Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations
ML20216D732
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/26/1999
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fetters D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20216D735 List:
References
50-271-99-05, NUDOCS 9907300084
Download: ML20216D732 (3)


See also: IR 05000271/1999005

Text

O

L

.*

Ju!y 26,1999

Mr. Drew B. Fetters

Vice President of Operations

Vermont Yankee Nuclear Power Corporation

185 Old Ferry Road

Brattleboro, Vermont 05301

SUBJECT: . NRC INTEGRATED INSPECTION REPORT 50-271/99-05

Dear Mr. Fetters:

On June 20,1999, the NRC completed an inspection at the Vermont Yankee (VY) Nuclear

Power Station. The enclosed report presents the results of this inspection.

During the six weeks covered by this inspection, your conduct of activities at Vermont Yankee

was characterized by safe plant operations. Appropriate actions and compensatory measures

were taken in response to problems identified with the Altemate Cooling System operating

procedure. Overall, routine maintenance and surveillance activities were adequately performed.

Some examples of poor work practices and informal work control were observed during

Instrument and Control (l&C) maintenance activities. However, these issues did not appear to

reduce the overall effectiveness of the maintenance. The implementation of your Radiological

Environmental Monitoring Program was found to be effective.

Based on the results of this inspection, the NRC has determined that two Severity Level IV

violations of NRC requirements occurred. These violations are being treated as Non-Cited

' Violations (NCVs), consistent with Appendix C of the Enforcement Policy. These NCVs involved

an inadequate procedure for operation of the Attemate Cooling System and inadequate quality

assurance controls for procured engineering services for a 1998 design change of the scram

discharge volume valves. These NCVs are further described in the subject inspection report. If

you contest the violation (s) or severity level of these NCVs, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region 1; and the Director, Office of Enforcement, United

. States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident

inspector at the Vermont Yankee facility.

I

\

\

9907300084 990726

.

I

[. of

PDR ADOCK 05000271

Q PDR

-

4

1

Drew B. Fetters 2  !

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room. I

Sincerely,

Original Signed By:

Clifford J. Anderson, Chief )

Projects Branch 5

Division of Reactor Projects

Docket No.: 50-271

l License No.: DPR-28

Enclosure: NRC Inspection Report 50-271/99-05

cc w/ encl:

- R. McCullough, Operating Experience Coordinator - Vermont Yankee

G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation

'

D. Rapaport, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

l Chief, Safety Unit, Office of the Attomey General, Commonwealth of Massachusetts

D. Lewis, Esquire

G. Bisbee, Esquire

J. Block, Esquire

I

T. Rapone, Massachusetts Executive Office of Public Safety

l D. Katz, Citizens Awareness Network (CAN)

M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

'

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee  ;

!

m

..

Drew B. Fetters 3

Distribution w/ enc!:

Region 1 Docket Room (with concurrences)

l PUBLIC

i Nuclear S2*ety Information Center (NSIC)

NRC Resident inspector

,

H. Miller, RA/J. Wiggins, DRA

L- C. Anderson, DRP

R. Summers, DRP

R. Junod, DRP i

. .

'

I

Distribution w/enci(VIA E-MAIL)-

M. Tschiltz, RI EDO Coordinator

E. Adensam, NRR ]

R. Croteau, NRR

R. Correia, NRR .

.

D. Screnci, PAO _

l

Inspection Program Branch, NRR (IPAS)

DOCDESK

. I

DOCUMENT NAME: G:\ BRANCH 5\1-VY\lNSPECT\W9905.WPD  !

_ To receive a copy of this document, indicate in the box: "C" = Copy without I

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy j

OFFICE Rl/DRP ,- Rl/DRP l- I

NAME BMcDermottCAR h, CAnderson Cl4

DATE 07/W99 07/9y99

OFFICIAL RECORD COPY