Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004
ML20210E223
Person / Time
Site: Pilgrim
Issue date: 07/20/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ted Sullivan
ENTERGY OPERATIONS, INC.
References
NUDOCS 9907280161
Download: ML20210E223 (3)


Text

. . .

1 f

I July 20, 1999 l

Mr. Theodore A. Sullivan Vice President - Nuclear and Station Director Entergy Nuclear incorporated Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 02360-5599 i

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - PILGRIM

Dear Mr. Sullivan:

In a telephone conversation on July 15,1999, Mr. S. Dennis and Mr. M. Santiago made arrangements for the NRC to inspect tht b nsed operator requalification program at the Pilgrim facility. The inspection is planned for the week of October 4,1999, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare  !

and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the requalification training program plan and operating tests scheduled for the week of the inspection to the NRC by September 16,1999. Mr. Santiago has been advised of this request and asked to send the material to Mr. S. Dennis.

I This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of )'ug Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail atBJSi@NRC. GOV: and to the U Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

i The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

9907280161 990720 PDR ADOCK 05000293 G PDR

l Mr. Theodore A. Sullivan Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact S. Dennis at (610) 337-5240.

i Sincerely, ORIGINAL. SIGNED BY:

Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety Docket No. 50-293 cc:

R. Ledgett, Executive Vice President - Operations J. Alexander, Nuclear Assessment Group Manager )

D. Tarantino, Nuclear information Manager S. Brennion, Regulatory Affairs Department Manager J. Fulton, Assistant General Counsel R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

. The Honorable Therese Murray The Honorable Vincent DiMacedo T. MacGregor, Mass. Dept. of Public Comm. & Energy 1 Chairman, Plymouth Board of Selectmen l Chairman, Duxbury Board of Selectmen l Chairman, Nuclear Matters Committee Plymouth Civil Defense Director P. Gromer, Massachusetts Secretary of Energy Resources J. Miller, Senior issues Manager i A. Nogee, MASSPIRG Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attorney General, Commonwealth of Massachusetts J Perlov, Secretary of Public Safety for the Commonwealth of Massachusetts Chairman, Citizens Urging Responsible Energy Commonwealth of Massachusetts, SLO Designee M. Santiago, Manager, Operator Training l

1

r Mr. Theodore A. Sullivan Distributiqc:

. Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC NRC Resident inspector C. Anderson, DRP R. Summers, DRP -

R. Junod, DRP H. Miller, RA/J. Wiggins, DRA  ;

W. Lanning, DRS B. Holian, DRS R. Conte, DRS l S. Dennis, DRS OL Facility File (V Curley, DRS) i DRS File Distnbution w/enci(VIA E-MAIL):

M. Tschiltz, RI EDO Coordinator E. Adensam, NRR A. Wang, NRR R. Correia, NRR DOCDESK Inspection Program Branch, NRR (IPAS) l I

1 I

DOCUMENT NAME: G14PEPB\ DENNIS \PIL60RPl.WPD Ta receive a copy of thie document. Indicato in the box: "C" = fo >y without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS l Rl/DRS / l l l NAME SDennis 3O RCont//V I DATE 07/16/99 07/3lf96 07/ /99 07/ /99 07/ /99 OFFICIAL RECORD COPY l