ML20217A529

From kanterella
Jump to navigation Jump to search
Notification of 991026 Meeting with Vynpc in King of Prussia,Pa to Discuss Licensee Responses to Maint Rule Violation of 10CFR50.65(a)(3), Balancing Reliability with Unavailability
ML20217A529
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/05/1999
From: Stephanie Coffin
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
99-52, NUDOCS 9910120010
Download: ML20217A529 (4)


Text

  • ,

i e 0ctober 5, 1999 No. 99-52 l

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee: Vermont Yankee Nuclear Power Corporation Facility: Vermont Yankee Docket No: 50-271 Time and Date:- 1:00 p.m., Tuesday, October 26,1999 Location: Public Meeting Room

. USNRC, Region i

< 475 Allendale Road King of Prussia, PA 19406

Purpose:

Licensee Requested Meeting to Discuss Their Response to a Maintenance Rule Violation of 10 CFR 50.65(a)(3), Balancing Reliability with Unavailability l

NRC Attendees: R. Conte, Chief, Human Performance and Emergency Preparedness j Branch (HPEPB), Division of Reactor Safety (DRS), Region I  !

Julian H. Williams, Sr. Operations Engineer, HPEPB, DRS Wayne D. Lanning, Director, DRS Lawrence T. Doerflein, Chief, Engineering Programs Branch, DRS Randall A. Musser, Acting Chief, Projects Branch 5, Division of Reactor Projects (DRP)

Richard Correia, Section Chief, NRR, Division of inspection Program Management, et al., (via Telephone Conference)

Licensee Attendees: Robert Wanczyk, Acting Director of Operations Richard Russin, Manager, Systems Engineering Robert Bums, Maintenance Rule Program Coordinator

- NOTE: This meeting is open for public observation. Attendance by additional NRC personnel or handicapped persons requiring assistance should be made known by October 16,1999, via telephone call to Stephanie Coffin, Region I, at 610-337-5227.

Original Signed by:

Prepared by: Robert J. Summers for Stephanie M. Coffin, Acting Chief Projects Branch 5 DRP, Region l I

O 9910120010 991Gv5 PDR ADOCK 05000271 P PDR C I

0FFICIAL RECORD COPY IE:45

r-1 2

cc:

R. McCullough, Operating Experience Coordinator - Vermont Yankee G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation D. Rapaport, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

D. Lewis, Esquire l G. Bisbee, Esquire l J. Block, Esquire T. Rapone, Massachusetts Executive Office of Public Safety D. Katz, Citizens Awareness Network (CAN)

M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

State of New Hampshire, SLO Designee State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee 1

I

1

[.

ls F

y 3

! Distribution:

R. Wanczyk, Acting Director of Openstions H. Miller, RA/J. Wiggins, DRA L C. Anderson, DRP l- R. Summers, DRP

! State of Vermont -

, ' Regional Administrator, Secretary, RI l DRP Division Secretary, RI l DRS Division Secretary, RI l DNMS Division Secretary, RI DRM Division Secretary, RI Region i Receptionist l _ Region I Docket Room (with concurrences)

. PUBLIC Nuclear Safety Information Center (NSIC)

NRC Resident inspector R. Junod, DRP Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO M. Knapp, Deputy Executive Director for Materials, Research and State Programs, OEDO L F. Miraglia, Jr., Deputy Executive Director for Reactor Programs, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation, NRR l D. Matthews, Director, Division of Regulatory improvement Programs, NRR

j. B. Boger, Director, Division of Inspection Program Management, NRR l R. Borchardt, Director, Office of Enforcement R. Zimmerman, Deputy Director, Office of Nuclear Reactor Regulation (NRR/ADPR)

J. Zwolinski, Director, Division of Licensing Project Management J. Crutchley, Secretary, incident Response Organization M. Tschi!tz, RI EDO Coordinator, OEDO

- E. Adensam, Project Directorate 1-1 (PD1/2), NRR R. Croteau, Project Manager L D. Screnci, Public Affairs, RI l N. Sheehan, Field Public Affairs Officer, RI M. Campion, ORA -

l R. Bores, ORA ~

W. Lanning, DRS l- B. Holian, DRS PMNS B. McDermott, Senior Resident inspector - VY l.

R. Correia, NRR Inspection Program Branch, NRR (IPAS)

DOCDESK g

p a

e e

4

)

l i

l DOCUMENT NAME: G:\HPEPB\ WILLIAMS \VYMTGNOT9952.WPD Ta receive a copy of thle document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachtnent/ enclosure "N" = No copy OFFICE DRI:DRS _

i l Rl:DRS , / l Rl/DRP g ,l l NAME JWilliams @ RConte/N SCoffin FQ DATE 10/4/99 I 10A//99 10/6'/99 10/ /99 OFFICIAL RECORD COPY