January 1998 Page 9.1-4 March 1998 Page 9.1-5 January 1998 Page 9.1-6 March 1998 Figure 9.1-1 January 1998 Figure 9.1-2 January 1998 Pages 9.2-1 through 9.2-16 January 1998 Tables 9.2-1 through 9.2-2 January 1998 Figure 9.2-1 (Sheet 1) March 1998 Figure 9.2-1 (Sheets 2 through 9) January 1998 p Figure 9.2-2 (Sheets I through 5) January 1998 Figure 9.2-3 (Sheets 1 and 2) January 1998
(
Figure 9.2-4 (Sheets 1 and 2) January 1998 EP-4 of EP-7 March 1998
HADDAM NECK PLANT UFSAR LIST OF EFFECTIVE PAGES O Page, Table or Figure Chapter 9 Figure 9.2-5 (Sheets 1 through 6)
Revision Date January *998 Figure 9.2-6 January 1998 Figure 9.2-7 January 1998 Figure 9.2-8 (Sheets 1 and 3) January 1998 Figure 9.2-8 (Sheet 2) March 1998 Pages 9.3-1 through 9.3-10 January 1998 Figure 9.3-1 (Sheet 1) March 1998 Figure 9.3-1 (Sheets 2,3 and 4) January 1998 Figure 9.3-2 (Sheets 1,2,3 and 9) January 1998 Figure 9.3-2 (Sheets 4,5,6,7 and 8) March 1998 Figure 9.3-3 January 1998 Figure 9.3-4 (Sheet 1) March 1998 Figure 9.3-4 (Sheet 2) January 1998 Figure 9.3-5 January 1998 Figure 9.3-6 January 1998 Figure 9.3-7 (Sheets 1,2,3 and 4) March 1998 Figure 9.3-7 (Sheets 5 and 6) January 1998 Figure 9.3-8 (Sheets 1 through 4) March 1998 Pages 9.4-1 January 1998 Pages 9.4-2 through 9.4-6 March 1998 Pages 9.4-7 through 9.4-11 January 1998 Os Figure 9.4-1 (Sheets 1 through 5) January 1998 Figure 9.4-2 (Sheets 1 and 2) January 1998 Pages 9.5-1 through 9.5-18 January 1998 Figure 9.5-1 (Sheet 1) March 1998 Figure 9.5-1 (Sheets 2 through 16) January 1998 Page, Table or Figure Chapter 10 Revision Date Pages 10-i through 10-ii January 1998 Page 10.1-1 January 1998 Pages 10.2-1 through 10.2-2 January 1998 Figure 10.2-1 January 1998 Pages 10.3-1 through 10.3-4 January 1998 Figure 10.3-1 (Sheets 1 through 11) January 1998 Figure 10.3-2 January 1998 Page 10.41 March 1998 Pages 10.4-2 through 10.4-10 January 1998 Figure 10.4-1 January 1998 Figure 10.4-2 March 1998 Figure 10.4-3 January 1998 Figure 10.4-4 January 1998 O Figure 10.4-5 (Sheets 1 through 13)
Figure 10.4-6 January 1998 January 1998 EP-5 of EP-7 March 1998
HADDAM NECK PLANT UFSAR i
LIST OF EFFECTIVE PAGES O Page, Table or Figure Chapter 11 Revision Date Pages ll-i through Il-iii January 1998 Pages 11.1-1 through 11.1-2 January 1998 Page 11.2-1 January 1998 Page 11.2-2 March 1998 Pages 11.2-3 through 11.2-6 January 1998 Table 11.2-1 January 1998 Figure 11.2-1 (Sheet 1) January 1998 Figure 11.2-1 (Sheets 2 through 5) January 1998 Pages 11.3-1 through 11.3-4 January 1998 l Table 11.3-1 January 1998 Figure 11.3-1 (Sheets 1 and 2) January 1998 Figure 11.3-1 (Sheet 3) March 1998 ,
Pages 11.4-1 through 11.4-3 January 1998 Table 11.4-1 January 1998 Pages 11.5-1 through 11.5-2 January 1998 Page 11.5-3 March 1998 Page 11.5-4 January 1998 Pages 11.5-5 through 11.5-7 March 1998 g Tables 11.5-1 through 11.5-2 January 1998
( .
l Page, Table or Figure Chapter 12 Revision Date l Pages 12-i through 12-ii March 1998 Page 12.1-1 March 1998 Page 12.1-2 January 1998 l Page 12.2-1 January 1998 Page 12.3-1 March 1998 Page 12.3-2 January 1998 i Table 12.3-1 January 1998 Page 12.4-1 January 1998 Pages 12.5-1 through 12.5-7 March 1998 Tables 12.5-1 and 12.5-2 March 1998 I
l l
l O ;
EP-6 of EP-7 March 1998 i
IIADDAM NECK PLANT UFSAR LIST OF EFFECTIVE PAGES O
Page, Table or Figure Chapter 13 Revision Date Page 13-i Janua y 1998 Pages 13.1-1 through 13.1-12 January 1998 Page 13.2-1 March 1998 Pages 13.3-1 through 13.3-2 January 1998 Page 13.4-1 January 1998 Pages 13.5-1 through 13.5-4 January 1998 Pages 13.6-1 through 13.6-2 January 1998 Page, Table 0:- Figure Chapter 14 Revision Date Page 14-i January 1998 Page 14.0-1 January 1998 Page, Table or Figure Chapter 15 Revision Date Pages 15-i through 15-ii January 1998 Pages 15.1-1 through 15.1-3 January 1998 Pages 15.2-1 through 15.2-6 January 1998 Page 15.3-1 January 1998 A Page 15.4-1 January 1998 U Page 15.5-1 March 1998 Pages 15.5-2 through 15.5-6 January 1998 Tables 15.5-1 through 15.5-7 January 1998 Page, Table or Figure Chapter 16 Revision Date Page 16-i January 1998 Page 16.1-1 January 1998 l Page, Table or Figure Chapter 17 Revision Date Page 17-i January 1998 Page 17.1-1 January 1998 l
l I
O EP-7 of EP-7 March 1998